Paul Industries designs, supplies, installs and starts up data center liquid cooling in Wyoming: coolant distribution units, technology cooling loops, cold plate manifolds, rear door heat exchangers and the dry coolers that reject the heat to Cheyenne’s cool, dry air. Wyoming suits warm-water liquid cooling unusually well, because the outdoor air is cool enough to make the loop water without compressors for most hours of the year. The work is in sizing for the warm exceptions, protecting every outdoor pipe from deep cold, and keeping the loop clean from the first fill.
Request a quote or call 201-450-8280
How data center liquid cooling in Wyoming uses the climate
Data center liquid cooling in Wyoming uses the climate by running the facility water warm enough that dry coolers alone can produce it nearly all year. Liquid-cooled processors accept supply water far warmer than the chilled water an air-cooled hall needs, and in Cheyenne the outdoor air sits below the temperatures that warm-water loops require for the great majority of hours.
The national data center liquid cooling page explains how liquid cooling works in data centers: a coolant distribution unit separates the rack-side technology cooling loop from the facility water, cold plates or rear door coils carry heat from the IT equipment into the loop, and the facility side rejects it through dry coolers, towers or chillers. This page applies that arrangement to Wyoming’s weather, water and winter.
Dry cooler hours for each ASHRAE water class in Wyoming
Dry cooler hours for a Wyoming liquid loop depend on the ASHRAE facility water class the IT equipment is rated for, since the classes are named for the maximum supply temperature in degrees Celsius: W17, W27, W32, W40, W45 and W+. Assuming a dry cooler can deliver water about 10 degrees Fahrenheit above the outdoor air, NOAA’s 2021 to 2024 hourly records give the share of hours each class can be met with no compressor running.
| Class and supply limit | Cheyenne | Laramie | Casper | Gillette |
|---|---|---|---|---|
| W17, 62.6 F | 58.0% | 66.1% | 62.3% | 58.6% |
| W27, 80.6 F | 85.4% | 89.3% | 85.3% | 83.9% |
| W32, 89.6 F | 93.8% | 96.1% | 92.5% | 91.9% |
| W40, 104 F | 99.9% | 100% | 99.6% | 99.2% |
The pattern is plain. A W32 loop in Cheyenne runs on dry coolers for about 94 percent of hours and needs trim cooling, from evaporative assist or a small chiller, for the rest. A W40 loop is met by dry coolers in practically every hour the four airports recorded. Many owners choose the warmest class the IT vendor will warrant and size trim cooling for the few hundred hours above it; a tighter approach widens those percentages further, and a looser one narrows them.
Are data centers liquid cooled in Wyoming today?
Data centers in Wyoming already run water-cooled computing at scale, most visibly at the NCAR-Wyoming Supercomputing Center in Cheyenne, which opened in 2012. Its current flagship, Derecho, is an HPE Cray EX cluster installed in 2023 with a peak of 19.87 petaflops, 2,488 compute nodes and 82 GPU nodes, and NCAR’s own description shows the cold water that keeps it cool.
The center’s operating record offers two lessons for anyone planning liquid-cooled racks in Wyoming. First, efficiency compounds: NCAR reported that Derecho uses about 40 percent more electricity than its predecessor while delivering about 3.5 times the throughput. Second, the plant ages on its own clock. In June 2025 the center shut down Derecho’s compute nodes for a week to swap out power and cooling hardware worn out by more than ten years of service, timing the job for good weather since much of it happened outdoors, while temporary cooling carried the systems left running. A liquid cooling design that provides isolation, bypasses and connection points for temporary equipment makes that kind of renewal far less disruptive.
Commercial campuses under construction in Cheyenne are being built for dense computing too, and Microsoft has said its latest datacenter designs can, in some cases, eliminate the need for ongoing water for cooling after an initial fill. Closed liquid loops rejecting heat to dry coolers are one of the arrangements that make that possible.
Liquid cooling options for Wyoming halls
Liquid cooling options for Wyoming halls range from rear door heat exchangers on existing racks to direct-to-chip cold plates and immersion tanks, and the choice changes what the facility plant must deliver. The table compares them as they apply in Wyoming conditions.
| Option | Facility water it needs | Wyoming fit | Points to settle |
|---|---|---|---|
| Rear door heat exchangers | Cooler water, often W17 to W27 | Good for retrofits; dry coolers carry most hours, trim cooling in summer | Dew point margin is wide in Cheyenne; door weight and hose routing |
| Direct-to-chip cold plates | Warm water, commonly W27 to W40 | Very good; dry coolers carry 92 to 100 percent of hours depending on class | Residual air load in the hall, CDU redundancy, filtration |
| Single-phase immersion | Warm water to the tank heat exchangers | Very good; long dry cooler hours | Floor loading, fluid handling, service access |
| Hybrid rows (liquid plus air) | Two temperatures: warm for liquid, cooler for air | Common in expansions of existing halls | Two loops or a mixing arrangement; controls that keep both stable |
Paul Industries supplies and installs the liquid cooling data center equipment on the facility and technology loop sides of every option: coolant distribution units, manifolds, rack hoses and quick disconnects as specified by the IT vendor, filtration, expansion tanks, dry coolers and trim cooling, along with the piping, valves and controls that connect them.
Freeze protection for liquid loops in a Wyoming winter
Freeze protection for a Wyoming liquid loop starts outside, where dry coolers and their piping face the state’s coldest air: Cheyenne recorded minus 25 degrees between 2021 and 2024, Gillette minus 38 and Casper minus 42. The technology loop inside the building stays warm, but the facility loop running to the yard must survive a power loss on the coldest night.
Two arrangements dominate. In the first, the outdoor loop is filled with propylene glycol at a strength chosen for the lowest temperature the coil can see while idle, and a heat exchanger separates it from the water-filled loop inside. In the second, the whole facility loop carries glycol, which simplifies the system but lowers heat transfer and raises pumping power. Either way, the design adds minimum-flow control through outdoor coils, fan cycling or louvers for very cold weather, drain and vent points, and heat trace on small exposed lines. Paul Industries designs the arrangement, sets the glycol strength, and proves the sequences in cold weather before the first winter.
Very warm return water helps here. A W32 or W40 loop returns water hot enough that, while the loop is running, the outdoor coils are unlikely to freeze; the hazard is the stopped loop. Control sequences therefore treat loss of flow in winter as an alarm with an automatic response.
| Arrangement | How it works | Advantages | Trade-offs |
|---|---|---|---|
| Glycol outdoor loop with heat exchanger | Dry coolers on propylene glycol; plate exchanger to an indoor water loop | Indoor loop stays water, so heat transfer is high and pumping is low | Exchanger approach adds a few degrees to the supply temperature |
| Glycol throughout the facility loop | One loop from dry coolers to CDUs, all on glycol | Simplest piping; no exchanger | Higher pumping power and lower capacity; larger glycol volume to maintain |
| Drain-down outdoor coils | Coils drain to a heated tank when the loop stops | No glycol on the outdoor side | Relies on valves and controls working in a power loss; slow restarts |
| Indoor dry coolers with ducted air | Coils inside a heated enclosure, outdoor air ducted to them | Coils never see subzero air when idle | Building cost, louvers and dampers that must close reliably |
Dew point and condensation on Wyoming liquid piping
Condensation risk on liquid cooling piping in Wyoming is low, because the air is dry for nearly the entire year. Cheyenne’s dew point reached 60 degrees for only about 29 hours a year in 2021 to 2024, and Laramie never reached it, so even a rear door coil supplied with W17 water sits above the room dew point almost all the time.
The practical consequence is design freedom: insulation on technology loop piping is chosen for energy and safety rather than vapor control, and facility water can run cooler on peak days without sweating. The opposite problem appears in winter, when very dry halls build static and humidifiers draw water, so the hall’s humidity control still matters even though the racks are liquid cooled.
Fill water, coolant and the drain-down route
Fill water for a Wyoming technology cooling loop should never be untreated city or well water, because minerals, chlorine compounds and microbes in raw supply foul cold plates and shorten coolant life. Cheyenne draws about 70 percent of its water from mountain streams and about 30 percent from wells, so the raw supply changes with the season and the source; the loop is filled from treated, low-conductivity water and dosed with the coolant or inhibitor package the IT vendor specifies.
The drain-down route matters as much as the fill. Loop water and coolant leaving a Cheyenne site are industrial discharges under the city’s pretreatment program, so the design includes holding capacity and sampling connections, and the commissioning plan names where flush water and spent coolant will go. The data center commissioning in Wyoming page covers that sequence, and the treated fill itself can come from the plant described on ultrapure water systems in Wyoming.
Technology loop materials, filtration and cleanliness
Technology loop materials for a Wyoming hall are chosen for compatibility with the cold plates and the coolant, since the loop carries fluid through passages a fraction of a millimeter wide. Stainless steel, typically 304L or 316L, is common for headers and manifolds, with materials and wetted parts matched to the IT vendor’s compatibility list; mixed metals, uncontrolled solder and unlisted elastomers are avoided because they shed corrosion products or leach into the coolant.
Filtration is set by the cold plate maker, often in the tens of microns on the technology loop, with side-stream or full-flow filters at the coolant distribution unit. Cleanliness starts in fabrication: pipe is cut, deburred, cleaned and capped before it reaches the hall, welds are purged, and every spool is flushed before installation. Paul Industries prefabricates loop spools and manifold assemblies off site under clean conditions, pressure tests them, and delivers them capped, which shortens the time crews spend working inside a live or nearly finished hall during a Wyoming winter.
After installation, the loop is flushed at velocity through temporary strainers, sampled until particle counts meet the specification, then filled with the final coolant. Coolant chemistry, conductivity and microbial counts are recorded at fill and again after the first weeks of operation, because a loop that begins clean is far easier to keep clean.
Phasing liquid cooling across a growing Wyoming campus
Phasing liquid cooling across a growing Wyoming campus means building the facility water backbone for the full build-out while installing coolant distribution units and rack manifolds only as each phase of racks arrives. Cheyenne campuses are being planned in hundreds of megawatts and built a building at a time, so the backbone decisions made in phase one govern every phase after it.
Paul Industries sizes facility headers, valve stations and dry cooler pads for the planned end state, installs capped connections for future rows, and keeps unused branches short or isolated so they do not become stagnant dead legs. Each new phase is tied in under a written procedure while earlier phases run, and the controls are expanded in step, so the operations team sees one consistent system rather than a patchwork of generations. Where the IT generation changes between phases, the backbone can carry two water classes, with a mixing or exchanger station serving the newer, warmer class.
How do liquid cooled data centers work at 6,100 feet?
Liquid cooled data centers work at 6,100 feet much as they do at sea level, with three adjustments for altitude. Atmospheric pressure at Cheyenne is about 11.7 psi rather than 14.7, which raises the risk of air coming out of solution at high points and lowers the suction margin of pumps drawing from vented tanks. Dry cooler fans move thinner air, so coils and fans are selected with the site density. And expansion tanks, air separators and vents are sized and placed for the lower ambient pressure.
Paul Industries pressurizes technology and facility loops so that every high point stays above atmospheric pressure in all operating states, installs air separation where the water is warmest, and checks pump suction conditions at the actual site elevation.
How much cooling does a data center need when racks go liquid?
How much cooling a data center needs does not change when racks go liquid, because every watt the IT equipment draws still becomes heat; what changes is where that heat leaves and at what temperature. In a direct-to-chip hall, most of the heat leaves in the warm liquid loop and a residual share stays in the room air, carried by air handlers or fan walls.
The split matters for Wyoming designs. The liquid share rides on dry coolers most of the year; the residual air share uses the outdoor air economizer most of the year. Paul Industries sizes both sides from the IT vendor’s heat split at full load, then checks the hot hours on the site’s weather record so trim cooling covers the gap without oversizing.
Wyoming data center power usage and the liquid loop
Wyoming data center power usage falls when liquid cooling lets dry coolers replace compressors, but pump energy rises, and the balance should be calculated, not assumed. A large technology loop moves a lot of water: as an illustration, 150 kilowatts of pumps running all year use about 1.31 million kilowatt-hours, roughly $125,000 at Wyoming’s 2025 commercial average of 9.53 cents.
Paul Industries reduces that figure with low-pressure-drop manifolds, variable-speed pumps controlled on rack differential pressure, and a supply temperature high enough to keep compressors off. Heat reuse is a further option in a city that averages about 6,959 heating degree days a year: warm return water can heat offices, warehouses or snowmelt areas on the campus through the long Cheyenne winter.
Controls for a liquid loop that sees 100 degree swings
Controls for a Wyoming liquid loop have to hold a steady supply temperature while the outdoor air swings across more than 100 degrees between a January night and a July afternoon. At minus 25, a dry cooler at full fan speed would overcool the loop; at 95, it may fall short and call for trim cooling. The control sequence moves smoothly between those states without upsetting the racks.
Paul Industries writes the sequence in stages: fan speed modulation first, then fan staging and coil bypass in cold weather, then evaporative assist or trim chillers as the air warms. Supply temperature is controlled at the coolant distribution unit, with the facility loop allowed to float within a band, and rack differential pressure drives pump speed. Every transition is trended through the first year, and the setpoints are tuned to the real campus behavior.
Power continuity belongs in the same design. Cold plates carry so little thermal mass that a loop which stops flowing lets processors reach their limits within seconds, so coolant distribution unit pumps and their controls are normally fed from uninterruptible power, with redundant pumps that take over automatically. On Cheyenne campuses where large loads pair with on-site generation, the transfer to generators must keep the technology loop moving throughout. Paul Industries specifies pump redundancy, the power source for each pump and the restart behavior, and tests a pump failure and a utility failure at commissioning.
Does the Wyoming sales tax exemption reach liquid cooling equipment?
Wyoming’s data processing services center exemption covers specialized heating and air conditioning equipment used to control the computer environment, when a qualifying center buys more than $2 million of such equipment in a calendar year and has invested at least $50 million in Wyoming. Whether a specific coolant distribution unit, manifold or dry cooler qualifies is for the Department of Revenue to decide. Paul Industries lists liquid cooling equipment separately from piping and labor on invoices so the owner’s advisers can make that case clearly.
What does data center liquid cooling cost in Wyoming?
Data center liquid cooling cost in Wyoming is driven by the number and capacity of coolant distribution units, the redundancy level, the length and material of the technology loop, the dry cooler and trim cooling plant, freeze protection, and whether the work is a new hall or a retrofit in a live one. Retrofits cost more per rack because of hot work controls, phasing and temporary cooling.
Paul Industries prices in two steps: a budget range drawn from comparable projects while the rack plan is forming, then a fixed proposal once the IT vendor’s flow, temperature and connection requirements are known. Supply-only orders for coolant distribution units, manifolds and dry coolers, design-build packages and complete installation are all available.
Who provides liquid cooling for data centers in Wyoming?
Paul Industries provides liquid cooling for data centers in Wyoming, from the dry cooler yard to the rack manifold: design, supply, installation, flushing, filling, startup and service of coolant distribution units, technology loops, rear door heat exchangers and immersion tank connections. Owners comparing liquid cooling data center providers for a Cheyenne, Laramie or Casper hall get the whole loop from Paul Industries under one contract.
From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries accepts liquid cooling work throughout Wyoming and the other 49 states. Its data center liquid cooling in Virginia page covers the headquarters state, and the California liquid cooling page shows how a very different energy code shapes the same loop. The facility plant behind the loop is covered on data center cooling in Wyoming, campus construction on data center mechanical contractors in Wyoming, and loop piping practice on process piping in Wyoming. The Wyoming hub lists every service in the state.
Paul Industries liquid loops for Wyoming racks
Paul Industries builds liquid loops for Wyoming racks that run on dry coolers through most of the year, stay safe through the coldest nights, and start clean from the first fill. Send the rack count and heat load, the IT vendor’s liquid cooling requirements and water class, the hall layout and the site location, and request a quote.
Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments (liquid cooling classes) · ASME B31.9 · ASME B31.3 · 2024 International Mechanical Code · W.S. 39-15-105 (data processing services center exemption)
Frequently asked questions
Who installs liquid cooling for dense racks in Cheyenne, Wyoming?
Paul Industries installs liquid cooling for dense racks in Cheyenne: coolant distribution units, technology loop piping, rack manifolds, rear door heat exchangers and the dry coolers and trim cooling on the facility side. Each loop is pressurized and vented for Cheyenne’s roughly 6,100 foot elevation, filled with treated water and the specified coolant, and proven under heat load before servers connect.
Does Paul Industries build liquid cooling for halls in Laramie, Casper and Sheridan?
Paul Industries builds liquid cooling for halls in Laramie, Casper, Sheridan and elsewhere in Wyoming. Laramie’s cooler, thinner air gives the longest dry cooler hours, while Casper’s colder winters, down to minus 42 degrees in 2021 to 2024, call for careful glycol and minimum-flow design on the outdoor loop. Each design uses the hourly weather record nearest the site.
Can a Wyoming liquid loop run without chillers?
A Wyoming liquid loop rated for the W40 class can run on dry coolers in practically every hour Cheyenne recorded from 2021 to 2024, assuming a 10 degree approach, and a W32 loop for about 94 percent of hours. Most owners still install trim cooling or evaporative assist for the hottest hours and for redundancy. Paul Industries sizes the trim to the site’s weather record.
Should a Wyoming liquid loop keep its outdoor coils on a separate glycol circuit?
Most Wyoming liquid loops benefit from a separate outdoor glycol circuit, joined to the water-filled indoor loop through a plate heat exchanger, because the dry coolers face readings as low as minus 25 at Cheyenne and minus 42 at Casper. Water inside keeps heat transfer high and pumping power low; glycol outside protects the coils during a stop. Paul Industries sizes the exchanger approach so the split costs little in supply temperature.
How much water do data centers use for cooling when racks are liquid cooled in Wyoming?
A liquid-cooled hall that rejects heat through dry coolers uses very little water after the initial fill, because the loops are closed and evaporation is used only for trim cooling, if at all. Water use rises if towers or evaporative assist carry the hottest hours. Paul Industries estimates annual water for each arrangement from the site’s hourly weather before the design is fixed.
Why is condensation rarely a problem on Wyoming liquid cooling piping?
Condensation is rarely a problem on Wyoming liquid cooling piping because the dew point is low: Cheyenne reached a 60 degree dew point for only about 29 hours a year in 2021 to 2024, and Laramie never did. Supply water well below room temperature still stays above the dew point almost all the time. Paul Industries still checks the dew point margin at peak conditions for each hall.
What water should fill a technology cooling loop in Cheyenne?
A technology cooling loop in Cheyenne should be filled with treated, low-conductivity water dosed with the coolant or inhibitor package the IT vendor specifies, never raw city or well water. Cheyenne’s supply blends mountain stream water and well water, so its chemistry shifts. Paul Industries supplies the treated fill, records conductivity and chemistry at fill, and plans the drain-down route under the city’s pretreatment rules.
How does altitude affect coolant distribution units and pumps in Wyoming?
At Cheyenne’s elevation atmospheric pressure is about 11.7 psi, so air comes out of solution more easily at high points and pumps drawing from vented tanks have less suction margin. Paul Industries pressurizes loops so every high point stays above atmospheric pressure, places air separators where the water is warmest, and checks pump suction at the site elevation.
Can liquid cooling heat warm buildings on a Wyoming campus?
Liquid cooling return water is warm enough to heat offices, warehouses and snowmelt areas, and Cheyenne averages about 6,959 heating degree days a year, so the heating season is long. A heat recovery loop with a plate heat exchanger connects the warm return to the building heating system. Paul Industries designs the connection so the data hall’s cooling never depends on the heating load.
Can liquid-cooled rows be added to an operating Cheyenne hall?
Liquid-cooled rows can be added to an operating Cheyenne hall by tapping facility water from the existing plant, or adding a dedicated dry cooler loop, and running a new technology loop to the rows behind coolant distribution units. Tie-ins are made under written procedures with isolation and rollback steps. Paul Industries phases the work so live racks keep their cooling throughout.
What does data center liquid cooling cost per rack in Wyoming?
The cost per rack depends on rack heat load, coolant distribution unit capacity and redundancy, loop length and material, the facility plant and whether the hall is new or live. Retrofits cost more per rack than new halls. Paul Industries gives a budget range from comparable projects first and a fixed proposal when the IT vendor’s requirements are known.
Does the Wyoming data center tax exemption cover coolant distribution units?
Wyoming’s exemption covers specialized heating and air conditioning equipment that controls the computer environment for qualifying data processing services centers, and the Department of Revenue decides whether a specific item qualifies. Coolant distribution units and dry coolers are cooling equipment, so owners often seek the exemption for them. Paul Industries itemizes equipment separately on invoices to support the claim.
How are leaks detected and contained in a Wyoming liquid-cooled hall?
Leaks in a liquid-cooled hall are detected with sensing cable or point sensors under manifolds and coolant distribution units, pressure and flow monitoring on each loop, and makeup water metering that reveals slow losses. Containment uses drip trays, isolation valves that close on alarm and loop volumes kept small by design. Paul Industries installs and tests each detection point before servers connect.
Who provides liquid cooling for data centers along with the chiller plant?
Paul Industries provides liquid cooling for data centers together with the facility plant behind it: chillers or evaporative trim, dry coolers, pumps, heat exchangers and controls, so one contractor answers for the loop from the rack to the yard. In Wyoming that combined scope lets the trim plant be sized for the few warm hours rather than the whole year.
How often does a Wyoming liquid loop need service?
A Wyoming liquid loop needs regular coolant sampling for chemistry, conductivity and microbial counts, filter changes on the technology loop, glycol strength checks on the outdoor loop before each winter, and inspection of quick disconnects and hoses. Dry coolers need coil cleaning and fan checks. Paul Industries offers service plans that cover the whole loop and keep the records the IT vendor’s warranty expects.
Does Paul Industries supply CDUs and manifolds for Wyoming projects as supply only?
Paul Industries supplies coolant distribution units, manifolds, filtration, expansion tanks and dry coolers for Wyoming projects as supply-only orders, with selections checked for site elevation and winter temperatures. Design-build and complete installation are available when the owner wants one contract for the whole loop.
Which rack and hall details start a Wyoming liquid cooling estimate?
A Wyoming liquid cooling estimate starts from the rack count and heat load per rack, the IT vendor’s liquid cooling specification and water class, the share of heat going to liquid versus room air, the hall layout and any existing cooling plant. With those in hand, Paul Industries prepares a budget figure first and a firm price after the design review. Phone 201-450-8280 or use the quote request form to begin.
Bringing liquid-cooled racks into a Wyoming hall?
Send the rack heat loads, the IT vendor’s water class and the hall layout for the Wyoming site. Call 201-450-8280 or request a quote.
