Paul Industries designs, supplies, installs and tests data center liquid cooling in Iowa, including coolant distribution units, cold plate and rear door loops, row manifolds, dry coolers and the facility water systems that feed them. Iowa adds two things to a liquid cooling job: a sales tax exemption whose qualifying list names cooling systems, with registration and design conditions attached, and a climate where warm-water loops run without compressors for most of the year but must ride through lows near minus 27 degrees Fahrenheit. Paul Industries builds the loops and the records for both.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Sales tax exemption Iowa Code 423.3(95) names cooling systems and cooling towers
Investment test $200 million in Iowa within six years
Design standard LEED certification plus ASHRAE 90.1-2007 (481 IAC 301.34)
Warm hours About 339 hours a year above 85 F at Des Moines (ASOS 2021 to 2025)
Reviewed November 2026

What does data center liquid cooling in Iowa involve?

Data center liquid cooling in Iowa involves a facility water system that rejects heat outdoors, coolant distribution units that separate that water from the rack loop, and a technology cooling loop that carries treated coolant to cold plates, rear door heat exchangers or immersion tanks. The loops are the same as in any state. What changes in Iowa is the paperwork that follows the purchase, the energy and design standard tied to the state’s tax exemption, and the weather the outdoor equipment has to survive.

The national reference on loop types, temperature classes and components is the data center liquid cooling page. This page concentrates on Iowa: the state’s data center tax law and its sustainable design rule, the warm-water hours at Iowa airports, freeze protection, fill water quality and the cost of adding liquid rows to operating Iowa halls.

Iowa data center sales tax exemption and the cooling scope

The Iowa data center sales tax exemption, in Iowa Code section 423.3, subsection 95, exempts the sales price of computers and equipment needed to operate a data center business, together with property connected to the computers, and the statute lists cooling systems, cooling towers and other temperature control infrastructure among its examples. Power infrastructure, backup generation, battery systems, racking, cabling and trays are also named. For a liquid cooling project, that list places CDUs, dry coolers, pumps and the loops serving the racks squarely in the conversation with the owner’s tax team.

Because the exemption depends on how each item is bought and documented, the cooling contractor’s paperwork matters. Paul Industries separates equipment, materials and labor on Iowa liquid cooling invoices, identifies each piece of equipment by tag and function, and keeps the records that the owner’s tax advisors ask for when the exemption certificate is presented. The Iowa Department of Revenue decides what qualifies; clean records make that decision simple.

What Iowa data center laws ask of the business claiming the exemption

Iowa data center laws set several tests the data center business must meet before and after it claims the exemption, and two of them touch the mechanical design directly. The table summarizes the requirements in the statute as it reads for 2026.

Requirements of the Iowa data center exemption, Iowa Code 423.3(95)
RequirementWhat the statute saysWhere the cooling work connects
Qualifying businessAn entity that operates or leases a data center; lessees are eligibleColocation tenants adding liquid rows have their own path
SizeAt least 5,000 square feet in Iowa used for the data center businessNone directly
Minimum investment$200 million in Iowa within the first six years, counted from site preparation or the initial lease termCooling plant and loops count toward the investment record
Sustainable designComply with the state standards set under Iowa Code 103A.8BEnergy modeling and commissioning records for the cooling systems
Registration and reportingRegister with the Department of Revenue; file an annual report by each January 31 beginning in 2026Fuel and electricity use reported; metering helps
Exemption certificateAfter January 31, 2026, present the annually issued certificate to the sellerEquipment purchases are made against the current certificate
ClawbackMissing 80 percent of the investment in six years ends the exemption, with tax, penalty and interest duePhasing plans show when cooling capacity is bought

The Iowa data center tax exemption therefore rewards owners who plan phases carefully. Paul Industries builds the liquid cooling scope in phases that match the owner’s investment schedule, with headers and valved branches installed for later halls so each phase buys only the equipment it needs.

LEED and ASHRAE 90.1-2007: Iowa’s design test for data centers

Iowa’s sustainable design rule for data centers, rule 481 IAC 301.34(3), approves a building or part of a building that hosts a data center when the project receives LEED certification at the base level and complies with ASHRAE 90.1-2007. That rule is the design standard the exemption points to, so it shapes Iowa data center regulations on the mechanical side even where the city or county energy code would ask for less.

Liquid cooling helps on both counts. Warm-water loops cut chiller hours and fan energy, which improves the energy model, and the testing and documentation that a liquid loop needs anyway, including pressure tests, flushing records, balancing data and sequence tests, are the same records a LEED submission draws on. Paul Industries assembles them as the work proceeds rather than reconstructing them at the end, and hands them to the owner’s design team in a form they file directly.

Electricity terms for halls finished after June 6, 2025

Iowa data center legislation now in the Code draws a line at June 6, 2025 for how long the exemption on electricity and backup generator fuel lasts. For property already operating before June 6, 2025, there is no time limit. For new construction or additions completed on or after that date, the electricity and fuel exemptions last for the first ten years of operation when the property lies at least partly in a city of more than 30,000 people, and for the first fifteen years elsewhere.

That clock puts weight on cooling efficiency in later years. Once the electricity exemption ends, every kilowatt the cooling system draws carries sales tax on top of the tariff, so the savings from warm-water loops and compressor-free hours grow. Paul Industries runs life-cycle comparisons for Iowa owners that include the exemption period and the years after it, so the cooling design is judged over the life of the hall. Among Iowa data center incentives, this is the one most tied to how the cooling plant runs.

How warm can an Iowa liquid loop run without chillers?

An Iowa liquid loop can run without chillers for nearly all of the year when the facility water supplies the CDUs at the warmer ASHRAE classes, because hot hours in Iowa are few. Hourly observations for 2021 through 2025 show Des Moines above 85 degrees Fahrenheit for about 339 hours a year and above 95 degrees for about 12, with Cedar Rapids and Davenport warmer than 85 degrees for only about 220 to 235 hours.

Warm and cold hours a year at Iowa airports, hourly observations 2021 to 2025
StationAbove 80 FAbove 85 FAbove 95 FBelow 0 FLowest hour
Des MoinesAbout 796About 339About 12About 97-17 F
Cedar RapidsAbout 595About 220About 3About 150-18.9 F
Sioux CityAbout 775About 353About 16About 126-27 F
DavenportAbout 659About 235About 3About 89-18 F

A dry cooler delivers fluid some degrees above the outdoor dry bulb, so a loop supplying water near 90 degrees covers almost every Iowa hour with fans alone, and a loop near 104 degrees covers essentially all of them. Paul Industries sizes dry coolers and trim chillers to the site’s measured hours and the IT vendor’s allowed supply range, so the trim capacity is only as large as the hottest few hundred hours require.

Freezing weather and the Iowa facility loop

Freezing weather is the main outdoor design risk for Iowa liquid cooling, because the same dry coolers that make warm water cheap sit in air below 0 degrees for 90 to 150 hours a year. The usual answer is a glycol facility loop outdoors and a plate heat exchanger or the CDU itself as the boundary, so the technology cooling loop at the racks carries the coolant the IT vendor specifies and never sees glycol it was not designed for.

Paul Industries sets glycol strength for the site’s record low with margin, specifies dry cooler fan and valve sequences that keep fluid moving through every coil in deep cold, and adds low-temperature alarms at the heat exchanger. Where a loop must sit idle in winter, such as a future phase, the piping is drained and blown down or kept circulating, and the valving is arranged so a frozen dead leg never becomes a leak inside the hall.

Inside the hall: the data center liquid cooling system

A data center liquid cooling system in an Iowa hall has the same parts as anywhere: CDUs, supply and return headers, row manifolds, hoses with quick disconnects, cold plates or rear doors, and the controls that hold temperature and pressure. The details that decide reliability are the materials, the joints and the way each branch is isolated.

Reading a data center liquid cooling diagram for an Iowa hall

A data center liquid cooling diagram for an Iowa hall usually shows three loops. The outdoor facility loop runs glycol to dry coolers, towers or a chiller plant. The facility water loop inside the building carries water to the CDUs. The technology loop on the far side of each CDU carries filtered, inhibited coolant to the racks. Each boundary is a heat exchanger, and each loop has its own expansion, air removal, filtration and makeup.

Data center liquid cooling piping in the facility loop is usually carbon steel or stainless, while the technology loop runs stainless, copper or approved polymer hose to the manifolds. Paul Industries welds or presses the headers, installs isolation and balancing valves at each row, and sets the data center liquid cooling pump arrangement in the CDUs and facility loop for redundancy. Every data center liquid cooling cold plate circuit is filled, vented and proven before IT is connected.

Data center liquid cooling technologies and their fit in Iowa halls
TechnologyWhere it fitsIowa design point
Direct-to-chip cold plates with CDUsDense GPU and CPU racks in new or retrofitted hallsWarm supply allows dry coolers for nearly every hour
Rear door heat exchangersModerate density in existing air-cooled hallsUses existing chilled water; check plant capacity in July
Single-phase immersionVery dense or specialized computeFloor loading, fluid handling and heat exchanger access
Hybrid air and liquid rowsHalls moving in stages to liquidAir system resized as the liquid share grows

Data center liquid cooling vs air cooling on Iowa power

Data center liquid cooling vs air cooling on Iowa power is a closer contest than in high-price states, because the 2024 average industrial electricity price in Iowa was 6.80 cents per kilowatt-hour and wind produced about 63 percent of the state’s generation. Air cooling stays cheap to run on cheap power for moderate densities. Liquid cooling wins on density, on fan energy at high rack loads and on the hours of compressor-free operation.

For a hall with racks of high power, the decision is less about energy cost than about whether air can remove the heat at all. Where it can, Paul Industries compares both methods with Iowa tariffs and weather. A reduction of 150 kilowatts in average fan and chiller draw is worth about $89,350 a year at Iowa’s industrial average price, before the change in sales tax treatment that comes when the electricity exemption period ends.

Heat reuse from Iowa liquid loops

Heat reuse from Iowa liquid loops is practical because the return water from cold plates is warm and Iowa’s heating season is long. Hourly records for 2021 through 2025 show the outdoor temperature below freezing for roughly 1,700 to 2,100 hours a year at the four airports studied, so offices, warehouses, shops and adjacent greenhouses all have heating demand for months. Return water in the range of 95 to 115 degrees Fahrenheit heats air and domestic water directly, and a heat pump raises it further for buildings that need hotter supply.

The engineering questions are reliability and control. The data hall must never depend on the heat customer to reject its load, so a heat recovery loop is always a side branch with its own heat exchanger and full bypass to the dry coolers. Paul Industries designs that branch, the metering that shows how much heat is delivered, and the controls that give the data hall priority. On a campus planning for LEED, recovered heat also helps the energy model.

Lead times and the data center liquid cooling market

Lead times in the data center liquid cooling market set the schedule for most Iowa projects more than field labor does. CDUs, large dry coolers, quick disconnects and stainless manifolds all have order books that move with national demand, and an Iowa hall waiting on one late component waits for all of it. Paul Industries locks equipment selections early, releases long-lead orders as soon as the owner approves them, and prefabricates headers, manifolds and pump skids while equipment is in production, so field installation starts with complete assemblies.

Prefabrication also suits Iowa weather. Outdoor piping and dry cooler connections are planned for the warm months where the schedule allows, and work that falls in winter is built as modules that need only a few field welds or press joints, each one tested before the loop is filled.

Adding liquid rows to an operating Iowa hall

Adding liquid rows to an operating Iowa hall means tapping the facility water or chilled water system while it carries load, finding space for CDUs, and testing new loops without risking the racks already running. Paul Industries plans each tie-in with hot taps or planned valve shutdowns, isolates new branches until they are flushed and tested, and stages CDU startup so one row commissions at a time.

The air system also changes. As liquid takes over a larger share of the heat, the remaining air load falls and the air handlers run at lower flow, so controls and setpoints are retuned. Where the chilled water plant now runs at higher return temperatures, Paul Industries checks chiller selections and economizer settings to take advantage of the warmer water.

Operating halls also set the working rules. Each step that touches a live system follows a written method of procedure approved by the operator, with rollback steps, isolation points, the people present and the time window spelled out. Hot work near racks is replaced by press fittings or prefabricated spools wherever possible, and every new manifold is pressure tested before it connects to a single server. Paul Industries works to those procedures as a normal part of liquid cooling work in occupied space.

Fill water, coolant chemistry and leak prevention

Fill water for an Iowa technology loop should be treated, never straight from the tap. Iowa surface water supplies carry nitrate from farm runoff, and Des Moines Water Works reported nitrate in treated water as high as 9.17 milligrams per liter as nitrogen in 2025, against a limit of 10. Nitrate, hardness and chloride affect inhibitor performance and corrosion in fine cold plate channels, so loops are filled with deionized or reverse osmosis water and the coolant the IT vendor approves.

Paul Industries supplies treated fill from a temporary or permanent system, and the ultrapure water systems in Iowa page describes the permanent equipment for campuses that fill and top up loops regularly. Data center liquid cooling leak prevention starts with that chemistry and continues with pressure testing, leak detection cable or point sensors under manifolds, drip trays where the design calls for them, and isolation valves close to every rack. A data center liquid cooling leak drill is part of the turnover training.

How much does data center liquid cooling cost in Iowa?

Data center liquid cooling cost in Iowa is driven by the number and capacity of CDUs, the length and material of the headers and manifolds, the outdoor heat rejection, the scope of work in an operating hall and the testing and documentation the owner needs for tax and LEED purposes. A new hall built for liquid from the start costs less per kilowatt than a retrofit that has to work around live racks.

Several smaller items add up on Iowa jobs and belong in the first estimate: glycol for the outdoor loop, treated fill water and the coolant itself, temporary flushing pumps and strainers, leak detection, the controls integration with the building management system, and the documentation package. Winter work adds heated enclosures for any outdoor welding and protection for filled piping. Listing them early keeps the budget steady from design to turnover.

Paul Industries prices Iowa projects from the rack layout, the target supply temperature, the heat rejection choice and the phasing plan, with equipment, piping, controls, testing and documentation priced separately. Owners choose supply-only CDU and skid packages, design-build delivery, or complete installation, and all three come with the same test records.

Who installs data center liquid cooling in Iowa?

Paul Industries installs data center liquid cooling in Iowa, headquartered at 256 Shore Drive in Kilmarnock, Virginia, and taking work across Iowa, in all 50 states and at plants abroad. The work covers CDUs, headers, row manifolds, hoses, dry coolers, heat exchangers, glycol systems, leak detection and controls, with testing and turnover records prepared for the owner’s tax and design teams.

Paul Industries also builds the larger plant through data center cooling in Iowa, proves the loops through data center commissioning in Iowa, and carries the full campus scope as a data center mechanical contractor in Iowa. The headquarters-state version of this work is data center liquid cooling in Virginia, and owners with halls in Michigan see the Great Lakes version at data center liquid cooling in Michigan.

Liquid cooling loops from Paul Industries across Iowa

Paul Industries designs, supplies, installs, tests and maintains liquid cooling for data halls in Des Moines, West Des Moines, Altoona, Council Bluffs, Cedar Rapids, Iowa City, the Quad Cities and Sioux City. Data center liquid cooling solutions from Paul Industries include CDU and pump skids, stainless and carbon steel headers, row manifolds, dry cooler and heat exchanger packages, treated fill water and the high-purity water systems that supply it, plus chiller repair in Iowa for the trim plant. For the wider state picture see Iowa and the Midwest. Send the rack layout, target supply temperature and phase plan, and request a quote.

Standards referenced: Iowa Code 423.3(95) (data center sales and use tax exemption) · Iowa Code 103A.8B and 481 IAC 301.34 (sustainable design) · ASHRAE 90.1-2007 · LEED green building rating system · 2024 International Mechanical Code (Iowa state mechanical code) · ASHRAE liquid cooling guidelines (W classes) · ASME B31.9

Frequently asked questions

Does the Iowa data center exemption cover CDUs and liquid cooling piping?

The statute exempts equipment needed to operate a data center business and property connected to the computers, and it names cooling systems, cooling towers and other temperature control infrastructure among its examples. Whether a given purchase qualifies is decided under the Department of Revenue’s rules and the owner’s exemption certificate. Paul Industries itemizes CDUs, pumps, piping and labor on separate lines so the owner’s tax team classifies each item cleanly.

What are the Iowa data center tax incentives worth to a liquid cooling project?

The main state incentive is the sales and use tax exemption in Iowa Code 423.3(95), which covers qualifying equipment, backup fuel and electricity for a data center business that meets the size, investment, design and registration tests. Iowa data center tax breaks on electricity and fuel are time-limited for new construction finished on or after June 6, 2025. Paul Industries provides the purchase and test records the owner’s advisors use to claim them.

Which Iowa data center regulations affect how a liquid loop is designed?

The state mechanical code, which is the 2024 International Mechanical Code with Iowa amendments, governs the installation, and the sustainable design rule tied to the tax exemption calls for LEED certification and ASHRAE 90.1-2007 compliance for data center buildings. Cities and counties issue the permits. Paul Industries designs the loops and their documentation to meet both sets of rules.

What does an Iowa data center exemption require for green building?

The data center business must comply with the sustainable design standards adopted under Iowa Code 103A.8B. For buildings hosting a data center, rule 481 IAC 301.34(3) approves projects that receive LEED certification at the base level and comply with ASHRAE 90.1-2007. Liquid cooling helps the energy side, and Paul Industries keeps the test and balance records that support the submission.

Who installs liquid cooling for data halls in Des Moines and West Des Moines?

Paul Industries installs CDUs, row manifolds, headers and dry coolers for data halls in Des Moines, West Des Moines, Altoona and the rest of central Iowa. Central Iowa halls see about 339 hours a year above 85 degrees, so warm-water loops there run on dry coolers for most of the year with a small trim plant for July afternoons.

Can Paul Industries add liquid cooling to colocation halls in Cedar Rapids and Council Bluffs?

Yes. Paul Industries adds liquid rows to operating colocation halls in Cedar Rapids, Council Bluffs and elsewhere in Iowa, with tie-ins planned around live loads and each new branch isolated until it is flushed and tested. Tenants who lease space are eligible for the Iowa exemption in their own right, so Paul Industries keeps their purchase records separate from the landlord’s.

Where does glycol stop and rack coolant start in an Iowa liquid cooling design?

At the heat exchanger that separates the outdoor loop from the building, or at the CDU itself. Glycol rated well below Iowa’s recorded lows, minus 27 degrees at Sioux City in 2021, stays outdoors, and the technology loop at the racks runs the coolant the IT vendor approves. Paul Industries places that boundary indoors and alarms it for low temperature, so a cold snap never reaches the servers.

What should Iowa operators look for in data center liquid cooling companies?

Look for a firm that builds both the facility side and the rack side, tests and documents every loop, and understands the Iowa tax and design records the owner needs. Paul Industries designs, installs, flushes, tests and maintains the full system, and hands over pressure test, flush, fill and sequence records with the equipment data.

What do data center liquid cooling options cost to run in Iowa compared with air?

Liquid cooling usually draws less fan and chiller power at high rack densities, and at Iowa’s 2024 industrial average of 6.80 cents per kilowatt-hour each 150 kilowatt reduction in average draw saves about $89,350 a year. At moderate densities air cooling stays competitive on Iowa power. Paul Industries runs the comparison with the owner’s tariff and rack plan.

Which data center liquid cooling solutions suit an Iowa retrofit?

Rear door heat exchangers suit moderate densities on an existing chilled water plant, and direct-to-chip cold plates with in-row or perimeter CDUs suit dense racks. The choice depends on floor space, chilled water capacity and the IT roadmap. Paul Industries surveys the hall, the plant and the tie-in points before recommending one.

Why is treated water used to fill liquid cooling loops in Iowa?

Tap water carries hardness, chloride and, in much of Iowa, nitrate from farm runoff, and those ions upset inhibitor chemistry and promote corrosion and fouling in fine cold plate channels. Des Moines Water Works reported nitrate in treated water as high as 9.17 milligrams per liter as nitrogen in 2025. Paul Industries fills technology loops with deionized or reverse osmosis water and the approved coolant.

How is a data center liquid cooling system tested before servers connect?

Each loop is pressure tested, flushed through temporary bypasses until the strainers stay clean, filled with treated coolant, vented, and run under heat load or simulated load while flow, pressure and temperature are recorded. Leak detection and alarms are tested, and valves are set for balance. Paul Industries keeps the records for the turnover file and any LEED or tax submission.

Does Iowa liquid cooling still need chillers?

Most Iowa liquid-cooled halls keep some mechanical cooling for the hottest hours and for any air-cooled equipment, but the share is small at warm supply temperatures. Des Moines sees only about 12 hours a year above 95 degrees. Paul Industries sizes the trim plant to those hours and the IT vendor’s limits, so the chillers rarely run for liquid loads.

What happens to the Iowa electricity exemption after a new hall's first years?

For data center construction or additions completed on or after June 6, 2025, the electricity and backup fuel exemptions last ten years when the property lies at least partly in a city over 30,000 people and fifteen years elsewhere. After that, purchased electricity is taxed normally, which raises the value of efficient cooling. Paul Industries includes those years in Iowa life-cycle comparisons.

How long does it take to add liquid cooling to an Iowa hall?

Timing depends on CDU and manifold lead times, the number of tie-ins to live systems, the outage windows the operator allows and the test sequence. New halls designed for liquid move faster than retrofits. Paul Industries prefabricates headers and manifolds where the layout allows and schedules each row so testing finishes before IT arrives.

What maintenance does an Iowa liquid cooling loop need?

Regular coolant sampling for inhibitor level, conductivity, pH and bacteria, strainer and filter changes, CDU pump and sensor checks, leak detection tests and a winter readiness check on the outdoor glycol loop. Paul Industries offers scheduled maintenance for Iowa loops with a written report after each visit and trending of coolant results.

What should an Iowa operator send to price a liquid cooling project?

Send the rack layout and heat loads, the IT vendor’s coolant and supply temperature requirements, drawings of the hall and the existing plant, the phase plan and any tax or LEED documentation needs. Paul Industries prices the CDUs, piping, heat rejection, controls, testing and records as separate items.