Paul Industries designs, supplies, installs and services data center cooling in Nebraska, building chilled water plants, economizers, cooling towers, dry coolers and the piping that joins them for halls in Omaha, Papillion, Lincoln and across the state. Nebraska gives a cooling designer two climates in one state, a humid east and a dry, high west, along with winters that freeze outdoor equipment for months and a water system managed by natural resources districts. Paul Industries takes each plant from design through startup and keeps it running after turnover.
Request a quote or call 201-450-8280
What shapes data center cooling in Nebraska?
Data center cooling in Nebraska is shaped by four conditions: a humid summer in the eastern third of the state, a long cold season that suits free cooling, water supplies that are allocated and permitted differently from one natural resources district to the next, and a power system in which every customer is served by public power. Each one changes a design choice. Humidity sets how far evaporative cooling can be pushed in July; winter sets the share of the year the chillers can rest; water rules decide whether the heat rejection plant evaporates water or rejects heat dry; and the electric rate sets how hard the owner should chase each fraction of a kilowatt per ton.
The general method, the equipment types and the design temperatures are covered on the data center cooling systems page. This page stays with what is particular to Nebraska: its weather station by station, its water governance, the campuses already operating around Omaha, and the choices those facts push an owner toward.
How do data center cooling systems work in a Nebraska hall?
Data center cooling systems in a Nebraska hall work by moving server heat into air or liquid at the rack, carrying it to a chiller or heat exchanger, and rejecting it outdoors through cooling towers, dry coolers or air-cooled condensers. Inside the hall, computer room air handlers or fan walls push cool air through cold aisles and pull hot exhaust back to their coils; in denser rows, cold plates or rear-door coils take heat straight into water. The chilled water then returns to a central plant where chillers lift the heat to a temperature the outdoor equipment can shed.
The answer to how are data centers kept cool through a Nebraska year is that the plant changes modes with the season. In July the chillers carry most of the load. In spring and autumn a water-side economizer, a plate heat exchanger between the condenser water and the chilled water, shares it. Through much of the winter the economizer or a dry cooler carries the whole load with the compressors idle. A Nebraska plant is designed around those transitions as much as around the peak.
Two climates: the humid east and the dry west
Nebraska’s climate splits between a humid east and a dry, higher west, and the split matters more to cooling design than the summer highs do. Omaha, Lincoln and Scottsbluff all reach the high 80s or low 90s on a normal July afternoon, but the moisture in the air differs widely. NOAA’s 1991 to 2020 hourly normals put the average July dew point at 65.9 degrees Fahrenheit at Omaha’s Eppley Airfield and 55.2 degrees at Scottsbluff, and that ten-degree gap is the difference between a cooling tower working near its limit and one with margin to spare.
| Station | July mean dew point | Normal hours at or below 50 F | Normal hours at or below 40 F | Design meaning |
|---|---|---|---|---|
| Omaha (Eppley Airfield) | 65.9 F | About 4,090 | About 2,990 | Humid summers limit evaporative approach; long winter economizer season |
| Lincoln | 65.1 F | About 4,090 | About 2,960 | Similar to Omaha; hotter afternoons on average |
| Grand Island | 64.4 F | About 4,250 | About 3,100 | Transition zone; slightly more cool hours than the metro areas |
| North Platte | 61.5 F | About 4,510 | About 3,320 | Drier air widens tower margin; colder nights add freeze risk |
| Scottsbluff | 55.2 F | About 4,660 | About 3,370 | Dry air favors evaporative and adiabatic cooling; the longest cool season |
The hour counts come from NOAA’s normal hourly temperatures, which smooth out day-to-day swings, so they indicate the size of the economizer season rather than replace an hourly bin analysis on real weather years. Paul Industries runs that bin analysis for the site in question before fixing chilled water temperatures, economizer changeover points and tower approach.
What the east-west split does to equipment choice
In the Omaha and Lincoln areas, an evaporative plant designed for a muggy July afternoon carries a few degrees of tower approach and a chiller sized for real lift. Toward North Platte and Scottsbluff, the same evaporative plant gains margin, and adiabatic dry coolers, which wet their air stream on the hottest hours, become a strong option because the dry air cools well by evaporation. A western site also spends more of its year below freezing, so the freeze protection has to be better, not lighter.
Data center cooling needs in Nebraska’s winter
Data center cooling needs in Nebraska’s winter come down to keeping heat rejection working while outdoor equipment sits in subfreezing air for weeks at a time. NOAA’s normals count about 135 nights a year at Omaha with a low of 32 degrees or colder and about 174 at Scottsbluff, plus roughly nine to twelve nights a year at or below zero across the stations listed above. A data hall makes heat on every one of those nights, so the cooling plant never shuts down for the season.
Winter design in Nebraska covers four things. Cooling tower basins, risers and spray headers need heaters, drain-down paths or indoor sumps so that a tower carrying a light load does not ice over. Dry coolers and any outdoor coils need a glycol strength matched to the site’s coldest hours, with the pumping penalty of glycol accounted for in the plant design. Economizer heat exchangers need controls that stage between partial and full free cooling without short-cycling chillers. And outdoor piping needs heat tracing and insulation sized for wind as well as temperature, because exposed headers on an open plain lose heat quickly.
Data center water usage in Nebraska and the heat rejection choice
Data center water usage in Nebraska depends on whether the plant rejects heat by evaporation or by dry exchange, and the water rules a site falls under can settle that choice early. The state Department of Water, Energy, and Environment (DWEE) explains in its data center guidance that groundwater is managed by Nebraska’s 23 natural resources districts, while DWEE administers surface water appropriations and the well registration system. The same guidance notes that the data centers operating in Nebraska so far receive their water from public water utilities.
For an owner, that produces three paths. A site on a municipal system follows the utility’s connection and capacity terms, and the utility judges whether its mains, storage and treatment can carry the new demand. A site drilling its own wells answers to the district’s rules, which in many districts include a large water user permit and metering. A site drawing from a river needs a surface water appropriation from DWEE, and some basins are designated fully appropriated or overappropriated. County and city rules add another layer: DWEE cites Lincoln County zoning that requires a closed loop or recycled water system for data centers, and a Kearney ordinance that requires a water and wastewater feasibility study before approval.
| Heat rejection | Water | Power and efficiency | Winter in Nebraska | Where it fits |
|---|---|---|---|---|
| Open cooling towers with water-cooled chillers | Evaporation, drift and blowdown; more withdrawal than the dry options | Lowest compressor lift on hot days | Basin heat, drain-down and fan control needed | Sites with confirmed water supply and sewer capacity |
| Closed-circuit fluid coolers | Evaporation on the outer surface; process loop stays sealed | Close to open towers | Glycol or drain protection for the coil | Plants wanting a clean, sealed loop with evaporative performance |
| Adiabatic dry coolers | Water on the hottest hours, dry the rest of the year | Higher fan energy; trimmed lift in summer | Run dry and drained through the cold months | Western Nebraska and sites with water conditions |
| Dry coolers with air-cooled or water-cooled chillers | Little to none after fill | Higher summer lift; strong winter free cooling | Glycol strength set for the coldest hours | Closed loop requirements and water-limited sites |
| Air-cooled chillers with integral free cooling | None in operation | Highest summer energy; good winter savings | Freeze protection on the evaporator and outdoor piping | Smaller halls, edge sites and phased starts |
Blowdown and the sewer connection
Cooling tower blowdown is the stream that ties evaporative cooling to the wastewater system. DWEE’s guidance describes the usual route as discharge to the sanitary sewer under the wastewater utility’s capacity, discharge limit and pretreatment terms, with an NPDES permit from DWEE needed only where the water goes straight to a river or stream. Paul Industries designs the blowdown, sampling and metering points so the plant can show the utility what it sends, and sizes the side-stream filtration and chemical feed that set how many cycles of concentration the tower can run. The treatment program itself is laid out on cooling tower water treatment.
Planning a data center: Omaha, NE and the Sarpy County campuses
The Omaha metro, with Papillion and Sarpy County to its south, holds several of the large data center campuses operating in Nebraska, and each new data center Omaha adds sits in the humid eastern climate described above. As market facts, Google reports that it built its Papillion data center in 2019 and its Omaha data center in 2022, and announced a Lincoln development in 2023; Meta reports that it broke ground on its Sarpy data center in Papillion in 2017 and announced an expansion of nearly 1 million square feet in 2021. For a data center Papillion or Omaha owners are planning beside campuses of that size, cooling design starts with three questions: what the utility can deliver and when, what water the site can count on, and what the city or county will ask for in sound and appearance.
Sound limits beside a data center: Papillion, La Vista and Kearney
Sound has become a design input in its own right. DWEE’s guidance points to Kearney’s data center rules, which set limits for noise, vibration and low-frequency and tonal sound at the property line. Fan walls, cooling tower fans and dry cooler banks are the loudest outdoor equipment on a data center site, so selections with larger, slower fans, acoustic louvers and screening walls are often cheaper than redesigning a yard after a complaint. Paul Industries models the outdoor equipment layout with sound in mind from the first plant layout.
Choosing chilled water temperatures for a Nebraska plant
Chilled water temperatures for a Nebraska plant should be set as warm as the IT equipment and the air handlers allow, because every degree added to the supply water widens the economizer season in a state with thousands of cool hours a year. ASHRAE’s thermal guidelines recommend server inlet air between 64.4 and 80.6 degrees Fahrenheit, and a hall designed toward the upper part of that band can run chilled water in the mid 60s rather than the low 40s that older office plants used.
In the Omaha area, a plant supplying water near 65 degrees with a water-side economizer can carry the full load on free cooling for a large part of the winter and share load with the chillers through spring and autumn. In the west, the drier summer air and the colder winters stretch both of those periods further. The price of a warm design is coil selection: air handlers need deeper coils or more airflow to hold room conditions on warm water, and liquid cooling loops need their own temperature plan, which is covered on data center liquid cooling in Nebraska.
| Season | Typical mode | What the plant must handle |
|---|---|---|
| December to February | Full free cooling through the plate exchanger; chillers on standby | Tower freeze control at light load; glycol and heat tracing on outdoor piping |
| March to May | Partial free cooling with chillers trimming | Smooth changeover without chiller short-cycling; spring storms and humidity swings |
| June to August | Mechanical cooling; economizer off on most afternoons | Condenser water temperature on humid days; tower capacity and approach |
| September to November | Partial free cooling returning; chillers stepping down | Restaging plant sequences; first freeze protection checks before cold nights |
Power price and the cooling overhead
Power price shapes how much an owner should spend to cut cooling energy, and Nebraska’s prices sit below the national average for business customers. The U.S. Energy Information Administration reports 2025 average prices in Nebraska of 8.50 cents per kilowatt-hour for commercial customers and 8.05 cents for industrial customers, against national averages of 13.37 and 8.51 cents. Every home and business in the state is served by a public power district, a municipal utility or a cooperative, so the rate that applies to a data center is set by that utility’s board and its large-load terms.
The arithmetic is simple even at those prices. One megawatt of cooling plant power running all year uses 8,760 megawatt-hours, which costs about $705,000 at the 2025 industrial average. A design change that trims a tenth of that, through warmer water, a longer economizer season or lower pumping head, returns tens of thousands of dollars a year per megawatt of plant. ASHRAE 90.4 and the 2018 International Energy Conservation Code, which Nebraska has adopted as its energy code, set the minimum efficiency; the owner’s rate and the site’s cool hours set how far past that minimum the plant is worth taking.
Heat rejection equipment and the plant layout
Heat rejection equipment on a Nebraska campus should be laid out for winter access, snow drifting and prevailing wind as well as for summer airflow. Towers and dry coolers set in rows need space for air to enter without recirculating discharge from the neighboring cell, which matters most on still, humid summer afternoons in the east. In winter, the same rows collect drifting snow, so equipment pads are raised, access walkways are kept clear and the piping that feeds the yard is routed so that a frozen section can be isolated without losing the rest.
The chillers themselves sit indoors in most Nebraska plants, which protects them from the cold and puts the refrigerant machinery under the room ventilation, detection and emergency controls of ASHRAE 15. Pumps, plate exchangers and water treatment usually share the plant room. Paul Industries sets the chillers, towers and dry coolers, pipes the plant and its headers to ASME B31.9, and brings the plant through its startup and testing. Details of the equipment itself are on data center chillers and data center cooling towers.
Adding cooling to an operating Nebraska hall
Adding cooling to an operating Nebraska hall means tying new chillers, towers or liquid cooling loops into a plant that is already carrying load, which is planned around the season as much as around redundancy. A tie-in scheduled for January in Omaha can take advantage of a plant running on free cooling, with chillers available as backup, while the same tie-in in July has to be made with every chiller needed. Paul Industries plans each tie-in with a written method of procedure, confirms the redundant path before isolating anything, uses line stops or hot taps where a header cannot be drained, and flushes and tests the new piping before it opens to the live loop.
The test and acceptance steps for those changes are covered on data center commissioning in Nebraska, and the full mechanical scope of a new building or campus phase is on data center mechanical contractor in Nebraska.
What does data center cooling cost in Nebraska?
The cost of data center cooling in Nebraska depends on the heat load in megawatts, the redundancy level, the heat rejection method the site’s water allows, the chilled water temperature, the share of liquid cooling, the winter protection the site needs, and the schedule. Dry heat rejection costs more in equipment and fan power but avoids water and sewer charges; evaporative heat rejection costs less in equipment but brings water treatment and blowdown. Freeze protection in the west and sound control near homes both add to the yard.
Operating cost follows the electric rate and the hours of free cooling. Paul Industries prices a plant from the load profile, the redundancy target, the site’s water source and the rate the utility will charge, and gives a budget range from comparable scope before a firm price once the design is set. Supply-only equipment packages, design-build plants and complete installation are all offered.
Who installs data center cooling in Nebraska?
Paul Industries installs data center cooling in Nebraska, taking chiller plants, economizers, cooling towers, dry coolers, chilled water and condenser water piping, and liquid cooling loops from design through startup for halls in Omaha, Papillion, La Vista, Lincoln, Kearney, Grand Island, Norfolk, North Platte and Scottsbluff. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes work across Nebraska and in all 50 states. Its Virginia data center cooling page, data center cooling in Virginia, covers the home state, and the Illinois work is on data center cooling in Illinois.
Among data center cooling contractors, the point that matters to an owner is accountability under one contract: the same team that designs the plant sets the equipment, welds and tests the piping, starts it up and keeps it running, so a fault traced from a rack to a tower stays with one responsible party. As a data center cooling company that also builds process plants, Paul Industries brings the same pipe fabrication and testing practice to a hall as to a pharmaceutical plant. Paul Industries also provides data center cooling service after turnover, with seasonal changeover checks, tower and dry cooler maintenance, water treatment reviews and chiller repair in Nebraska.
Data center cooling from Paul Industries across Nebraska
Paul Industries designs, supplies, installs, starts up and maintains data center cooling plants in Nebraska, from a single chiller added to an enterprise room to a campus central plant. To price a project, send the IT load and its phasing, the redundancy target, the site location, the water source and any county or city conditions, the utility serving the site and the preferred heat rejection method. Call 201-450-8280 or request a quote. The Nebraska page lists the process, water and piping work Paul Industries delivers in the state, and the wider region is on the Midwest page.
Standards referenced: ASHRAE TC 9.9 thermal guidelines for data processing environments · ASHRAE 90.4 · 2018 International Energy Conservation Code (Nebraska energy code) · Nebraska State Building Code (2018 IBC) · ASME B31.9 · ASHRAE 15 · Title 129, Nebraska Air Quality Regulations
Frequently asked questions
Who builds cooling plants for an Omaha, Nebraska data center?
Paul Industries builds cooling plants for an Omaha, Nebraska data center, from the chillers and towers to the economizer, pumps and the chilled water mains that feed the halls. Plants in the Omaha metro face a humid July, with a mean dew point near 66 degrees at Eppley Airfield, and long cold winters, so the design balances evaporative capacity in summer with free cooling and freeze protection the rest of the year. Send the load and site details to start the design.
Does Paul Industries handle data center cooling in Lincoln and Lancaster County?
Yes. Paul Industries designs and installs cooling for data centers and enterprise computer rooms in Lincoln and Lancaster County, including chiller plants, dry coolers, cooling towers and liquid cooling loops. Lincoln’s normals are close to Omaha’s in humidity, with more hot afternoons, so tower approach and chiller lift are sized for July while the economizer is set up to carry the winter. Paul Industries also services existing plants there after turnover.
What cooling suits a data center in Kearney, North Platte or Scottsbluff?
Drier air west of Grand Island favors evaporative and adiabatic heat rejection, because the July dew point falls to about 61 degrees at North Platte and 55 degrees at Scottsbluff. The same sites see more nights below freezing, so glycol strength, drain-down paths and heat tracing need more attention. Kearney’s ordinance also sets sound limits and a water and wastewater feasibility study, which shape the yard layout. Paul Industries designs to those conditions.
How much water does a Nebraska data center cooling plant use?
Water use depends almost entirely on the heat rejection method. A plant with open cooling towers evaporates water in proportion to the heat it rejects, plus drift and blowdown, while a dry cooler plant uses little beyond its first fill. Withdrawal and consumption also differ, because blowdown returns to the sewer. Paul Industries estimates evaporation, blowdown and makeup from the load profile and the site weather so the water utility or district can judge the demand.
Does a Nebraska data center need a groundwater permit for its cooling towers?
The answer depends on the source. A site supplied by a municipal water system follows the utility’s terms rather than holding its own permit. A site drilling wells answers to its natural resources district, and many districts require a large water user permit, metering and reporting. A site drawing from a river needs a surface water appropriation from DWEE. Paul Industries sizes the plant’s makeup demand so the permit or service application states accurate figures.
How are data centers kept cool through a Nebraska winter?
Most Nebraska plants can carry their full load on free cooling for much of the winter when the chilled water supply is set in the mid 60s or warmer. NOAA’s hourly normals show roughly 4,000 to 4,700 hours a year at or below 50 degrees across the state’s main stations. Chillers stay available for warm spells and maintenance, and the changeover controls are tuned so the plant moves between modes without cycling compressors on and off.
How cold does glycol need to be rated for a dry cooler in Nebraska?
Glycol strength is set from the coldest hours the site can expect, with margin, rather than from monthly averages. NOAA’s normals show nine to twelve nights a year at or below zero across Omaha, Lincoln, Grand Island, North Platte and Scottsbluff, and colder extremes occur. Paul Industries selects concentration against the site’s design low and the burst protection needed, then accounts for the higher pumping power and lower heat transfer that stronger glycol brings.
Why does humidity in eastern Nebraska matter for a cooling tower?
A cooling tower cools water toward the outdoor wet bulb temperature, and the wet bulb rises with humidity. On a humid Omaha afternoon the condenser water returns warmer, so the chillers work against a higher lift and use more power. Sizing the tower for a realistic approach at the site’s design wet bulb, rather than a dry-climate figure, keeps the chillers efficient on the days when the hall is most heavily loaded.
Which data center cooling service tasks prepare a Nebraska plant for winter?
Autumn work includes testing basin heaters and heat tracing, confirming glycol concentration in dry coolers and outdoor loops, checking economizer valves and changeover sequences, cleaning plate exchangers and inspecting tower fill and drift eliminators. Paul Industries also reviews the freeze protection alarms and the response steps for a lost heater circuit, so a cold snap finds the plant ready rather than mid-repair.
Do county or city rules affect a cooling plant design in Nebraska?
Yes. Zoning and conditional use permits are set by counties and cities, and some now address data centers directly. DWEE’s guidance cites Lincoln County zoning that requires a closed loop or recycled water system and Kearney’s rules on sound and water feasibility. Those conditions can decide between towers and dry coolers or set fan and screening choices, so Paul Industries reviews them before the plant layout is fixed.
Does Nebraska's energy code apply to a data center cooling plant?
Nebraska has adopted the 2018 International Energy Conservation Code as its energy code, and its commercial provisions cover cooling equipment efficiency, economizers, pumping and controls in buildings including data centers, with ASHRAE 90.4 used where the code path allows it. Cities that enforce their own codes adopt the same or a newer edition. Paul Industries documents equipment efficiencies and control sequences so the plant passes plan review and inspection.
What does it cost to run cooling for a Nebraska data center?
Running cost is the cooling plant’s power multiplied by the hours and the rate. At the 2025 Nebraska industrial average of 8.05 cents per kilowatt-hour reported by EIA, one megawatt of continuous cooling plant load costs about $705,000 a year. Water, sewer, chemicals and maintenance add to that for evaporative plants. Paul Industries estimates annual operating cost from the site’s load profile, weather hours and utility tariff before the design is fixed.
Can an older chilled water plant in an Omaha building be converted for a data hall?
Often it can. Older plants built for offices usually run chilled water in the low 40s and have no economizer, so a conversion raises the supply temperature, adds a plate exchanger for free cooling, replaces controls and checks pump and pipe capacity for the denser load. Paul Industries surveys the existing chillers, towers and piping, then sets out what can be reused and what needs replacing to carry the new hall reliably.
Is an adiabatic dry cooler a good fit for a western Nebraska data center?
Western Nebraska’s dry summers suit adiabatic dry coolers well, because wetting the incoming air on the hottest hours cools it close to the low wet bulb and trims chiller lift, while the coolers run dry for most of the year. Water use is a fraction of an open tower’s, which helps where a district or county limits consumption. The coil still needs glycol or drain-down protection for the cold months, which Paul Industries designs into the system.
How is cooling tower noise kept within a Nebraska property-line limit?
Noise is controlled at the source and on the path. Larger, slower fans and low-noise fan blades reduce sound power at the tower or cooler, variable speed drives keep fans slow at part load, and acoustic louvers, barriers and equipment spacing reduce what reaches the boundary. Paul Industries checks predicted levels against the applicable ordinance during layout, because changing equipment after it is set costs far more than choosing it correctly.
Can Paul Industries supply cooling equipment for a Nebraska data center without installing it?
Yes. Paul Industries supplies chillers, cooling towers, dry coolers, pumps, plate exchangers and prefabricated pump and piping skids on a supply-only basis for Nebraska projects, with submittals and factory test records. The same equipment is also offered as part of a design-build plant or a complete installation that runs through startup and testing, so owners choose the route that fits their contract structure.
What should a Nebraska data center send to get a cooling plant priced?
Send the IT load by phase, the redundancy target, the preferred or required heat rejection method, the site location, the water source and any district, county or city conditions, the serving utility, the planned chilled water temperatures and the schedule. For an existing building, add the current plant equipment list and drawings. Paul Industries uses that information to prepare a budget range and then a firm price once the design is defined.
Planning a cooling plant for a Nebraska data hall?
Send the IT load by phase, the redundancy target, the site, the water source and the serving utility. Call 201-450-8280 or request a quote.