Paul Industries provides chiller repair in Rhode Island, diagnosing and repairing centrifugal, screw, scroll and process chillers at hospitals, biologics and manufacturing plants, universities, shipyard suppliers, offices and data rooms from Providence and the Blackstone Valley to Kent County, Quonset, Newport and South County. Rhode Island adds its own refrigerant rule to the federal ones, a state license requirement for refrigeration work, a pressure vessel law with no general carve-out for chiller shells, and power that costs Rhode Island plants well over double the US industrial rate. Paul Industries repairs, overhauls, retrofits and replaces chillers with each of those built into the repair plan.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Rhode Island HFC rule New comfort chillers on R-134a or R-410A barred in Rhode Island since January 1, 2024
Federal leak rule HFC appliances of 15 lb or more, from January 1, 2026 (EPA)
Providence summer July normals of 84 F high and 65 F low (NOAA, 1991-2020)
Industrial power 19.70 cents/kWh in 2024; US average 8.13 (EIA)
Reviewed November 2026

Chiller repair in Rhode Island: what a repair call covers

Chiller repair in Rhode Island covers fault diagnosis, refrigerant leak search and repair, compressor and motor work, bearing and seal replacement, condenser and evaporator tube cleaning and eddy current testing, starter, drive and control repairs, purge unit work on low pressure machines, and the leak rate and refrigerant records that federal and state rules now expect. Paul Industries runs each repair from a written diagnosis: logged pressures and temperatures, oil and refrigerant analysis where the fault calls for it, and a repair scope the owner approves before the machine is opened.

The general fault and repair methods are explained on the chiller repair page. This page covers what is particular to Rhode Island: the state’s hydrofluorocarbon rule and its 50 percent test, the license and pressure vessel laws, the buildings whose chillers run all year, the coastal conditions that age air cooled machines, and the cost of running a chiller on Rhode Island power. A Rhode Island repair call ends with the machine run under load, its safeties tested, and a service report that records what was found, what was replaced and the refrigerant added or recovered.

Rhode Island’s HFC rule and the 50 percent test on an overhaul

Rhode Island’s Prohibition of Hydrofluorocarbons in Specific End-Uses, RIDEM regulation 250-RICR-120-05-53, has barred new centrifugal and positive displacement comfort chillers using HFC-134a, R-410A, R-407C, R-404A and a long list of other refrigerants since January 1, 2024. The rule covers chillers typically used for commercial comfort cooling and expressly leaves out chillers used for industrial process cooling and refrigeration. Existing machines built before that date can keep running, and the rule allows refrigerant and parts to be sold and installed to service them, so an R-134a comfort chiller in a Providence office tower is repairable and rechargeable under state law.

The detail that matters on a large repair is the rule’s definition of new equipment. A chiller counts as new if it is expanded with components that add capacity, or if parts are replaced, one job at a time or all at once, until the cumulative capital cost of replacement passes 50 percent of the capital cost of replacing the whole system. A compressor replacement, then a condenser, then a starter on the same machine over a few years can add up. Paul Industries tracks the cumulative replacement cost on comfort chillers it repairs in Rhode Island and shows the owner where a proposed repair sits against that line, so a major overhaul never turns an existing machine into a prohibited new one by surprise.

Chiller refrigerants in Rhode Island buildings under state and federal rules in 2026
RefrigerantTypical machinesRhode Island ruleFederal positionRepair outlook
R-22Older screw and reciprocating chillersOutside the HFC ruleProduction and import ended January 1, 2020; reclaimed supply onlyShort horizon repairs; replacement planning due
R-123Low pressure centrifugal chillersOutside the HFC ruleHCFC phaseout complete in 2030; reclaimed supply may service existing machinesRepairable; purge and shell tightness protect the charge
R-134aCentrifugal and screw comfort and process chillersBarred in new comfort chillers since January 1, 2024; existing machines serviceableLeak repair rule at 15 pounds and up from 2026Repairable; watch the 50 percent replacement test
R-410AScroll chillers and air cooled packagesBarred in new comfort positive displacement chillers since January 1, 2024New comfort chillers limited to GWP under 700 since January 1, 2025Repairable; replacements move to lower GWP refrigerants
R-513A, R-1233zd(E), R-1234ze(E) and similarNewer chillersOutside the prohibited list for chillersMeet the federal GWP limitsRepairable; technicians follow the refrigerant’s safety class

What do federal leak repair rules ask of a Rhode Island chiller owner in 2026?

The EPA’s Emissions Reduction and Reclamation rule has required leak repair since January 1, 2026 on appliances holding 15 pounds or more of an HFC or certain substitute refrigerants, and its comfort cooling threshold is a 10 percent annual leak rate. Industrial process refrigeration machines trigger at 30 percent and commercial refrigeration at 20 percent. Once a leak rate passes the threshold, the repair is due within 30 days, extended to 120 days when the fix requires shutting down an industrial process, and verification tests follow.

The leak rate is calculated each time refrigerant is added, which makes accurate charging records part of every service visit. Paul Industries weighs refrigerant in and out, records the leak rate calculation on the service report, and keeps the history so an owner can show the repair timeline for any machine. The federal Technology Transitions rule, revised in May 2026, still limits new comfort cooling chillers to refrigerants under 700 GWP from January 1, 2025, and process chillers delivering fluid at minus 30 C or warmer came under the same 700 limit on January 1, 2026, so a replacement in Rhode Island has to satisfy both the state list and the federal limit.

Licensing, code and pressure vessel rules on a Rhode Island repair

Under Chapter 28-27 of the General Laws, the mechanical trades statute, anyone installing, repairing, replacing, servicing, maintaining or altering refrigeration and air conditioning equipment, heating and cooling equipment or the piping connected to them must hold a state license. The Rhode Island refrigeration license comes in master and journeyperson classes issued by the Division of Professional Regulation in the Department of Labor and Training, and the journeyperson refrigeration technician class rests on 10,000 hours of registered apprenticeship plus a state exam. Federal Section 608 technician certification for refrigerant handling applies on top of the state license.

Since December 1, 2025 the state mechanical code, RISBC-4, has been the 2021 IMC with Rhode Island amendments, and two of those amendments bear on chiller rooms: a refrigerant detector with audible and visual alarms placed where leaking refrigerant would collect, and a ban on potable water as single-pass cooling in the refrigeration cycle of HVAC equipment. When a chiller repair replaces or relocates the detector, or a repair turns into a replacement, the machinery room is brought up to those requirements under a permit from the city or town building official.

Welded repairs on chiller shells and vessels

Rhode Island’s boiler and pressure vessel law defines a pressure vessel by pressure from an external source, and the exemption list in section 28-25-18 has no general carve-out for refrigeration equipment. The law exempts vessels rated 15 psig or below and any vessel no more than six inches across, but condenser shells, receivers and oil separators on most high pressure chillers are larger and run well above 15 psig. Under section 28-25-10, any welded repair or alteration on a vessel within the law is reported to the boiler unit of the Division of Occupational Safety or an authorized inspector before work starts, made under the National Board Inspection Code, and documented on the NBIC form afterward. Paul Industries plans shell and nozzle repairs with that notice built into the schedule.

Which Rhode Island buildings run their chillers through the winter?

Rhode Island hospitals, biologics and manufacturing plants, research buildings and data rooms run chillers through the winter, because surgical suites, cell culture suites, process equipment and servers make heat year round. Brown University Health’s hospitals, including Rhode Island Hospital and The Miriam Hospital in Providence and Newport Hospital, along with Kent Hospital in Warwick, carry critical cooling loads. Amgen’s West Greenwich biologics campus, Electric Boat’s Quonset Point facility and Naval Station Newport are among the large industrial and defense sites, and Brown University, the University of Rhode Island, RISD and Providence College run campus plants. These are market facts about where chillers work hardest in the state.

Providence’s July normals are an 84 degree high and a 65 degree low, and the humid air off Narragansett Bay keeps latent load high through August nights. Comfort machines in offices and schools run from May into October and sit idle in winter, while hospital, lab and process machines run every month. That split decides when each kind of repair is scheduled.

How chiller repairs are timed in Rhode Island buildings
BuildingWhen the chiller runsBest repair windowWhat has to be in place first
Hospital central plantAll yearSpring and fall shoulder months, one machine at a timeSpare capacity confirmed for critical areas, temporary cooling ready
Biologics or pharmaceutical plantAll year, tied to batchesPlanned shutdownsChange control, process temperature limits, validated area procedures
Shipyard and defense manufacturingProcess loads all year, comfort in summerBetween production phases or on weekendsSite access and security clearance arranged ahead
University central plantResearch loads all year, comfort in sessionWinter break and early springLoop minimum capacity confirmed for labs
Office tower or state buildingMay to OctoberNovember to AprilProper winter layup so the spring start is clean
Data roomAll yearAny month, under a method of procedureRedundant unit verified before isolation

Hospital chiller plants and HVAC chiller repair under infection control

HVAC chiller repair at a Rhode Island hospital starts with the hospital’s own rules: an infection control risk assessment for work near clinical areas, a confirmed backup for operating rooms, sterile processing, pharmacies and imaging, and a clear plan for what happens if a second machine trips during the outage. Paul Industries reviews the load profile for the repair window, connects temporary cooling where redundancy is thin, and returns the repaired machine to service once a load test and a safety check are complete, with the records written for the hospital’s environment of care files.

Industrial chiller repair for biologics, marine and process plants

Industrial chiller repair at Rhode Island plants follows the production schedule. A cell culture plant needs its process and jacket cooling held within tight limits, a shipyard supplier needs cooling for welding equipment, compressors and process loops, and a food or chemical plant needs glycol at the right temperature for each line. Paul Industries carries the likely parts for the planned window, works under the plant’s change control where systems are validated, and provides an industrial chiller repair service report that a quality team can file. Dedicated machines on a single process are covered on the process chillers page.

Commercial chiller repair in Rhode Island offices, campuses and state buildings

Commercial chiller repair in Rhode Island office towers, campuses, schools and state buildings fits the months when the building rides on reduced capacity or none at all. Major overhauls go into the winter, and the machine’s layup and spring start are part of the same scope, because a chiller drained badly in October comes back in May with corroded tubes or a seized pump.

Why is my commercial chiller not cooling? Rhode Island fault patterns

A commercial chiller that runs but fails to hold its chilled water setpoint usually has one of five causes: fouled condenser tubes or a weak cooling tower raising head pressure, low refrigerant charge from a leak, too little water flow through the evaporator, air and moisture in a low pressure machine, or a control or capacity fault that keeps the compressor from loading. In Rhode Island the first two show up most on humid August afternoons, when the tower’s wet bulb rises and every scaled tube costs capacity. Paul Industries diagnoses from the approach temperatures, the refrigerant pressures and the control history before any part is ordered.

Chiller symptoms, likely causes and what Paul Industries checks first
SymptomLikely causeFirst checksRhode Island angle
High head pressure tripsFouled condenser tubes, tower underperforming, non-condensablesCondenser approach, tower approach, purge run timeHumid afternoons push tower water warmer from July into September
Low suction pressure or freeze tripsLow charge, low evaporator flow, fouled strainerEvaporator approach, flow, leak rate historyLeak rate calculation required each time refrigerant is added
Chilled water temperature drifting upCompressor unable to load, vane or slide valve fault, control setpointMotor current, vane or slide position, control logsYear-round hospital and lab loads leave few chances to test at full load
Air cooled unit losing capacityCoil corrosion and fin loss, failed fan motorsCoil condition, fan operation, condensing pressureSalt air from the Bay and the sound shortens coil life
Rising oil or bearing temperatureOil degradation, bearing wear, cooler foulingOil analysis, vibration trend, oil cooler flowMachines running all year accumulate hours fast

Air cooled chiller repair from Narragansett Bay to Westerly

Air cooled chiller repair on the Rhode Island coast centers on the condenser coil, because salt carried off Narragansett Bay and Block Island Sound attacks aluminum fins and copper tubes and opens leaks at the joints. Paul Industries inspects coils for fin loss and pitting, repairs or replaces failed sections, applies protective coatings to sound coils, replaces corroded fan motors and guards, and seals control panels against moist salt air. Where a coil is beyond repair, a replacement coil on a sound chassis often costs far less than a new unit, and on a comfort chiller the cost goes onto the 50 percent tally under the state rule.

Water cooled chiller repair and the tower behind it

Water cooled chiller repair in Rhode Island almost always includes the condenser water side: tube cleaning, eddy current testing to find thinning tubes before they leak, tower fill and nozzle condition, and water treatment. The state mechanical code’s ban on potable water as single-pass cooling means a failed tower is fixed rather than bypassed with city water, so tower repair belongs in the same plan, and the cooling tower repair page covers that work.

Centrifugal chiller repair, screw and scroll work

Centrifugal chiller repair covers impeller and diffuser inspection, bearing and seal replacement, guide vane linkages, oil systems and the purge on low pressure machines. Screw machines need rotor and bearing work, slide valve repairs and oil separator service, and scroll chillers are repaired by replacing failed compressors in the circuit. Each repair ends with a run under load and vibration readings for the trend file.

Glycol chiller repair at food, beverage and process plants

Glycol chiller repair at Rhode Island food, beverage and chemical plants adds the fluid to the scope: glycol concentration and inhibitor levels are tested at every visit, heat exchangers are checked for fouling, and pumps and expansion tanks are serviced with the chiller. An industrial water chiller repair on a process loop follows the same practice with treated water in place of glycol.

What carries the load while a Rhode Island chiller is out for repair?

Temporary cooling during a Rhode Island chiller repair comes from spare capacity in the plant where it exists, and from rental chillers connected through temporary hoses or hard piped connection points where it does not. Paul Industries sizes the temporary unit to the load expected during the repair window, arranges the electrical feed and the water connections, and runs the changeover so the building sees no gap in chilled water. Chiller rental cost depends on the tonnage, the length of the rental, the electrical connection and generator if building power is short, and the hoses, pumps and labor to connect and disconnect, and permanent connection points on the chilled water mains cut that cost on every future outage.

Repair, overhaul or replace at Rhode Island power prices

Rhode Island industrial electricity averaged 19.70 cents per kilowatt hour in 2024, against 8.13 cents nationally, so a chiller’s efficiency carries real weight in every Rhode Island repair decision. A 400 ton machine that runs 0.15 kilowatts per ton worse than a new one, over an assumed 3,000 equivalent full load hours a year, wastes about 180,000 kilowatt hours, or roughly $35,460 a year at the Rhode Island rate. Paul Industries sets that figure beside the repair price, the remaining life of the machine, its refrigerant, and the state’s 50 percent test when it recommends a repair, an overhaul or a replacement.

When replacement wins, Paul Industries removes the old machine and recovers its refrigerant, supplies and sets the new chiller on a refrigerant allowed under both the state list and the federal limits, reconnects piping, power and controls, upgrades the machinery room detection where needed, and starts the machine up with its first service report. The mechanical plant behind a larger replacement is described on the data center mechanical contractor in Rhode Island and data center cooling in Rhode Island pages for owners whose chillers serve computer rooms.

Who repairs chillers in Rhode Island?

Paul Industries repairs chillers in Rhode Island for hospitals, plants, campuses, offices and data rooms in Providence, Cranston, Warwick, Pawtucket, East Providence, Woonsocket, West Greenwich, North Kingstown, Newport, Westerly and throughout the state. Paul Industries keeps its headquarters at 256 Shore Drive in Kilmarnock, Virginia, after earlier years in northern New Jersey and then Pennsylvania, and provides chiller service in Rhode Island, across New England and in all 50 states.

Owners comparing a chiller repair company for a Rhode Island building want a diagnosis they can read, a repair price before the machine is opened, records that satisfy the EPA and the state, and one accountable firm for the chiller, the tower, the pumps and the piping. Paul Industries provides each of those, and supplies parts, overhaul kits and replacement chillers as supply-only orders, or delivers a replacement as design-build or complete installation. The same work in Paul Industries’ headquarters state is on the chiller repair in Virginia page, and the neighboring New England pages for Massachusetts and Connecticut cover their own state rules. Boilers in the same plants are covered on the boiler repair in Rhode Island page.

Chiller repair cost in Rhode Island: what sets the number

Chiller repair cost in Rhode Island is set by the machine type and size, the fault, the parts and refrigerant needed, access to the machinery room, the repair window and any temporary cooling, and Paul Industries quotes each repair from a diagnosis rather than a flat rate. A control or sensor fault on a scroll chiller is a short visit. A centrifugal compressor teardown with bearings, seals and an impeller inspection is a multi-day job with parts on order. A leak repair on a large R-134a machine adds the cost of refrigerant, which tightens each year under the federal phasedown, and the leak rate records.

Planned work costs less than breakdown work. A chiller repair and maintenance program that trends oil, vibration, approach temperatures and leak rates finds faults while they are cheap, and lets a repair be scheduled into the shoulder months rather than an August emergency. Owners sending a request get the most accurate price by including the nameplate data, the refrigerant and charge, recent alarms, operating logs and this year’s refrigerant additions.

Paul Industries chiller service across Rhode Island

Paul Industries diagnoses, repairs, overhauls, retrofits, maintains and replaces centrifugal, screw, scroll, air cooled, water cooled, glycol and process chillers across Rhode Island, with leak rate records under the EPA rule, the state HFC rule’s 50 percent test tracked on every comfort machine, machinery rooms kept to RISBC-4, and welded vessel repairs made under the NBIC. The scope extends to towers, pumps, heat exchangers and the chilled water piping on the process piping in Rhode Island page. To schedule a repair or a replacement study, request a quote. Other Rhode Island process and utility work is on the Rhode Island page.

Standards referenced: RIDEM Prohibition of Hydrofluorocarbons in Specific End-Uses, 250-RICR-120-05-53 · EPA Emissions Reduction and Reclamation rule, 40 CFR 84.106 · EPA Technology Transitions rule, 40 CFR Part 84 Subpart B · Clean Air Act Section 608 · RISBC-4 Rhode Island Mechanical Code (2021 IMC with Rhode Island amendments) · R.I. Gen. Laws Chapter 28-27, mechanical trades · R.I. Gen. Laws Chapter 28-25, boiler inspection and pressure vessels · National Board Inspection Code · ASME Boiler and Pressure Vessel Code, Section VIII · ASHRAE 15 · ASHRAE/ACCA 180 · AHRI 700

Frequently asked questions

Who handles chiller repair in Providence for hospitals, campuses and downtown towers?

Paul Industries handles chiller repair in Providence for hospital central plants, university and college buildings, office towers and state buildings, from centrifugal machines in basement plants to air cooled units on roofs. Hospital and lab machines that run all year are repaired one at a time with spare capacity or temporary cooling confirmed first, while comfort machines in towers are overhauled between November and April.

Does Paul Industries repair chillers in Warwick, Cranston and West Warwick?

Paul Industries repairs chillers in Warwick, Cranston and West Warwick for hospitals, manufacturers, offices, schools and distribution buildings along the Route 95 corridor. Repairs cover leak search and repair, compressor and motor work, tube cleaning and controls, and each visit records refrigerant added and the leak rate calculation that the federal rule requires for machines holding 15 pounds or more of an HFC.

Who repairs process chillers in West Greenwich, East Greenwich and Kent County plants?

Paul Industries repairs process and comfort chillers in West Greenwich, East Greenwich, Coventry and the rest of Kent County, including machines that serve biologics manufacturing, research and light industry. Process repairs are planned into shutdowns and follow the plant’s change control, so the records fit a quality system. Process chillers sit outside Rhode Island’s HFC rule for comfort equipment and fall under the federal process limits instead.

Does Paul Industries service chillers at Quonset and in North Kingstown?

Paul Industries services chillers at the Quonset Business Park and across North Kingstown, for marine and defense manufacturers, food and materials plants and the offices around them. Air cooled units near the water get coil inspection, coating and fan motor work against salt corrosion, and process machines are maintained to the production schedule, with access and security arrangements settled before each visit.

Who repairs chillers in Newport, Middletown and on Aquidneck Island?

Paul Industries repairs chillers in Newport, Middletown and Portsmouth for the hospital, colleges, hotels, defense research buildings and offices on Aquidneck Island. Salt air is the steady enemy of rooftop units there, so repairs pair coil and enclosure work with the mechanical fault. Comfort machines are overhauled in winter, and hospital machines are repaired with backup cooling confirmed.

Does Paul Industries handle chiller maintenance in Providence, Pawtucket and the Blackstone Valley?

Paul Industries handles chiller maintenance in Providence, Pawtucket, Central Falls, Lincoln, Cumberland and Woonsocket under scheduled programs: spring start and fall layup on comfort machines, oil, vibration and refrigerant analysis, leak rate records, purge checks, tube cleaning and eddy current testing. Mill buildings converted to offices and labs in the Blackstone Valley often have chillers in tight spaces, so access is planned at the first visit.

What does the Rhode Island refrigeration license cover on a chiller repair?

Chapter 28-27 of the General Laws requires a state license for installing, repairing, replacing, servicing, maintaining or altering refrigeration and air conditioning equipment and its piping, which takes in chiller repair. The Division of Professional Regulation issues master and journeyperson refrigeration licenses, and journeypersons complete a 10,000 hour registered apprenticeship and an exam. Federal Section 608 rules for refrigerant handling apply as well.

Does a major overhaul count as a new chiller under Rhode Island's HFC rule?

An overhaul counts as new under RIDEM’s rule when the cumulative capital cost of replaced components passes 50 percent of the capital cost of replacing the whole system, or when components are added to increase capacity. A comfort chiller on R-134a or R-410A that crosses that line falls under the 2024 prohibition. Paul Industries tracks the running total on each comfort machine and shows it with every large repair quote.

Can a Rhode Island comfort chiller still be recharged with R-134a?

An existing comfort chiller built before January 1, 2024 can be repaired and recharged with R-134a in Rhode Island, because the state rule allows refrigerant and parts to service existing equipment. The prohibition applies to new comfort chillers. Under the federal rule, a machine holding 15 pounds or more must have its leak rate calculated at each charge and repaired within 30 days if it passes 10 percent.

How much refrigerant does a chiller hold, and when does the 15 pound leak rule apply?

A small scroll chiller holds tens of pounds of refrigerant, while large centrifugal and screw machines hold several hundred to a few thousand pounds, and the charge is printed on the nameplate. Nearly every commercial and industrial chiller is above the 15 pound line in the EPA leak repair rule when its refrigerant is an HFC or a covered substitute, so leak rate records apply to almost every Rhode Island plant.

Can city water cool a Rhode Island chiller while the tower is being repaired?

The Rhode Island Mechanical Code prohibits potable water as open loop, single-pass cooling in the refrigeration cycle of HVAC equipment, so city water through the condenser is ruled out as a stopgap. Temporary cooling comes from a rental chiller or tower, or from spare capacity in the plant. Paul Industries plans tower repairs with the temporary arrangement ready before the tower comes out of service.

What does chiller rental cost while a Rhode Island machine is being repaired?

Chiller rental cost is driven by tonnage, rental length, the electrical connection and any temporary generator, and the hoses, pumps and labor to connect and remove the unit. Short repairs scheduled in the shoulder months often need little or no rental capacity. Paul Industries sizes the temporary unit to the actual load in the repair window and recommends permanent connection points where outages recur.

How much does a chiller cost to run at Rhode Island electricity prices?

A 500 ton chiller at 0.6 kilowatts per ton, running an assumed 2,500 equivalent full load hours a year, uses about 750,000 kilowatt hours, which costs roughly $147,750 at the 2024 Rhode Island industrial average of 19.70 cents, against about $60,975 at the national average. Pumps and towers add to that. Paul Industries uses the plant’s own logs to give owners the real figure.

Who installs chillers in Rhode Island once a machine reaches the end of repair?

Paul Industries installs replacement chillers in Rhode Island: refrigerant recovery and removal of the old machine, rigging the new one into place, piping, power and control connections, machinery room detection to RISBC-4, and startup with a first service report. New comfort chillers use refrigerants allowed under both the state HFC rule and the federal GWP limit, and process machines meet the federal process chiller limits.

Does welding on a chiller shell need notice to the Rhode Island boiler unit?

A welded repair or alteration on a chiller vessel that falls within Rhode Island’s pressure vessel law needs notice to the boiler unit of the Division of Occupational Safety or an authorized inspector before work begins, and an NBIC repair form filed afterward. Exemptions cover vessels at or below 15 psig and vessels six inches or less in inside diameter. Paul Industries builds that notice into the repair schedule.

What should a chiller repair and maintenance agreement in Rhode Island include?

A chiller repair and maintenance agreement in Rhode Island should list each visit’s tasks, oil, refrigerant and vibration analysis intervals, leak rate records under the federal rule, a running total of replacement cost against the state HFC rule’s 50 percent test for comfort machines, tube cleaning and eddy current testing, and tower and pump checks. Paul Industries prices the agreement per plant after a walk-through.

Is an R-22 chiller in a Rhode Island building worth repairing?

An R-22 chiller can be repaired with reclaimed refrigerant, since production and import ended in 2020 but use of existing systems continues. Supply costs keep rising, so repairs suit machines with a short planned life. Paul Industries prices the repair alongside a replacement on a refrigerant allowed under the state and federal rules, with the energy savings at Rhode Island power prices shown for comparison.

Which records speed up pricing for chiller repair in Rhode Island?

The chiller’s manufacturer, model and serial number, the refrigerant and charge, the alarm history, a week or two of logged pressures and temperatures, the last service report and this year’s refrigerant additions let Paul Industries price a repair quickly and accurately. For a comfort chiller, add the dates and costs of major past repairs, so the state HFC rule’s 50 percent tally can be checked.

Have a chiller to repair or replace in Rhode Island?

Send the nameplate details, refrigerant and charge, recent alarms, operating logs and the history of major repairs. Call 201-450-8280 or request a quote.