Paul Industries provides tank fabrication in Wyoming: API 650 and API 12F storage tanks for oil fields and refineries, fuel tanks for fleets and plants, AWWA water storage tanks for towns and mines, and carbon steel and stainless process tanks for soda ash, mineral and food plants. Each tank is designed for Wyoming wind, snow and cold, built to the code the owner and regulators call for, and supplied alone, erected complete, or repaired and rebuilt in place.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
DEQ aboveground tank scope Dealer tanks dispensing gasoline or diesel to the public
DEQ notice 30 days before installing, repairing or modifying a regulated tank system
Federal oil storage plan SPCC above 1,320 gallons aggregate aboveground (40 CFR 112)
Public water tanks AWWA D100-series standards, DEQ rules Chapter 12 (2023)
Reviewed November 2026

What rules apply to tank fabrication in Wyoming?

Tank fabrication in Wyoming answers to different rules depending on what the tank holds and who uses it: the Department of Environmental Quality for underground tanks and public fueling tanks, the State Fire Marshal for aboveground fuel tanks in its jurisdiction, the federal SPCC rule for oil storage, the DEQ water rules for public water tanks, and Wyoming OSHA process safety rules for tanks in covered processes. Many industrial tanks in Wyoming fall under only the federal and owner-specified layers, because the state’s tank program reaches a narrower set of aboveground tanks than most buyers expect.

Which rules reach which tanks in Wyoming
TankRuleWhat it requires
Underground petroleum and hazardous substance tanksDEQ Storage Tanks rules, Chapter 1Design, release detection, spill and overfill control, 30-day notice, DEQ installation inspection, annual operator inspection
Aboveground tanks dispensing gasoline or diesel to the publicDEQ Storage Tanks rules, Chapter 1, Sections 34 to 37Welded steel only, 110 percent secondary containment, vehicle impact barriers, corrosion protection, leak detection
Other aboveground flammable or combustible fuel tanksW.S. 35-9-108 and the 2024 International Fire CodeState Fire Marshal plan review before installation and a letter of compliance before use, unless a city or county holds code authority
Tanks at oil field operations, refineries, mines and LPG facilitiesOutside the fire marshal statute under W.S. 35-9-118; SPCC and owner standards applyAPI 650, 12F or 620 construction, API 653 inspection, SPCC containment and integrity testing
Oil storage above 1,320 gallons aggregate40 CFR 112 (SPCC)Secondary containment for the largest container plus precipitation, integrity testing on a schedule
Public water storageDEQ Water Quality rules, Chapter 12AWWA D100-series standards, design sealed by a Wyoming registered professional engineer
Tanks in a covered refinery or gas plant process29 CFR 1910.119(j), adopted by Wyoming OSHAMechanical integrity inspection and testing, documented

What the Wyoming Storage Tank Program covers

The Wyoming Storage Tank Program, run by the Department of Environmental Quality under Chapter 1 of its storage tank rules, covers underground storage tanks and one narrow class of aboveground tanks: those a fuel dealer uses to dispense gasoline or diesel to the public. The state statute, W.S. 35-11-1415, defines an aboveground storage tank that way, and the rule says plainly that only aboveground systems used by a dealer to dispense gasoline or diesel to the public are regulated. A refinery’s crude tank, a soda ash plant’s liquor tank or a mine’s fuel tank is outside the program, while Wyoming underground storage tanks of almost every kind are inside it.

For tanks inside the Wyoming DEQ Storage Tank Program, the rules are detailed. The owner notifies the department at least 30 days before installing, repairing or substantially modifying a tank system, and the department schedules its own inspection and must find the work meets the standards before the tank operates. Regulated aboveground tanks must be welded steel; bolted, riveted and non-steel tanks are prohibited, and a tank built for underground use may not be installed above ground. Aboveground storage tank registration is part of the same rule: owners of new dealer tanks certify on the notification form that the system meets the construction requirements. Repairs follow NFPA 30, API 620, API 650, API 653 or PEI RP200.

Containment is specific. The aboveground storage tank secondary containment requirements in Section 35 call for capacity of at least 110 percent of the largest single tank inside the wall, made of fireproof material compatible with the product, with rainwater released only when it is free of floating oil. Corrosion protection is required too, by a cathodic protection system designed by a corrosion expert or by isolating the tank on dry gravel over concrete inside the containment.

Fire marshal review of aboveground fuel tanks

Aboveground flammable and combustible fuel tanks outside the DEQ program still need State Fire Marshal plan review in much of Wyoming. Under W.S. 35-9-108, the owner submits plans before installing such tanks, installation may not begin until the plans are approved, and the premises may not be used until the fire marshal inspects them and issues a letter of compliance. Cities and counties that hold code enforcement authority under W.S. 35-9-121 review those tanks themselves, under the code edition they have adopted.

The state code is current: the Council on Fire Prevention and Electrical Safety in Buildings adopted the 2024 International Fire Code, along with the 2024 building, mechanical and fuel gas codes, effective June 26, 2024. One important carve-out applies to industrial buyers. W.S. 35-9-118 removes mines and their facilities, oil field operations, petroleum refineries and liquefied petroleum gas facilities from that part of the fire marshal’s statute, so tanks at those sites are governed by the owner’s standards, the federal oil storage rules and, at refineries and gas plants, process safety mechanical integrity. Paul Industries prepares tank drawings, foundation details, containment layouts and venting calculations for whichever review applies.

Oil tank storage regulations: SPCC in Wyoming

Federal oil tank storage regulations apply at most Wyoming oil fields, refineries, mines and plants through the Spill Prevention, Control and Countermeasure rule in 40 CFR Part 112. A facility is exempt only when its aggregate aboveground oil storage is 1,320 U.S. gallons or less, counting containers of 55 gallons or more. Above that, bulk storage installations need a secondary means of containment that holds the biggest single container’s full volume with freeboard for rain and snowmelt, and each aboveground container is tested or inspected for integrity on a regular schedule and after material repairs, with the frequency and inspector qualifications set by industry standards.

For Wyoming buyers, those fuel storage tank regulations decide more of a tank’s design than the state rules do. Paul Industries sizes dikes and containment for the largest tank plus snowmelt and rain, specifies tank bottoms and foundations that can be inspected, adds level instruments and overfill protection, and delivers each tank with the drawings, material records and test results the facility’s SPCC plan and integrity program will cite.

API 650 vs API 12F for Wyoming oil field tanks

API 650 vs API 12F is the first choice on a Wyoming oil field or gathering site tank, and the two standards are written for different jobs. API 12F covers shop-welded tanks of standard sizes for storing production liquids at the lease: crude, condensate and produced water in batteries of identical tanks that ship complete on a truck. API 650 covers welded tanks for oil storage at larger sizes and with design options for higher internal pressure, heavier roofs, anchorage and special service, built in the shop when they can be shipped and erected in the field when they cannot.

Production batteries usually run 12F tanks; terminal, refinery and plant tanks usually run 650. The API 650 tank requirements then govern material, shell thickness, bottom and roof design, welding, examination and the hydrostatic test, and API 653 governs inspection, repair, alteration and reconstruction once the tank is in service. Paul Industries builds both, along with the walkways, stairways, thief hatches, vapor recovery connections, heater fire tubes and containment that complete a Wyoming tank battery, and fabricates API 650 tanks with nozzles and reinforcement laid out for the piping that will meet them.

Fuel storage for fleets, generators and remote operations

Fuel storage for Wyoming fleets, generators and remote operations ranges from a single double-wall diesel unit at a pump station to a bank of large vessels feeding haul trucks at a surface mine. Mines and oil field operations sit outside the fire marshal’s plan review, but their diesel and gasoline still count toward the federal SPCC threshold, and fueling areas need containment, overfill protection and spill kits sized to the deliveries they receive.

Paul Industries builds these systems as packages: welded steel or UL-listed double-wall units, containment basins with rain and snow drainage that can be checked for sheen before release, fill connections with spill buckets, high-level alarms and automatic shutoffs, dispensing pumps and filtration, and emergency vents sized for fire exposure. Generator day units for hospitals, data halls and water plants are matched to the generator’s run-time requirement and fitted with return lines, leak detection and level transmitters tied to the building controls. Every package arrives with the drawings and test records the site’s spill plan and fire reviewer will ask for, so it can be placed in service without a second round of paperwork.

Water storage tanks for Wyoming towns, plants and mines

Water storage tanks for Wyoming public water systems follow Chapter 12 of the DEQ Water Quality rules, in force since July 26, 2023, which require finished water storage to meet the AWWA tank standards, among them D100 for welded carbon steel, D103 for factory-coated bolted steel, and D110 and D115 for prestressed concrete. Tank and foundation design must be done by a Wyoming registered professional engineer, with the plans signed and sealed, and the inlet and outlet separated as far as practical so water does not sit and age.

Plants and mines that are not public systems use the same standards for fire water, raw water and process water tanks because the details they carry suit Wyoming conditions: vents screened and sized for freezing weather, overflows that cannot ice shut, roof hatches that seal against blowing snow, and coatings or cathodic protection for long life. Paul Industries fabricates and erects welded steel water tanks with the sealed design package, coating system, disinfection and test records each owner’s reviewer asks for.

Process and liquor tanks at Wyoming mineral and chemical plants

Process and liquor tanks at Wyoming mineral and chemical plants hold hot brines, carbonate liquors, slurries and treatment chemicals, and the tank has to suit the chemistry, the temperature and the solids as well as the volume. Wyoming’s soda ash industry, which the U.S. Geological Survey puts at four producers with five plants, runs circuits that use dissolving, settling, storage, surge and mother liquor tanks, many of them insulated and some agitated.

Agitated tanks need shells and roofs designed for the mixer’s loads, baffles, and bottom details that keep solids moving. Hot liquor tanks need insulation, heat tracing on nozzles and vents, and allowance for thermal growth at the connections. Slurry tanks need wear plates where the flow strikes. Paul Industries designs and builds these tanks in carbon steel, stainless steel or lined construction, fabricates the internals, and sets them during planned outages with the connecting spools already built.

Designing tanks for Wyoming wind, snow and cold

Designing tanks for Wyoming wind, snow and cold starts with loads that coastal designs rarely meet: high winds on open ground that can buckle an empty shell or lift an unanchored tank, drifting snow on roofs and platforms, and long cold spells that freeze vents, drains and instrument connections. NOAA’s 1991 to 2020 normals put January average lows at 10.3 degrees Fahrenheit at Laramie and 13.6 at Rock Springs, and the state record low is minus 66 degrees.

Wyoming site conditions and the tank design response
ConditionRisk to the tankDesign response
Wind on open groundShell buckling when empty, overturning, upliftWind girders, shell stiffening and anchor bolts checked to ASCE 7 for the site
Drifting snowRoof overload, blocked vents and hatchesRoof designed for site snow load, vents and hatches raised and hooded
Freezing weatherIce in vents, overflows, drains and level bridlesHeated or insulated vents, self-draining nozzles, heat tracing on instruments
Low metal temperatureBrittle fracture of shell plate in cold servicePlate toughness selected to the design metal temperature under API 650
Frost and expansive soilFoundation movement and bottom distortionRing wall or slab below frost depth, geotechnical data used in the design
Produced water and brineInternal corrosion at the bottom and water lineInternal coating, corrosion allowance, cathodic protection where suited

Paul Industries writes those conditions into the tank data sheet before design starts, so the shell, roof, anchorage and fittings are sized for the actual site rather than adjusted after the first winter.

How often should above ground storage tanks be inspected in Wyoming?

How often should above ground storage tanks be inspected in Wyoming depends on the tank’s regulatory class and its service. DEQ-regulated systems get an operator’s inspection within one year of the previous one, with the report sent to the department within 60 days, cathodic protection tested at least every three years, and impressed current systems checked every 60 days. SPCC tanks are inspected on the schedule the facility’s industry standard sets, which for most welded steel tanks means routine visual checks by the operator and periodic formal inspections under API 653 or the Steel Tank Institute standard.

How often is an API 653 inspection required? API 653 sets external inspections at intervals tied to the tank’s remaining corrosion life and internal inspections based on measured bottom corrosion rates, so a tank with a coated bottom and slow corrosion goes longer between entries than a bare-bottom produced water tank. How often do fuel tanks need to be inspected at a Wyoming fleet yard or mine? As often as the SPCC plan’s chosen standard and the operator’s checks require, and after any repair. Paul Industries designs tanks for easy inspection, with bottom and annular plate details that can be examined, release prevention barriers where specified, and baseline thickness data in the turnover file.

Inspection and testing schedule for Wyoming tanks

An inspection and testing schedule for a Wyoming tank combines the state rule, the federal spill rule and the tank standard, and the table brings the common intervals together for planning.

Recurring inspections and tests for Wyoming storage tanks
ItemApplies toInterval or triggerSource
Operator’s facility inspection and reportTanks in the DEQ Storage Tank ProgramWithin one year of the previous inspection; report to DEQ within 60 daysDEQ Storage Tanks rules, Chapter 1
Galvanic cathodic protection testDEQ-regulated steel tanks and pipingAt least every three years, and within six months of installationDEQ Storage Tanks rules, Chapter 1
Impressed current rectifier checkDEQ-regulated tanks with impressed current systemsEvery 60 days, with readings recordedDEQ Storage Tanks rules, Chapter 1
Spill and overfill equipment testDEQ-regulated underground systemsAt least every three yearsDEQ Storage Tanks rules, Chapter 1
Integrity inspection or testAboveground oil containers at SPCC facilitiesOn the schedule of the industry standard the plan adopts, and after material repairs40 CFR 112.8(c)(6)
External and internal inspectionAPI 650 tanks in serviceSet from measured corrosion rates and remaining lifeAPI 653
Mechanical integrity inspectionTanks in a covered refinery or gas plant processPer recognized engineering practice, documented each time29 CFR 1910.119(j)

Paul Industries builds tanks so these checks are practical: accessible cathodic protection test stations, manways and cleanouts sized for inspection crews, nameplates kept visible, and a baseline record of plate thickness and bottom condition delivered with each new or rebuilt tank.

Repairing, rebuilding and relocating tanks in Wyoming

Repairing, rebuilding and relocating tanks in Wyoming follows API 653 for tanks built to API 650 or its predecessors, and the DEQ repair rules for tanks in the Storage Tank Program. Common scopes include bottom replacements and new release prevention barriers, shell course and nozzle repairs, roof replacements after snow damage, new manways and cleanouts, and relocation of shop-built tanks between lease sites.

A tank taken apart and rebuilt at a new site is a reconstruction under API 653, with the shell plates evaluated, new welds examined and the tank hydrostatically tested before service. Paul Industries plans the repair or reconstruction from the latest inspection report, fabricates replacement plate and components ahead of the outage, and closes the job with the records the owner’s integrity program and SPCC plan need.

What does tank fabrication in Wyoming cost?

Tank fabrication in Wyoming costs what the volume, material, code, roof type, foundations, coatings, internals and site work make it cost. A shop-built API 12F tank delivered to a battery is priced very differently from a field-erected API 650 tank with a floating roof, and a stainless agitated process tank differs from both. Wyoming-specific cost drivers include wind girders and anchorage for open sites, snow-rated roofs and platforms, heat tracing and insulation, freight to remote fields and mines, and winter erection protection.

Paul Industries gives a budget figure from comparable tanks while the data sheet is forming and a fixed price once volume, code, materials and site conditions are settled. Supply-only, design-build and complete erection with foundations, containment and piping connections are all available.

Who fabricates tanks in Wyoming?

Paul Industries fabricates tanks in Wyoming: API 650 and API 12F oil storage and production tanks, fuel tanks, AWWA water storage tanks, and carbon steel, stainless and lined process tanks for oil fields, refineries, gas plants, soda ash and mineral plants, mines, towns and food plants around Casper, Gillette, Cheyenne, Rock Springs, Green River, Sinclair, Newcastle and Evanston. Among tank fabrication companies serving the state, Paul Industries carries the design, fabrication, erection, testing and repair of tanks in Wyoming on one contract.

The same contract covers what connects to the tank: process piping in Wyoming for fill, transfer and vapor lines, pressure vessel fabrication in Wyoming where a tank’s duty calls for a code vessel, industrial welding services in Wyoming for repairs and alterations, and boiler repair in Wyoming where heated tanks draw on plant steam. Tanks holding hot caustic are covered on the caustic cracking page, and every other Paul Industries service in the state appears on the Wyoming overview. Tanks in Wyoming built through Paul Industries arrive with the records their regulators and owners need.

Tank work from Paul Industries for Wyoming sites

Headquartered at 256 Shore Drive, Kilmarnock, Virginia, Paul Industries is an East Coast contractor that takes tank work across Wyoming, the West and all 50 states. The approach is the one described for its headquarters state on the tank fabrication in Virginia page and for Gulf Coast terminals on the Texas tank fabrication page: a complete data sheet, a design for the actual site, documented fabrication and testing, and a turnover file that fits the owner’s spill plan and inspection program. National tank types and standards are explained on the tank fabrication service page. Send the volume, product, code, site location and required date, and request a quote for tank fabrication in Wyoming.

Standards referenced: API 650 · API 12F · API 653 · API 620 · NFPA 30 · PEI RP200 · AWWA D100 and D103 · ASCE 7 · Wyoming DEQ Storage Tanks rules, Chapter 1 · Wyoming DEQ Water Quality rules, Chapter 12 · 40 CFR Part 112 (SPCC) · 2024 International Fire Code (as adopted June 26, 2024)

Frequently asked questions

Who builds tank batteries for Casper and Powder River Basin oil fields?

Paul Industries builds tank batteries for oil fields around Casper, Gillette and the Powder River Basin: API 12F production tanks for crude, condensate and produced water, walkways, thief hatches, vapor recovery connections and containment sized for SPCC. Tanks are built with internal coatings for produced water service and fittings protected against freezing. Batteries can be supplied for the operator to set or installed complete.

Does Paul Industries build liquor and process tanks for Green River soda ash plants?

Paul Industries builds dissolving, settling, surge and mother liquor tanks for soda ash plants around Green River and Rock Springs, in carbon steel, stainless or lined construction, with agitator supports, baffles, wear plates, insulation and heat tracing where the duty calls for them. Replacement tanks are fabricated ahead of the outage and set with the connecting spools already built.

Who erects water storage tanks for Cheyenne, Laramie and Wyoming towns?

Paul Industries erects welded steel water storage tanks for Cheyenne, Laramie and other Wyoming towns, mines and plants to AWWA D100, with the tank and foundation design sealed by a Wyoming registered professional engineer as DEQ Water Quality Chapter 12 requires for public water systems. Vents, overflows and hatches are detailed for freezing weather and blowing snow, and each tank is disinfected and tested before service.

Does the Wyoming DEQ regulate aboveground tanks at an industrial plant?

The Wyoming DEQ storage tank rules regulate aboveground tanks only when a fuel dealer uses them to dispense gasoline or diesel to the public, so most industrial aboveground tanks sit outside that program. Those tanks still answer to the federal SPCC rule for oil storage, State Fire Marshal plan review for fuel tanks where it applies, and the owner’s standards. Paul Industries builds each tank to the rules that reach it.

What do Wyoming underground storage tanks require before installation?

Wyoming underground storage tanks require notice to the DEQ at least 30 days before installation, repair or substantial modification, installation to API 1615, PEI RP100 or NFPA 30 and 30A, and a department determination that the installation meets the standards before the tank operates. New petroleum tanks are double-walled with interstitial monitoring. Paul Industries plans the installation schedule around the department’s inspection.

Does a new aboveground fuel tank at a Wyoming plant need fire marshal approval?

A new aboveground flammable or combustible fuel tank at a Wyoming plant needs State Fire Marshal plan approval before installation and a letter of compliance before use under W.S. 35-9-108, unless the city or county holds code authority, in which case its office reviews the tank. Oil field operations, refineries, mines and LPG facilities fall outside that statute. Paul Industries prepares the drawings for the review that applies.

When does a Wyoming facility need an SPCC plan for its tanks?

A Wyoming facility needs an SPCC plan under 40 CFR Part 112 when its aggregate aboveground oil storage exceeds 1,320 U.S. gallons, counting containers of 55 gallons or more, and a discharge could reach navigable waters. The plan sets containment, inspection and testing for each tank. Paul Industries designs and builds tanks and containment that match the plan and supplies the records it cites.

How often do fuel tanks need to be inspected at a Wyoming mine or fleet yard?

Fuel tanks at a Wyoming mine or fleet yard are inspected on the schedule the facility’s SPCC plan adopts from an industry standard, such as API 653 or the Steel Tank Institute standard, with routine operator checks between formal inspections and an integrity test after any material repair. Tanks in the DEQ program add an annual operator’s inspection. Paul Industries repairs tanks that fail inspection.

Can a used API 12F tank be moved to another Wyoming lease?

A used API 12F tank can be moved to another Wyoming lease when an inspection shows the shell, bottom and roof are sound and the tank suits the new service. The move includes cleaning, inspection, any repairs, new gaskets and fittings, a level foundation and containment at the new site, and an integrity check before filling. Paul Industries inspects, repairs, relocates and resets these tanks.

What secondary containment does a regulated Wyoming fuel tank need?

A fuel tank in the Wyoming DEQ program needs secondary containment holding at least 110 percent of the largest single tank inside the wall, built of fireproof material compatible with the product, with runoff released only when free of floating oil. The federal SPCC rule asks for the full capacity of the largest container plus precipitation freeboard. Paul Industries sizes containment for both and for snowmelt.

Which AWWA standard applies to a welded steel water tank in Wyoming?

A welded carbon steel water tank in Wyoming is built to AWWA D100, one of the standards DEQ Water Quality Chapter 12 lists for finished water storage. Bolted steel tanks use D103, and coatings, disinfection and inspection follow the companion AWWA standards. Paul Industries fabricates D100 tanks with the sealed design, coatings and test records the department reviews.

What does a floor replacement involve on a Wyoming refinery storage tank?

A floor replacement on a Wyoming refinery storage tank follows API 653. After draining, cleaning and gas-freeing, the old floor is removed or a new one is laid above it with a release prevention barrier where specified, the new welds are examined and vacuum tested, and the tank is returned to service with the inspector’s acceptance. Paul Industries prefabricates plates and plans the work into the turnaround.

Do tanks at Wyoming gas plants fall under process safety rules?

Tanks in a covered process at a Wyoming gas plant or refinery fall under the mechanical integrity part of 29 CFR 1910.119, which Wyoming OSHA has adopted, so the plant keeps written procedures and documented inspections and tests for them. Paul Industries supplies new tanks with material, weld and test records that fit those programs.

What should a Wyoming site send to get a tank priced?

Send the volume, product, temperature, code (API 650, API 12F, AWWA D100 or other), roof type, nozzle list, materials, site location and elevation, soil data if available, containment needs and the date the tank is needed. Paul Industries returns a budget figure, then a fixed price. Call 201-450-8280 or request a quote.

What changes when a field-erected tank goes up during a Wyoming January?

A field-erected tank built during a Wyoming January needs heated enclosures around the welding, plate preheated to the welding procedure’s requirements, frost protection for the foundation, and a hydrostatic test timed for conditions that keep the water and shell above their limits. Paul Industries plans each of those steps, and schedules crane lifts and plate handling around wind limits.

Are tanks at a Wyoming mine covered by the fire marshal statute?

Tanks at a Wyoming mine and its appurtenant facilities fall outside the fire marshal plan review statute under W.S. 35-9-118, so their design rests on the mine’s standards, the federal SPCC rule for oil storage, and the mine safety rules. Paul Industries builds mine fuel, water and process tanks to API or AWWA standards with containment and records for the mine’s plans.

Planning a new, rebuilt or relocated tank in Wyoming?

Send the volume, stored product, code, location and required date. Call 201-450-8280 or request a quote.