Paul Industries provides industrial welding services in Wisconsin for plants, mills, dairies, breweries, utilities and campuses, covering code repairs on boilers and pressure vessels, pipe welding on process, steam and ammonia lines, tank work, structural steel and repair welding on production equipment. Each weld is made to a qualified procedure, examined to the code that governs it and recorded for the inspector or owner. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and welds at sites from Kenosha to Superior.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Structural welding DSPS welder registration under SPS 305.34
Welder retest Qualification test within one year before each registration or renewal
Boiler and vessel welds NBIC, R program, R-1 registered (SPS 341.60 to 341.62)
Ammonia piping Welded steel inspected before installation (SPS 345.31)
Reviewed November 2026

What do industrial welding services in Wisconsin have to satisfy?

Industrial welding services in Wisconsin have to satisfy whichever code governs the item being welded, and the state adds its own steps in four places: structural steel welding under the commercial building code, welded repairs to boilers and pressure vessels under chapter SPS 341, welded power piping under the same chapter, and welded refrigeration piping under chapter SPS 345. Everything else, from B31.3 process piping to a cracked machine frame, follows the owner’s specification and the relevant ASME, AWS or API standard.

The common thread is qualification. Procedures for boiler, vessel and piping work are qualified to ASME Section IX, procedures for structural steel to the AWS structural codes, and each welder is qualified for the processes, positions and materials the job needs. Welding in Wisconsin also runs under the state’s fire code, chapter SPS 314, which adopts NFPA 1 and through it the hot work practices of NFPA 51B. Paul Industries sets the code, the procedure and the examination for each weld before a job starts, so the inspector reviews a plan rather than a pile of welds.

Where Wisconsin adds a state step to industrial welding
WorkGoverning codeWisconsin requirementRecord
Structural steel welding in buildingsAWS D1.1, D1.2, D1.3 or D1.6; 2021 IBCWelder registration with DSPS under SPS 305.34; special inspection under IBC chapter 17Welder marks on members, inspection reports
Weld repair or alteration of a boiler or pressure vesselNBIC, ASME Section IXMade under the National Board R program with the inspector consulted (SPS 341.61)R-1 or R-2 registered with the National Board
Seal welding six or more boiler tubesNBICRegistered as a repair on an R-1 (SPS 341.62)R-1 with inspector’s signature
Power piping: steam above 15 psig, hot water or thermal fluid above 250 FASME B31.1Registration and inspection after delivery and before construction (SPS 341.16, 341.41)Signed SBD-5204-E
Ammonia and refrigerant steel pipingASME B31.5, IIAR 2Material inspection before installation, 5 business days’ notice (SPS 345.31)Inspection record, system registration
Process piping, frames, platforms, wear partsASME B31.3, AWS D1.1, owner specificationNo separate state step; fire code hot work rules applyWeld map, examination and test records

Registered welders for Wisconsin structural steel

Structural steel welding governed by Wisconsin’s commercial building code is performed by welders registered with the Department of Safety and Professional Services under SPS 305.34, which makes Wisconsin one of the states that ties structural welding to a state credential. To register, a welder passes one or more tests under AWS D1.1, D1.2, D1.3 or D1.6, taken no more than a year before the application and conducted by or under the supervision of a weld test conductor credentialed under SPS 305.35.

The rule carries on after registration. A registered welder performs only the structural procedures qualified by test within the last four years, carries proof of those qualifications, shows it to the department on request, and marks the welding on each structurally significant member with a distinguishing stamp. Renewal depends on passing a fresh test within a year before the renewal application. For a plant project with platforms, pipe racks, mezzanines or equipment supports, those marks and records are part of what the building inspector and the special inspector check.

Wisconsin welders working on platforms, stairs, crane rails and equipment frames inside plants follow the same AWS procedures whether or not a building permit covers the work, and Paul Industries applies the structural code to every load-bearing weld. The welder marks and qualification records go into the turnover file with the inspection reports.

Milwaukee welding inspection and special inspection under the 2021 IBC

Milwaukee welding inspection on building projects, and structural welding inspection across Wisconsin, follows the special inspection provisions in chapter 17 of the 2021 International Building Code, which Wisconsin adopted with the rest of its 2021 commercial codes effective September 1, 2025. The registered design professional’s statement of special inspections lists the welds to be inspected, the frequency and the methods, and the special inspector’s reports go to the building official.

Plant work that falls under a building permit, such as a new mezzanine, a pipe rack attached to the structure or a platform for new equipment, is planned with that inspector’s hold points from the start. Paul Industries schedules fit-up and visual inspection, ultrasonic or magnetic particle examination where required, and the release of each area, so the special inspector sees welds at the right stage and the steel can be painted and loaded on time.

Welding on boilers and pressure vessels in Wisconsin

Welding on Wisconsin boilers and pressure vessels is a repair or alteration under subchapter VI of SPS 341, and the chapter sends it to the National Board Inspection Code. The work is made under a National Board R certificate of authorization that covers the intended scope, with the inspector consulted on the method; the finished work goes onto the matching R form and is registered with the National Board. Before the inspector signs, the stamping or repair nameplate is attached and verified.

Wisconsin draws two lines that matter on the shop floor. Even a routine repair, as the NBIC defines one, needs an R-1 registration plus a stamp or nameplate in Wisconsin, and seal welding of six or more boiler tubes is a registered repair even though each weld is small. Boiler external piping that ASME Section I requires to carry code symbol stamping is welded within that system as well. Paul Industries welds tubes, stays, nozzles, tube sheets and shell patches to procedures qualified under ASME Section IX, with the examination and pressure test the inspector requires; boiler work is described further on boiler repair in Wisconsin and vessel work on pressure vessel fabrication in Wisconsin.

Pipe welding on Wisconsin steam, process and ammonia lines

Pipe welding at Wisconsin plants spans three regimes with different paperwork. Steam above 15 psig, hot water above 250 F and thermal fluid above 250 F is power piping welded to ASME B31.1, with Wisconsin’s limit on slip-on flanges to Class 300 service with double fillet welds and a state inspection after the pipe reaches the site and before construction. Ammonia and other refrigerant lines are welded to ASME B31.5 and IIAR 2, and Wisconsin requires welded refrigerant steel piping to be inspected after delivery and before it is installed. Product, chemical and utility lines are welded to ASME B31.3 under the owner’s specification.

Sanitary stainless lines for dairies, breweries and food plants add another discipline: autogenous orbital welding with purge control, weld logs, coupons and borescope inspection, so the inside of each weld is smooth, fully penetrated and free of heavy heat tint before passivation. Paul Industries carries both kinds of pipe welding, carbon steel and stainless, from spool fabrication to field tie-ins. Piping scope and testing are covered on process piping in Wisconsin.

A welding services list for Wisconsin plants

A welding services list for a Wisconsin plant reads like its equipment register: steam and condensate, ammonia, product and CIP lines, tanks and silos, boilers and vessels, structural steel, conveyors and process machinery. The table matches each service with the process and examination Paul Industries uses for it.

Industrial welding services Paul Industries performs in Wisconsin
ServiceTypical processesMaterialsExamination
Boiler tube, stay and shell repairsGTAW root, SMAW or GTAW fillCarbon steel boiler tube and plateVisual, radiography or ultrasonic as the inspector requires, hydrostatic test
Steam, condensate and feedwater pipingGTAW root with SMAW or FCAW fillCarbon and chrome-moly steelVisual and volumetric examination per B31.1
Ammonia refrigeration pipingGTAW and SMAWCarbon steel suited to low temperatureVisual and examination per IIAR 2 and B31.5
Sanitary product and CIP tubingOrbital GTAW with purge304L and 316L stainless tubeBorescope, weld logs, coupons
Tank and silo fabrication and repairGTAW, GMAW, SAWCarbon steel and stainless plateVisual, vacuum box, radiography per API 650 and API 653
Platforms, racks and equipment supportsSMAW, FCAW, GMAWStructural carbon steelVisual, ultrasonic or magnetic particle per AWS D1.1 and special inspection
Machine frames, conveyors and wear partsSMAW, FCAW, hardfacingCarbon, alloy and abrasion-resistant steelsVisual, dye penetrant or magnetic particle on cracked frames

Industrial welding at operating plants also needs the work around it: isolation and lockout of the system, purging or draining, hot work permits, fire watch and gas testing where the plant requires it, and rigging and fit-up. Paul Industries plans the welding with those steps so the hot work window is short and the restart is clean. The rigging side is covered on millwright and rigging services, and off-site spool and frame fabrication on pipe fabrication.

Procedure and welder qualification records for Wisconsin code work

Procedure and welder qualification records are the first thing a Wisconsin boiler inspector, special inspector or plant engineer asks to see, and they come in three layers. The welding procedure specification sets the process, filler, position, preheat, interpass and other variables; the procedure qualification record proves by test that the procedure produces sound welds with the required mechanical properties; and the welder performance qualification shows that each welder has passed a test within the range of the procedure. ASME Section IX governs those records for boilers, vessels and pressure piping, and the AWS structural codes govern them for steel, where some procedures are prequalified.

Qualifications have to stay current. Under ASME Section IX a welder’s qualification for a process lapses if the welder has not used that process for six months, and Wisconsin’s structural welder registration demands a fresh test within a year before each renewal and limits work to procedures qualified within the last four years. Paul Industries keeps continuity logs for every welder and issues a procedure and welder matrix with each job, so the inspector can check any weld against its qualification at a glance.

How are welds examined at operating Wisconsin plants?

Welds at operating Wisconsin plants are examined by the method the code calls for, chosen with the plant’s safety rules in mind. Visual examination applies to every weld; dye penetrant and magnetic particle testing find surface cracks on frames, fillet welds and repairs; and radiography or ultrasonic testing checks the full volume of butt welds in pressure piping, vessels and tanks. Sanitary stainless welds add borescope inspection of the inside surface.

Radiography needs an exclusion zone around the source, which means clearing an area of a running dairy, mill or brewery, often at night or during an outage. Ultrasonic and phased array testing avoid the exclusion zone and suit many pipe and plate welds, so Paul Industries proposes them where the governing code accepts them. Examination reports are tied to the weld map, so every weld on an isometric has its examination result next to it.

Welding on live lines and hot taps

Welding on live lines, including hot taps for new branches on steam, water, air and some process lines, lets a Wisconsin plant add connections without draining or shutting down a system. The work is planned to API RP 2201 practice: the line’s wall thickness is measured at the weld location, flow and pressure are confirmed within safe limits for the heat input, the fitting and valve are rated for the service, and the tapping machine is sized for the line.

Some services are never hot tapped, such as lines whose contents could decompose, ignite or crack under welding heat, and lines too thin at the weld point. Paul Industries reviews each request against those limits, writes a procedure for the tap and carries it out with the plant’s operators standing by the isolating valves. Where a hot tap is the wrong answer, the tie-in is planned into the next outage instead, with spools prefabricated so the outage is short.

Welding through a Wisconsin winter

Welding through a Wisconsin winter is a matter of temperature control, because outdoor steel at sites designed for minus 10 F in Milwaukee and minus 25 F along Lake Superior can sit far below the minimum temperatures that welding codes set. AWS D1.1 requires base metal below freezing to be preheated before welding, and ASME procedures carry their own preheat and interpass limits by material and thickness. Thick sections, restrained joints and higher-carbon steels need preheat even in milder weather.

Cold-weather controls for field welding at Wisconsin sites
ConditionRisk to the weldControl
Base metal below freezingFast cooling, hydrogen cracking, lack of fusionPreheat to the procedure’s minimum across the joint, checked with temperature indicators
Frost, snow or condensation on the jointPorosity and hydrogen pickupDry the joint with heat before fit-up and keep it dry under cover
Wind at outdoor tie-insLoss of shielding gas, porosity in GTAW and GMAWWindbreaks, heated enclosures, or SMAW and FCAW where the procedure allows
Low-hydrogen electrodes exposed to cold, damp airMoisture pickup and crackingHeated electrode ovens and controlled exposure times
Rapid cooling after the last passHard heat-affected zones in thicker or alloy steelsInsulating blankets and post-weld heat treatment where the code requires it

Paul Industries builds enclosures and heat into winter work, schedules outdoor examination for daylight, and keeps records of preheat and interpass temperatures with the weld map. Where the season allows a choice, field welding on outdoor racks and tanks is planned for spring through autumn, with prefabrication indoors over the winter so the field scope is smaller.

Industrial welding across Wisconsin’s regions

Industrial welding demand in Wisconsin follows the state’s manufacturing map. In Milwaukee and Southeast Wisconsin, foundries, machinery and engine plants, breweries, food processors and hospitals bring structural, pipe and repair welding, often inside occupied buildings where hot work permits and fire watches are strict. Madison and Dane County add laboratory, campus and food plant work with stainless utility and process lines. The Fox Valley and Green Bay carry paper mills and converters, whose steam systems, chemical lines and machine frames need welding during planned outages.

Across central and western Wisconsin, from Wausau and Stevens Point to Eau Claire and La Crosse, dairies and cheese plants run stainless product lines, ammonia refrigeration and steam, while Sheboygan and Manitowoc add manufacturers and food plants along the Lake Michigan shore. Paul Industries plans each job around the plant’s production calendar, building spools, frames and platforms off site so the welding inside the plant is limited to tie-ins and repairs that must be made in place.

Repair welding on Wisconsin production equipment

Repair welding on Wisconsin production equipment covers the cracks, wear and breakage that stop a line: cracked machine frames and bases, worn conveyor and auger flights, broken brackets, eroded pump casings, and hoppers and chutes worn through by abrasive product. The approach starts with finding why the part failed, because a crack repaired without removing its cause usually returns at the end of the new weld.

Paul Industries grinds out the full crack length, confirms the ends with dye penetrant or magnetic particle examination, drills crack arrest holes where the design suits them, and rebuilds with procedures matched to the base metal, adding reinforcement where loads exceeded the original design. Hardfacing extends the life of wear surfaces, and stainless repairs on food contact equipment are ground and finished to the plant’s sanitary standard.

How much do industrial welding services in Wisconsin cost?

The cost of industrial welding services in Wisconsin depends on the code and the paperwork, the material and thickness, the number and position of welds, examination requirements, access, preheat and post-weld heat treatment, the hot work conditions at the plant and whether the work fits a scheduled outage. A registered boiler repair with radiography and an R-1 costs more per weld than structural repair welding on a frame, and orbital sanitary welding with borescope records costs more per joint than carbon steel utility pipe.

Wisconsin adds a few lines: winter enclosures and heat, inspection notice periods for power and refrigeration piping, and special inspection on structural work under a permit. Paul Industries gives a budget range from comparable work once the scope and code are known, then fixes the price once the site has been walked. Request a quote with drawings or photographs, materials and the outage dates.

Pricing can follow the job. Defined scopes such as a retube, a set of tank nozzles or a new platform are priced as a lump sum against drawings, while outage support and breakdown repairs are often priced at agreed rates with a not-to-exceed figure, so the plant controls cost while the scope is still being found. Paul Industries offers both and states the examination and documentation included in either case.

Who welds at Wisconsin plants, mills and campuses?

Paul Industries welds at Wisconsin plants, mills and campuses, providing industrial welding, installation and repair on boilers, pressure vessels, power and process piping, ammonia refrigeration, tanks and silos, structural steel and production equipment. The work runs from procedure selection and qualification records through fit-up, welding, examination, pressure testing and the final records, with supply of welded assemblies, design-build packages and complete installation offered.

Plants comparing Wisconsin welding companies for code work should look at the qualification records offered for each procedure and welder, the examination plan, how state steps such as R forms, power piping inspection and refrigeration piping inspection are handled, and the completeness of the turnover file. Paul Industries provides all of them. The national service is described on industrial welding services, the headquarters state’s work on industrial welding services in Virginia and a Northeast comparison on industrial welding services in Pennsylvania.

Industrial welding from Paul Industries across Wisconsin

Paul Industries is an East Coast contractor with its headquarters at 256 Shore Drive, Kilmarnock, Virginia; the company was formerly based in northern New Jersey, then Pennsylvania, and it now takes welding work at Wisconsin sites, in all 50 states and at plants outside the United States. Tank welding is described on tank fabrication in Wisconsin, and the state’s industrial picture on the Wisconsin and Midwest pages. Send the item, material, code, drawings or photographs, the plant’s hot work rules and the dates the equipment is available. Call 201-450-8280 or request a quote.

Standards referenced: Wisconsin Administrative Code ch. SPS 305.34 (registered welders) and SPS 305.35 · Wisconsin Administrative Code chs. SPS 341 and SPS 345 · ASME Boiler and Pressure Vessel Code, Section IX · National Board Inspection Code (NBIC) · ASME B31.1 Power Piping and B31.3 Process Piping · AWS D1.1, D1.2, D1.3 and D1.6 Structural Welding Codes · 2021 International Building Code chapter 17 as adopted in SPS 361 to 366 · NFPA 1 as adopted in SPS 314, and NFPA 51B · API 653

Frequently asked questions

Who provides industrial welding, Wisconsin plants and mills included?

Paul Industries provides industrial welding at Wisconsin plants and mills, including boiler and vessel repairs under the NBIC, B31.1 and B31.3 pipe welding, ammonia piping, tank and silo work, structural steel and repair welding on production equipment. Every weld is made to a qualified procedure and examined to the governing code, with records handed over at the end of the job.

Who handles industrial welding, Milwaukee plants and breweries included?

Paul Industries handles welding for plants, breweries, foundries and food processors in Milwaukee, Waukesha, Racine and Kenosha. Sanitary stainless lines get orbital welds with purge and borescope records, steam and ammonia lines follow the Wisconsin inspection steps, and structural work under a building permit is planned around the special inspector’s hold points.

Does Paul Industries weld at mills and plants in Green Bay, Appleton and Wausau?

Yes. Paul Industries welds at paper mills, food plants and manufacturers in Green Bay, Appleton, Neenah, Wausau and Stevens Point, from boiler tube repairs and steam piping to stainless process lines, tank repairs and frame and conveyor repairs. Work at continuous mills is scheduled into planned outages, with spools and assemblies built off site beforehand.

What should a plant ask welding companies, Milwaukee or elsewhere, before code work?

Ask for the welding procedure specifications and qualification records for each process and material, welder qualifications current for the work, the examination plan and who performs it, how R forms or state piping inspections will be handled, and a sample turnover file. Paul Industries provides those with the proposal for Wisconsin code work.

How do Wisconsin welding companies prove a welder can do structural work?

For structural steel under Wisconsin’s commercial building code, the welder holds a DSPS registration under SPS 305.34, based on an AWS D1.1, D1.2, D1.3 or D1.6 test passed within a year before registration or renewal and given under a credentialed weld test conductor. The welder carries proof of procedures qualified within the last four years and marks the welds on structural members.

Do registered welders, Milwaukee projects included, have to mark their welds?

Yes. SPS 305.34 requires a registered welder doing structural steel welding to identify the welding on each structurally significant member with a distinguishing mark stamped by that welder. The mark lets the building official and special inspector trace each weld to a registered welder and that welder’s qualification records.

How does a welding inspection service, Milwaukee building projects included, fit with the welding?

On permitted building work, the special inspector named in the statement of special inspections checks structural welds under chapter 17 of the 2021 IBC and reports to the building official. Paul Industries schedules fit-up, welding and examination around that inspector’s hold points and keeps its own visual and NDE records, so the special inspector’s reports and the welding records line up.

Who may weld on a boiler or pressure vessel in Wisconsin?

Under SPS 341.61, a boiler or vessel repair or alteration proceeds only under a current National Board R certificate of authorization whose scope covers the job, with procedures and welders qualified to ASME Section IX. The repair is registered with the National Board on an R form after the inspector verifies the stamping or nameplate.

Does seal welding boiler tubes count as a repair in Wisconsin?

Yes, once it reaches six or more tubes. SPS 341.62 requires seal welding of six or more boiler tubes to be registered with the National Board on an R-1 form, with the inspector’s verification. Smaller seal welding is still done to a qualified procedure and recorded for the next inspection.

Does welded ammonia piping need a state inspection in Wisconsin?

Yes. SPS 345.31 has the state, or its authorized agent, look at refrigerant steel pipe destined for welded joints once it arrives on site and before any of it is installed, and the rule asks for five business days’ notice. The system is registered and inspected again after completion.

Can welding be done outdoors in a Wisconsin winter?

Yes, with controls. Base metal below freezing is preheated as AWS D1.1 and the ASME procedures require, joints are dried, wind is blocked to protect shielding gas, low-hydrogen electrodes are kept in heated ovens, and enclosures with heat are built where conditions need them. Preheat and interpass temperatures are recorded with the weld map.

Is a hot work permit needed for welding at a Wisconsin plant?

Wisconsin’s fire code, chapter SPS 314, adopts NFPA 1, which carries hot work requirements drawn from NFPA 51B, and most plants also run their own hot work permit systems. Paul Industries works under the plant’s permit, with fire watch, gas testing and combustible control as the permit sets out, and closes the permit when the work is finished.

Can stainless dairy lines be welded without heavy heat tint?

Yes. Orbital GTAW with a controlled inert gas purge, clean tube ends, correct fit-up and qualified weld schedules produce smooth, fully penetrated welds with light or no heat tint inside. Weld logs, coupons and borescope inspection document each joint, and passivation after welding restores the passive layer on the stainless.

Can tanks be weld repaired at Wisconsin plants?

Field-erected storage tanks are repaired and altered to API 653, and Paul Industries welds bottom and shell repairs, nozzles and roof repairs with the examinations that standard requires. Process and sanitary tanks are repaired to the owner’s specification and finished to the original standard, with passivation on stainless.

What records does Paul Industries hand over after a Wisconsin welding job?

The file includes the welding procedure specifications and qualification records used, welder qualifications, a weld map tying each weld to its welder, examination reports, preheat and heat treatment records where required, pressure test records, and any state forms such as an R-1 or a signed power piping form. Structural work adds the welder marks and special inspection reports.

Which photos and data speed up a Wisconsin welding quote?

Send a description of the item and fault or the new work, drawings or photographs, the material and thickness, the code the plant uses, any inspection reports, access conditions, the plant’s hot work rules and the dates the equipment can be released. Paul Industries uses that package to plan the welding and price it.

Need code welding at a Wisconsin plant?

Send the item, material, code and photographs, with the dates it can be released. Call 201-450-8280 or request a quote.