Paul Industries designs, fabricates, installs and services ultrapure water systems in Wyoming for power and steam plants, research laboratories, data center liquid cooling loops and industrial users that need water stripped of ions, organics, particles and dissolved gases. Wyoming feedwater ranges from snowmelt-fed city supplies to mineral-heavy well water, the winters chill feed water and threaten every outdoor line, and the disposal route for reject water has to be settled with state and city regulators before the plant is built. Paul Industries plans all three into the treatment train from the start.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Drinking water oversight EPA Region 8 runs the program in Wyoming, the one state without primacy
Cheyenne supply About 70% mountain streams, 30% wells (Cheyenne BOPU)
Deep-well disposal Class I industrial injection wells regulated by Wyoming DEQ
Freezing hours About 2,780 a year at Laramie, 2021 to 2024 (NOAA)
Reviewed November 2026

Where ultrapure water systems in Wyoming are needed

Ultrapure water systems in Wyoming serve a different mix of users from the semiconductor-heavy markets of other states. The demand comes from high-pressure steam generation, research and testing laboratories, the closed liquid loops of high-density computing, and industrial processes where trace impurities cause scale, corrosion or product defects. The national ultrapure water systems page explains the treatment stages and specifications in general; this page applies them to Wyoming water, weather and permits.

Wyoming users of ultrapure water and what each needs
UserWhere in WyomingWhat the water must doTypical system
High-pressure steam and power generationGenerating stations and industrial boiler plants statewide; a new reactor plant under construction at KemmererMake up boiler and steam cycle losses without depositing silica or salts on turbines and tubesRO followed by EDI or mixed-bed polishing; a boiler feedwater demineralizer on older plants
Research and testing laboratoriesUniversity, state and federal laboratories in Laramie and CheyenneReagent-grade water for analysis, cell culture and instrumentsCentral loop or a laboratory ultrapure water system at each bench
Liquid-cooled computingCheyenne campuses and research computingLow-conductivity fill and makeup for technology cooling loopsRO and deionization skid with storage, sized for fills and top-ups
Industrial processesMineral, chemical, energy and manufacturing plantsRinse, dilution, catalyst and analyzer water free of trace ionsRO and EDI with polishing and a recirculating loop

Wyoming’s most notable new steam project is TerraPower’s Natrium plant at Kemmerer, which received what the U.S. Department of Energy described as the first construction permit ever issued by the Nuclear Regulatory Commission for a commercial non-light-water power reactor, in March 2026. Any steam turbine cycle depends on very pure makeup water, and plant construction across the state keeps that need current.

Wyoming feedwater: city supplies, wells and seasonal change

Wyoming feedwater for an ultrapure plant comes from city systems fed by snowmelt and reservoirs, from municipal and private wells, or from a blend of the two, and each source sets a different starting point. Cheyenne, for example, draws about 70 percent of its water from mountain streams through its trans-basin system and about 30 percent from wells in four well fields, according to its Board of Public Utilities, so the mineral content and temperature reaching a plant can shift with the season and the mix.

Wells elsewhere in the state often carry higher hardness, sulfate, silica or dissolved solids than snowmelt supplies, and some carry iron, manganese or hydrogen sulfide. Paul Industries begins every Wyoming design with a full water analysis taken across seasons where possible, including silica, boron, total organic carbon, alkalinity and microbial counts, because the reverse osmosis recovery, antiscalant choice, pretreatment and polishing load all follow from those numbers. Sites that plan their own well must obtain a permit from the State Engineer before the well is constructed, under W.S. 41-3-930.

EPA Region 8 and the drinking water behind your feed

Drinking water behind a Wyoming ultrapure plant is regulated differently from every other state, because Wyoming has not assumed primacy for the federal Public Water System Supervision program. A 2023 Wyoming Department of Environmental Quality briefing to the Legislature stated that Wyoming is the only state in the nation in that position, and EPA Region 8 therefore implements and enforces drinking water rules for Wyoming’s public water systems directly.

That arrangement matters in two practical ways. First, the compliance records and water quality data for a city supply are reported under EPA’s program, so the plant designer reads EPA’s records alongside the utility’s reports. Second, an industrial site that drills its own well and supplies drinking water to enough people on site can itself become a public water system under federal rules, with EPA as the regulator and the state Department of Environmental Quality issuing the construction permits it requires. Paul Industries checks the status early so the domestic water and the ultrapure feed are designed with the right approvals.

Cold feedwater and reverse osmosis sizing in Wyoming

Cold feedwater reduces reverse osmosis output, and Wyoming plants see some of the coldest feed in the country through long winters: Laramie recorded about 2,780 hours a year at or below freezing in 2021 to 2024, and Casper reached minus 42 degrees. Water drawn from surface supplies and shallow mains cools with the season, and membrane permeability falls as viscosity rises.

A Wyoming RO train is therefore sized at the coldest expected feed temperature, not the average. The usual responses are added membrane area, higher feed pressure within the membrane’s limits, or a feed water heat exchanger that tempers incoming water using a waste heat source such as boiler blowdown, compressor heat or a warm return loop. Paul Industries evaluates the options with the plant’s own utilities, since tempering the feed often saves pump energy and membranes as well as capacity.

Temperature also moves the chemistry. Silica solubility falls as water cools, so the RO recovery that is safe in August may scale the last membranes in January, and antiscalant dosing and recovery setpoints are checked at both ends of the year. Conversely, summer feed from a reservoir can carry more organics and microbial activity than winter feed. Paul Industries sets recovery, antiscalant and cleaning intervals from the seasonal water analyses and trends normalized permeate flow and salt passage so operators can tell a temperature effect from fouling. Where feed temperature varies widely, a modest feed tempering heat exchanger often pays for itself by keeping the RO at a steady, predictable operating point all year.

Altitude, dissolved gases and hot water sanitization

Altitude changes the gas and temperature behavior of an ultrapure plant in Wyoming, and some of the changes help. At Cheyenne’s roughly 6,100 feet, atmospheric pressure is about 11.7 psi instead of 14.7, so water open to the air holds proportionally less dissolved oxygen and nitrogen at equilibrium, about 80 percent of the sea-level amount at the same temperature. Degassing membranes and vacuum degasifiers still have work to do, but the starting load is lower.

Lower pressure also lowers the boiling point, to about 201 degrees Fahrenheit at Cheyenne and about 199 at Laramie. Hot water sanitization of loops and storage tanks typically runs near 80 to 85 degrees Celsius, so the margin to boiling in vented tanks is narrower than at sea level, and vents, rupture discs and pump suction conditions are checked for the actual site pressure. Paul Industries designs storage, venting and sanitization temperature control around the measured site elevation.

Ultrapure water system design for Wyoming plants

Ultrapure water system design for a Wyoming plant follows the familiar sequence of pretreatment, reverse osmosis, electrodeionization or ion exchange, polishing and a recirculating distribution loop, with each stage adjusted for the feed and the climate. The table sets out the main stages and the Wyoming details at each.

Ultrapure water treatment stages and Wyoming design details
StagePurposeWyoming detail
PretreatmentRemove particles, chlorine or chloramine, iron, hardnessSeasonal changes in city supplies; iron, manganese or sulfide on some wells
Reverse osmosisRemove most ions, organics and silicaSized at the coldest feed temperature; recovery set by silica and sulfate scaling limits
DegassingRemove carbon dioxide and oxygenLower dissolved gas at altitude; membrane contactors or vacuum units sized for site pressure
EDI or mixed-bed ion exchangeBring resistivity toward 18 megohm-cmFeed hardness and carbon dioxide control set EDI reliability
UV and polishingReduce total organic carbon and final ionsLow TOC targets for laboratories and analyzers
Storage and loopDeliver water at quality and flow to every point of useFreeze-protected routing, nitrogen blanket or vent filtration, sanitization within site boiling margins

Paul Industries prepares the full ultrapure water system drawing set, from P&IDs and equipment layouts to loop isometrics, and fabricates skids and loop spools off site so installation in the building is limited to setting and connecting.

Laboratory ultrapure water system or a central loop?

The choice between a laboratory ultrapure water system at each bench and a central loop depends on the number of users, the quality each needs, and the building’s layout. Point-of-use units fed from a central purified water supply suit research buildings where a few benches need Type 1 water and the rest need less; a central loop suits buildings where many users need the same high grade.

A Type 1 ultrapure water system for analytical work is typically specified around ASTM D1193 or the instrument maker’s limits, with resistivity close to the 18.2 megohm-cm theoretical maximum at 25 degrees Celsius and a low TOC ultrapure water system where organic analysis is involved. Paul Industries designs the purified water supply, the polishing at each point of use or in the central plant, and the loop that ties them together, for university, state and federal laboratories in Laramie, Cheyenne and elsewhere in Wyoming. An ultrapure water system for laboratory use is often the first stage of a building that later adds a central loop, so the design leaves room to grow.

Ultrapure water for liquid-cooled computing in Cheyenne

Liquid-cooled computing in Cheyenne needs a steady supply of low-conductivity water to fill and top up technology cooling loops, because raw city or well water would foul cold plates and shorten coolant life. Research computing at the NCAR-Wyoming Supercomputing Center already runs on water cooling, and Microsoft has said its latest datacenter designs can, in some cases, operate without ongoing water for cooling after an initial fill, which makes the quality of that fill decisive.

For a data center campus, a practical plant is often a compact RO and deionization skid with treated water storage, sized for the largest single loop fill plus routine makeup, and placed where it can serve each building as it comes online. Paul Industries builds these skids and the distribution to coolant distribution units, and coordinates the fill water quality with the loop design described on data center liquid cooling in Wyoming.

Reject water and concentrate: Wyoming disposal routes

Reject water from reverse osmosis and regeneration waste from ion exchange must go somewhere, and in Wyoming the route is set by the site’s location and the regulators involved. On city sewers, discharges fall under the city’s pretreatment rules; Cheyenne’s Board of Public Utilities has run an industrial pretreatment program since the early 1990s that permits, inspects and samples industrial users.

Disposal routes for ultrapure water reject and waste streams in Wyoming
RouteRegulatorWhere it fits
City sewerCity pretreatment program, such as Cheyenne BOPUSites on municipal service; limits on volume, chemistry and pH
Surface dischargeWyoming DEQ, WYPDES permitSites with a receiving water and a permitted outfall
Class I injection wellWyoming DEQ Underground Injection Control programLarger industrial sites with suitable geology below the deepest usable aquifer
Reuse on siteSite permits as applicableCooling tower makeup, washdown or process uses that accept higher dissolved solids

Paul Industries designs the plant to suit the route: higher RO recovery and reject reuse where disposal is limited, neutralization and equalization tanks where pH and flow must be controlled, and metering and sampling points that support the permit. Reusing RO reject as cooling tower makeup is often the simplest win on Wyoming industrial sites, since the tower tolerates dissolved solids the ultrapure loop cannot.

Freeze protection for ultrapure plants and loops

Freeze protection for an ultrapure plant in Wyoming covers every place water can sit still in cold air: feed lines entering the building, outdoor storage, reject lines to drains or outfalls, and loop piping that crosses unheated spaces. A frozen and split ultrapure line is doubly costly, because the repair must be followed by sanitization and a rinse-up before the loop returns to service.

Paul Industries routes ultrapure loops inside heated space wherever possible, insulates and traces the lines that must cross colder areas, keeps loop velocity up so water is always moving, and protects reject and drain lines, which are easy to forget because nothing downstream depends on them until they freeze and back up the RO. Equipment rooms are designed with heat loss calculated for Wyoming winters and wind, and alarms are set on room temperature as well as water quality.

Boiler and steam cycle makeup in Wyoming

Boiler and steam cycle makeup is one of the oldest uses of very pure water in Wyoming, because high-pressure boilers and turbines tolerate almost no silica, sodium or other dissolved solids. Many older plants still run a boiler feedwater demineralizer based on cation and anion ion exchange with acid and caustic regeneration; newer and retrofitted plants use reverse osmosis and electrodeionization, which avoid most regeneration chemicals.

Paul Industries converts and expands makeup plants for Wyoming generating stations and industrial boiler houses, adding RO ahead of existing ion exchange to cut regeneration chemical use, replacing exhausted trains with RO and EDI, and upgrading analyzers so silica and conductivity are watched continuously. Work at operating plants is planned around outages so the steam cycle never loses its makeup supply. Plants with boiler work alongside the water system can see boiler repair in Wyoming.

Materials of construction for Wyoming ultrapure loops

Materials for a Wyoming ultrapure loop are chosen for the purity required, the sanitization method and the temperature swings the piping will see. PVDF and other high-purity thermoplastics suit laboratory and electronics-grade loops because they leach very little; electropolished 316L stainless steel suits hot water sanitized systems and steam plant analyzer lines; and PVC or CPVC can serve lower grades such as loop fill water for computing, where the specification allows.

Wyoming adds two considerations. Thermoplastic pipe expands and contracts far more than steel, and loops that cross spaces with large seasonal temperature differences need expansion loops and supports that allow movement without stress at joints. And any line that could freeze is a weak point, because a cracked plastic fitting or split stainless tube means repair, sanitization and rinse-up before the loop returns to service. Paul Industries specifies materials and supports with those movements in mind, fabricates spools under clean conditions, and documents every weld, joint and test.

Expanding an ultrapure plant while it runs

Expanding an ultrapure plant while it runs is common in Wyoming laboratories and plants that add users over time, and it calls for planning that protects water quality in the operating loop. New generation capacity, such as an added RO or EDI train, is built and rinsed up on its own before it joins the system; new loop branches are fabricated clean, sanitized and qualified before connection.

Tie-ins are made at planned isolation points with the loop drained only as far as necessary, then sanitized and rinsed to specification before users return. Paul Industries writes each tie-in as a procedure with water quality acceptance criteria, schedules it with the users, and keeps temporary supply available where an outage would interrupt research or production.

Monitoring, sanitization and service

Monitoring an ultrapure plant means continuous resistivity or conductivity at key points, total organic carbon where organics matter, silica where steam purity matters, and periodic particle and microbial checks, with each reading recorded against its limit. Wyoming’s seasonal feedwater changes make trending especially useful, because a slow rise in RO permeate conductivity in winter may be temperature, while the same rise in summer may be fouling.

Paul Industries installs and calibrates the analyzers, writes the sanitization procedures for the loop and storage, and offers service agreements that cover membrane cleaning, resin and EDI care, UV lamp changes, filter changes, analyzer calibration and the records a laboratory, power plant or data center operator needs.

What sets an ultrapure water system price in Wyoming?

An ultrapure water system price in Wyoming is set by the flow and quality required, the feedwater analysis, the number of points of use and loop length, the redundancy level, materials of construction, and site-specific items such as feed tempering, freeze protection and the reject disposal route. A plant that must hold or treat its reject before disposal costs more than one that discharges to a sewer within limits.

Operating ultrapure water cost includes power, membranes, resin and EDI stacks, filters, UV lamps, chemicals and labor. Power is a steady share: as an illustration, 50 kilowatts of pumps and electrical load running all year use about 438,000 kilowatt-hours, about $38,000 at Wyoming’s 2025 industrial average of 8.65 cents per kilowatt-hour. Paul Industries prices in two steps, a budget range first and a fixed proposal once the water analysis and use points are settled, and offers supply-only skids, design-build and complete installation.

Who installs ultrapure water systems in Wyoming?

Paul Industries installs ultrapure water systems in Wyoming: pretreatment, reverse osmosis, degassing, electrodeionization and ion exchange, UV and polishing, storage, distribution loops and analyzers, along with the reject handling and freeze protection that Wyoming sites need. Owners comparing ultrapure water purification systems for a laboratory, power plant or data center campus get design, fabrication, installation, startup and service from Paul Industries under one contract.

Paul Industries has its headquarters at 256 Shore Drive in Kilmarnock, Virginia, and as an East Coast company it builds ultrapure plants across Wyoming and in every state. The ultrapure water systems in Virginia page covers the headquarters state, and the ultrapure water in Texas page shows a fab-driven market. In Wyoming, mineral plant water and evaporation work is covered on evaporation and process water in Wyoming, loop piping on process piping in Wyoming, storage on tank fabrication in Wyoming, and data center plants on data center cooling in Wyoming. Every Wyoming service page is linked from the Wyoming hub.

Ultrapure water from Paul Industries for Wyoming sites

Paul Industries delivers ultrapure water for Wyoming sites from the first water analysis to a running, monitored loop, with feed tempering, freeze protection and a permitted reject route built in. Send the feedwater analysis, the flow and quality at each point of use, the site location and the disposal options available, and request a quote.

Standards referenced: ASTM D1193 (reagent water) · Safe Drinking Water Act Public Water System Supervision program (EPA Region 8 in Wyoming) · Wyoming Underground Injection Control rules (Class I and Class V) · WYPDES (Wyoming Pollutant Discharge Elimination System) · W.S. 41-3-930 (underground water permits) · ASME BPE · ASME B31.3

Frequently asked questions

Who builds ultrapure water systems for laboratories in Laramie and Cheyenne?

Paul Industries builds ultrapure water systems for laboratories in Laramie and Cheyenne: purified water pretreatment, reverse osmosis, electrodeionization, polishing and distribution loops, or point-of-use polishers at each bench fed from a central supply. Designs account for cold winter feed water, the site’s elevation and the building’s disposal route for reject water.

Does Paul Industries install ultrapure makeup systems for power and steam plants in Gillette, Casper and Kemmerer?

Paul Industries installs makeup water systems for power and steam plants in Gillette, Casper, Kemmerer and elsewhere in Wyoming, from RO and EDI trains to upgrades of existing ion exchange demineralizers. Work at operating plants is staged around outages so the steam cycle keeps its makeup supply, and analyzers for silica and conductivity are added or upgraded.

Why does EPA, not the state, regulate drinking water in Wyoming?

Wyoming has not assumed primacy for the federal Public Water System Supervision program, and a 2023 state briefing described it as the only state in that position, so EPA Region 8 implements and enforces drinking water rules there. The state Department of Environmental Quality still issues construction permits for public water supplies. Paul Industries checks both when a site’s water supply is part of the project.

Does a site well for an ultrapure plant need a permit in Wyoming?

A site well needs a permit from the Wyoming State Engineer before construction begins, under W.S. 41-3-930, and if the well also supplies drinking water to enough people on site it can become a public water system under federal rules. Paul Industries designs the treatment around the well’s water analysis once the permit and yield are known.

How does cold Wyoming feed water affect reverse osmosis?

Cold feed water raises viscosity and lowers membrane permeability, so an RO train makes less permeate in a Wyoming winter at the same pressure. Laramie recorded about 2,780 hours a year at or below freezing in 2021 to 2024. Paul Industries sizes RO at the coldest feed temperature or adds a feed water heat exchanger using available waste heat.

Where can RO reject water go at a Wyoming plant?

RO reject at a Wyoming plant can go to a city sewer under the pretreatment program, to surface water under a WYPDES permit from the Department of Environmental Quality, to a Class I injection well regulated by the department’s Underground Injection Control program, or to reuse such as cooling tower makeup. Paul Industries designs recovery, equalization and metering to suit the route.

Does altitude change hot water sanitization of an ultrapure loop?

Altitude lowers the boiling point to about 201 degrees Fahrenheit at Cheyenne and about 199 at Laramie, so hot water sanitization near 80 to 85 degrees Celsius has less margin to boiling in vented tanks than at sea level. Paul Industries checks vents, relief devices, tank design and pump suction against the actual site pressure.

Which grade of water goes into a liquid cooling loop at a Cheyenne campus?

A technology cooling loop in Wyoming should be filled with low-conductivity treated water, typically from RO and deionization, then dosed with the coolant or inhibitor the IT vendor specifies. Raw city or well water carries minerals and microbes that foul cold plates. Paul Industries builds fill water skids with storage sized for the largest loop fill on the campus.

What does a laboratory ultrapure water system need from the building?

A laboratory ultrapure water system needs a pretreated or purified feed, a drain for reject and sanitization water, electrical power, space for service access, and a room kept above freezing with stable temperature. Central loops also need routes for supply and return piping that keep water moving. Paul Industries matches those requirements to the building design.

Can an old ion exchange demineralizer in Wyoming be converted to RO and EDI?

An old ion exchange demineralizer can be converted in stages: adding RO ahead of the existing trains cuts regeneration chemical use sharply, and replacing the ion exchange with EDI later removes acid and caustic handling. Each stage is planned around plant outages. Paul Industries evaluates the feed water and the plant layout to set the sequence.

What resistivity does Type 1 laboratory water reach?

Type 1 laboratory water is typically specified near 18 megohm-cm resistivity, close to the 18.2 megohm-cm theoretical value for pure water at 25 degrees Celsius, along with limits on total organic carbon, bacteria and particles set by ASTM D1193 or the instrument maker. Paul Industries designs polishing and monitoring to meet the user’s actual specification.

How is an ultrapure plant protected from freezing in Wyoming?

An ultrapure plant in Wyoming is protected by routing loops through heated space, insulating and tracing lines that cross colder areas, keeping loop water moving, heating equipment rooms for Wyoming winters and wind, and protecting reject and drain lines. Room temperature alarms sit alongside water quality alarms. Paul Industries designs and tests each measure before handover.

Does Wyoming's dry climate affect an ultrapure water plant?

Wyoming’s dry climate affects an ultrapure plant mainly through the equipment room: very dry winter air raises static and dries out instrument enclosures, while large daily temperature swings stress outdoor piping and seals. Water quality itself is driven by the source and season. Paul Industries specifies room conditions and outdoor materials for those conditions.

How long does a new ultrapure loop take to rinse up?

A new ultrapure loop takes from days to a few weeks to rinse up to final resistivity and TOC, depending on materials, cleanliness during fabrication, loop length and the target quality. Clean fabrication and passivation where stainless is used shorten the rinse. Paul Industries fabricates loop spools off site under clean conditions and records the rinse-up curve for the owner.

What service does an ultrapure plant need after startup in Wyoming?

An ultrapure plant needs membrane cleaning when performance drops, EDI and resin care, UV lamp and filter changes, analyzer calibration, periodic sanitization and microbial checks, with seasonal attention to RO performance as feed temperature changes. Paul Industries offers service agreements that cover each task and keep the records the owner’s users expect.

Can Paul Industries supply an ultrapure skid for a Wyoming site without installing it?

Paul Industries supplies ultrapure water skids for Wyoming sites as supply-only orders, factory tested with documentation and selected for the site’s feed water, elevation and winter conditions. Design-build and complete installation, including loops, storage and reject handling, are available when the owner wants one contract.

What should a Wyoming site send to get an ultrapure water system designed?

Send a full feedwater analysis, ideally from more than one season, the flow and quality needed at each point of use, the building layout, the site location and elevation, the available drains or disposal routes, and any existing treatment equipment. Paul Industries answers with a budget figure, then a firm proposal once the design is fixed. Call 201-450-8280 or request a quote.

Planning ultrapure water for a Wyoming lab, plant or campus?

Send the feedwater analysis, the use points and the disposal options at the Wyoming site. Call 201-450-8280 or request a quote.