Paul Industries designs, supplies and installs data center liquid cooling in Nevada, from coolant distribution units and cold plate loops in Las Vegas and Henderson halls to warm-water dry cooler plants in Reno, Sparks and the Tahoe-Reno Industrial Center. Liquid cooling changes the Nevada cooling problem more than it does in a mild climate: a loop that accepts warm facility water can reject its heat to dry desert air for most of the year, which matters in a valley where new buildings cannot be served with cooling towers. Paul Industries delivers the piping, equipment, controls and testing as supply, design-build or complete installation.
Request a quote or call 201-450-8280
Why does liquid cooling suit Nevada’s climate?
Liquid cooling suits Nevada’s climate because cold plate and rear-door systems can run on facility water far warmer than a chilled water plant supplies to air handlers, and warm water can be cooled by dry coolers on all but the hottest Nevada afternoons without evaporating a drop. That pairing answers both of the state’s main constraints at once: summer heat that punishes compressors and, in the Las Vegas Valley, water rules that keep towers off new commercial buildings.
The general workings of coolant distribution units, cold plates, manifolds and the technology cooling loop are explained on the data center liquid cooling page, and the Nevada air and chilled water plants are covered on the data center cooling in Nevada page. This page deals with what Nevada adds to a liquid cooling job: the facility water temperature that makes a dry plant work in each region, freeze protection in the north, fill water in the south, and phasing dense racks into halls that are already running.
Which facility water temperature works in Reno and in Las Vegas?
The facility water temperature that works in Nevada depends on how far above the outdoor dry bulb a dry cooler can deliver water, because a dry cooler can never make water cooler than the air passing over it. With a typical approach of several degrees, supply water near 32 C (89.6 F), the upper limit of the ASHRAE W32 class, is reachable without compressors whenever the outdoor air sits in the low 80s F or below, while W40 water at up to 40 C (104 F) and W45 water at up to 45 C (113 F) stretch that limit into the 90s and low 100s.
| Facility water class | Upper supply limit | Reno (July normal high 93.9 F) | Las Vegas (July normal high 104.5 F) |
|---|---|---|---|
| W17 | 17 C (62.6 F) | Chillers needed most of the year; economizer in winter | Chillers needed most of the year |
| W27 | 27 C (80.6 F) | Dry coolers carry nights and cool seasons; trim chillers on summer days | Trim chillers through most summer days and many nights |
| W32 | 32 C (89.6 F) | Dry coolers carry most hours; trim on hot afternoons | Dry coolers through winter and shoulder months; trim cooling in summer |
| W40 | 40 C (104 F) | Dry coolers carry nearly all hours | Dry coolers carry most hours; trim on afternoons above about 95 F |
| W45 | 45 C (113 F) | Dry coolers carry all normal hours | Dry coolers carry most hours; trim on extreme days such as the 120 F afternoon of July 7, 2024 |
The class is set by the IT equipment, so the first step on any Nevada project is the server vendor’s published facility water limits and the flow per rack at those limits. Paul Industries then selects dry coolers and any trim chiller at the site’s hot-day ambient, not at the catalogue rating, and sizes pumps for the flow the cold plates need when the water is at its warmest.
Data center liquid cooling: Las Vegas, Henderson and North Las Vegas
Data center liquid cooling Las Vegas projects ask for is shaped by the long hot season. NOAA’s daily record shows the Las Vegas airport at or above 110 F on 36 days in 2024, and a facility water loop that is fully dry at 95 F needs a trim stage for those afternoons. The trim is usually a small air-cooled chiller or a refrigerant-based heat exchanger in series with the dry coolers, sized for the share of the load the dry coolers cannot carry at peak, and it sits idle for most of the year.
The water rules close off the familiar alternative. The Las Vegas Valley Water District’s service rules count cooling towers and other evaporative equipment as evaporative cooling and limit service to developments that met permit and occupancy dates between 2023 and 2026. A new liquid-cooled hall in the district’s area is therefore designed around dry heat rejection from the start, and the warmer the facility water, the smaller the trim plant.
Data center liquid cooling: Reno, Sparks and Storey County
Data center liquid cooling Reno owners plan has the opposite emphasis. Reno’s July normal high is 93.9 F and its July nights fall to about 60 F, so W32 and warmer loops reject their heat to dry coolers for nearly every hour of the year. The risk moves to winter: the airport’s normal January low is 26.1 F and its recorded low is -16 F, so outdoor coils and piping must survive a deep cold snap with the IT load running and, worse, with a dry cooler idle and full of water.
Switch advertises cabinet densities of up to 2 MW at its Tahoe Reno campus, which shows where rack loads in northern Nevada are heading. At those densities the facility water loop is the cooling plant, and Paul Industries designs it with the redundancy and freeze protection of a primary utility.
Data center liquid cooling design for desert heat rejection
Data center liquid cooling design in Nevada starts at the dry cooler yard and works inward, because the outdoor equipment sets the warmest water the loop can count on, and everything inside the hall, from coolant distribution unit selection to cold plate flow, has to work at that temperature on the hottest day.
- Dry cooler selection: coil rows, fin spacing and fan speed chosen for the ambient, with fin spacing that tolerates desert dust and cleaning.
- Trim cooling: sized for the gap between dry cooler capacity and load at the hot-day ambient, and controlled so it runs only when needed.
- Coolant distribution units: selected for the approach between facility water and technology cooling water, so the rack-side supply stays inside the server’s limits.
- Pumps and piping: sized for full flow at the warmest water, with variable speed control for the many hours when the loop has spare capacity.
- Controls: sequences that stage fans, open trim cooling and reset setpoints against outdoor conditions and rack return temperatures.
Yard layout matters as much as selection. Rows of dry coolers on a hot roof draw in each other’s discharge air, raising the entering temperature above the weather report; Paul Industries lays out spacing, height and discharge direction to keep each unit breathing outdoor air, and checks the layout again whenever a later phase adds units.
Freeze protection for liquid loops in northern Nevada
Freeze protection for liquid cooling loops in northern Nevada covers the outdoor side of the facility water system, because the technology cooling loop inside the hall stays warm while servers run. Dry coolers, roof piping and any loop that can stagnate during maintenance are exposed to Reno-area winters with lows well below freezing.
Three methods are used, often together. Propylene glycol in the facility water loop protects coils at a concentration set against the record low, at the cost of some heat transfer and pumping power. A glycol-filled outdoor loop separated from a water loop by a plate heat exchanger keeps glycol out of the hall’s coolant distribution units. Controls hold minimum flow through every outdoor coil and close dampers or stop fans on cold nights. Paul Industries specifies the method with the owner, installs drain and isolation valves so a single coil can be serviced in winter, and tests the freeze sequences before the first cold season.
Fill water and coolant chemistry in the Las Vegas Valley
Fill water for a liquid cooling loop in the Las Vegas Valley needs treatment before it goes into the system, because the district’s 2026 water quality summary reports total hardness of 280 ppm, total dissolved solids of 591 ppm, chloride near 99 ppm and a chlorine residual close to 1 ppm. Water like that scales heat transfer surfaces, raises corrosion risk on copper cold plates and feeds microbial growth once the disinfectant is consumed.
Technology cooling loops are filled with the coolant the server or coolant distribution unit manufacturer specifies, commonly a propylene glycol blend such as PG25 made with deionized water and inhibitors, or deionized water with inhibitors and biocide. Facility water loops in the valley are filled with softened or deionized water and treated with an inhibitor program. Paul Industries flushes new piping, fills from treated water, samples the loop before IT connection and hands the operator a baseline analysis to trend against.
| Loop | Typical fluid | Nevada concern | What is checked at handover |
|---|---|---|---|
| Technology cooling loop (rack side) | Manufacturer-specified PG25 or inhibited deionized water | Hard, high-solids tap water in the south must stay out | Conductivity, pH, inhibitor level, glycol strength, particle count and bacteria |
| Facility water loop to dry coolers | Glycol solution in the north; treated water or glycol in the south | Freeze risk in Reno winters; scaling and corrosion in Las Vegas | Freeze point, inhibitor level, hardness and iron |
| Trim chiller loop, where used | Treated water or glycol | Runs only on hot days, so it can stagnate | Flow verification and stagnation flushing plan |
Adding liquid-cooled racks to a running Nevada hall
Adding liquid-cooled racks to a running Nevada hall means bringing a facility water source to the white space without disturbing the racks already there, and the source depends on the building. A Henderson or Las Vegas hall with an air-cooled chiller plant can feed coolant distribution units from its chilled water, warmed through a mixing or heat exchange arrangement; a northern hall can tap a dry cooler economizer loop; and many owners add a dedicated warm-water loop with its own dry coolers so the dense racks never compete with the air side.
Paul Industries surveys the hall, the roof or yard and the electrical capacity, then builds the new loop in stages: outdoor equipment and mains first, branch headers with isolation valves next, and rack connections last, each step pressure tested and flushed before it is opened to the live system. Work near operating racks follows the operator’s method of procedure, with drip protection, leak detection along new runs, and hot work avoided inside the white space by using prefabricated, pre-tested spools.
A liquid cooled data center also changes how the hall is commissioned and maintained, and those steps are covered on the data center commissioning in Nevada page.
Planning liquid cooling capacity for later phases on a Nevada campus
Liquid cooling capacity on a Nevada campus is easiest to add when the first phase is built with the later phases in mind, because facility water mains, dry cooler pads and electrical feeders are far cheaper to oversize once than to replace while racks run. Campuses in Storey County and the Las Vegas Valley are commonly built hall by hall over several years, and rack densities tend to climb between the first and last hall.
Paul Industries sizes mains and headers for the planned final flow, installs isolation valves and capped connections at each future branch point, and keeps those stubs short and drainable so they do not hold stagnant water that later seeds bacteria into the live loop. Dry cooler yards are laid out with pads, piping and spacing for the full build, so later units do not crowd the first ones and push up the entering air temperature on a hot afternoon. Controls are written with room for added coolant distribution units and dry coolers, and the first phase is commissioned in a way that leaves the test records needed to prove each extension. When the next hall arrives, its loop is fabricated off site, pressure tested and flushed before it is tied in during a planned window.
Codes and permits for liquid cooling piping in Nevada
Liquid cooling piping in Nevada is permitted under the mechanical code adopted by the county or city that issues the building permit, so the code basis changes with the address. Clark County applies the 2024 Uniform Mechanical Code with Southern Nevada amendments to new permit applications from January 11, 2026, which covers Las Vegas-area hydronic piping in the county’s jurisdiction, while Washoe County adopted the 2024 International Mechanical Code among its 2024 codes effective July 1, 2025, with the 2024 editions required for all submittals from January 1, 2026.
Owners and engineers commonly specify ASME B31.9 for facility water and technology cooling piping, which sets materials, joining, examination and the hydrostatic leak test. Storey County, Carson City and other jurisdictions adopt their own editions, and a project inside an existing hall may also need the landlord’s approval for roof penetrations, structural loads from water-filled piping and work near occupied suites. Paul Industries confirms the permitting jurisdiction and edition before submittals, prepares the piping drawings and test plans, and keeps the test records the inspector and the owner will ask for.
Maintaining liquid loops through Nevada seasons
Maintaining a liquid loop in Nevada follows the seasons more than it would in a mild state, because the outdoor equipment faces summer heat and dust in the south and hard freezes in the north, while the coolant inside has to stay clean and inhibited all year. A maintenance plan that ignores the calendar finds its problems on the worst day.
| Task | When | Why it matters in Nevada |
|---|---|---|
| Dry cooler coil inspection and cleaning | Spring, before the first 100 F week, and after dust storms | Dirty fins raise approach temperature exactly when the loop is warmest |
| Glycol strength and freeze point test | Autumn, before the first hard frost in the north | Reno-area winters reach well below freezing; dilution from top-ups weakens protection |
| Coolant sampling: conductivity, pH, inhibitor, bacteria | Monthly for the first quarter, then quarterly | Early drift shows contamination before cold plates foul |
| Strainer and filter differential pressure | Monthly | Construction debris and corrosion products load filters in the first months |
| Leak sensor and isolation valve test | Quarterly | Proves the alarm path and that valves close when needed |
| Trim chiller run test | Before summer in the south | Equipment that idles all winter must start on the first hot afternoon |
Paul Industries offers this work under a service agreement, with the coolant results trended against the baseline taken at startup, and with dry cooler cleaning timed to the Las Vegas summer and glycol testing to the Reno winter.
Power savings from liquid cooling at Nevada rates
Liquid cooling saves power in two places: the fans that would otherwise move air through dense racks, and the compressors that a dry plant needs less often when the loop runs warm. The value of each kilowatt saved follows from the EIA’s 2025 figures, which put Nevada commercial electricity at 9.21 cents per kilowatt-hour against 13.37 nationally.
As a worked example, removing 50 kW of continuous fan and compressor draw saves about 438,000 kWh a year, or roughly $40,340 at the Nevada average commercial rate, before demand charges. The larger benefit in Las Vegas is often capacity rather than energy: a warm-water plant needs a smaller electrical service for cooling, which frees power for IT load on a site where the utility feed is the limit.
What sets the price of data center liquid cooling in Nevada?
The price of data center liquid cooling in Nevada is set by the number of racks and their flow, the facility water class, the amount of trim cooling the region needs, freeze protection in the north, and the difficulty of working inside a live hall. A firm figure needs the server vendor’s flow and temperature data and a survey of the space, so Paul Industries prices from those inputs rather than from a rate per rack.
- Coolant distribution units: quantity, capacity, redundancy and whether they are in-row or in a gallery.
- Piping: main and branch lengths, material, joining method and the number of rack connections.
- Dry coolers and trim cooling: sized at the site’s hot-day ambient.
- Freeze protection: glycol, heat exchangers and heat trace for northern sites.
- Fill and treatment: deionized water, coolant and the startup analysis.
- Phasing inside a live hall: night or weekend work, prefabrication and method of procedure steps.
Paul Industries gives a budget range from comparable scope once rack counts and the water class are known, and a firm price once the design is set.
Who designs and installs data center liquid cooling in Nevada?
Paul Industries designs and installs data center liquid cooling in Nevada, taking a project from loop design and equipment supply through prefabrication, installation, flushing, testing, startup and service. The company is headquartered at 256 Shore Drive in Kilmarnock, Virginia, and carries out liquid cooling projects throughout Nevada, in every other state and at plants abroad.
Owners comparing data center liquid cooling companies for a Nevada hall should ask each one which facility water class the design assumes, what ambient the dry coolers were selected at, how freeze protection is handled, and what fill water analysis will be delivered at handover. Paul Industries answers those in the proposal. The wider campus scope is on the data center mechanical contractor in Nevada page, chillers that provide trim cooling are serviced through chiller repair in Nevada, and process piping in Nevada covers the fabricated headers. For comparison, the headquarters-state page is data center liquid cooling in Virginia, and the dry-climate counterpart is data center liquid cooling in Texas.
Liquid cooling for Nevada halls from Paul Industries
Paul Industries builds liquid cooling for Nevada halls end to end: it selects and supplies coolant distribution units, dry coolers and trim chillers, fabricates and installs stainless and carbon steel loops, sets glycol and treatment programs, flushes and fills the system, and services it after the racks go live. Owners weighing immersion cooling or closed loop cooling systems get the same Nevada analysis of ambient, freeze risk and water. The state overview is on the Nevada page and the regional view on the Southwest page. To price a liquid cooling loop, send rack counts and flow, the server vendor’s water class and the site, then request a quote.
Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments (liquid cooling W classes) · ASHRAE TC 9.9 liquid cooling guidance · ASME B31.9 Building Services Piping · 2024 Uniform Mechanical Code with Southern Nevada amendments · 2024 International Mechanical Code (Washoe County) · LVVWD Service Rules (evaporative cooling)
Frequently asked questions
Who installs liquid cooling for dense racks in Las Vegas data halls?
Paul Industries installs liquid cooling for dense racks in Las Vegas, Henderson and North Las Vegas halls, including coolant distribution units, cold plate manifolds, facility water piping, dry coolers and trim chillers sized for afternoons above 115 F. Work inside operating halls follows the operator’s method of procedure, with prefabricated spools and pressure tests before each connection.
What does a Reno or Storey County hall need from a warm-water rack loop?
A northern Nevada hall needs a loop that uses the climate and survives the winter. Paul Industries builds warm-water loops for data centers in Reno, Sparks and Storey County, pairing coolant distribution units with dry coolers that carry nearly every hour of the year in the northern climate. Each design adds freeze protection for winters that have reached -16 F at the Reno airport, using glycol, heat exchangers and controls that keep outdoor coils from freezing.
Is direct to chip cooling using water practical in a desert?
Direct to chip cooling uses water in a closed loop, so it consumes almost none in operation, and in a desert that is its strength. The heat still has to leave the building, and in Nevada it can leave through dry coolers rather than evaporative towers when the facility water runs warm enough. The water that matters is the fill: treated, deionized or glycol-based, never untreated tap water.
Does a liquid-cooled hall in Las Vegas still need a chiller?
A hall supplying W32 water in Las Vegas needs some trim cooling on summer afternoons, because a dry cooler cannot deliver water below the outdoor air temperature. A W40 or W45 loop needs much less, with trim reserved for the hottest days. Air-cooled parts of the hall, such as storage and network rows, usually still rely on a chilled water or direct expansion system.
What glycol concentration do Reno liquid cooling loops use?
The concentration is chosen for the coldest temperature the outdoor equipment may see, not the January average. With the Reno airport’s record at -16 F, the propylene glycol strength for outdoor loops comes from the fluid supplier’s freeze and burst protection curves at that temperature, plus a margin. Higher strength costs heat transfer and pump power, so some designs isolate glycol outdoors with a heat exchanger.
Can Las Vegas tap water be used to fill a liquid cooling loop?
Untreated Las Vegas tap water is a poor fill for a liquid cooling loop. The district reports hardness around 280 ppm and dissolved solids near 590 ppm, enough to scale microchannel cold plates and raise corrosion risk. Technology cooling loops are filled with the manufacturer’s specified coolant, and facility loops with softened or deionized water and an inhibitor program.
How do data center liquid cooling companies differ on Nevada projects?
The differences show up in the assumptions: the facility water class, the hot-day ambient used for dry cooler selection, the freeze protection method, the joining method for piping, and the fill and flushing procedure. Paul Industries states each of those in its proposal, so an owner can see how the loop will behave on a 120 F afternoon and a -10 F night.
How long does a liquid cooling retrofit take in an operating Nevada hall?
Duration depends on rack count, the source of facility water and how much work the operator allows in each maintenance window. Outdoor equipment and mains are usually built first without disturbing the hall, followed by branch headers and rack connections in phases. Paul Industries builds a schedule from the survey, and prefabricated, pre-tested spools shorten the time spent inside the white space.
Does the Las Vegas water district allow cooling towers for liquid-cooled halls?
The Las Vegas Valley Water District does not distinguish by IT type: its service rules count cooling towers as evaporative cooling and limit service to developments that met permit and occupancy dates set between 2023 and 2026. A new liquid-cooled hall in the district’s area is designed for dry heat rejection, which warm facility water makes practical.
What leak detection belongs on a Nevada liquid cooling installation?
Rope or spot sensors run along facility water and technology cooling piping, under coolant distribution units and below manifolds, wired to the building management system with zone alarms. Drip trays under overhead branches and automatic isolation valves on headers add protection. Paul Industries installs and tests the sensors, and confirms that each alarm reaches the operator before racks are connected.
How much flow does a liquid-cooled rack need at Nevada facility water temperatures?
Flow depends on rack heat load and the temperature rise the cold plates allow. A common rule is about 1.5 liters per minute per kilowatt at a 10 C rise, so a 100 kW rack needs roughly 150 liters per minute. Warmer facility water does not change rack flow directly, but it can raise the flow the coolant distribution unit needs on the facility side, which Paul Industries checks at the hot-day condition.
Should Nevada liquid cooling piping be stainless or carbon steel?
Technology cooling loops are commonly stainless steel or manufacturer-approved polymer, because they connect to copper cold plates and must stay clean. Facility water loops are often carbon steel with an inhibitor program, or stainless where water quality or the owner’s standard calls for it. Paul Industries fabricates and installs both, and matches materials to the coolant and the server manufacturer’s wetted-material list.
Can dry coolers on a Las Vegas roof keep up with liquid cooling in July?
Dry coolers keep up in July when they are selected at an ambient above the normal high, spaced so they do not recirculate hot air, and paired with trim cooling sized for afternoons above 110 F. Roof temperatures run hotter than the weather station, so Paul Industries adds an allowance for the roof itself when selecting units.
What records come with a finished liquid cooling installation in Nevada?
The turnover package includes pressure test reports, flushing and cleanliness records, fill water and coolant analyses, glycol strength readings, valve and sensor lists, controls sequences, as-built drawings, and the startup data for coolant distribution units and dry coolers. Operators in Reno and Las Vegas use the baseline analysis to trend coolant condition through the first year.
What does Nevada's dry air mean for rear-door heat exchangers?
Dry air lowers the dew point in the hall, which lets rear-door heat exchangers and cold plates run with cooler water without condensation risk. The opposite concern applies in some northern Nevada halls in winter, where very low humidity is managed for static control. Paul Industries checks the hall dew point against the coldest water the system will supply.
Is liquid cooling worth it for a mid-density Nevada hall?
Racks in the low tens of kilowatts are cooled well by air in many halls, especially in Reno, where air-side and water-side economizers run for much of the year. Liquid cooling pays sooner where racks are denser, where Las Vegas heat makes air cooling power-hungry, or where the electrical service is the limit. Paul Industries compares the two for the actual rack plan and site.
Bringing liquid-cooled racks into a Nevada hall?
Send rack counts and heat loads, the server vendor’s facility water class and the site address. Call 201-450-8280 or request a quote.
