Paul Industries designs, installs and services data center cooling in New Mexico, building chilled water plants, economizers, evaporative and dry heat rejection and the piping that ties them to the white space for operators in Albuquerque, Los Lunas, Rio Rancho, Santa Fe and Las Cruces. New Mexico gives a cooling designer dry air, long cool nights and thin air at altitude, and asks in return for careful water use. Paul Industries sizes each plant for those conditions, then installs, starts and maintains it.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Albuquerque air 7,142 of 8,760 normal hours below 75 F (NOAA)
Altitude Sunport at 5,310 ft; air about 85% as dense as at sea level
Commercial power 11.01 cents/kWh in 2025, US 13.37 (EIA)
Equipment rule IT cooling refrigerants under GWP 700 from January 1, 2027 (EPA)
Reviewed November 2026

What does data center cooling in New Mexico have to account for?

Data center cooling in New Mexico has to account for three site conditions together: air that is dry for most of the year, an elevation above 3,000 feet almost everywhere data halls are being built, and a water supply that owners, utilities and neighbors all watch closely. Each condition pushes design in a different direction. Dry air makes free cooling and evaporative cooling very effective. Altitude makes every fan and air-cooled coil move less heat than its sea-level catalog rating. Water scrutiny pushes owners toward closed loops, dry coolers and reuse, even where evaporation would save power.

The broader menu of cooling methods, equipment and tradeoffs is set out on the national data center cooling systems page. This page applies that menu to New Mexico: the weather data, the elevation corrections, the water sources, the codes and the power prices that decide which plant fits a given site.

How dry is New Mexico air for a data hall?

New Mexico air is dry enough that humidity, the limiting factor for free cooling across most of the eastern United States, rarely constrains a hall in the Rio Grande valley. At the Albuquerque Sunport, the NOAA 1991 to 2020 hourly normals put the dew point at or below 32 degrees Fahrenheit in 5,592 of the year’s 8,760 hours, and in no hour does the normal dew point reach 55 degrees; its annual peak is 54.7. In a hall held within the ASHRAE recommended inlet range of 64.4 to 80.6 degrees, condensation on coils and piping is a rare event instead of a design driver.

Temperature is equally favorable. The same normals place 7,142 hours, about 82 percent of the year, below 75 degrees, and 3,961 hours at or below 55 degrees. Only 16 normal hours reach 90 degrees. For a data center, Albuquerque’s climate means an air-side or water-side economizer carries most of the annual load, and mechanical cooling is a peak and backup function. Roswell, lower and further east, is warmer and more humid: 6,536 hours below 75 degrees and 2,212 hours with a dew point of 50 degrees or more, which still leaves a long economizer season but narrows the margin on summer afternoons.

Cooling-season normals at New Mexico data center locations (NOAA, 1991 to 2020)
StationElevationDays at or above 90 FDays at or above 100 FNights at or below 32 F
Albuquerque Sunport5,310 ft64.42.692.8
Rio Rancho5,230 ft84.87.0130.9
Los Lunas4,840 ft91.713.1152.2
Santa Fe airport6,344 ft40.80.4153.4
Las Cruces (university station)3,886 ft108.619.369.0
Roswell3,649 ft110.125.987.4
Farmington5,495 ft68.73.1148.8

The table shows why one plant design rarely carries over unchanged from one New Mexico site to another. A Las Cruces or Roswell hall sees more than 100 days a year at 90 degrees or above, so the heat rejection plant has to carry real summer duty. A Santa Fe or Farmington hall rarely gets hot but spends roughly 150 nights a year at or below freezing, so freeze protection and economizer control in winter become the main design work.

How are data centers kept cool at high altitude?

Data centers at high altitude are kept cool with the same chillers, air handlers and heat rejection equipment used at sea level, but every air-moving component is selected for the lower air density at the site. Under the standard atmosphere, air at the Sunport’s 5,310 feet is about 85 percent as dense as sea-level air, and at Los Alamos, near 7,400 feet, about 80 percent. A fan moving its rated cubic feet per minute carries 15 to 20 percent less mass, and with it, less heat.

The correction touches almost every piece of equipment. Computer room air handlers and fan walls need more airflow, larger coils or a wider temperature difference to deliver rated capacity. Air-cooled chillers and dry coolers lose condenser capacity and need larger coil faces or more fans. Fan motor power falls with density at a given speed, which helps, but the extra fans and larger coils needed to recover capacity cost money. Altitude also affects the standby generators and their radiators, so the cooling plant and the electrical plant should be derated on the same basis.

Air density at New Mexico elevations and what it changes in a cooling plant (standard atmosphere approximations)
ElevationExample locationAir density vs sea levelDesign consequence
About 3,900 ftLas CrucesAbout 89%Modest derate on air-cooled condensers; summer heat is the bigger factor
About 5,300 ftAlbuquerque, Rio RanchoAbout 85%Upsize fans or coils for rated airflow mass; recheck dry cooler capacity
About 6,300 ftSanta FeAbout 83%Larger correction; winter freeze control matters as much as summer capacity
About 7,400 ftLos AlamosAbout 80%Largest correction; fan and coil selections made at site density from the start

The practical rule is simple: ask for every air-side and condenser selection at site elevation, not sea level, and check that the commissioning agent tests airflow on the same basis. A plant that looks right on a sea-level submittal can come up short on the first hot afternoon.

Data centers in New Mexico and how they cool

Data centers in New Mexico range from enterprise rooms in Albuquerque office buildings and university and laboratory computing in Albuquerque and Los Alamos to hyperscale campuses in Valencia and Doña Ana counties. The two largest public projects show the two directions cooling design is taking in the state, and they are named here as market facts.

Meta data center Los Lunas: water and power

Meta’s Los Lunas campus broke ground in 2016 and went online in 2018, and Meta reports more than $2.5 billion invested in New Mexico. Many people still call it the Facebook data center. New Mexico readers searching for the Meta data center New Mexico hosts will find that Meta describes its cooling technology there as significantly more water efficient than the industry standard, and says the site reuses water numerous times before discharging it. Meta also says it pays the full cost of water and wastewater service to the Village of Los Lunas and worked with PNM on energy planning. For anyone researching a data center in Los Lunas, New Mexico, those statements are the published record; the fact sheet gives no gallons figure for the site.

Project Jupiter in Doña Ana County

Project Jupiter, a four-building campus under construction in Doña Ana County with Oracle as tenant, takes the other path. Oracle states that the buildings use a closed-loop, non-evaporative cooling system, filled once with about 2.5 million gallons of non-potable water per building over two to three years, with yearly top-offs of roughly 0 to 1,000 gallons. That approach trades water for electricity: with no evaporation, every unit of heat leaves through dry heat exchangers and, on hot days, through compressors.

New Mexico data center water usage: evaporative, adiabatic or dry?

New Mexico data center water usage depends almost entirely on how the heat leaves the building. An evaporative cooling tower rejects heat by evaporating water: about 1,000 Btu leaves with each pound evaporated, so each megawatt of heat rejected this way evaporates roughly 3,400 pounds, or about 410 gallons, an hour before blowdown is added. Dry coolers and air-cooled chillers use no water in operation but need more fan power, larger coils and, on hot days, more compressor work. Adiabatic coolers sit between: dry most of the year, with water sprayed or wetted media only above a set temperature.

New Mexico’s climate makes the tradeoff unusually favorable to water-light designs. With most hours below 75 degrees in the central and northern parts of the state, a dry cooler on a warm-water loop rejects the full load for most of the year, and an adiabatic stage is needed only on the hottest afternoons. Data center cooling water consumption therefore falls further here, for a given amount of evaporative help, than it would in a humid state where wet-bulb relief is small.

Heat rejection choices for a New Mexico data hall
ApproachWater in operationEnergy at peakBest fit in New MexicoWatch points
Open cooling tower with chillersHighest; evaporation plus blowdownLowestSites with secured water rights or reclaimed water and a hot summer, such as the southern valleysScale from hard makeup water; freeze protection of basins and lines
Adiabatic dry coolerLow; water only above a set temperatureModerateCentral Rio Grande valley halls where hot hours are fewWater quality for sprays or pads; control setpoints tuned to dry air
Dry cooler with chiller trimNear zeroHigher on hot daysCampuses with no water allocation, as at Project Jupiter’s stated designAltitude derate on coils and fans; glycol for winter
Air-cooled chillersNear zeroHighestSmaller rooms and enterprise sites in Albuquerque and Santa FeCondenser capacity at altitude and in 100 F hours
Direct or indirect air economizerNone, or a little for evaporative assistLowPurpose-built halls in dry, cool locations such as Santa Fe or FarmingtonDust, smoke and filter loading; humidity floor in very dry air

Are data centers water cooled in a dry state?

Most large data centers are water cooled at the chip, coil or chiller, even in a dry state, because water carries heat far better than air; the open question is whether that water is evaporated to the atmosphere. Data center cooling without water consumption is achievable in New Mexico with closed loops and dry heat rejection, and the state’s cool nights help it. The price is a larger heat rejection yard and higher peak power. Where a site has reclaimed water or an existing allocation, cooling towers for data centers remain the most energy-efficient way to reject heat on a 100 degree afternoon in Las Cruces or Roswell.

Paul Industries prices both paths on a given site: the yard area, connected power and water each option needs, and the annual energy and water at the owner’s tariff, so the decision rests on numbers instead of habit.

Makeup water quality in the Albuquerque area

Makeup water quality in the Albuquerque area changes with the mix of sources the water utility serves, which matters for any tower, adiabatic pad or spray system. The Albuquerque Bernalillo County Water Utility Authority has blended treated surface water and groundwater since December 2008, and it describes the result as moderately hard to hard depending on the sources and blend. Its San Juan-Chama Drinking Water Project supplied about 28 percent of the water it distributed in 2025, against a long-term goal of 70 to 75 percent, so the share of river water swings with drought and river flow.

A changing blend means changing hardness, alkalinity and silica at the tower, and the right cycles of concentration move with it. Paul Industries sets up conductivity-based blowdown, makeup metering and chemical feed, coordinated with cooling tower water treatment, so that the plant holds its cycles without scaling condenser tubes when the supply shifts.

Freeze protection on a high-desert site

Freeze protection is a core part of data center cooling design in the northern half of New Mexico, where NOAA normals show about 150 nights a year at or below 32 degrees in Santa Fe, Los Lunas and Farmington. A dry cooler, tower basin, adiabatic header or outdoor pipe run that sits idle on a still January night will freeze unless it is drained, heated or filled with glycol. The economizer itself creates the risk: the coldest nights are exactly when the plant wants to run full free cooling.

The usual protections are a glycol loop on the outdoor side, isolated from the indoor chilled water or technology cooling loop by a plate heat exchanger; basin heaters and heat-traced makeup and drain lines on towers; automatic drain-down of adiabatic headers; and controls that keep minimum flow through every outdoor coil. Glycol reduces heat transfer and raises pumping power, so the concentration is set from the site’s design low temperature, not from habit.

Data center cooling regulations in New Mexico

Data center cooling regulations in New Mexico come from state construction codes, federal refrigerant rules and, for standby power, air permits. The Construction Industries Division of the Regulation and Licensing Department publishes the codes: the 2021 New Mexico Commercial Energy Conservation Code, based on the 2021 International Energy Conservation Code and effective January 30, 2024, and the 2021 New Mexico Mechanical Code, which adopts the 2021 Uniform Mechanical Code. Some cities and counties run their own building departments and permit the work under the same state codes.

Refrigerants are federal. Under EPA’s Technology Transitions rule, new data center, computer room air conditioning and IT equipment cooling systems must use refrigerants with a global warming potential below 700 from January 1, 2027, and new stand-alone chillers for comfort cooling have been under the same limit since January 1, 2025. Chillers and CRAC units on order today should be checked against those dates and the ASHRAE 15 safety requirements for the chosen refrigerant. Generator and fuel permits are covered on the data center mechanical contractor in New Mexico page, and commissioning requirements under the energy code on the data center commissioning in New Mexico page.

Data center cooling needs and the electricity bill

Data center cooling needs in New Mexico are priced against some of the lower power rates in the West, which changes how hard an owner should chase cooling efficiency. EIA’s 2025 figures put the average New Mexico commercial price at 11.01 cents per kilowatt-hour against 13.37 nationally, and the industrial price at 5.85 cents against 8.51. Every 100 kilowatts of continuous fan, pump and compressor load costs about $96,448 a year at the commercial average and about $51,246 at the industrial average.

Lower rates lengthen the payback on efficiency measures bought for energy alone, a point the New Mexico hub makes for process plants as well. They do not change the value of capacity: in a hall where the utility connection is the binding limit, every kilowatt saved in cooling is a kilowatt available for servers. On a campus with its own generation, the same logic applies to the on-site plant.

Which chilled water temperatures suit New Mexico halls?

Warmer chilled water suits New Mexico halls well, because dry air keeps the dew point far below coil surface temperatures for most of the year. Plants serving air handlers at 60 to 65 degrees supply, or technology cooling loops in the 70s and above, extend economizer hours and let dry coolers carry more of the load. The right data center cooling water temperature depends on the IT equipment, the air-side design and whether liquid-cooled racks share the plant; the liquid side is covered on the data center liquid cooling in New Mexico page.

Very dry air brings its own control issue. With dew points below freezing for most of the year, humidity inside a hall supplied by an air economizer can fall below the lower limit an owner’s operations team sets, and evaporative or steam humidification then adds water use back. Water-side economizers avoid that by keeping outdoor air out of the white space.

What drives data center cooling cost in New Mexico?

Data center cooling cost in New Mexico is set by the heat rejection approach, the altitude derate, freeze protection, redundancy and how much of the plant is prefabricated, more than by any rule of thumb per megawatt. A water-free plant needs more dry cooler area and connected power than a tower plant of the same capacity. A site above 6,000 feet needs larger fan and coil selections than one at 4,000 feet. N+1 or 2N redundancy, generator support for cooling and the number of phases all move the price.

Paul Industries prepares a budget range from comparable scope once the IT load, phasing, site elevation and water position are known, and a firm price once drawings and equipment selections are fixed. For a priced proposal, send the load per phase, target supply temperatures, redundancy level, the water source and any allocation, and the site location.

Redundancy and containment in a mild, dry climate

Redundancy planning for a New Mexico hall starts from the fact that the economizer, not the chiller, carries most annual hours, so the failure that matters most is the loss of heat rejection on a hot afternoon. A plant designed N+1 on chillers but with no spare dry cooler or tower cell can lose capacity at exactly the wrong time. Paul Industries checks redundancy at the worst site condition: the hottest design hour at site elevation, with one heat rejection unit and one pump out of service.

Containment matters more, not less, in a free-cooling climate. Hot aisle or cold aisle containment lets supply air or water run warmer, which adds economizer hours, and it keeps fan power down at altitude, where every cubic foot of air carries less heat. Fan walls and computer room air handlers should be selected with containment in the design from the start, and blanking panels, brush grommets and floor sealing included in the installation scope. The central plant equipment behind those air handlers is covered on the data center chillers page, and the wider market on the data centers industry page.

Who installs data center cooling in New Mexico?

Paul Industries installs data center cooling in New Mexico, from the yard equipment and central plant through the piping mains, air handlers and coolant distribution connections in the hall. The company is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes work across New Mexico and in all 50 states, as described for the region on the Southwest page. Owners choose supply-only delivery of prefabricated pump skids and piping modules, design-build from a performance target, or complete installation through startup and turnover.

The same scope is described for other markets on the data center cooling in Virginia page for the headquarters state and the data center cooling in Texas page for the neighboring state, where Gulf humidity and the ERCOT grid shape the design; seismic and energy code rules lead on the data center cooling in California page. In New Mexico the drivers are dry air, altitude and water.

Planning a New Mexico cooling plant with Paul Industries

Paul Industries engineers, fabricates, installs, tests and services data center cooling plants for New Mexico operators: chillers, cooling towers and dry coolers rated at site elevation, glycol and freeze protection for northern winters, water-light heat rejection for sites without an allocation, and controls that keep economizers running on cold nights. After startup, Paul Industries maintains the plant and its chillers. To start, request a quote with the load, phasing and site details.

Standards referenced: 2021 New Mexico Commercial Energy Conservation Code (14.7.9 NMAC, 2021 IECC) · 2021 New Mexico Mechanical Code (14.9.2 NMAC, 2021 Uniform Mechanical Code) · ASHRAE TC 9.9 thermal guidelines for data processing environments · EPA Technology Transitions rule (40 CFR Part 84) · ASHRAE 15

Frequently asked questions

Who provides data center cooling service for halls in Albuquerque and Rio Rancho?

Paul Industries provides data center cooling service for halls in Albuquerque and Rio Rancho, covering chiller plants, cooling towers, dry coolers, computer room air handlers and the piping between them. Service includes seasonal changeover between economizer and mechanical cooling, glycol testing before winter, tower water treatment checks against the current utility blend, and repairs. New installations and expansions in the same area are designed at the Sunport’s 5,310 foot elevation basis.

Does Paul Industries build cooling for a data center in Las Cruces or elsewhere in Doña Ana County?

Yes. Paul Industries builds and services cooling plants for data halls in Las Cruces and across Doña Ana County. The southern valleys are the warmest part of the state for data center work, with more than 100 days a year at 90 degrees or above at the university station near Las Cruces, so heat rejection there is sized for real summer duty while still taking advantage of dry air for most of the year.

Who handles data center cooling in Santa Fe and Los Alamos?

Paul Industries handles data center cooling in Santa Fe and Los Alamos, where the work is shaped more by winter and altitude than by summer heat. Santa Fe averages about 153 nights a year at or below freezing, and Los Alamos sits near 7,400 feet, where air is roughly 80 percent as dense as at sea level. Fan, coil and dry cooler selections are made at site density, and outdoor loops carry glycol.

Which data center cooling companies work on New Mexico hyperscale campuses?

Paul Industries is among the data center cooling companies that take hyperscale and colocation work in New Mexico, supplying prefabricated pump skids, piping modules and yard equipment and installing central plants and mains. On large campuses Paul Industries builds in phases that match each building’s power date and delivers supply-only packages, design-build plants or complete installation through turnover.

How much water would an evaporative cooling tower use at a New Mexico data center?

An evaporative tower evaporates roughly 410 gallons an hour for each megawatt of heat it rejects, because about 1,000 Btu leaves with every pound of water evaporated. Blowdown comes on top of that, and its size depends on how many cycles of concentration the makeup water allows. In New Mexico, where most hours are cool, a hybrid plant that evaporates only on hot afternoons uses a small fraction of a full tower’s annual water.

Can a New Mexico data center run on outside air most of the year?

In much of the state, yes. NOAA hourly normals for the Albuquerque Sunport place about 82 percent of the year below 75 degrees, with dew points far below the ASHRAE recommended range for most hours. Direct air systems need strong filtration for dust and smoke and a plan for very low indoor humidity, so many owners prefer indirect air or water-side economizers that keep outdoor air out of the white space.

Why do fans and air-cooled chillers lose capacity in Albuquerque?

Air at Albuquerque’s elevation is about 85 percent as dense as at sea level, so a fan moving its rated volume moves less mass and carries less heat. Air-cooled chiller condensers, dry coolers and air handler coils all lose some capacity unless they are selected at site conditions. The fix is to require site-elevation ratings on every submittal and to test airflow and capacity on the same basis at commissioning.

Do New Mexico data centers need glycol in their cooling loops?

Outdoor loops in most of New Mexico need freeze protection, and glycol is the usual choice for dry coolers and air-cooled equipment. Santa Fe, Los Lunas and Farmington each average about 150 freezing nights a year, and the coldest nights are when economizers run hardest. A plate heat exchanger usually separates the glycol loop from indoor chilled water so the larger indoor system stays on treated water.

What do data center cooling regulations require for new CRAC units bought in 2026 or later?

EPA’s Technology Transitions rule requires new data center, computer room air conditioning and IT equipment cooling systems to use refrigerants with a global warming potential below 700 from January 1, 2027. Units ordered now for delivery after that date should be specified to comply. The New Mexico Mechanical Code, based on the 2021 Uniform Mechanical Code, and ASHRAE 15 then govern installation and machinery room requirements for the chosen refrigerant.

Is a waterless cooling plant practical for a data center in Albuquerque, New Mexico?

A waterless plant is practical in Albuquerque because the climate gives dry heat rejection most of the year: only 16 normal hours reach 90 degrees at the Sunport. The cost is a larger dry cooler yard, altitude-corrected fans and coils, and chillers or trim cooling sized for the hottest afternoons. Paul Industries compares that plant with an adiabatic or tower design on the owner’s own tariff and water terms.

What is known about Los Lunas data center water usage?

Meta’s Los Lunas Data Center in Valencia County broke ground in 2016 and went online in 2018. Meta’s fact sheet says the site uses cooling technology significantly more water efficient than the industry standard, reuses water numerous times before discharge, and pays the full cost of its water and wastewater service to the Village of Los Lunas. It is named here as a market fact about cooling in the state.

How does Project Jupiter cool without evaporating water?

Oracle states that Project Jupiter’s four data center buildings in Doña Ana County use a closed-loop, non-evaporative system filled once with about 2.5 million gallons of non-potable water per building, with yearly top-offs of roughly 0 to 1,000 gallons. Heat leaves through dry heat exchangers instead of evaporation, which uses more electricity on hot days. The campus is under construction and is named here as a market fact.

How do Albuquerque's changing water sources affect a cooling tower?

The Albuquerque Bernalillo County Water Utility Authority blends river water from the San Juan-Chama project with groundwater, and the river share was about 28 percent in 2025. Hardness ranges from moderately hard to hard with the blend. A tower set up for one blend can scale when the supply shifts, so blowdown should be controlled by conductivity and the treatment program reviewed as the source mix changes.

How warm can chilled water run in a high-desert data hall?

Supply temperatures in the low 60s or warmer suit most New Mexico halls cooled by air handlers, and warm-water loops for liquid-cooled racks run warmer still. Dry air keeps coil surfaces well above the dew point at those temperatures, and warmer water extends economizer and dry cooler hours. The final choice follows the IT equipment limits and how air and liquid loads share the plant.

Do New Mexico electricity rates favor water-free cooling plants?

New Mexico’s 2025 average commercial electricity price was 11.01 cents per kilowatt-hour, against 13.37 nationally (EIA), so 100 kilowatts of continuous cooling load costs about $96,448 a year. Lower prices make water-free designs that use more power easier to justify than in high-cost states. Where the utility connection limits IT capacity, efficiency still matters, because every kilowatt saved in cooling is available for servers.

How is cooling capacity added to an operating New Mexico data hall?

Paul Industries adds chillers, dry coolers, pumps and mains to operating halls in New Mexico through planned tie-ins: hot taps or isolation at existing valves, temporary cooling where redundancy is thin, and work sequenced around the operator’s change windows. New equipment is started and tested before it carries load, and the existing plant’s controls are updated so the added capacity stages correctly.

Which site details shape a New Mexico cooling plant estimate?

Send the IT load by phase, rack densities and any liquid-cooled share, target supply temperatures, redundancy level, the site address and elevation, the water source and any allocation or reclaimed supply, available electrical capacity, and drawings or a site plan. Paul Industries uses that to set the heat rejection approach, size equipment at site conditions and return a budget range, then a firm price once the design is fixed.

Planning cooling for a New Mexico data hall?

Send the IT load by phase, the site elevation, the water source and the redundancy target. Call 201-450-8280 or request a quote.