Paul Industries works as a data center mechanical contractor in South Dakota, building central chiller and dry cooler plants, chilled water and glycol mains, liquid cooling distribution, generator fuel systems and plumbing for data halls and campuses from Sioux Falls to Rapid City. The state passed its first data center statutes in 2026, taxes contract work under its own excise tax, leaves siting to counties and cities, and gives builders a short outdoor season. Paul Industries plans the mechanical package around each of those conditions and delivers it under one contract.
Request a quote or call 201-450-8280
What a data center mechanical contractor in South Dakota delivers
A data center mechanical contractor in South Dakota delivers every system that moves heat, water and fuel through the facility: heat rejection equipment in the yard, chillers and pumps in the central plant, piping mains to the halls, CRAH and fan wall connections, coolant distribution units and rack manifolds for liquid cooling, generator fuel storage and day tanks, plumbing, and the controls that run the plant. The mechanical package is a major share of a data center’s construction cost, and its schedule sets when the hall can take IT load.
Paul Industries engineers, prefabricates, installs, tests and starts those systems, and keeps servicing them after turnover. The national data center mechanical contractors page covers the general scope; the sections below cover what South Dakota adds, from statute and tax to weather and water.
Are data centers being built in South Dakota?
Data centers are being built and proposed in South Dakota, and in 2026 the Legislature passed two data center laws aimed at halls of 10 megawatts or more while Sioux Falls set up a council committee on data center regulation. Both steps show that large projects are on the table, and that the rules around them are still being written at the city and county level.
Each data center being built in South Dakota at that scale now meets a defined set of state requirements, and its cooling and water design must satisfy the county or city where it sits. For a mechanical contractor, that means early involvement in the water projection, the utility load profile and the noise and siting conditions a city may impose, because each of those depends on mechanical design choices made months before steel arrives.
South Dakota data center law after the 2026 session
South Dakota data center law after the 2026 session consists of two enacted bills, SB 135 and HB 1038, both aimed at data centers with a peak demand of 10 megawatts or more, while bills for a tax exemption, a moratorium and nuisance limits did not advance. The table summarizes the South Dakota data center legislation a mechanical contractor plans around.
| Bill | Outcome | Content | Mechanical consequence |
|---|---|---|---|
| SB 135, Data Center Bill of Rights for Citizens | Signed by the Governor, March 2026 | Separate electric terms and full cost recovery; county and city authority kept; water notice before operation; semi-annual water reports | Heat rejection choice, makeup metering and water projection become permit-stage work |
| HB 1038 | Signed, Session Laws chapter 185 | Public Utilities Commission may assess actual costs of reviewing a data center’s electric service agreement | Plant load and demand data feed the utility contract review |
| HB 1005, sales and use tax exemption | Deferred to the 41st legislative day | Would have exempted data center goods and services | Mechanical equipment carries ordinary tax treatment |
| SB 232, one-year moratorium on hyperscale data centers | Tabled in committee | Would have paused construction and expansion | No statewide pause; county and city rules still apply |
| HB 1301, costs and moratorium | Deferred to the 41st legislative day | Would have limited electricity costs and risks and imposed a moratorium | No statewide pause |
| SB 127, data center nuisances | Deferred to the 41st legislative day | Would have limited nuisances from data centers | Noise and light limits come from county and city rules instead |
The South Dakota data center bill of rights, as SB 135 is titled, took effect on July 1, 2026 under the state’s default effective date for regular-session acts. Because the South Dakota data center tax exemption failed, South Dakota data center incentives tied to equipment purchases did not materialize in 2026, and a South Dakota data center moratorium was rejected at the state level, though counties and cities keep full authority to regulate siting. Owners who expected an exemption on chillers, coolers and pumps should budget for ordinary tax treatment.
Contractor’s excise tax and licensing on the mechanical scope
Under South Dakota construction law, the state imposes a contractor’s excise tax of 2 percent on the gross receipts of prime contractors engaged in realty improvement contracts, under SDCL 10-46A-1, and the next section of the code extends it to every firm in the construction trades classification on the job. A data center mechanical package is a realty improvement, so the tax is a line in every mechanical price for South Dakota work, alongside the sales or use tax on materials.
Is there a South Dakota mechanical contractor license for data center work?
South Dakota’s statewide trade licensing laws cover electrical contracting, which requires a license under SDCL 36-16-1 administered by the State Electrical Commission, and plumbing, governed by SDCL chapter 36-25 and the State Plumbing Commission. Heating, cooling and process piping work is permitted through the city or county building department under its adopted codes. Owners asking about a South Dakota mechanical contractor license should therefore check three things for each site: the electrical licensing the statute requires for control wiring and equipment connections, the plumbing requirements for domestic water and drains, and the permit conditions of the city or county where the hall is built. Paul Industries prepares permit drawings and coordinates every inspection those permits call for.
Building codes, permits and county authority
Building codes for a South Dakota data center start from SDCL 11-10-5, which requires any county or city building ordinance for non-residential buildings to comply with the 2024 International Building Code after the 2026 amendment, and SDCL 11-10-6, which makes the 2024 edition the design standard for buildings commenced after July 1, 2026 where no ordinance exists. Structural support for rooftop dry coolers, equipment anchorage, roof loads from snow drifting around equipment, and mechanical room requirements all follow that base code and the companion codes the jurisdiction adopted.
SB 135 adds that the state may not preempt or limit the authority of a county, municipality or other political subdivision to regulate the construction, development or operation of data centers. In practice, data center construction requirements can differ from one county to the next. Sioux Falls, for example, set up a council Regulatory Oversight Committee, which held a joint session with Lincoln County commissioners in fall 2026 and owes the council its data center recommendations by January 12, 2027. Paul Industries checks the ordinance in force at each permit and designs equipment yards, sound attenuation and setbacks to it.
Generator fuel tanks and the DANR storage tank rules
Generator fuel tanks on a South Dakota data center are regulated by the Department of Agriculture and Natural Resources, which administers the state’s storage tank statutes, SDCL 34A-2-98 through 34A-2-101, and its rules for underground tanks in ARSD 74:56:01 and aboveground tanks in ARSD 74:56:03. A tank holding a regulated substance such as diesel must be registered, and plans and specifications for a new tank system must be submitted for review at least 30 days before installation.
The aboveground tank plans must show the performance standards, overfill control and secondary containment, and the fire prevention authority may review them as well. Paul Industries designs and installs the bulk storage, day tanks, transfer pumps, fuel polishing and piping to NFPA 30 and the generator manufacturer’s requirements, and assembles the plan submittal so the 30-day review fits the schedule. Fuel systems are tested and documented with the rest of the mechanical scope, as described on the data center commissioning in South Dakota page, and tank fabrication itself is covered on the tank fabrication in South Dakota page.
Water supply for the mechanical plant
Water supply for a South Dakota data center’s mechanical plant comes from a city or rural water system, or from a well, and state water law treats every non-domestic use as needing a water right granted by the Water Management Board. A hall of 10 megawatts or more also gives each water provider notice of projected consumption before it operates, under SB 135, and reports its water use twice a year once running.
The mechanical contractor’s design choices set those figures: dry coolers or towers, cycles of concentration, softening or reverse osmosis on makeup, humidification, and domestic use. Paul Industries prepares the water balance during design, installs meters on makeup, blowdown and process water so the reports come from instruments, and builds the treatment equipment described on the ultrapure water systems in South Dakota page where liquid cooling or humidification needs purified water. Cooling plant options are compared on the data center cooling in South Dakota page.
How long does it take to build a data center in South Dakota?
How long it takes to build a data center in South Dakota depends on power delivery, equipment lead times, permits and weather, and a single hall typically runs from site work to integrated testing over more than a year, with large campuses phased over several years. Power under the data center tariff that SB 135 requires usually sets the outer limit; long-lead mechanical equipment such as chillers, large dry cooler banks and switchgear sets the inner one.
Weather is South Dakota’s third constraint. The table shows how many days a year the high temperature stays at or below freezing and how many nights reach zero, from NOAA’s 1991 to 2020 normals.
| Station | Days with high at or below 32 F | Nights at or below 0 F | Mechanical planning note |
|---|---|---|---|
| Sioux Falls | 65.6 | 24.9 | Enclose the building before wet testing; schedule yard work for spring through fall |
| Rapid City | 43.1 | 17.7 | Longer outdoor season; fewer days that stay below freezing, so more winter yard work is possible |
| Aberdeen | 78.0 | 38.5 | Prefabricate heavily; heated enclosures for any winter welding outdoors |
| Pierre | 56.6 | 20.9 | Plan crane lifts for calm weeks; wind sets lift windows |
| Huron | 66.7 | 27.7 | Similar to Sioux Falls with colder nights |
| Watertown | 84.2 | 35.4 | Longest frozen season in the table; finish underground piping before freeze-up |
South Dakota data center construction through a prairie winter
South Dakota data center construction keeps moving through winter when the mechanical work is planned around it: underground piping and yard foundations before freeze-up, the building enclosed and heated before wet testing, and as much welding and assembly as possible done off site. Paul Industries builds pipe rack modules, pump skids, CDU connection kits and header spools in fabrication facilities, pressure tests them there, and ships them ready to set, which moves weeks of field work indoors.
Prefabrication also controls quality. Welds made in a shop on a positioner, with documented procedures and inspection, are more consistent than welds made outdoors in wind at minus ten degrees. The modules arrive with their test records, so field work comes down to the connections between them, and each connection is tested before insulation and heat tracing go on.
Mechanical systems on a South Dakota data center
The mechanical systems on a South Dakota data center fall into eight groups, and each carries a South Dakota detail that a generic scope would miss.
| System | Typical contents | South Dakota detail |
|---|---|---|
| Heat rejection yard | Dry coolers, adiabatic coolers or towers, glycol circuits | Freeze protection, snow drift clearances, sound limits set by the county or city |
| Central plant | Chillers, pumps, plate exchangers, expansion and air separation | Refrigerant below 700 GWP for data center equipment installed from 2027 |
| Piping mains | Chilled water or glycol headers, valves, supports | Underground or buried sections finished before frost; heat tracing above grade |
| White space air side | CRAH units, fan walls, containment connections | Economizer modes that run most of the year |
| Liquid cooling | CDUs, row manifolds, technology loop | Treated fill water; hard municipal water kept out of rack loops |
| Fuel systems | Bulk tanks, day tanks, transfer and polishing | DANR registration and 30-day plan review |
| Plumbing and water | Domestic water, makeup, drains, meters | State plumbing rules; meters for SB 135 water reports |
| Controls | Plant controls, sequences, monitoring | Winter overcooling protection and seasonal mode changes |
Liquid cooling distribution is set out on the data center liquid cooling in South Dakota page, and chiller service after turnover on the chiller repair in South Dakota page.
Building inside an operating South Dakota hall
Building inside an operating South Dakota hall, whether adding a chiller, a dry cooler bank or a liquid cooling row, depends on tie-ins that keep the live load cooled at every step. Each tie-in gets a written method of procedure that states the redundancy remaining, the valve sequence, the rollback and the people present, and is scheduled for a window the operator approves.
Hot taps and line stops let new branches join live chilled water mains without draining them, and prefabricated spools reduce the time any valve stays open. Paul Industries keeps temporary cooling, spare pumps and isolation plans ready for each window, and returns the plant to its normal configuration with a check of flows and temperatures before the window closes.
Who builds data centers in South Dakota, and who installs the mechanical scope?
Who builds data centers in South Dakota is usually a team: the owner, a design team, a general contractor or construction manager, and trade packages for electrical and mechanical work, sometimes combined under a design-build agreement. Paul Industries installs the mechanical scope in South Dakota, from the heat rejection yard to the rack manifolds, and takes it from engineering through prefabrication, installation, testing and service.
Data center owners reviewing mechanical contractors in South Dakota get one firm from Paul Industries for the whole mechanical path, with a single schedule, a single set of test records and a single point of accountability when the plant goes live. That matters most on phased campuses, where the second and third halls must connect to systems the first phase left in service, and where the records from phase one decide how quickly the later tie-ins can be planned and approved.
When comparing mechanical contractors, South Dakota owners, like buyers of data center construction contractors everywhere, should look at prefabrication capacity, winter planning, experience with liquid cooling and the records each one hands over. Paul Industries supplies those answers in its proposal: the module plan, the winter sequence, the test plan and a sample turnover file.
Equipment yards, snow drift and sound
Equipment yards on South Dakota data centers have to handle wind, drifting snow and, increasingly, sound limits written by the county or city. A dry cooler bank sited without regard to prevailing winter wind can bury its own intakes in drifted snow, and rooftop units create drifts that add structural load the 2024 building code requires the engineer to account for. Spacing, platform height and screening are mechanical layout decisions as much as architectural ones.
Sound has become a siting topic wherever large halls are proposed near homes, and with counties and cities free under SB 135 to regulate data center operation, a yard may face a limit at the property line. Paul Industries lays out yards with low-speed fans, variable speed control, barriers and distance where the site allows, and models the yard’s sound at the boundary early enough that a change costs a drawing revision rather than a field retrofit. The same layout keeps service lanes clear for snow removal so technicians can reach every unit in January.
Maintenance contracts once South Dakota halls go live
Maintenance contracts on South Dakota data centers cover the seasonal work the climate imposes as well as routine service: glycol testing and top-up before each winter, coil cleaning after cottonwood and harvest dust seasons, tower or adiabatic media startup and drain-down, heat tracing checks, and chiller service under the EPA’s leak repair rules. Paul Industries offers those programs for the halls it builds and for existing facilities across the state, starting each one with a survey of the plant and its service history.
A good maintenance program also feeds the water reports. Metered makeup and blowdown, read monthly and checked against the design water balance, give the owner a reliable semi-annual figure for the Board of Water Management and an early warning when a valve leaks or a float sticks.
What drives the price of a South Dakota data center mechanical package?
The price of a South Dakota data center mechanical package is driven by capacity and redundancy, the heat rejection method, liquid cooling scope, piping length and material, the share of work prefabricated, winter protection, fuel storage, and the taxes that apply to contract work. The 2 percent contractor’s excise tax on realty improvement contracts and ordinary tax on equipment both belong in the budget, since the 2026 exemption bill did not pass.
Paul Industries gives an early budget from comparable plants once the IT load, density and site are known, then a firm price after design development, and offers supply-only prefabricated modules, design-build or complete installation. EIA data put the 2025 statewide commercial average at 10.61 cents per kilowatt-hour, well under the 13.37-cent national figure, so efficiency measures are judged on the owner’s actual service agreement rather than the average.
Paul Industries on South Dakota data center sites
Paul Industries is headquartered at 256 Shore Drive in Kilmarnock, Virginia, the base for its data center mechanical contractor work in Virginia, and it builds mechanical systems for data centers across South Dakota, in every other state and abroad. Campus experience from projects such as data center mechanical contractor work in Illinois carries into South Dakota planning, along with the cold-weather practice shown on the Midwest page.
The South Dakota page lists the wider plant work Paul Industries handles in the state. Send the IT load, phasing plan, site and utility status, or request a quote for the mechanical package.
Standards referenced: South Dakota SB 135 (2026), Data Center Bill of Rights for Citizens · South Dakota HB 1038 (2026) · SDCL chapter 10-46A, contractor's excise tax · SDCL chapter 36-16, electrical contracting · SDCL chapter 36-25, plumbing · SDCL 11-10-5 and 11-10-6, 2024 International Building Code · ARSD 74:56:01 and 74:56:03, storage tanks · ASME B31.9 · ASME B31.3 · NFPA 30 · NFPA 110
Frequently asked questions
Is Paul Industries one of the mechanical contractors Sioux Falls, SD data center owners can call?
Paul Industries takes data center mechanical work in Sioux Falls and across Lincoln and Minnehaha counties: central plants, dry cooler yards, piping mains, liquid cooling and fuel systems. Sioux Falls is reviewing data center ordinances through a council committee due to report by January 12, 2027, so Paul Industries checks the rules in force at each permit. Call 201-450-8280 to discuss a project.
Can Rapid City and Black Hills data center projects get their mechanical package from Paul Industries?
Paul Industries builds data center mechanical systems in Rapid City and the Black Hills region. Rapid City’s longer outdoor working season and dry air suit adiabatic heat rejection, while its 17.7 nights a year at or below zero still call for freeze protection on every outdoor circuit. Yards and mains are scheduled for the warmer months and indoor work continues through winter.
Which firm builds mechanical plants for northeastern halls around Aberdeen, Watertown and Brookings?
Paul Industries installs data center mechanical systems in Aberdeen, Watertown, Brookings and northeastern South Dakota. Watertown averages about 84 days a year that never rise above freezing and Aberdeen about 78, so mechanical packages there rely on prefabricated modules, early underground work and heated enclosures for winter connections.
Are data centers in South Dakota subject to a state moratorium?
The 2026 Legislature rejected a statewide moratorium: SB 232 was tabled and HB 1301 was deferred to the 41st legislative day. SB 135 confirms that counties and cities keep authority to limit, prohibit or regulate data centers, so conditions can differ by site. Paul Industries reviews the county or city rules before designing the mechanical yard.
Does South Dakota offer a sales tax exemption for data center equipment?
The 2026 bill that would have exempted data center goods and services, HB 1005, was deferred to the 41st legislative day, so chillers, coolers and other mechanical equipment carry ordinary tax treatment. Contract work also carries the 2 percent contractor’s excise tax. Paul Industries shows both in its South Dakota budgets so the owner sees the full figure.
What does the South Dakota contractor's excise tax mean for a data center project?
SDCL 10-46A-1 imposes a 2 percent excise tax on the gross receipts of prime contractors engaged in realty improvement contracts, and SDCL 10-46A-2 extends it to firms throughout the construction trades. A data center’s mechanical installation is a realty improvement, so the tax is part of the contract price. Paul Industries includes it as a stated line in every South Dakota proposal.
Which statute licenses electrical work on a South Dakota data center?
SDCL 36-16-1 requires a license to engage in electrical contracting in South Dakota, administered by the State Electrical Commission, and that covers equipment power connections and control wiring on mechanical systems. Plumbing falls under SDCL chapter 36-25 and the State Plumbing Commission. Paul Industries plans the mechanical scope so every connection meets the statute that governs it.
Which building code applies to a new South Dakota data center?
SDCL 11-10-5 requires county and city codes for non-residential buildings to comply with the 2024 International Building Code, and SDCL 11-10-6 makes the 2024 edition the design standard for buildings commenced after July 1, 2026 where no ordinance exists. Companion mechanical and energy codes come from the jurisdiction’s ordinance. Paul Industries designs supports, anchorage and equipment rooms to the adopted editions.
Do generator fuel tanks on a South Dakota data center need state approval?
Tanks holding regulated substances such as diesel must be registered with the Department of Agriculture and Natural Resources, and plans for a new tank system go to the department at least 30 days before installation. Aboveground systems follow ARSD 74:56:03, including overfill control and secondary containment. Paul Industries prepares the submittal and installs the tanks, pumps and piping.
What does SB 135 require of a data center's utility service?
Each electricity provider must, under SB 135, maintain a distinct set of service terms for any data center whose demand reaches 10 megawatts and recover from it all costs fairly attributed to serving it, including costs incurred if the data center leaves the system or materially reduces its load. HB 1038 lets the Public Utilities Commission charge the review cost. The mechanical plant’s demand profile feeds those agreements.
Which utilities serve data center sites in South Dakota?
The Public Utilities Commission lists six investor-owned electric companies in South Dakota: Xcel Energy, NorthWestern Energy, Black Hills Energy, Otter Tail Power, MidAmerican Energy and Montana-Dakota Utilities, alongside rural electric cooperatives and municipal systems. The serving utility shapes energization dates and the data center tariff. Paul Industries sequences mechanical startup to each energization stage.
What permits does groundwater for a data center plant require in South Dakota?
Outside domestic use, every South Dakota water use needs an appropriation from the Water Management Board, so a well supplying cooling makeup or humidification needs an appropriation permit. A hall of 10 megawatts or more also gives water providers notice of projected use under SB 135. Paul Industries provides the flow and annual use figures for both.
How is a new hall connected to a South Dakota campus loop already carrying load?
New halls join a live campus loop through valved tie-ins prepared during earlier phases, or through hot taps and line stops where no valve was left. Each step follows a method of procedure that confirms remaining redundancy and the rollback. Paul Industries prefabricates the connecting spools so valves stay open for the shortest possible time.
Which mechanical equipment has the longest lead times for a South Dakota data center?
Large chillers, dry cooler banks, switchgear-fed pump packages, coolant distribution units and large generators typically carry the longest lead times, often longer than the building’s construction. Releasing those orders early, with refrigerant and low-ambient requirements specified for South Dakota, protects the schedule. Paul Industries manages procurement and expediting within the mechanical package.
Are prefabricated pipe modules for a South Dakota hall available as supply-only?
Paul Industries supplies pipe rack modules, pump skids, CDU connection kits and header spools for South Dakota data centers on a supply-only basis, pressure tested and delivered with drawings and test records. Owners can also choose design-build or complete installation. The fabrication and documentation standard is the same on every route.
What records come with the mechanical turnover on a South Dakota data center?
The turnover file includes as-built drawings, pressure test and flushing records, equipment startup reports, functional test results, glycol and water treatment records, tank registrations, permits and inspection sign-offs, sequences of operation and maintenance schedules, plus the metered water figures SB 135 reporting needs. Paul Industries assembles it as the work proceeds.
What does Paul Industries need to price mechanical work on a South Dakota data center?
Send the IT load and phasing, rack density, cooling concept, site location, utility and water status, drawings at whatever stage they are, and the target dates. Paul Industries returns a budget from comparable plants and then a firm price after design development. Call 201-450-8280 or request a quote.
Building a data hall or campus in South Dakota?
Send the IT load, phasing plan, site and utility status for the campus. Call 201-450-8280 or request a quote.