Paul Industries designs, supplies, installs and commissions data center liquid cooling in Kansas: direct-to-chip loops, coolant distribution units, rear door heat exchangers and the warm-water dry cooler plants that reject their heat, for halls in Johnson County, Lawrence, Manhattan, Topeka, Wichita and western Kansas. Kansas suits warm-water liquid cooling better than most states because its air is dry for much of the year, yet its winters freeze outdoor loops more than a hundred nights a year. Headquartered at 256 Shore Drive, Kilmarnock, Virginia, Paul Industries is an East Coast contractor taking liquid cooling projects across Kansas and throughout all 50 states.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Freezing nights Goodland 157, Wichita 103 a year at or below 32 F (NOAA, 1991-2020)
Hottest days Salina 15.8 days a year at 100 F or above (NOAA, 1991-2020)
Grid All major Kansas utilities are Southwest Power Pool members (KCC)
Power price Kansas industrial average of 8.04 cents per kWh in 2025 (EIA)
Reviewed November 2026

What does data center liquid cooling in Kansas involve?

Data center liquid cooling in Kansas involves three pieces of work that have to be designed together: the technology cooling loop that carries coolant to cold plates or rear doors, the coolant distribution units that separate that loop from the building water, and a facility water plant whose heat rejection survives Kansas extremes from 100 degree afternoons to sub-zero nights. A design that gets the rack side right but leaves the outdoor side to chance fails on the first hard freeze or the first July heat wave.

The national service description, covering rack densities, coolant types and cold plate technology, sits on the data center liquid cooling page. This page covers what Kansas changes: the weather the heat rejection plant faces, the way Southwest Power Pool interconnection terms affect pump power, the research clusters at Kansas universities, and how the 2025 state sales tax exemption treats liquid cooling purchases.

How does liquid cooling work in a data center?

Liquid cooling in a data center works by moving heat from processors into a liquid at the rack, then passing it through one or more heat exchangers until it leaves the building through a dry cooler, tower or chiller. Water carries far more heat per unit volume than air, so a liquid loop removes the heat of a dense rack with a small pipe where air would need a large duct and fan wall. Each stage of the chain has a job and a failure mode, which the table sets out.

Stages of a liquid cooling system in a Kansas hall
StageWhat it doesKansas design point
Cold plates or rear doorsPick up heat at the chip or the rack exhaustSpecified by the server maker; flow and pressure drop set the loop design
Technology cooling loopClean, treated coolant between racks and CDUsFilled with treated water or a premixed coolant, never raw hard water
Coolant distribution unitPumps the rack loop and exchanges heat with facility waterRedundant pumps on protected power; approach temperature sets supply limits
Facility water loopCarries heat from CDUs to the heat rejection plantWarm water extends dry cooler hours; glycol only where it runs outdoors
Heat rejectionDry coolers, adiabatic coolers, towers or trim chillersSized for the hottest Kansas afternoons and protected for the coldest nights

Direct to chip liquid cooling with Kansas warm-water heat rejection

Direct to chip liquid cooling pumps coolant through cold plates fixed to processors and accelerators, and in Kansas its warm return water pairs naturally with dry coolers that run without chillers for much of the year. ASHRAE names its liquid cooling facility water classes for the maximum supply temperature in Celsius, from W17 through W27, W32, W40 and W45 to W+, and many current servers accept facility water in the W32 to W40 range, 89.6 to 104 degrees Fahrenheit. A dry cooler can deliver water that warm whenever outdoor air is a few degrees cooler still, which in Kansas covers the great majority of hours.

A direct to chip cooling data center still has residual air heat from memory, power supplies and storage, often a fifth to a third of the rack load depending on the server, so the hall keeps an air system sized for that share. The design question in Kansas is how to cover the hottest afternoons, when dry bulb temperature climbs past the facility water setpoint. NOAA’s 1991 to 2020 normals put Salina at 15.8 days a year at 100 degrees or above and Dodge City at 14.1, against about 6 at Topeka and Goodland.

Kansas weather extremes that size a liquid cooling heat rejection plant (NOAA normals, 1991-2020)
StationDays at 100 F or aboveNights at or below 32 FNights at or below 0 FHeat rejection emphasis
Salina15.8115.52.1Adiabatic assist or trim chiller for July peaks
Dodge City14.1127.52.1Dry coolers with adiabatic pads; strong freeze protection
Wichita12.4102.80.7Hybrid dry cooler and tower or trim chiller
Garden City10.8138.73.2Dry coolers sized for peak; glycol for deep cold
Topeka5.9113.92.7Humid summers favor a tower or chiller trim
Goodland6.2157.15.4Long dry cooler season; the hardest freeze design in the set

Direct to chip cooling using water or a glycol mix

Direct to chip cooling using water in the technology loop gives stronger heat transfer than any glycol mix, and Kansas freezing weather has no bearing on that loop as long as it stays indoors behind a coolant distribution unit. The outdoor facility loop is where freeze protection belongs. Keeping glycol out of the rack loop protects cold plate performance, while the dry cooler loop carries propylene or ethylene glycol at a strength set by the site’s design low temperature, separated from the indoor water by a heat exchanger in the CDU or at the plant.

Freeze protection for Kansas liquid cooling loops

Freeze protection for Kansas liquid cooling loops starts from NOAA’s count of cold nights: Goodland averages 157 nights a year at or below freezing and more than five at or below zero, Garden City about 139 and three, and even Wichita, with the fewest in the set, about 103 freezing nights. Any coil, pipe or valve outdoors in Kansas spends a third or more of the year at risk of freezing.

Paul Industries protects Kansas loops in layers. The outdoor loop carries glycol at a concentration matched to the site’s design low, verified by refractometer at fill and at every service visit. Heat trace and insulation cover exposed water piping and instrument lines, dry coolers get controls that hold minimum flow and bypass the coil when the load is light, and drain points are placed so a loop can be emptied quickly if a unit must be isolated in winter. The startup of a new loop in cold weather is planned so no section sits filled with plain water outdoors before the glycol goes in. The same principles apply to process and comfort loops described on glycol cooling systems.

Coolant distribution unit data center choices

A coolant distribution unit separates the clean technology loop from the facility water and pumps coolant to the racks, and the choice between in-rack, in-row and facility-scale CDUs is the central layout decision in a Kansas liquid-cooled hall. In-rack units suit a few dense racks in an existing room, in-row units serve a row or pod, and large floor-mounted units feed whole halls through a header system.

Coolant distribution unit types for Kansas halls
CDU typeTypical reachNeeds facility water?Where it fits in Kansas
In-rack, liquid-to-liquidOne rackYes, a branch to the rackA few dense racks in an enterprise room in Topeka or Wichita
In-rack or in-row, liquid-to-airOne rack or a short rowUses room air as the heat sinkPilots in rooms with spare air capacity and no water at the row
In-row, liquid-to-liquidA row or podYes, from a facility headerColocation pods and university clusters in Lawrence and Manhattan
Facility-scale, floor-mountedA whole hall through secondary headersYes, from a dedicated warm-water loopNew Kansas halls built for liquid from the start

Liquid-to-liquid CDUs exchange heat with facility water, while liquid-to-air units reject heat into the room and suit pilots in rooms without facility water. For any coolant distribution unit, data center operators specify redundant pumps, fine filtration, coolant quality monitoring, leak detection and controls that hold supply temperature within the server maker’s limits. Paul Industries sizes the CDUs, installs the headers, manifolds and hoses, and integrates their controls with the plant.

What is the coolant distribution unit working principle?

The coolant distribution unit working principle is a closed secondary loop driven by the CDU’s pumps, with a plate heat exchanger transferring rack heat to the facility water and a control valve on the facility side holding the secondary supply temperature at setpoint. Sensors watch flow, pressure, temperature and coolant condition, and the unit alarms or switches pumps on any fault. Because the secondary loop is isolated, its coolant chemistry and cleanliness stay under tight control regardless of the building water.

Rear door heat exchangers and humid Kansas summers

Rear door heat exchangers in Kansas must run with water above the room dew point, and eastern Kansas summers make that rule matter. NOAA’s hourly normals put the mean July dew point at 67.4 degrees at Topeka and 66.3 at Wichita, so any outdoor air that leaks into a hall, and any humidity added by people and makeup air, raises the risk that a cold door coil will sweat onto the floor or the servers. A rear door fed with 45 degree chilled water in a poorly sealed room is a condensation problem waiting for August.

Paul Industries designs Kansas rear door systems with a dedicated loop or a mixing station that holds supply water a safe margin above the measured room dew point, room humidity control on the makeup air, and controls that raise the door’s water temperature automatically when room dew point climbs. Western Kansas rooms, with Dodge City and Goodland averaging July dew points near 61 and 58 degrees, face less of this risk, but the same controls protect them during the occasional humid spell. Door coils, valves and hoses are pressure tested and the room’s dew point trend is reviewed after the first summer of operation.

Keeping coolant moving on the Southwest Power Pool grid

Coolant movement in a liquid-cooled hall depends on continuous pump power, and in Kansas the grid terms behind that power come from the Southwest Power Pool, to which all major Kansas utilities belong according to the Kansas Corporation Commission. SPP has published High Impact Large Load pathways for data centers, including a Conditional High Impact Large Load service that offers faster connection in exchange for potential curtailment during periods of system stress, and a generation assessment that studies a large load and its on-site generation together.

A hall that accepts conditional service must ride through curtailment without losing rack cooling. A cold plate has very little thermal mass, so processors throttle within seconds if coolant flow stops. Paul Industries designs Kansas liquid loops with CDU pumps on uninterruptible power, buffer volume or thermal storage on the facility water side where the transfer to generators takes longer than the racks tolerate, and controls that restart pumps and dry cooler fans in a defined order. The commissioning tests that prove those sequences are covered on data center commissioning in Kansas.

Research computing and liquid cooling at Kansas universities

Research computing at Kansas universities is a steady source of liquid cooling demand, because high-performance clusters pack accelerators densely and often sit in rooms first built for air cooling. Kansas State University’s Beocat cluster in Manhattan, run by the Institute for Computational Research, serves educational researchers across the state, and the University of Kansas Center for Research Computing in Lawrence runs the KU Community Cluster. Both are public market facts that show where dense computing already lives in Kansas.

University rooms bring their own constraints: limited floor loading, chilled water from a campus plant designed for cold supply, and research schedules that leave short windows for work. Rear door heat exchangers on the campus chilled water often make the first step, followed by in-row CDUs and direct-to-chip racks as new hardware arrives. Paul Industries plans these upgrades around the academic calendar and the campus plant’s capacity.

Liquid cooling data center design for an existing Kansas hall

Liquid cooling data center design for an existing Kansas hall begins with a survey of floor loading, ceiling space, pipe routes, the capacity of the existing chilled water plant, and the power available for CDUs. Liquid-cooled racks weigh far more than the racks many older raised floors were rated for, so slab-on-grade rows or reinforced floor tiles are planned before hardware is ordered. Piping overhead with drip trays and leak detection, or under the floor with sensing cable, follows the room’s construction. The data center cooling in Kansas page covers the plant side of a retrofit.

Fill water and loop cleanliness in Kansas

Fill water for a Kansas liquid loop must be treated before it goes in, because many Kansas supplies are hard and carry dissolved minerals that scale cold plate microchannels and foul heat exchanger plates. Server makers specify coolant chemistry, conductivity, particle size and microbiological limits for the technology loop, and premixed coolants or deionized water with inhibitors meet those limits where raw supply water cannot.

Cleanliness during installation matters as much as the coolant. New piping is flushed until filters stay clean, passivated where the material calls for it, and filled through filtration, and coolant samples are taken and logged before servers connect. Kansas sites that need deionized water for fill and top-up draw on the same treatment equipment described on ultrapure water systems in Kansas.

Pipe materials, flow and pressure in a Kansas liquid loop

Pipe materials for a Kansas liquid loop are chosen for coolant compatibility first, because cold plates contain copper and fine channels that react badly to mixed metals and dissolved oxygen. Technology cooling loops are usually built in stainless steel or approved polymer piping with compatible hoses and quick disconnects, while the facility water loop runs in carbon steel, stainless steel or ductile iron depending on size and glycol. Mixing copper, aluminum and carbon steel in one loop invites galvanic corrosion, so the server maker’s wetted-materials list governs every fitting.

Flow and pressure are set by the cold plates. Each server model has a required flow per rack and a pressure drop at that flow, and the manifold and header sizes follow from the sum of the racks a CDU serves, with margin for added racks. Paul Industries balances each branch, records flows at turnover, and sets differential pressure control so racks added later receive their share without starving the ones already running. Pressure ratings are matched to the CDU pumps and the static head of the building, which matters in multistory Kansas City and Wichita buildings where risers carry coolant between floors. Pressure tests use the medium and test pressure the piping code and the equipment makers specify, and every test is witnessed and recorded.

Liquid cooling purchases under the Kansas exemption

Liquid cooling purchases for a qualified Kansas data center fall within a statute that defines data center equipment to include all equipment necessary to cool and maintain a controlled environment for the servers, listing chillers, mechanical equipment, refrigerant piping, free cooling systems and air handlers as examples, “including, but not limited to” (K.S.A. 74-50,331). Labor to install, repair, service, alter or maintain data center equipment is also covered for a qualified firm with an approved agreement.

For the owner, that makes CDUs, manifolds, dry coolers, piping and controls part of the same exemption certificate process as the main cooling plant, and it extends to later service work during the 20-year exemption period. Paul Industries keeps invoices and equipment records organized against the project exemption certificate. The wider mechanical scope, including fuel and water systems, is set out on data center mechanical contractor in Kansas.

Direct to chip cooling system commissioning and maintenance

A direct to chip cooling system is commissioned in stages: pressure testing of headers and manifolds, flushing until filters clear, coolant fill and sampling, CDU functional tests, and finally integrated tests with heat load banks or live servers that confirm flow, supply temperature and failover. Each stage leaves a record, and the owner receives the test sheets, coolant analyses, setpoints and as-built drawings.

Maintenance after turnover follows the coolant. Filter changes, coolant sampling for conductivity, inhibitor level and microbiological growth, glycol checks on the outdoor loop before each winter, dry cooler coil cleaning before each summer, and pump inspections keep the loop within the server maker’s limits. Paul Industries provides that service under contract for Kansas halls and keeps the history with the original commissioning records.

What does data center liquid cooling cost in Kansas?

The cost of data center liquid cooling in Kansas depends on the number and density of liquid-cooled racks, whether CDUs are in-rack, in-row or hall-scale, the length of header and manifold runs, the state of the existing chilled water plant, the heat rejection added outdoors, freeze protection, floor reinforcement, and the commissioning scope. A retrofit in an occupied room costs more per rack than the same racks in a new hall designed for liquid from the start.

Operating cost tilts toward liquid in Kansas. Removing 50 kilowatts of fan and compressor power for a year saves 438,000 kilowatt-hours, about $35,000 at Kansas’s 2025 average industrial price of 8.04 cents (EIA), and warm-water dry coolers remove much of the chiller energy that air cooling of the same racks would need. Paul Industries gives a budget range per rack from comparable scope, then a firm price after the survey.

Who installs data center liquid cooling in Kansas?

Paul Industries installs data center liquid cooling in Kansas, including CDUs, manifolds, rear door heat exchangers, facility water loops, dry coolers and controls, for colocation suites in Johnson County and Kansas City, university and research rooms in Lawrence and Manhattan, enterprise halls in Topeka and Wichita, and new campuses in western Kansas. Paul Industries offers supply-only packages of CDUs and prefabricated manifolds, design-build of complete liquid systems, and full installation with commissioning.

Immersion cooling projects are covered on data center immersion cooling. For comparison with other states, Paul Industries describes retrofit work in its headquarters state on data center liquid cooling in Virginia and closed-loop dry cooler designs for hot plains on data center liquid cooling in Texas. The Kansas and Midwest pages list the rest of the work Paul Industries takes on in the region.

Liquid cooling for Kansas halls from Paul Industries

Paul Industries engineers, prefabricates, installs, tests and maintains liquid cooling for Kansas data centers, from a single row of direct-to-chip racks to a campus of warm-water halls with freeze-proof dry cooler plants. Send the rack count and density, the server maker’s coolant limits, the room’s floor and plant details, and the site location, and Paul Industries will lay out the loop architecture with a budget range. Call 201-450-8280 or request a quote.

Standards referenced: ASHRAE TC 9.9 liquid cooling guidance (facility water classes W17 to W+) · ASHRAE 90.4 · Kansas qualified data center sales tax exemption, K.S.A. 74-50,331 to 74-50,333 · Southwest Power Pool High Impact Large Load (HILL) integration · Kansas Fire Prevention Code, K.A.R. 22-1

Frequently asked questions

Who installs liquid cooling for colocation halls in Overland Park, Lenexa and Kansas City, Kansas?

Paul Industries installs liquid cooling for colocation halls in Overland Park, Lenexa, Olathe and Kansas City, Kansas, from in-row CDUs and manifolds to the facility water and heat rejection that serve them. Colocation work is phased around tenants, with valved connections left for future rows. Call 201-450-8280 or request a quote with the rack count and density.

Does Paul Industries add liquid cooling to research computing rooms in Lawrence and Manhattan?

Paul Industries adds liquid cooling to research computing rooms in Lawrence and Manhattan, starting with a survey of floor loading, campus chilled water capacity and power. Rear door heat exchangers on campus chilled water often come first, with CDUs and direct-to-chip racks following as clusters are refreshed. Work is scheduled around the academic calendar.

Who builds dry cooler plants for liquid-cooled halls in Wichita and western Kansas?

Paul Industries builds dry cooler plants for liquid-cooled halls in Wichita, Hutchinson, Salina, Garden City, Dodge City and Liberal. Western and central Kansas sites get long dry cooler seasons, then need adiabatic assist or a trim chiller for the 10 to 16 days a year that reach 100 degrees, and glycol protection for well over 100 freezing nights.

What glycol concentration does a Kansas dry cooler loop need?

A Kansas dry cooler loop needs a glycol concentration whose freeze point sits safely below the site’s design low, which in western Kansas means planning for nights below zero; Goodland averages more than five a year. Propylene glycol is common where incidental contact matters, ethylene where heat transfer matters more. Paul Industries checks strength at fill and before every winter.

Should glycol go into the rack-side loop of a Kansas liquid cooling system?

Glycol belongs in the outdoor facility loop, while the indoor rack-side loop usually runs treated water or the coolant the server maker specifies, because glycol lowers heat transfer and raises pumping power. A heat exchanger in the CDU or at the plant keeps the two fluids apart, so Kansas winter weather never reaches the cold plates.

Can a Kansas dry cooler run liquid-cooled racks without chillers?

A Kansas dry cooler can carry liquid-cooled racks without chillers whenever outdoor air sits a few degrees below the facility water setpoint, and with W32 or W40 class water that covers most hours of the year. The hottest afternoons, up to 16 days a year at Salina, need adiabatic pads, a tower or a trim chiller to hold supply temperature.

How does SPP conditional service affect a liquid-cooled hall in Kansas?

The Southwest Power Pool’s Conditional High Impact Large Load service connects a large load faster in exchange for potential curtailment during system stress. A liquid-cooled hall on that service needs CDU pumps on uninterruptible power and enough thermal buffer to keep coolant moving through any transfer to on-site generation, since cold plates hold heat only for seconds.

Do CDU pumps need uninterruptible power in a Kansas hall?

CDU pumps in a Kansas hall should sit on uninterruptible power, because direct-to-chip racks have almost no thermal mass and throttle quickly when flow stops. Facility water pumps and dry cooler fans can follow on generator power if buffer volume or thermal storage covers the gap. Paul Industries tests the restart order during commissioning.

Can the existing chilled water plant feed liquid cooling in an older Kansas hall?

An existing chilled water plant can usually feed a first phase of liquid cooling through CDUs, since liquid-to-liquid units accept cold water as readily as warm. As liquid load grows, a separate warm-water loop with dry coolers saves chiller energy. Paul Industries checks the plant’s spare capacity, pump head and redundancy before connecting new load.

Why can't Kansas tap water go straight into a technology cooling loop?

Many Kansas water supplies are hard and mineral-rich, and those minerals scale the fine channels of cold plates and foul CDU heat exchangers. Server makers set limits on conductivity, particles and microbiological growth, so fill water is deionized or replaced with a premixed coolant, filtered on the way in, and sampled before servers connect.

Are CDUs covered by the Kansas data center sales tax exemption?

The Kansas statute defines data center equipment as all equipment necessary to cool and maintain a controlled environment for the servers, with a list of examples that is expressly not exhaustive, and it covers labor to install and service that equipment for a qualified firm. CDUs, manifolds and dry coolers fit that description; the owner’s agreement and project exemption certificate govern each project.

How heavy are liquid-cooled racks for an older Kansas raised floor?

Liquid-cooled racks with dense accelerators, coolant and manifolds often weigh well beyond what older raised floors were rated for, so the floor rating is checked before hardware is ordered. Options include slab-on-grade rows, reinforced pedestals and stringers, or spreading load with platforms. Paul Industries includes the floor check in the survey that opens every retrofit.

What leak protection goes into a Kansas liquid cooling retrofit?

A Kansas liquid cooling retrofit gets leak protection at several levels: sensing cable under manifolds and along pipe runs, drip trays under overhead piping, CDUs that detect pressure loss and isolate, dry-break quick disconnects at the racks, and alarms tied into the building management system. Each detector is tested during commissioning and listed in the turnover file.

Is rear door cooling a good first step for a Kansas data hall?

Rear door heat exchangers are a practical first step for a Kansas hall that has chilled water but racks too dense for its air system, since they remove rack exhaust heat at the source without changing the servers. They add piping to each rack and need water above the room dew point. Direct-to-chip cooling follows when new hardware calls for it.

How long does a liquid cooling refit take in a Kansas hall that stays live?

A liquid cooling refit in a live Kansas hall is planned in phases, each row or pod built, tested and turned over before the next starts, so the length depends on rack count, the amount of hot work and the hall’s change windows. Paul Industries prefabricates manifolds and pipe spools off site to cut work inside the room, and confirms the schedule after the survey.

Can a Kansas owner buy CDUs and manifolds from Paul Industries without installation?

Paul Industries supplies CDUs, prefabricated manifolds, headers and dry cooler packages to Kansas owners as supply-only orders, documented with drawings, pressure test records and startup instructions. The same equipment is also available under design-build or complete installation contracts that include commissioning and service.

What details start a Kansas liquid cooling estimate?

Send the number of liquid-cooled racks and their density, the server maker’s coolant and temperature limits, the room layout and floor rating, the existing chilled water plant data, the available power, and the site location. Paul Industries returns a concept with CDU and heat rejection choices and a budget range. Call 201-450-8280 or request a quote.

Bringing liquid cooling into a Kansas hall?

Send the rack count and density, the server maker’s coolant limits and the room and plant details. Call 201-450-8280 or request a quote.