Paul Industries designs, builds and services data center cooling in Alabama: chilled water plants, cooling towers, dry coolers, pumps, piping and the liquid loops that feed dense racks, for data halls from Huntsville and the Tennessee Valley to Montgomery, Birmingham and Mobile. Alabama asks two things of a cooling plant that many states ask separately: summer nights that rarely drop below the low seventies, and a water and power picture split between two utilities and dozens of river basins. Paul Industries plans the plant around both, then supplies, installs, starts up and maintains it.
Request a quote or call 201-450-8280
Data center cooling in Alabama: from the yard to the white space
Data center cooling in Alabama covers every piece of equipment that moves heat from the servers to the outdoor air: the chillers, towers or dry coolers in the yard, the pumps and headers in the central plant, the distribution piping, the air handlers or fan walls in the hall, and, in newer rooms, coolant distribution units serving liquid-cooled racks. Each of those pieces is sized against Alabama’s climate, its water rules and the utility that serves the site, which is why two halls with the same IT load in Decatur and in Montgomery often end up with different plants.
Plant types, components and design temperatures in general are explained on the national data center cooling systems overview. Below, the focus is what Alabama changes: the heat and humidity, the water registration program, the Gulf storm season, the code arrangement and the power territories.
Where are data centers in Alabama, and what do they cool?
Data centers in Alabama cluster in four places: the Tennessee Valley in the north, the Montgomery area along Interstate 65, metro Birmingham, and the Auburn and Opelika corridor, with smaller enterprise and edge rooms spread through Mobile, Tuscaloosa and Dothan. The large campuses named below are public market facts drawn from company and state announcements, listed so a reader can see the scale of the cooling loads arriving in the state.
| Area | Site as announced | Status | What it means for cooling work |
|---|---|---|---|
| Jackson County, northeast Alabama | Google data center, built from 2018; more than $2 billion invested in Alabama | Operating | Hyperscale heat rejection in the Tennessee Valley climate |
| Huntsville | Meta campus, ground broken 2018, more than $1.5 billion investment | Operating campus | Large chilled water and air handling plants, continuous service and expansion work |
| Montgomery, off Interstate 65 | Meta campus, ground broken 2024, more than 1.3 million square feet once completed | Under construction (state announcement, September 2025) | Dense, high-heat halls in the hottest of the four large Alabama cities |
| Montgomery and Huntsville | DC BLOX edge sites: 5 MW initial in each city, Montgomery planned to scale to 40 MW | Announced November 2024 | Modular plants sized to grow in steps |
Beyond those campuses, data centers in Huntsville, Alabama serve the aerospace, defense and research employers of the Tennessee Valley, data centers in Birmingham, Alabama serve banks, hospitals and the university, and data centers in Montgomery, Alabama serve state government as well as the new hyperscale campus. Each of those rooms needs the same disciplines at a smaller scale, and many of them now face their first liquid cooling retrofit.
Alabama summer nights and the size of the heat rejection plant
Alabama summer nights set the size of the heat rejection plant more than the afternoon peak does, because July lows across the state’s four largest cities sit between 71 and 73 degrees Fahrenheit in moist air (NOAA normals, 1991 to 2020). A plant that leans on cool nights to recover, precool thermal storage or run in economizer mode finds little relief in an Alabama July, so towers, dry coolers and chillers are selected to carry full load around the clock for weeks at a time.
| City | July normal high / low | January normal low | Cooling plant consequence |
|---|---|---|---|
| Huntsville | 91.5 F / 71.1 F | 33.1 F | Longest waterside economizer season of the four; freeze protection on idle yard piping |
| Birmingham | 91.0 F / 72.1 F | 34.9 F | Warm nights in a valley setting; tower plume and sound limits near neighborhoods |
| Montgomery | 93.7 F / 72.1 F | 36.5 F | Highest July afternoon normal; dry cooler and air-cooled chiller selections derate hardest |
| Mobile | 90.9 F / 73.1 F | 40.7 F | Warmest nights and wettest summers; salt air and hurricane exposure for yard equipment |
The numbers explain why data center cooling in Montgomery is selected differently from a Huntsville plant. Montgomery’s July afternoon normal is more than two degrees above Huntsville’s, and an air-cooled chiller or dry cooler loses capacity as the entering air warms, so equipment in the capital city is often upsized or paired with evaporative trim. Huntsville sees January lows near freezing, which opens more hours for a waterside economizer through the winter and also means drained or glycol-protected piping for anything that can sit idle on a cold night. Data center cooling in Huntsville therefore usually carries a larger economizer heat exchanger and a freeze protection sequence that a Mobile plant barely needs.
Running chillers less: economizers in a humid Gulf climate
Economizer operation in Alabama comes mostly from the waterside, because the outdoor air through most of the cooling season is warm and moist enough that bringing it into a data hall would mean dehumidifying it first. A waterside economizer uses the cooling tower or dry cooler to make cold water directly when the outdoor wet bulb or dry bulb is low enough, with a plate heat exchanger between the condenser water and the chilled water loop, and the chillers stay off or trim the last few degrees.
The warmer the chilled water a hall accepts, the more Alabama hours qualify. ASHRAE’s recommended server inlet range of roughly 64 to 81 degrees Fahrenheit lets modern halls run supply air in the mid to upper seventies, which in turn allows chilled water in the high fifties or sixties, and every degree of supply temperature added opens winter and shoulder-season hours to partial or full free cooling. Dew point is the limit: water cold enough to sit below the hall’s dew point condenses on coils and pipe, so the air side and the water side are set together. Paul Industries sizes economizer heat exchangers, valves and controls to the supply temperature the IT equipment is specified for, and tunes the changeover sequence so the plant moves between modes without temperature swings in the hall.
Alabama data center water: towers, rivers and the Certificate of Use
Alabama data center water use is tracked by the state when a site can withdraw a large volume itself: any organization with the capacity to withdraw 100,000 gallons per day or more must register with the Office of Water Resources at the Alabama Department of Economic and Community Affairs, obtain a Certificate of Use and report its annual use. A campus that buys water from a city or county system works under that utility’s supply agreement instead, but a site that draws from a well or from one of the state’s rivers for tower makeup files for the certificate before the intake runs.
Open cooling towers are where a chilled water plant uses its water. As a rule of thumb, a tower evaporates roughly one percent of the water circulating through it for every ten degrees Fahrenheit of range, and blowdown adds to that depending on how many cycles of concentration the water chemistry allows. With Alabama nights staying warm, a tower plant evaporates through the night as well as the day for much of the summer, so the annual makeup volume is larger than a plant with the same peak in a cooler state.
| Arrangement | Water use | Power use in an Alabama summer | Where it fits |
|---|---|---|---|
| Water-cooled chillers with open towers | Greatest; evaporation and blowdown continue round the clock in July and August | Lowest chiller power, because tower water tracks the wet bulb | Large campuses with a reliable municipal or registered river supply |
| Closed-circuit fluid coolers | Moderate; evaporative section runs in warm weather, dry in winter | Moderate | Sites that want a closed glycol or water loop and lower treatment burden |
| Air-cooled chillers | Near zero | Highest; capacity falls on Montgomery and Mobile afternoons | Edge and enterprise rooms, sites with no water allocation |
| Dry coolers with chiller trim | Near zero | Low in winter, chillers carry the summer | Warm-water liquid cooling loops and halls with high supply temperatures |
| Adiabatic dry coolers | Low; spray or pads used on the hottest hours | Between dry and evaporative | Sites balancing water limits against summer power |
Tower water treatment carries its own Alabama detail. Surface water from the Tennessee, Coosa, Black Warrior and Alabama river systems varies in hardness and suspended solids with the season, and heavy rain in the wet months changes turbidity at the intake. Paul Industries pairs tower plants with side-stream filtration and cooling tower water treatment programs set to the actual source water, so cycles of concentration stay high and makeup stays down.
Data centers, Alabama Power and the TVA: two grids, one cooling plant
Data centers in Alabama connect to one of two large power systems: Alabama Power, a Southern Company subsidiary serving the southern two-thirds of the state, or the Tennessee Valley Authority, whose service area takes in north Alabama through municipal and cooperative distributors. The cooling plant draws a large share of a campus’s power at the summer peak, so the utility’s rate design, its demand charges and the date it can energize a new substation all bear on the mechanical design.
Alabama produces far more electricity than it sells to its own customers. In 2024 the state’s plants generated about 142.9 million megawatt-hours while retail sales were about 87.5 million (EIA), and natural gas is its primary energy source. That surplus is part of what draws large loads, and data centers on Alabama Power’s system are increasingly planned around the generation and transmission the utility can commit. For a Montgomery data center, Alabama Power sets the energization date; for one in the Tennessee Valley, the TVA distributor does. In either territory, a cooling plant that draws less at the summer peak makes the electrical capacity go further.
Prices tell the same story. EIA reports Alabama’s 2025 average commercial electricity price at 14.60 cents per kilowatt-hour and industrial at 7.73 cents, against national averages of 13.37 and 8.51. A large campus negotiates its own contract, but the gap between those two averages shows how much the tariff class matters to the payback on high-efficiency chillers, variable-speed pumps and economizers.
Pumps, piping and redundancy in an Alabama cooling plant
Pumps, piping and redundancy decide whether an Alabama cooling plant keeps the hall within its temperature limits when a machine fails on a 94 degree afternoon. Most data center plants are built to N+1 at the equipment level, meaning one spare chiller, tower cell, dry cooler and pump beyond what the peak load needs, and many campuses add a second, physically separate distribution path so a pipe or valve failure can be isolated while the other path carries the load.
Alabama’s summer duty makes that spare equipment work harder than in a cooler state. With the plant near full load for weeks, the standby machine is often needed during maintenance as well as during faults, so owners specify maintenance valves, isolation points and bypasses that let any single chiller, tower cell or pump come out of service without touching the rest. Variable-speed primary pumping, with flow measured at each chiller and controlled at the coils, keeps pump energy low at part load and is the usual arrangement on new plants.
The piping itself is welded or grooved carbon steel for most chilled and condenser water mains, with stainless steel or approved plastics on smaller loops and on liquid cooling branches where water quality must stay high. Paul Industries designs supports and anchors for thermal movement and seismic requirements where the code applies, prefabricates headers and pump skids off site, and pressure tests, flushes and cleans every loop before it is connected to equipment. Process and utility piping practice for Alabama plants is described on process piping in Alabama, and the treated closed loops that serve many halls on closed loop cooling systems.
Gulf storms and the south Alabama cooling yard
Gulf storms shape cooling yards in south Alabama, where Hurricane Sally came ashore near Gulf Shores as a Category 2 storm in September 2020 and Frederic in 1979 and Ivan in 2004 damaged the Mobile area. Wind, flying debris, flooding and long utility outages all reach the cooling plant, which is the first system a data hall loses when power drops.
A storm-ready plant in Mobile or Baldwin County anchors chillers, towers and dry coolers to resist the design wind load, sets electrical gear and pump motors above flood levels, protects air-cooled coils and cabinets against salt air with coatings and sealed enclosures, and keeps the pumps and controls needed for minimum cooling on generator power. Thermal storage tanks or a chilled water buffer carry the hall through the transfer to standby power, and the restart sequence brings chillers back one at a time so the generators are never overloaded. Paul Industries designs and installs those provisions on new plants and retrofits them onto existing ones.
Which Alabama codes apply to a data center cooling plant?
Alabama’s State Building Code, administered by the Division of Construction Management, governs state-owned and state-funded buildings, schools, public colleges, hotels and theaters, so a privately owned data center is permitted by the city or county where it stands, under the edition that jurisdiction has adopted. Where no city or county code office exists, the state code book names the State Fire Marshal as the default enforcement authority.
The state code shows where Alabama editions are heading. Its mechanical code is the 2021 International Mechanical Code, amended on March 17, 2025 with the refrigeration sections of the 2024 edition and references to ASHRAE 15-2022, ASHRAE 34-2022 and UL 60335-2-40, the documents that govern the mildly flammable A2L refrigerants now used in new chillers. Its energy standard is ASHRAE 90.1-2013 with an exception permitted to the economizer requirement. Paul Industries confirms the adopted editions with the permitting office for each site before design starts, so machine room ventilation, refrigerant detection and relief piping match what the inspector expects. Pressure testing, flushing and functional testing follow the commissioning program described on data center commissioning in Alabama.
Inside the hall: air handling, containment and liquid loops
Air handling inside an Alabama data hall usually means computer room air handlers or fan walls fed with chilled water, with hot or cold aisle containment so the warm return air reaches the coils undiluted. Containment is what lets the supply air and chilled water temperatures rise, which in turn is what makes the economizer hours described above available.
Racks above roughly 40 to 50 kilowatts outrun air, and that is where Alabama halls are heading. A hyperscale data center in Alabama built for dense compute brings facility water to coolant distribution units at the end of each row or in the gallery, and the rack-side loop carries heat from cold plates on the processors. The facility water for those loops runs warmer than traditional chilled water, often warm enough for dry coolers to carry it through the cooler half of the year. The design questions for that work, from loop temperature to coolant chemistry, are set out on data center liquid cooling in Alabama.
Adding cooling to an Alabama hall that stays online
Adding cooling capacity to an operating Alabama data hall is a sequence of planned tie-ins, each written as a method of procedure and timed for the cooler months when the existing plant has the most margin. The work typically includes new chillers or dry coolers in the yard, valved connections on the existing headers, hot taps or line stops where the loop cannot be drained, and controls changes that bring the new equipment into the plant sequence.
Timing matters more in Alabama than in a northern state, because the window when one existing chiller can safely come offline is shorter. Paul Industries schedules shutdown-dependent tie-ins from November through March where possible, sets temporary cooling where redundancy is thin, and prefabricates spools and pump skids off site so the time with any loop isolated is measured in hours. Each step ends with flow, temperature and alarm checks before the next valve moves.
Data center cooling costs in Alabama: equipment, water and power
The cost of data center cooling in Alabama is set by the IT load and its density, the heat rejection arrangement, the redundancy level, the water source, storm hardening on Gulf sites, and the utility rate the plant will run under for twenty years. Equipment selection drives the first cost; the climate and tariff drive the operating cost, and in Alabama the operating cost often decides the design.
A worked example shows the scale. A cooling plant that draws an average of 1,500 kilowatts uses about 13.1 million kilowatt-hours a year. At the 2025 Alabama industrial average of 7.73 cents that is about $1.02 million a year; at the commercial average of 14.60 cents it is about $1.92 million. Every tenth of a kilowatt per ton saved at the chillers, or every month of extra economizer operation in Huntsville, is measured against that bill. Paul Industries prices a plant after reviewing the load schedule, site plan, utility service and water source, with a budget range first and a firm price once the scope is fixed.
Who builds data center cooling plants in Alabama?
Paul Industries builds data center cooling plants in Alabama, designing, fabricating, supplying, installing, starting up and maintaining chilled water plants, towers, dry coolers, pumps, piping and liquid cooling distribution for hyperscale, colocation and enterprise halls. With headquarters at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries takes cooling work across Alabama, from Huntsville, Decatur and the Shoals to Birmingham, Tuscaloosa, Anniston, Montgomery, Auburn and Opelika, Dothan and Mobile, and in all 50 states.
The chiller plant itself is covered on data center chillers, and repair of existing machines on chiller repair in Alabama. For the full mechanical scope of a new campus, see data center mechanical contractor in Alabama. Buyers comparing states see the same discipline applied in Paul’s home state on data center cooling in Virginia and next door on data center cooling in Georgia and data center cooling in Tennessee; the regional picture is on the Southeast page.
Paul Industries cooling work for Alabama data halls
Paul Industries delivers data center cooling in Alabama as a design-build plant, a complete installation from the owner’s design, or a supply-only order of chillers, skids and prefabricated piping, and maintains the plant after startup. Send the IT load schedule, rack densities, site plan, utility and water source, and any redundancy and storm requirements. Call 201-450-8280 or request a quote. The Alabama page lists the process, water and piping work Paul Industries delivers across the state.
Standards referenced: ASHRAE TC 9.9 thermal guidelines for data processing environments · ASHRAE 90.1-2013 (Alabama State Building Code edition) · 2021 International Mechanical Code with 2024 refrigeration sections (Alabama State Building Code) · ASHRAE 15-2022 · ASHRAE 34-2022 · UL 60335-2-40 · Alabama Water Use Reporting Program (ADECA Office of Water Resources)
Frequently asked questions
Who installs data center cooling in Huntsville and Madison County?
Paul Industries installs data center cooling in Huntsville and across Madison County: chilled water plants, cooling towers, dry coolers, pumps, CRAH galleries and liquid cooling distribution, for hyperscale campuses, colocation halls and the computing rooms that serve the area’s aerospace and research employers. Tennessee Valley sites see near-freezing January lows, so Paul Industries pairs a larger waterside economizer with freeze protection on yard piping. Call 201-450-8280 to discuss a Huntsville project.
Who designs cooling for the new data halls around Montgomery?
Paul Industries designs, builds and services cooling plants for data centers in Montgomery and the surrounding River Region. Montgomery has the highest July afternoon normal of Alabama’s four largest cities, 93.7 degrees Fahrenheit, so air-cooled chillers and dry coolers there are selected for that heat, and many plants add evaporative trim. Paul Industries sizes the plant to the hottest weeks of the year and to the energization schedule set by the utility.
Who handles data center cooling in Birmingham and Jefferson County?
Paul Industries handles data center cooling in Birmingham and Jefferson County, from enterprise rooms at banks and hospitals to colocation halls and new campuses south and west of the city. Birmingham plants often sit near neighborhoods, so tower sound, plume and equipment screening are part of the layout. Paul Industries designs the plant, installs it, starts it up and maintains it under one contract.
Can Paul Industries cool a data hall in Mobile or Baldwin County?
Paul Industries builds and services data hall cooling in Mobile and Baldwin County with the coast in mind: anchorage for hurricane winds, electrical gear and pumps above flood levels, coated coils and sealed cabinets against salt air, and pumps and controls on generator power. Mobile’s July nights average about 73 degrees Fahrenheit, the warmest of the large Alabama cities, so heat rejection runs hard through the night.
Where are data centers in Alabama?
Public announcements place Alabama’s hyperscale data centers in Jackson County in the northeast, in Huntsville, in Montgomery along Interstate 65, and in the Auburn and Birmingham areas, with announced edge sites in Montgomery and Huntsville. Smaller enterprise rooms operate across Mobile, Tuscaloosa, Dothan and the other cities. Paul Industries works on cooling for halls of every size across the state.
Does an Alabama data center need a state certificate to draw its own cooling water?
A site that can withdraw 100,000 gallons per day or more from a well, river or lake must register with the Office of Water Resources at the Alabama Department of Economic and Community Affairs, obtain a Certificate of Use and report annual withdrawals. Campuses buying water from a city or county system work under that utility’s supply terms instead. Paul Industries sizes tower makeup and storage to whichever source the site uses.
How much water does a cooling tower use at an Alabama data center?
A tower evaporates roughly one percent of its circulating water for every ten degrees Fahrenheit of range, and blowdown adds to that according to the cycles of concentration the water chemistry allows. Because Alabama nights stay in the low seventies through July and August, evaporation continues around the clock in summer. Raising cycles with good treatment and filtration, and moving part of the load to dry coolers in winter, lowers the annual total.
How many months can an Alabama data center run on free cooling?
The answer depends on the city and on the water temperature the hall accepts. Huntsville, with January lows near 33 degrees Fahrenheit, gets the most winter hours; Mobile, with January lows near 41, gets the fewest. A hall designed for warmer chilled water or a warm-water liquid loop gains economizer hours in every Alabama city. Paul Industries models the hours for the actual site and supply temperature before sizing the economizer equipment.
How are tower plume and sound handled at a Birmingham data center?
Birmingham sites often sit in valleys near homes, so towers and dry coolers are placed and screened with sound and plume in mind. Low-speed fans, variable-speed drives that slow fans at night, acoustic barriers and plume abatement coils keep the yard within the limits the city sets in the site approval. Paul Industries models sound at the property line during design and measures it during startup.
Which refrigerant rules affect new chillers for an Alabama data hall?
New chillers increasingly use A2L refrigerants, which are mildly flammable, and the codes have added rules for machine room ventilation, detection and charge limits to match. Alabama’s State Building Code adopted the 2024 International Mechanical Code refrigeration sections, with ASHRAE 15-2022 and UL 60335-2-40, on March 17, 2025. Paul Industries designs the machine room and relief piping to the edition the site’s permitting office enforces.
How should an Alabama cooling plant be prepared for hurricane season?
Before June, a Gulf Coast plant should have its anchorage and screens inspected, loose items removed from the yard, generator fuel and transfer controls tested, and the restart sequence after a power loss rehearsed. Thermal storage or a chilled water buffer should be confirmed full. Paul Industries runs those checks as part of scheduled service and adds missing provisions, such as flood-proofed pump controls, during the off-season.
Does the utility territory change how an Alabama cooling plant is designed?
The territory changes the rate structure, demand charges and the date power can be delivered, and those shape the plant. A site on Alabama Power’s system and a site served by a TVA distributor in north Alabama see different tariffs and interconnection steps. Paul Industries reviews the utility service with the owner early, then weighs chiller efficiency, thermal storage and economizer size against the actual rate.
When does a closed-loop design make sense for an Alabama data center?
A closed-loop design using dry coolers or air-cooled chillers makes sense where water is limited, where the site has no registered withdrawal or municipal capacity for tower makeup, or where the hall runs warm-water liquid cooling that dry coolers can carry for much of the year. The trade is higher summer power in Alabama’s heat. Paul Industries compares both arrangements over the plant’s life before the owner commits.
Can new chillers be added to an operating Alabama data hall without a shutdown?
In most plants, yes. New equipment is connected through valved branches installed in advance, hot taps or line stops where a header cannot be drained, and controls changes made one step at a time under a written method of procedure. Paul Industries schedules isolation-dependent steps in the cooler months, when the existing plant has the most spare capacity, and confirms temperatures after each step.
Does Paul Industries supply chillers and skids for an Alabama data center without installing them?
Paul Industries offers supply-only orders of chillers, pump skids, economizer heat exchanger skids and prefabricated piping spools for Alabama data centers, alongside design-build and complete installation contracts. Equipment ships with factory test data, and Paul Industries attends startup or handles it as an added scope when the owner wants one point of contact for the machinery.
Which details let Paul Industries scope cooling for an Alabama data hall?
Send the IT load schedule by phase, rack densities and any liquid cooling plans, the site plan, the utility and the energization date, the water source, the redundancy target, and any storm or sound requirements. For an existing hall, add the current plant equipment list and trend data. Paul Industries returns a budget range first and a firm price once the scope is fixed.
Why do warm Alabama nights matter more than the afternoon peak?
Warm nights remove the recovery period that plants in cooler climates rely on. With July lows near 72 degrees Fahrenheit in Birmingham and Montgomery, towers and dry coolers run at high load for weeks, thermal storage has little cool night air to recharge with, and economizers stay off through the summer. Paul Industries sizes heat rejection for sustained duty, which is why Alabama plants often carry more tower or dry cooler surface than the afternoon peak alone suggests.