Paul Industries designs, installs and maintains data center liquid cooling in Hawaii, piping coolant distribution units, cold plate loops, rear door coils and the dry coolers and trim chillers behind them for dense racks in Honolulu, Kapolei, Maui and the other islands. Liquid cooling suits the islands especially well, because a warm water loop can reject heat to Hawaii’s air in every hour of the year when chilled air cannot. Paul Industries builds the whole path, from the rack manifold to the heat rejection on the roof.
Request a quote or call 201-450-8280
Why does data center liquid cooling in Hawaii make so much sense?
Data center liquid cooling in Hawaii makes sense because it turns the islands’ main weakness for air cooling, warm humid air with no cold season, into a manageable condition. A cold plate loop accepts facility water at temperatures well above anything Honolulu’s air reaches on a normal day, so the heat can leave the building through dry coolers with little or no compressor work. An air-cooled hall, by contrast, has to chill and dry its air around the clock.
The economics follow from power prices. Hawaii businesses paid an average of 36.31 cents for each commercial kilowatt-hour in 2025, close to triple the 13.37 cent US figure the EIA reports, so every 10 kilowatts of compressor power taken off the bill around the clock saves about $31,800 a year. The general engineering of cold plates, CDUs and rear door coils is on the national data center liquid cooling page; this page applies it to island conditions.
Do data centers use liquid cooling in Hawaii today?
Data centers in Hawaii use liquid cooling where rack density demands it, and the state’s computing mix makes that a growing share of the work. Research computing is part of the island mix, with the Air Force Research Laboratory’s Department of Defense supercomputing center on Maui, which the University of Hawaii runs under contract. Any graphics processor rack that exceeds what air can carry in a standard cabinet, whether it lands in a Honolulu or Kapolei colocation suite or in a private room, needs liquid to reach the chips.
Enterprise server rooms are the other entry point. A hospital or bank with one or two high-density rows can add rear door heat exchangers or a small CDU fed from the building chilled water, rather than rebuilding the room. Paul Industries scopes both paths: the full loop for a new liquid-cooled hall and the targeted retrofit for a room that needs only a few dense racks.
Data center liquid cooling temperature against Honolulu’s warmest hours
The data center liquid cooling temperature an owner chooses decides whether Hawaii’s air can carry the heat on its own. ASHRAE groups facility water by its maximum supply temperature in Celsius: W32 allows supply up to 32 degrees Celsius, or 89.6 degrees Fahrenheit, while W40 and W45 allow 104 and 113 degrees. Honolulu’s warmest hourly normal is 87.4 degrees, and the 90th percentile of its hottest hours reaches 90.0 degrees, according to the NOAA 1991 to 2020 normals.
A dry cooler can only bring water down to some margin above the air entering its coil, an approach that depends on coil size and fan speed. At W32, that margin is gone on a warm Honolulu afternoon, so a W32 loop needs a trim chiller or adiabatic assist for the hottest hours. At W40 or W45, the same dry cooler has a margin of well over ten degrees even in the warmest normal hour, and compressors become backup equipment. The server and cold plate maker’s limits govern, so Paul Industries confirms the class with the IT team before sizing anything.
| Station | Warmest hourly normal | 90th percentile peak | W32 loop (89.6 F) | W40 or W45 loop (104 or 113 F) |
|---|---|---|---|---|
| Honolulu, Oahu | 87.4 F | 90.0 F | Trim chiller or adiabatic assist for warm afternoons | Dry coolers carry the load year round |
| Kahului, Maui | 86.9 F | 90.0 F | Trim cooling for warm afternoons | Dry coolers carry the load year round |
| Hilo, Hawaii Island | 82.6 F | 86.2 F | Dry coolers most hours; small trim margin needed | Dry coolers with wide margin |
| Lihue, Kauai | 83.9 F | 86.0 F | Dry coolers most hours; small trim margin needed | Dry coolers with wide margin |
Data center cooling without water: dry coolers in island heat
Data center cooling without water is practical in Hawaii once the loop runs warm, because a closed dry cooler rejects heat to air by fans alone and evaporates nothing. Data center liquid cooling water consumption then falls to the small volume used to fill and top up the loops, against a cooling tower that evaporates water every hour of the year in a climate with no winter. On islands where fresh water is carefully managed, that difference matters to owners and to the county.
The trade is coil area and fan power. A dry cooler sized for a tight approach on a 90 degree afternoon is large, and on a crowded Honolulu roof that space has to be found and the structure checked for weight and wind. Salt air is the other cost: fins and fasteners on a dry cooler near the shore need factory coatings, stainless hardware and fresh water rinsing on a schedule, or the approach widens year by year.
Are data centers water cooled in Hawaii, and is the loop closed?
Liquid-cooled data centers in Hawaii use water or a water and glycol mix inside sealed loops, so the coolant at the rack never touches outside air or the building’s potable supply. The technology cooling loop between the CDU and the cold plates is closed, the facility water loop between the CDU and the dry coolers or chillers is closed, and only an open cooling tower, where one is used, evaporates water to the atmosphere.
Glycol earns its place in Hawaii for reasons other than freezing. The coolest hourly normal at the four main airport stations is 65.1 degrees, so freeze protection is unnecessary at sea level, but many cold plate makers specify a propylene glycol and inhibitor blend for biological control and corrosion protection of copper and aluminum. Paul Industries fills each loop with the fluid the IT maker’s warranty calls for and records its chemistry at turnover.
Comparing data center liquid cooling options in a Hawaii hall
Data center liquid cooling options range from rear door heat exchangers on existing cabinets to direct to chip cold plates and immersion tanks, and each puts a different demand on an island building. The table sets them against Hawaii conditions.
| Approach | Typical fit | Facility water it accepts | Hawaii consideration |
|---|---|---|---|
| Rear door heat exchangers | Existing enterprise rooms adding a few dense racks | Cooler water, often from the building chilled water loop | Supply must stay above the room dew point, which in Hawaii rooms needs careful humidity control |
| Direct to chip cold plates with CDU | New high-density rows and colocation suites | Warm water, often in the W32 to W45 range | Opens year-round dry cooler heat rejection on all four islands |
| Single-phase immersion | Dense compute in purpose-built rooms | Warm water to the tank heat exchanger | Floor loading in older buildings; dielectric fluid handling and spares |
| Hybrid cold plate plus air | Racks where memory and drives still need air | Warm water for plates, chilled air for the rest | The air portion still meets Hawaii’s latent load, so the CRAH plant stays |
Immersion detail is on the data center immersion cooling page, and the closed loops that carry facility water are covered on the closed loop cooling systems page.
How the CDU, piping and dry coolers come together
A data center liquid cooling CDU is the boundary between the facility water and the technology cooling loop, holding the plate heat exchanger, pumps, filtration and controls that keep the rack-side coolant at the right temperature, pressure and cleanliness. In Hawaii, Paul Industries places CDUs so that each one can be isolated and serviced while the second unit carries the row, because a failed pump waits for a part to arrive by sea.
Piping is stainless steel or the material the cold plate maker approves, built to ASME B31.9 or B31.3 as the project specifies, and pressure tested before any server is connected. Water moves heat at about 500 Btu per hour for each gallon per minute and each degree of rise, so a 100 kilowatt row at a 10 degree rise needs about 68 gallons per minute. Paul Industries prefabricates manifolds and headers off site, tests them and crates them in installation order, which keeps hot work in an operating Honolulu building to a minimum.
Retrofitting liquid cooling into an occupied Honolulu room
Retrofitting liquid cooling into an occupied Honolulu room starts with a survey of what the building already gives: chilled water temperature and spare capacity, riser sizes, floor loading, ceiling space for overhead piping, electrical capacity for CDU pumps and the route a crated CDU can take from the loading dock to the room. Older office towers often have tight freight elevators and low ceilings, so CDU size and manifold routing are chosen around the building as much as around the racks.
Paul Industries then phases the work. Piping is run and pressure tested while the room stays live, with hot work kept outside the room or replaced by grooved or press joints where the specification allows. Tie-ins to the building chilled water are grouped into one short planned outage, often overnight, with temporary cooling standing by. Racks move to liquid one row at a time, so the IT team never has more than one row in transition.
Flushing, pressure testing and fill before the first rack connects
Flushing, pressure testing and fill are the steps that decide whether a new liquid loop protects its cold plates or clogs them, because cold plate channels are narrow and any weld scale, cutting oil or debris left in new pipe ends up there. Paul Industries pressure tests each section to the specified code, flushes at velocities high enough to lift debris with temporary strainers in place, verifies cleanliness by particle count or filter inspection, and only then fills with the specified coolant.
In Hawaii, fill water quality deserves extra care because tap hardness varies across Oahu, and because a second fill after a contamination event means waiting on coolant and filters to arrive. The loop is vented at every high point, circulated through the CDU filters until readings are stable, and sampled before the first server connects. Those records become the baseline for every later coolant test.
Where does the heat go? Reuse options in a warm climate
Heat from a liquid-cooled hall in Hawaii leaves as warm water, often above 100 degrees Fahrenheit at W40 or W45, which makes it usable rather than waste. Hawaii buildings need no space heating, but hotels, hospitals and laundries heat large volumes of domestic hot water every day, and a heat pump or a direct exchanger can lift data hall heat into that service. A mixed-use building with a server room and a large hot water demand is the natural candidate.
Paul Industries evaluates heat recovery where the hot water load sits in the same building or campus, sizes the exchanger and controls so the IT loop always has priority, and prices the energy recovered at Hawaii rates so the payback is visible.
Data center liquid cooling vs air cooling on Hawaii power
Data center liquid cooling vs air cooling in Hawaii is largely a question of how many compressor hours each one needs, because power is a large operating cost and the islands offer no free cooling to air systems. An air-cooled hall in Honolulu cools and dries its air with compressors in every hour of the year. A warm water liquid loop moves most of the heat with pumps and dry cooler fans, leaving compressors for the residual air load and the hottest afternoons.
Liquid cooling data center PUE improvements come from that shift. The exact figure depends on the share of heat captured by liquid, the facility water class and the redundancy design, so Paul Industries models it for each project instead of quoting a generic number. The arithmetic is plain at Hawaii prices: one kilowatt of pump, fan or compressor load running all year runs to roughly $3,180 on a 2025 commercial bill.
Growing a liquid-cooled hall after the first phase
Growing a liquid-cooled hall after the first phase works smoothly only when the first phase was built for it. Paul Industries sizes headers and CDU connections for the end-state rack count, installs capped and valved branches where future rows will land, and keeps those branches short or flushed so stagnant water does not breed bacteria in a warm loop. Spare valve positions on the facility water side let a new CDU connect without draining the system.
Each later phase repeats the same sequence at smaller scale: prefabricate the new branch, pressure test it isolated from the live loop, flush it to the same cleanliness standard, then open it to the system and fill to the existing coolant chemistry. On an island, buying the next phase’s valves, hoses and quick disconnects with the first order keeps every row on matching parts, which simplifies spares and avoids mixing hardware from different makers at the rack.
Codes, refrigerants and permits for liquid cooling in Hawaii
Liquid cooling projects in Hawaii follow the county building permit process under the state’s current 2018 code editions, as listed by the State Building Code Council, with the counties free to update their own codes. Trim chillers and any compressor-based cooling installed for the hall from January 1, 2027 onward fall under the EPA’s 700 GWP ceiling for new data center and IT equipment cooling, and liquid cooling reduces how much of that refrigerant equipment a hall needs at all.
Buffer tanks, expansion tanks and air separators on the facility water side are checked against Hawaii’s Boiler and Elevator Safety Law, which covers pressure vessels and pressure systems and is administered by the HIOSH Boiler and Elevator Inspection Branch. Each vessel Paul Industries furnishes is built to ASME Section VIII with its manufacturer’s data report, and the installation file for the branch is assembled before startup.
Data center liquid cooling maintenance on an island
Data center liquid cooling maintenance in Hawaii centers on coolant chemistry, filtration, pump health and dry cooler condition, with a spares strategy that assumes parts come by ocean freight. Oahu’s tap water can range from 25 to 300 parts per million of hardness depending on which wells are in service, according to the Board of Water Supply, so loops are filled and topped up only with treated water of known quality, never straight from the tap.
| Task | Typical interval | Why it matters in Hawaii |
|---|---|---|
| Coolant sampling: inhibitor, pH, conductivity, bacteria | Quarterly, and after any top-up | Warm loops all year favor biological growth |
| CDU strainer and filter checks | Monthly in the first year, then per pressure drop trend | Cold plate channels are fine; debris from new piping shows up early |
| Pump vibration and seal inspection | Quarterly | Early warning lets a spare be on hand before failure |
| Dry cooler coil rinse and inspection | Quarterly near the shore, semiannually inland | Salt deposits widen the approach and raise fan power |
| Quick disconnect and hose inspection | At each rack change and annually | Prevents leaks at the rack as hardware turns over |
| Spares audit | Annually | Pumps, seals, sensors, filters and hoses held for an island site |
Treated fill and makeup water systems are covered on the ultrapure water systems in Hawaii page, and service of the trim chillers on the chiller repair in Hawaii page.
What does data center liquid cooling cost in Hawaii?
Data center liquid cooling cost in Hawaii is driven by the number of racks and their density, the approach chosen, the facility water class, whether new heat rejection is needed, the condition of the existing building and the freight and installation premium of an island job in an occupied room. A rear door retrofit on six racks and a new cold plate hall with its own dry cooler plant differ by orders of magnitude, so a figure without that scope would mislead.
Operating savings belong in the same comparison. Paul Industries prices the liquid cooling installation alongside the energy it saves at Hawaii rates, offers a budget range from comparable scopes, and then fixes the price once the rack count, CDU selection and heat rejection plan are settled.
Who installs data center liquid cooling in Hawaii?
Paul Industries installs data center liquid cooling in Hawaii, from rear door heat exchangers in Honolulu enterprise rooms to CDU and cold plate loops in Kapolei colocation suites and research computing on Maui, with the dry coolers, trim chillers and piping that serve them. One contract covers design, prefabrication, installation, pressure testing, flushing, fill and startup, and the maintenance that follows.
Owners with halls on the mainland as well as in Hawaii get the same drawing standards, test records and coolant procedures at every site, which keeps training and spares consistent across a portfolio. Paul Industries also takes on single-room scopes, such as one CDU and two rows of cold plate racks in a Honolulu hospital or university building, with the same documentation as a full hall.
The wider plant behind a liquid-cooled hall is covered on the data center cooling in Hawaii page, startup testing on the data center commissioning in Hawaii page and the full mechanical package on the data center mechanical contractor in Hawaii page. For a humid mainland comparison, the data center liquid cooling in Florida page shows the same service under a different grid and storm regime.
Liquid cooling from Paul Industries across Hawaii
Paul Industries delivers liquid cooling for Hawaii data rooms three ways: supply-only CDUs, manifolds and prefabricated piping; a design-build package with one price; or complete installation to the owner’s engineer’s drawings, with coolant management and service afterward. Its headquarters at 256 Shore Drive, Kilmarnock, Virginia, also anchor its data center liquid cooling in Virginia projects, and the company accepts liquid cooling work on every Hawaiian island, nationwide and abroad; the Hawaii page lists its wider island work.
To start, send the rack count and density, the cold plate or server maker’s coolant requirements, the island and building, and the existing cooling plant, or request a quote.
Standards referenced: ASHRAE TC 9.9 liquid cooling guidelines (W classes) · ASHRAE 15 · ASME B31.9 · ASME B31.3 · EPA Technology Transitions rule (40 CFR Part 84, Subpart B) · Hawaii Boiler and Elevator Safety Law and HAR Title 12, chapters 220 to 225.1 · 2018 International Energy Conservation Code (Hawaii state energy code)
Frequently asked questions
Who installs liquid cooling for dense racks in Honolulu colocation suites?
Paul Industries installs liquid cooling in Honolulu colocation suites and enterprise rooms, including CDUs, rack manifolds, rear door heat exchangers and the facility water piping behind them. Work in an occupied building is phased so neighboring racks keep cooling, with manifolds prefabricated and tested before they arrive. Send the rack layout, density and the landlord’s facility water conditions for a scope and budget.
Does Paul Industries build liquid cooling for computing on Maui and in Kapolei?
Paul Industries builds liquid cooling loops for computing facilities on Maui and for data halls in Kapolei on Oahu’s Ewa plain. Maui’s Kahului station shows warm afternoons with a 90th percentile peak of 90 degrees Fahrenheit, so dry cooler sizing and the choice of facility water class matter there. Each loop is designed, pressure tested, flushed and filled before the IT equipment connects.
How does data center liquid cooling work in a Hawaii building with no cold season?
Liquid cooling carries heat from the chips through cold plates into a sealed coolant loop, across a CDU heat exchanger into facility water, and out to dry coolers or chillers. In Hawaii the key is to run that facility water warm, because warm water can reject heat to the air in every hour of the year. Compressors then serve the hottest afternoons and the residual air load only.
Is data center water cooling closed loop in a Hawaii liquid system?
The rack-side technology cooling loop and the facility water loop are both closed, so neither loses coolant except through small top-ups after maintenance. Water is consumed only where an open cooling tower is used for heat rejection. A dry cooler design in Hawaii keeps the whole system closed and evaporates nothing, which is a strong case for warm water classes on the islands.
Does a liquid loop in Hawaii need glycol?
A liquid loop at sea level in Hawaii needs no freeze protection, since the coolest hourly normal at the four main airport stations is 65.1 degrees Fahrenheit. Many cold plate makers still specify a propylene glycol and inhibitor blend for corrosion and biological control, and their warranty governs the choice. Paul Industries fills each loop with the specified fluid and tests its chemistry at turnover.
What facility water temperature should a Honolulu liquid-cooled hall run?
A Honolulu hall should run facility water as warm as the server and cold plate maker allows, because the warmer the water, the more hours dry coolers can carry the load. W32 water at 89.6 degrees Fahrenheit sits near Honolulu’s warmest air, so it needs trim cooling on hot afternoons, while W40 or W45 water leaves a wide margin all year. Paul Industries confirms the class with the IT team first.
Why do rear door heat exchangers need dew point control in Hawaii rooms?
Rear door coils usually run on cooler water than cold plates, and any coil surface below the room’s dew point collects condensation. Hawaii’s outdoor dew point never drops below about 61 degrees in Honolulu’s hourly normals, so any outside air or infiltration raises room humidity. Paul Industries sets door water temperature above the room dew point and checks the room’s dehumidification before the doors go live.
Can an existing Honolulu chilled water plant feed a new liquid cooling CDU?
An existing chilled water plant can feed a CDU, and that is frequently the quickest route for a few dense racks in an older building. The plant’s capacity, its night setpoint resets and its redundancy have to suit the IT load. Paul Industries surveys the plant, adds a dedicated heat exchanger or controls change where needed, and plans the tie-in so the building and the racks keep cooling.
What water should fill a liquid cooling loop on Oahu?
A liquid cooling loop on Oahu should be filled with treated water of known quality, usually deionized or reverse osmosis water blended with the inhibitor or glycol the IT maker specifies. Oahu tap water can range from 25 to 300 parts per million of hardness depending on the wells in service, which would scale cold plate channels. Paul Industries supplies treated fill water systems for that purpose.
What liquid cooling data center PUE is realistic for a Hawaii hall?
A realistic PUE depends on how much of the heat goes to liquid, the facility water class and the redundancy design, so Paul Industries models it project by project. The direction is clear: moving heat to a warm water loop with dry coolers removes most compressor hours, which matters more in Hawaii than on the mainland because a single kilowatt of overhead left running all year adds roughly $3,180 to the power bill.
How are CDU pumps kept running during a Hawaii power interruption?
CDU pumps sit on uninterruptible power alongside the IT load they serve, because rack-side coolant must keep moving through any transfer to generator power. Paul Industries sizes pump power on the UPS, sets controls to restart pumps before compressors, and verifies the sequence during commissioning. On an island grid, the generator and transfer sequence is tested against the utility’s standby service terms.
Which refrigerant rules affect trim chillers for liquid cooling in Hawaii?
Trim chillers and other compressor equipment installed for data center and IT equipment cooling in Hawaii are held to a refrigerant global warming potential ceiling of 700 for installations from January 1, 2027, under the EPA Technology Transitions rule. Leak repair rules apply to units with 15 pounds or more of HFC refrigerant. A warm water design shrinks the trim plant and the refrigerant it holds.
Do buffer and expansion tanks on a Hawaii liquid loop need state review?
Pressure vessels and pressure systems fall under Hawaii’s Boiler and Elevator Safety Law, with plan review and operating permits handled by the HIOSH branch that administers it. Paul Industries checks every buffer tank, expansion tank and air separator against those rules during design, supplies ASME vessels with data reports and prepares the paperwork the branch needs before startup.
How does salt air affect dry coolers serving a liquid loop in Hawaii?
Salt air corrodes uncoated fins and fasteners, widening the gap between fin and tube and raising the approach temperature a dry cooler can hold. For a warm water loop that margin is the difference between running without compressors and switching on trim cooling. Coated coils, stainless hardware and scheduled fresh water rinsing keep dry coolers near their design approach for years.
Can Paul Industries supply CDUs and manifolds for a Hawaii project without installing them?
Paul Industries supplies CDUs, rack manifolds, prefabricated headers and pipe spools for Hawaii projects as supply-only packages, pressure tested and crated in installation order with drawings and test records. The same equipment is offered with design-build or complete installation. A spares list for pumps, seals, filters and sensors is included for an island site.
What records does an owner receive after a liquid cooling installation in Hawaii?
The owner receives as-built drawings, pressure test and flushing records, coolant fill and chemistry data, CDU startup reports, control sequences and the spares list. Those records support the server maker’s warranty and give the operations team a baseline for future coolant sampling. Paul Industries keeps the same format across sites for owners with halls on the mainland as well as Hawaii.
What should a Hawaii owner send to price a liquid cooling project?
Send the rack count and density, the server or cold plate maker’s coolant and temperature requirements, the island and building, drawings or photos of the room, and details of the existing chilled water plant. Recent power bills for the cooling equipment help with the energy comparison. Paul Industries returns a budget range from similar scopes, then a firm price once the design is fixed.
Bringing liquid-cooled racks into a Hawaii data room?
Send the rack count, density, coolant requirements, island and building, and the existing cooling plant. Call 201-450-8280 or request a quote.