Paul Industries provides boiler repair in Wisconsin for manufacturing plants, dairies, paper mills, hospitals, campuses and commercial buildings, carrying each repair through chapter SPS 341 of the Wisconsin Administrative Code and the National Board Inspection Code. Paul finds the fault, plans the repair around the inspector and the permit to operate, makes the mechanical or welded repair, tests the controls and returns the boiler with the records Wisconsin asks for. The company is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes boiler work statewide, from Milwaukee and Madison to Green Bay, Wausau and the Chippewa Valley.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Wisconsin boiler code SPS 341, Department of Safety and Professional Services
Inspection intervals Power boilers 12 months; low-pressure steam and hot water heating 36 months
Repair records NBIC R-1 report registered with the National Board (SPS 341.62)
Winter design Minus 10 F in Milwaukee to minus 25 F up north (SPS Table 363.0302)
Reviewed November 2026

What does boiler repair in Wisconsin answer to under SPS 341?

Boiler repair in Wisconsin answers to chapter SPS 341, the boilers and pressure vessels code of the Department of Safety and Professional Services (DSPS), which covers boilers, their piping, pressure vessels and power piping at places of employment and public buildings. The chapter adopts the 2010 edition of the ASME Boiler and Pressure Vessel Code, ASME B31.1-2010, ASME CSD-1-2009 and the 2011 National Board Inspection Code, then layers Wisconsin rules on top. Where a department-written rule differs from a referenced standard, the Wisconsin rule governs.

One clause decides more about a repair than any other. Under SPS 341.03, the design, construction and installation rules of the chapter apply to every alteration, repair and replacement part on an existing boiler, even where the boiler itself predates the current rules. A tube, a stay, a burner or a section of blowoff piping put into a 1970s boiler today is held to today’s requirements. Paul Industries scopes Wisconsin repairs against that clause from the first site visit, so the inspector sees work that already matches the chapter.

Enforcement runs through DSPS and its authorized agents. An authorized agent is either an inspector credentialed by DSPS who works under a contract with the department, or a first class city that has accepted responsibility for the chapter. The code’s own note records the City of Milwaukee as that city. Where Milwaukee enforces the chapter, questions and filings go to the city before the department, and an installation registration filed with the city stands in for the state form. Cities, villages and towns may also add requirements of their own, provided they do not conflict with the chapter.

How often do boilers need to be inspected in Wisconsin?

Wisconsin boiler inspections run on two clocks under SPS 341.17: power boilers, miniature boilers and organic-fluid heat-transfer boilers at least every 12 months, and low-pressure steam and hot-water heating boilers at least every 36 months. Each visit may be internal or external, and an external inspection is acceptable where the construction of a power boiler makes an internal one impossible. Safety and safety relief valves must have been operated or tested within the past 12 months, or the owner shows records that testing follows Part 2, section 2.5.8 of the NBIC.

Wisconsin periodic inspection intervals under SPS 341.17 and 341.18
EquipmentHow Wisconsin defines itMaximum intervalWhat changes the clock
Power boilerSteam or vapor above 15 psig12 months, internal or externalUnits of 100,000 lb/h or more, other than chemical recovery boilers, may run up to 24 months between internals with an external at 12 months
Miniature boilerUp to 16 in shell, 20 sq ft heating surface, 5 cu ft, 100 psig12 monthsWritten extension of up to 6 months
Organic or synthetic fluid heaterThermal fluid boilers and coil heaters12 monthsWritten extension of up to 6 months
Low-pressure steam boilerSafety valves set at 15 psig or less36 monthsWritten extension of up to 6 months
Hot-water heating boiler160 psig and 250 F or less at the outlet36 monthsWritten extension of up to 6 months
Hot-water supply boiler and water heaterWater at 210 F or lessExempt from periodic inspectionDSPS may order an inspection on complaint or reasonable cause
Safety and safety relief valvesOn any inspected boiler or vesselOperated or tested every 12 monthsNBIC Part 2, 2.5.8 test records accepted in place of the operating check

The 24-month allowance for large power boilers has three conditions: a documented maintenance program, a documented water treatment program, and written confirmation from the inspector to DSPS that both are adequate for the boiler. Chemical recovery boilers at pulp mills are excluded from it and stay on the 12-month internal cycle. Any other extension, of up to six months, starts with a written request from the owner and needs the inspector’s written concurrence sent to the department.

An owner who plans repairs around these intervals saves an outage. When the boiler is opened for its internal inspection, Paul Industries is on hand with tube plugs, gaskets, refractory and the welding package ready, so findings that can be cleared in the same window are cleared before the boiler is closed again. That also gives the Wisconsin plant one restart instead of two.

Wisconsin boiler inspection requirements: who inspects and what the permit says

Wisconsin boiler inspection requirements allow three kinds of inspector: a DSPS inspector, an inspector working for an authorized agent such as the City of Milwaukee, or an inspector employed by an insurance company that is authorized to write boiler and machinery insurance in Wisconsin and actively writes it. Every one of them must hold a DSPS credential under SPS 305.60, which requires passing the National Board competency examination plus years of design, construction, operation or inspection experience. The Wisconsin state boiler inspector assigned to a plant, or the insurer’s inspector, is the person who accepts a repair method and signs the repair report.

After each inspection that finds the boiler in compliance, DSPS issues a permit to operate within 30 business days. The permit states the maximum allowable working pressure determined under the chapter, the inspector’s name and telephone number, and the expiration date, which is the next required periodic inspection. The owner posts it near the boiler. No boiler may run above the pressure on its current permit, and a permit can be rescinded for code violations.

Findings carry short deadlines on paper. The inspector gives the owner any report of noncompliance within five business days, leaves a copy on site when a life-safety violation is found, and the owner must correct the condition within the time the inspector or the department sets. Penalties under the statutes run from $10 to $100 for each violation, and every day a department order is ignored counts as a separate violation. When Paul Industries receives an inspection report, the repair plan is written to answer each cited code section by number.

What does a boiler inspection consist of in Wisconsin?

A state of Wisconsin boiler inspection consists of an examination under the NBIC, internal where the boiler’s construction allows, plus a check that the controls and their paperwork meet ASME CSD-1 for boilers within its scope. The inspector looks at the waterside and fireside surfaces, tubes, stays, tube sheets, furnace and refractory, then at the safety valves, gage glass, low-water cutoffs, pressure and temperature limits, blowoff equipment and the boiler room itself.

Preparation is the owner’s duty under SPS 341.19, and it is where repair outages most often lose a day. Manhole plates, wash-out plugs and enough handhole plates must be off, the shell and heads cleaned when asked, and each steam boiler drained with its fireside surfaces cleaned. On a boiler tied to a common header, the steam and feed stop valves are closed, tagged and preferably padlocked with the drains between them open, and blowoff lines are disconnected between pressure parts and valves where practicable. The inspector has the right to refuse entry to a boiler judged unsafe to enter. Paul Industries prepares boilers to that list, under the plant’s confined space program, so the inspection starts on time.

The CSD-1 side is a records check as much as a physical one. For each boiler installed under CSD-1, the inspector verifies that the manufacturer’s instructions, the manufacturer’s and contractor’s reports, a log or service invoice showing periodic control testing, and the operator’s checklist are all available. Wisconsin modifies CSD-1 in two ways: it does not apply to boilers and burner assemblies of 400,000 Btu per hour input or less, and the emergency shutdown switch may sit just inside the principal entrance to the boiler room, rather than just outside the door, where the department or authorized agent approves.

Welded repairs and alterations under the Wisconsin boiler code

The Wisconsin boiler code sends every welded repair, repair part and alteration to the NBIC under SPS 341.60, and SPS 341.61 requires repairs and alterations to boilers and pressure vessels to be made under a valid National Board R certificate of authorization covering the intended scope. The repair is registered with the National Board on the R form that fits it. Stamping or the repair nameplate is completed and then verified by the inspector before the inspector signs the form, and where the nameplate cannot go where the NBIC places it, the substitute location is described on the form and verified.

Two Wisconsin details catch owners out. Routine repairs, which the NBIC lets an inspector accept without prior review, must still be registered on an R-1 form with a stamp or nameplate under SPS 341.62. And seal welding six or more boiler tubes counts as a registered repair on an R-1, even though each seal weld is small. Paul Industries plans these registrations into the job so the final report reaches the National Board with the inspector’s signature, and the owner keeps a copy in the boiler file.

Common Wisconsin boiler repairs and the record each one creates
RepairWisconsin ruleBefore workRecord the owner keeps
Tube replacement or full retubeSPS 341.60 to 341.62, NBIC Part 3Inspector accepts the method; welding procedures qualified to ASME Section IXR-1 registered with the National Board, NDE and test results
Seal welding six or more tubesSPS 341.62(2)(b)Same as a routine repairR-1 registered with the National Board
Rerate or other alterationNBIC alteration rules, SPS 341.62Calculations and inspector review before workR-2 report, revised nameplate, new permit pressure
Riveted patch on an older boilerSPS 341.63Design and method acceptable to DSPSPatch records; pressure test where the inspector requires it
Safety valve repair or resetSPS 341.64Work under an ASME V, HV or UV stamp or a National Board VR stampRepair nameplate with organization, stamp number, date and any new set pressure
Burner, flame safeguard or limit controlSPS 341.29, ASME CSD-1Listed components bearing a recognized markCSD-1 test record and updated operator’s checklist

Valve work has its own Wisconsin definition. Repair of a safety valve includes replacing, re-machining or cleaning any critical part, lapping the seat and disc, and any disassembly or adjustment that affects function, and a valve with a broken seal is treated as needing repair. The repair nameplate carries the repair organization’s name, the symbol stamp and its number and the date; if the set pressure changed, the old set pressure and capacity are marked out but left legible. The welding side of all this, from procedure qualification to examination, is described further on the page for industrial welding services in Wisconsin.

Burners, fuel conversions and DNR air permits

Burner and fuel changes on a Wisconsin boiler carry two separate obligations: a report to DSPS under SPS 341.38, and a check against the Department of Natural Resources (DNR) construction permit rules in chapter NR 406. The owner reports a conversion of the boiler’s primary fuel and any modification that raises heat input capacity on form SBD-6314-E. SPS 341.37 adds a hard ceiling: a new or modified burner assembly may not exceed the boiler’s original stamped output capacity.

On the air side, NR 406.04 exempts external combustion furnaces from a construction permit where no individual unit is designed to burn more than set rates: 25 million Btu per hour of gaseous fossil fuel, 10 million of distillate oil, 5 million of residual oil or wood, and 1 million of coal. The exemption falls away where an existing permit, plan approval or special order prohibits the change, and it gives no relief for sources that need a permit under chapters NR 405 or NR 408. Paul Industries confirms which side of those lines a burner retrofit falls on before the burner is ordered, so a replacement that looks like maintenance does not become an air permit question after installation.

Blowdown is the other place Wisconsin is specific. Blowdown that enters a sewer, or that would be a hazard, must leave the blowoff equipment at no more than 160 F and 5 psig. The blowoff tank or separator is designed for at least 50 psig, carries a 0 to 50 psi gage, a thermometer well, a gage glass and a 2 inch drain, vents full size to the outdoors, and has connections designed so freezing cannot close the inlet, outlet or vent. Boiler water quality behind all of it is covered under boiler water treatment.

Power piping and boiler external piping in Wisconsin

Power piping in Wisconsin is any steam piping above 15 psig, hot water piping above 250 F or thermal fluid piping above 250 F that lies beyond the scope of ASME Section I, and SPS 341.46 requires it to meet ASME B31.1. Boiler external piping within Section I is installed to B31.1 as well. Slip-on flanges are limited to Class 300 primary service and must carry double fillet welds.

New power piping, replacements and alterations get an installation inspection unless they fall under the exemptions: pipe of 2 inch nominal size and smaller, work of 50 feet or less, and underground piping outside a walk-in tunnel. The installer gives the department, the authorized agent or an inspector at least five business days’ notice before construction, completes form SBD-5204-E, and the inspection happens after the material reaches the site and before the system is built. The piping may not be insulated or placed in service until the inspector signs that form. Prefabricated spools are inspected where they are fabricated, and the fabricator sends the signed form or the inspector’s report to the site with them.

A boiler repair often reaches this piping. A failed main steam stop valve, a corroded feedwater line or a new blowdown run can turn a boiler job into a registered power piping job, and Paul Industries scopes both together. The wider piping picture for Wisconsin plants, from B31.3 process lines to ammonia refrigeration piping, is set out on the page for process piping in Wisconsin.

How Wisconsin winters shape boiler repair

Wisconsin winters set the boiler repair calendar, because the state’s own energy code designs heating systems for winter temperatures from minus 10 F in the southeast to minus 25 F in the far north. A boiler that is down in January is a building, a process line and a set of frozen pipes at risk, so heating plant repairs are pushed into the warm months and production boilers are repaired one unit at a time.

Winter design temperatures from SPS Table 363.0302 and what they mean for boiler outages
RegionExample countiesWinter design temperatureRepair planning
Southeast WisconsinMilwaukee, Waukesha, Racine, Kenosha, RockMinus 10 FHeating boiler retubes from May to September; process boilers one at a time with standby capacity confirmed
South central and LakeshoreDane, Dodge, Sheboygan, Manitowoc, Fond du LacMinus 15 FCampus and hospital plants schedule internals in summer; dairies schedule around milk receipts
Fox Valley and Green BayBrown, Outagamie, Winnebago, CalumetMinus 15 FMill boilers tied to planned outages; temporary steam staged for longer repairs
Central and western WisconsinMarathon, Portage, Wood, Eau Claire, La CrosseMinus 20 FFreeze protection for idle boilers, drains and outdoor blowoff vents
Northern WisconsinDouglas, Ashland, Vilas, Oneida, ChippewaMinus 25 FShort summer window; materials staged before the outage starts

When a repair has to happen in winter, the plan starts with what keeps the building warm and the pipes full. Paul Industries sizes and connects temporary or rental boilers, isolates the failed unit, and protects its drains and instrument lines from freezing while it is open. Portable boilers used for that purpose are exempt from Wisconsin’s secondhand vessel test under SPS 341.75, though SPS 341.34 still requires a permit to operate before a portable boiler brought into the state is used; and a used boiler brought in from another state as a permanent replacement must be ASME stamped, its data report must go to DSPS, and it must pass a hydrostatic test at one and a half times its maximum allowable working pressure at the new location, witnessed by a credentialed inspector.

Where Wisconsin boilers work hardest

Wisconsin boilers work hardest in the plants that use steam for the product itself: dairies and cheese plants, paper and pulp mills, breweries, food processors and the hospitals and campuses that heat through long winters. Wisconsin makes about a quarter of the nation’s cheese, 3.64 billion pounds in 2025 according to the state agriculture department, and every pasteurizer, cheese vat, whey evaporator and CIP system in those plants depends on steam or hot water.

In Milwaukee and Southeast Wisconsin, the boiler stock spans food and beverage plants, foundries and metal plants, hospitals and older commercial buildings with low-pressure steam. Owners there look for boiler repair, Milwaukee building heating plants included, and for boiler maintenance Milwaukee facility teams can schedule between heating seasons. Madison and Dane County bring university and state heating plants, hospitals and laboratory buildings, where boiler maintenance Madison WI campuses run is planned around research loads that never stop. Green Bay and the Fox Valley carry the paper industry’s large power and recovery boilers alongside food plants, and central and western Wisconsin add dairies, cheese plants and smaller mills.

Plants with steam in the product also tend to have pressure vessels beside the boiler: deaerators, blowoff tanks, flash tanks, condensate receivers and air receivers, all inside SPS 341. Paul Industries repairs and replaces that equipment as well; vessel work is covered on the page for pressure vessel fabrication in Wisconsin, and deaerator service on the deaerators page.

Boiler repair or replacement: what a new boiler sets off in Wisconsin

Choosing boiler repair or replacement in Wisconsin changes the paperwork as much as the price, because a new boiler starts the installation requirements of SPS 341 subchapter IV. The installer registers the installation with DSPS on form SBD-6314-E before the boiler operates, unless the boiler is exempt from periodic inspection or the registration has been filed with a first class city. The boiler must be built to the ASME code, CSD-1 and the NBIC, and its manufacturer’s data report must be registered with the National Board, with exemptions only for cast iron sectional and cast aluminum boilers stamped H and vessels stamped UM.

The new boiler then needs an installation inspection before it runs, and the inspector affixes the Wisconsin registration number where it can be easily seen. Clearances must allow inspection and repair, with passageways of at least 18 inches around all sides unless approved otherwise. Hot-water heating boilers installed in multiples on a common header, none over 500,000 Btu per hour output, may be treated as one boiler without isolation valves if each unit has its own relief protection or the header has enough capacity, approved controls and a low-water fuel cutoff.

Repair still wins for most firetube and watertube boilers with sound shells and drums, especially where retubing or a burner upgrade restores efficiency. Replacement wins where the shell or furnace is wasted, where the boiler is oversized for a load that has shrunk, or where the permit pressure has been lowered after repeated findings. Paul Industries prices both routes on the same scope sheet, supplies and installs the replacement where that is the better answer, and starts up and commissions it; the commissioning side is described under validation and commissioning in Wisconsin.

How much does boiler repair in Wisconsin cost?

The cost of boiler repair in Wisconsin is driven by the boiler type and size, whether the repair is welded and registered, the parts and tubes needed, access and rigging, refractory, the outage window and whether temporary steam or heat is needed while the boiler is down. A control or low-water cutoff repair is a small fraction of a retube, and a retube is a fraction of a replacement. Winter work costs more because temporary boilers, freeze protection and overtime to shorten the outage all add up.

Code costs sit inside every number. Registered repairs need welding procedures qualified to ASME Section IX, examination, the inspector’s time and the R form; a rerate needs calculations; a burner retrofit may need an NR 406 review; and a power piping change can add a registered inspection. Paul Industries gives a budget range from comparable scope once the boiler type, rating and fault are known, then a firm price after the boiler is opened and the inspector has agreed the method. Request a quote with the nameplate data, the permit to operate and the last inspection report.

Who repairs boilers in Wisconsin?

Paul Industries repairs boilers in Wisconsin, from firetube and watertube steam boilers to hot water heating boilers, thermal fluid heaters and the controls, valves and piping around them. The work covers diagnosis, tube replacement and retubing, refractory, burner and flame safeguard repair, CSD-1 control testing, safety valve replacement, deaerator and feedwater repair, power piping and complete boiler replacement. Paul takes the repair from first inspection to the signed R-1 and the next permit to operate.

Owners comparing a boiler company in Wisconsin, or weighing Madison boiler contractors for a campus plant, usually ask three things: whether the repair will be accepted by the inspector the first time, whether the boiler will be back before the season turns, and whether the paperwork will be complete. Paul Industries answers all three with a written repair plan tied to the inspection report, a schedule built around the outage window, and a closing file that holds the R form, test records and updated CSD-1 checklist. The national scope of the service is described on the boiler repair page, the headquarters state’s rules on boiler repair in Virginia, and a comparison with an eastern program on boiler repair in Pennsylvania.

Boiler repair from Paul Industries for Wisconsin plants and buildings

Paul Industries is an East Coast contractor headquartered at 256 Shore Drive, Kilmarnock, Virginia, formerly based in northern New Jersey, then Pennsylvania, and it takes boiler repair, service and replacement work across Wisconsin, in all 50 states and at plants abroad. Wisconsin is part of the twelve-state region described on the Midwest page, and the boiler often shares an outage with the plant’s chillers, covered under chiller repair in Wisconsin. Send the boiler’s nameplate data and National Board number, the current permit to operate, the most recent inspection report, the fault or alarm history and the dates the boiler can be taken down. Call 201-450-8280 or request a quote.

Standards referenced: Wisconsin Administrative Code ch. SPS 341, Boilers and Pressure Vessels · Wisconsin Administrative Code ch. SPS 305 (inspector credentials) · National Board Inspection Code (NBIC), 2011 edition as adopted · ASME Boiler and Pressure Vessel Code, Sections I, IV and IX · ASME B31.1 Power Piping · ASME CSD-1 Controls and Safety Devices for Automatically Fired Boilers · Wisconsin Administrative Code NR 406 (DNR construction permits) · Wisconsin Commercial Building Code, SPS 361 to 366

Frequently asked questions

Who handles boiler repair, Milwaukee, WI plants and buildings included?

Paul Industries handles boiler repair in Milwaukee, Waukesha, Racine, Kenosha and the rest of Southeast Wisconsin for plants, hospitals and commercial buildings. Milwaukee is the first class city the SPS 341 note records as having accepted enforcement of the boiler code, so filings for boilers inside the city go to the city before the state. Paul plans the repair with whichever inspector holds the boiler, and returns it with the R-1 and test records the permit to operate depends on.

Who provides boiler repair, Madison, WI hospitals and Dane County plants use?

Paul Industries provides boiler repair in Madison, Middleton, Sun Prairie and across Dane County for hospitals, campus heating plants, laboratories and food plants. Dane County’s winter design temperature is minus 15 F, so heating plant repairs there are usually scheduled from late spring to early autumn, and boilers serving research buildings are repaired one at a time. Send the nameplate data, permit to operate and last inspection report, and Paul prepares a repair plan and price.

Does Paul Industries take boiler repair, Green Bay and Fox Valley mill work included?

Yes. Paul Industries takes boiler repair in Green Bay, Appleton, Oshkosh, Neenah and the rest of the Fox Valley, including power boilers at paper mills and steam boilers at food and dairy plants. Large power boilers rated at 100,000 pounds of steam per hour or more may qualify for a 24-month internal inspection interval in Wisconsin, but chemical recovery boilers are excluded, so mill repair plans are built around those fixed outages.

What is the Wisconsin boiler permit to operate, and where does it go?

The Wisconsin boiler permit to operate is the document DSPS issues within 30 business days after an inspection finds the boiler in compliance. It shows the maximum allowable working pressure, the inspector’s name and telephone number and the expiration date, which is the next required periodic inspection. The owner posts it near the boiler, and the boiler may not run above the pressure printed on it. A rerate or a finding can change that pressure.

How does a Wisconsin boiler permit get renewed after a repair?

A Wisconsin boiler permit follows the inspection cycle, so a repair alone does not renew it. When a repair is completed, the inspector verifies it, signs the R form where one applies and records the result; the next periodic inspection that finds the boiler compliant leads to the next permit. If a repair or alteration changes the maximum allowable working pressure, the new pressure must appear on the permit before the boiler runs at it.

Which edition of the Wisconsin boiler code applies to a repair made in 2026?

SPS 341 as published adopts the 2010 ASME Boiler and Pressure Vessel Code, ASME B31.1-2010, ASME CSD-1-2009 and the 2011 NBIC, with Wisconsin modifications. The repair must also meet the chapter’s own rules, which govern where they differ from those standards. Because SPS 341.03 applies current design and construction rules to every repair and replacement part, the repair is held to the chapter as it stands on the day of the work.

Who carries out a state of Wisconsin boiler inspection: DSPS, an insurer or Milwaukee?

Any of the three, depending on the boiler. DSPS inspectors cover many boilers directly, an insurance company may inspect boilers it insures if it is authorized and actively writes boiler and machinery insurance in Wisconsin, and the City of Milwaukee is recorded as enforcing the code within its limits. Every inspector must hold the DSPS boiler-pressure vessel inspector credential, which requires passing the National Board competency examination.

What does a Wisconsin boiler and pressure vessel inspection check besides the boiler?

A Wisconsin boiler and pressure vessel inspection also covers the pressure vessels around the boiler that SPS 341 does not exempt, such as deaerators, blowoff tanks, flash tanks and larger air receivers, on a 36-month cycle. The inspector checks safety valve testing records, blowoff equipment limits of 160 F and 5 psig at discharge, and the CSD-1 documents for automatically fired boilers above 400,000 Btu per hour input.

Is boiler service, Milwaukee buildings included, the same as a code repair?

Boiler service in Milwaukee and elsewhere in Wisconsin covers combustion tuning, control and low-water cutoff testing, safety valve operation, water treatment checks and log reviews, which keep the boiler ready for inspection. A code repair is work on pressure-retaining parts under the NBIC, made under the R program and registered on an R form. Paul Industries offers both, and service records double as the CSD-1 periodic testing evidence the inspector asks to see.

What should boiler service, Madison, WI campuses included, cover before each heating season?

Before each heating season, boiler service in Madison and across Wisconsin should cover burner and combustion setup, flame safeguard and limit control tests, low-water cutoff blowdown and testing, safety valve operation, gage glass and gage checks, and a review of water chemistry and the boiler log. Those results become the written record of periodic testing that a Wisconsin inspector verifies under CSD-1, so the paperwork is ready before the inspector arrives.

What is the average boiler repair cost for a Wisconsin plant?

There is no meaningful statewide average, because a Wisconsin boiler repair can be a control replacement or a full retube with refractory, temporary steam and a registered R-1. The main drivers are boiler size and type, the number of tubes or parts, welding and examination, access and rigging, the season and the length of the outage. Paul Industries gives a budget range from comparable work once the nameplate data and fault are known, then a firm price after inspection.

How should boiler repair companies be compared for Wisconsin work?

Compare boiler repair companies on what Wisconsin will ask of the repair: a written method the inspector can accept, welding procedures qualified to ASME Section IX, registration of the work on the correct R form, CSD-1 control testing, and a schedule that fits the outage window. Ask to see a sample closing file. Paul Industries provides that file on every Wisconsin repair, with the R form, test records and updated checklist in one place.

Can a Wisconsin boiler run past its inspection date while a repair is pending?

The permit to operate is valid until the next required periodic inspection, so a boiler past that date is out of compliance unless DSPS has approved an extension. An extension of up to six months needs a written request from the owner and the inspector’s written concurrence. Paul Industries helps owners line up the repair and the inspection in the same outage, so the boiler returns with a fresh permit rather than a request for more time.

What must happen after a boiler accident in Wisconsin?

If a boiler, pressure vessel or power piping failure causes an injury needing more than first aid, the owner reports the facts to DSPS on form SBD-10787-E within 24 hours. The equipment and its components must stay undisturbed until the department or Milwaukee authorizes removal, except to save life or prevent further damage. Paul Industries works with the owner and inspector once release is given, and repairs or replaces the equipment under the NBIC.

Does replacing a burner on a Wisconsin boiler need a state or DNR filing?

A burner change that converts the primary fuel or raises heat input is reported to DSPS on form SBD-6314-E, and the new burner may not exceed the boiler’s original stamped output. On the air side, DNR chapter NR 406 exempts boilers where no unit is designed to burn more than 25 million Btu per hour of gas or 10 million of distillate oil, unless an existing permit or order says otherwise.

Can a used boiler from another state be installed in a Wisconsin plant?

Yes, if it meets SPS 341 subchapter VII. A secondhand boiler from out of state must have been built and stamped to an edition of the ASME code, a copy of its manufacturer’s data report and any repair or alteration report must go to DSPS, and it must pass a hydrostatic test at one and a half times its maximum allowable working pressure at the new location, witnessed by a credentialed inspector.

Which Wisconsin boilers are exempt from periodic inspection?

SPS 341.18 exempts boilers inspected by federal inspectors, heating boilers inside dwelling units, boilers used only for agriculture, hot-water supply boilers and water heaters at 210 F or less, and installations at one- and two-family dwellings. DSPS can still order an inspection of exempt equipment on a complaint or when it suspects an unsafe condition. Plant process boilers, campus steam boilers and commercial heating boilers remain on the 12- or 36-month cycle.

What should a Wisconsin facility send to get a boiler repair priced?

Send the boiler’s make, type, rating and National Board or Wisconsin registration number, the current permit to operate, the latest inspection report with any cited code sections, the alarm or fault history, recent water treatment results and photographs of the boiler and its room. Add the dates the boiler can be down and what carries the load meanwhile. Paul Industries uses that package to plan the visit and price the repair.

Boiler down or carrying an inspection finding in Wisconsin?

Send the nameplate data, the permit to operate, the last inspection report and your outage dates. Call 201-450-8280 or request a quote.