Paul Industries builds and services data center liquid cooling in Arkansas, designing, piping, filling and testing coolant distribution units, cold plate and rear door loops, rack manifolds, facility water mains, pumps and the dry coolers or trim chillers that send the heat outdoors. Dense racks are arriving in Arkansas halls from West Memphis to Bentonville, and the state’s weather lets a warm-water loop reject most of its heat with fans alone, provided the loop is protected through Ozark freezes and sized for south Arkansas afternoons. From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, the company carries out Arkansas liquid cooling projects as an East Coast contractor that also works in every US state and at sites in other countries.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Dry cooler weather Little Rock: 7,371 hourly normals below 80 F; Fayetteville 7,964 (NOAA)
Ozark freezes About 93 nights a year at or below 32 F at Fayetteville Drake Field (NOAA)
Tax statute Modular data centers and preassembled components listed in Ark. Code 26-52-456
Commercial power 10.76 cents/kWh in Arkansas against 13.37 US (EIA, 2025)
Reviewed November 2026

The data center liquid cooling system in an Arkansas hall, rack to yard

A data center liquid cooling system in an Arkansas hall is built as two linked loops and the plant behind them. The technology cooling loop runs from coolant distribution units through rack manifolds to each data center liquid cooling cold plate on processors and memory, or to rear door coils; the facility water loop carries heat from the CDUs to dry coolers, cooling towers or chillers in the yard. Paul Industries designs and installs both loops, the controls that keep them in balance and the heat rejection outside. Data center liquid cooling in Arkansas also depends on choices made before any pipe is cut: the facility water temperature, the redundancy target, the coolant, and whether the loop serves a new building or an operating room.

How does data center liquid cooling work in practice? Water carries roughly 3,500 times more heat per unit volume than air, so a loop of modest pipe can remove the heat from racks that fans alone could never cool. As a rule of thumb, each megawatt moved with a 10 degree Fahrenheit temperature rise needs about 680 gallons a minute of water. The national overview of loop types sits on the data center liquid cooling page; what follows is the Arkansas version: the weather the heat goes into, the freezes the loop has to survive, and the codes and tax statute the work sits under.

What is direct liquid cooling, and where does it fit in Arkansas?

Direct liquid cooling is the method of bringing coolant to cold plates mounted on the hottest components inside each server, so most of the heat leaves the rack in liquid instead of air. A direct liquid cooling data center still needs some air cooling for the remaining heat from power supplies, drives and network gear, a share of the rack load that depends on the server design. Direct liquid cooling for data centers in Arkansas suits new high-density halls, research computing rooms and existing halls adding a few dense rows.

Why a direct liquid cooling data center still needs some air

Server power supplies, drives and network switches still shed heat into the room air, so the hall keeps air handlers sized for that remainder, and the air and liquid sides are tested together.

Data center liquid cooling vs air cooling is mostly a question of rack density. Air with good containment handles racks into the tens of kilowatts; beyond that, fan power, airflow volume and noise climb steeply and liquid takes over. Rear door heat exchangers sit between the two, cooling the exhaust air of an air-cooled rack with a water coil at the back of the cabinet. Immersion tanks are a further step, covered on the data center immersion cooling page.

Liquid cooling methods and how each suits an Arkansas hall
MethodTypical useFacility water needArkansas fit
Rear door heat exchangersExisting air-cooled racks pushed past their airflow limitCool water, often from the existing chilled water plantRetrofit route for older Little Rock and Northwest Arkansas rooms; supply water kept above the room dew point
Single-phase cold plates with CDUsDense processor and accelerator racksWarm facility water from dry coolers or a heat exchanger off the chilled water plantThe main route for new dense halls; dry coolers carry most hours
In-row or sidecar CDUs with liquid-to-air coolingA few dense racks in an air-cooled roomNone at first; heat goes into the room airPilot rows ahead of a facility water extension
ImmersionSpecialized dense deploymentsWarm water to tank heat exchangersSuits warm-water rejection; floor loading and fluid handling planned up front

How many hours can an Arkansas dry cooler carry a warm-water loop?

An Arkansas dry cooler can carry a warm-water liquid cooling loop on its own for most of the year: NOAA’s 1991 to 2020 hourly normals put Little Rock below 80 degrees Fahrenheit for about 7,370 of 8,760 hours, 84 percent of the year, and Fayetteville below 80 for about 7,960 hours, 91 percent. A dry cooler typically delivers water 8 to 15 degrees above the outdoor air, so the facility water temperature the IT vendor accepts decides how many of those hours count.

Hours a year at or above three outdoor temperatures, from NOAA hourly normals (1991 to 2020)
StationHours at or above 80 FHours at or above 85 FHours at or above 90 FHours at or below 70 F
Fayetteville (Drake Field)79633106,639
Fort Smith1,3657652415,502
Little Rock (Adams Field)1,3897531155,423
Pine Bluff1,360761525,381
El Dorado1,3598161875,413
Texarkana1,4718172465,247

Hourly normals average out the extremes, so a design day in July is hotter than any value in the table; El Dorado averages about 88 days a year at or above 90 degrees by NOAA’s daily count. The table still shows the shape of the decision. A loop that accepts facility water in the upper 80s or low 90s, in the range ASHRAE data center liquid cooling guidance labels W32 and above, runs on dry coolers alone for all but a few hundred hours almost anywhere in Arkansas, and a small trim chiller or adiabatic stage covers the rest. A loop held to cooler water, in the W17 or W27 classes, leans on chillers for much of the summer.

The data center liquid cooling temperature, then, is the first number Paul Industries confirms with the server vendor, because it sets the yard size, the trim chiller capacity and the power the plant draws. Raising it a few degrees in Texarkana or El Dorado saves more than any change to the equipment list.

Freeze protection for liquid loops in the Ozarks and the north

Freeze protection matters for liquid loops in northern Arkansas because the facility water in a dry cooler sits outdoors in thin coil tubes: NOAA counts about 93 nights a year at or below freezing at Fayetteville’s Drake Field and about 92 at the Northwest Arkansas Regional Airport, where January’s normal low is 26.7 degrees. A dry cooler coil that freezes splits its tubes, and the hall loses heat rejection exactly when the servers are still running.

Paul Industries protects outdoor loops with propylene glycol at a concentration matched to the site’s design low, isolates the glycol side from the technology loop with a heat exchanger or the CDUs themselves, and writes control sequences that keep flow moving through idle coils or drain them. South Arkansas sites see far fewer freezing nights, about 37 a year at Texarkana, but a single hard freeze is enough to split a coil, so every Arkansas yard gets the same protection logic with the glycol strength set for its own climate.

Is data center water cooling closed loop in an Arkansas liquid-cooled hall?

Data center water cooling in an Arkansas liquid-cooled hall is closed loop on the technology side in every design Paul Industries builds: the coolant that touches the cold plates circulates in a sealed loop and is topped up only to replace small losses. The facility side can be closed or open. A dry cooler loop is closed and uses almost no water; a cooling tower loop evaporates water to reject heat.

Closed loop data center cooling water usage is therefore close to zero for heat rejection when dry coolers do the work, which is why liquid cooling and warm water suit Arkansas sites over the stressed eastern and southern aquifers. Data center cooling water usage rises only if the design adds evaporative trim for the hottest hours. Paul Industries models the annual hours each stage runs, so the owner knows what the yard will draw before the water service is sized.

Coolant and fill water for an Arkansas liquid loop

Data center cooling water quality inside a liquid loop has to be far tighter than in a tower loop, because cold plate channels are fine passages that scale, particles and biological growth can block. The fill water is the starting point. Northwest Arkansas municipal water from Beaver Lake is soft and low in dissolved solids, about 75 parts per million of hardness and 115 of total dissolved solids in 2025, yet it still carries chlorine, chloride and minerals that a cold plate loop has to be kept free of. Paul Industries treats fill water through filtration and deionization before it enters the loop, whatever the source.

Data center liquid cooling coolant choices for Arkansas loops
CoolantWhere it is usedArkansas considerationWhat Paul Industries checks
Propylene glycol mixture with inhibitorsTechnology loops specified by many server vendorsFreeze margin if the loop is drained or shipped in winterConcentration, inhibitor level, pH and particle count at fill and on a schedule
Treated deionized waterTechnology loops where the vendor allows waterNeeds a biocide and corrosion inhibitor programConductivity, microbial counts, inhibitor residual
Higher-strength glycolOutdoor dry cooler loopsSet for Ozark design lows in the north, lighter in the southFreeze point by refractometer each autumn
Treated water with tower chemistryOpen tower loops serving a plate heat exchangerKept separate from the technology loopCycles, scale and corrosion indices, blowdown

Paul Industries flushes new loops until particle counts meet the server vendor’s limits, fills with the specified data center liquid cooling coolant, and documents the chemistry at handover so the first sample after startup has a baseline to compare against. Stainless and copper components are cleaned and, where the specification calls for it, passivated; the same discipline appears on the passivation services in Arkansas page.

Piping, CDUs and leak control in Arkansas halls

Data center liquid cooling piping in Arkansas follows the 2021 International Mechanical Code, which the state applies to mechanical work through the Arkansas Department of Labor and Licensing, along with the building and fire provisions of the 2021 Arkansas Fire Prevention Code. Facility water mains are typically steel, stainless or copper built to ASME B31.9; technology loops downstream of the CDUs use stainless or approved polymer piping and hoses with dripless quick disconnects at the racks.

Each data center liquid cooling CDU holds the pumps, heat exchanger, filtration and controls that condition the technology loop. Paul Industries sets CDUs in N+1 or 2N arrangements to match the owner’s redundancy target, puts data center liquid cooling pumps on uninterruptible or generator-backed power where the rack load demands it, and pressure tests every joint before coolant goes in. A data center liquid cooling leak is controlled the same way in every hall: leak detection cable under manifolds and CDUs, drip trays where piping crosses electrical gear, isolation valves at each row, and test records showing every joint held pressure before it was hidden.

Liquid cooling for data center racks also changes the floor. A dense liquid-cooled rack with its manifolds and coolant weighs far more than an air-cooled rack of the same footprint, so Paul Industries confirms floor loading, overhead pipe support and the route from the yard to the white space before the first rack is set. Prefabricated pipe spools and skid-mounted CDU assemblies, built off site and tested before shipping, shorten the field work in an operating Arkansas hall; the piping side is described further on the process piping in Arkansas page.

Arkansas tax and code points for a liquid cooling project

Arkansas tax and code points for a liquid cooling project start with Act 548 of 2025, which amended Arkansas Code 26-52-456 and took effect on October 1, 2025. The statute’s list of data center equipment covers racks and server equipment regardless of whether they are affixed to the building, mechanical and cooling equipment, modular data centers and preassembled components, and labor services to install, repair, service, alter or maintain those items, all for qualified data centers that meet the state’s investment and cost-benefit tests.

For a liquid cooling job, that wording reaches the CDUs, manifolds, cold plate loops, dry coolers and the prefabricated skids that carry them, as well as the labor to install them. Whether a given hall qualifies is for the owner and the state to settle; Paul Industries prepares itemized schedules so each CDU, skid and line of labor appears clearly on the record. The wider tax and contracting picture is on the Arkansas data center mechanical contractor page.

Adding liquid cooling to an operating Arkansas hall

Adding liquid cooling to an operating Arkansas hall means extending facility water into a live room without disturbing the racks already running there. Paul Industries plans the tie-in to the existing chilled water or condenser water system with hot taps or line stops where shutdowns are impossible, runs new mains overhead or under the floor according to the room’s layout, and brings CDUs online one at a time.

Sequence for a liquid cooling retrofit in a live Arkansas data hall
StepWorkRecord produced
1. SurveyExisting plant capacity, water temperatures, floor loading, pipe routes, powerSurvey report and basis of design
2. Tie-inHot tap or line stop on the facility main under a written method of procedureApproved procedure and tie-in log
3. Mains and manifoldsPrefabricated spools installed, supported and pressure testedPressure test certificates by section
4. Flush and fillFlushing to the vendor’s particle limit, then fill with specified coolantFlushing log and fluid analysis
5. CDU startupPump rotation, controls, alarms, leak detection, failoverStartup and functional test reports
6. Load testHeat load banks on the loop before servers connectLoad test data at design flow and temperature

Testing through load banks and failure scenarios is set out on the data center commissioning in Arkansas page, and the yard plant on the Arkansas data center cooling page.

Who installs data center liquid cooling in Arkansas?

Paul Industries installs data center liquid cooling in Arkansas, taking responsibility for the full path from the cold plate connection to the dry cooler fans. The company sizes the loops, selects or supplies CDUs, manifolds and dry coolers, prefabricates piping, sets and connects the equipment, wires controls and leak detection, flushes and fills, and tests the system under load before the servers arrive. Owners can buy equipment as a supply-only package, ask for a design-build loop, or have Paul Industries complete the installation to their engineer’s drawings.

The same scope is described for the headquarters state on the Virginia data center liquid cooling page and for a hotter, larger grid on the Texas data center liquid cooling page. In Arkansas the emphasis falls on dry cooler hours, freeze protection in the north and the Act 548 record.

The state’s technology base points the same way. The University of Arkansas dedicated its Multi-User Silicon Carbide Facility in Fayetteville on November 14, 2025, and the university names data centers among the systems that silicon carbide power devices serve; Google lists West Memphis as a data center location in development. These are market facts about Arkansas. For an owner, they mean dense computing is arriving in the state’s halls, and the facility water, controls and maintenance plan behind a liquid-cooled row should be designed for growth from the first phase. Paul Industries sizes mains, valves and CDU connections for the rack count planned in later phases, so adding rows later means connecting to capped branches instead of shutting down a live loop.

What does data center liquid cooling in Arkansas cost?

Data center liquid cooling cost in Arkansas depends on the rack count and density, the facility water temperature, whether the heat goes to new dry coolers or to an existing chiller plant, the CDU redundancy, the route from yard to hall, and whether the work happens in a new building or a live room. Retrofits cost more per rack than new halls because of tie-ins, phasing and protection of running equipment.

Operating cost is mostly pump and fan power. At the 2025 Arkansas commercial average of 10.76 cents per kilowatt hour, 100 kilowatts of pumps and fans running all year cost about $94,000, which is why Paul Industries sizes pumps for the real flow and pressure drop rather than adding margin on margin. A budget range follows from the rack plan and site; a firm price follows from a fixed design.

Data center liquid cooling maintenance in Arkansas

Data center liquid cooling maintenance in Arkansas follows a fixed rhythm: coolant sampling for chemistry and particles, filter and strainer changes, CDU pump and sensor checks, leak detection tests, and an autumn check of glycol strength in every outdoor loop before the first Ozark freeze. Paul Industries offers maintenance agreements that cover the whole liquid cooling system or the CDUs and yard equipment alone, with records kept in the same format as the commissioning file.

Seasonal checks matter as much as the routine ones. Before summer, Paul Industries cleans dry cooler coils, checks fan motors and confirms the trim cooling stage starts on its setpoint; before winter, it confirms heat tracing, glycol strength and the freeze sequences; and after any major rack move it verifies the loop’s flow balance so each row still gets its design flow.

Paul Industries and liquid cooling across Arkansas

Paul Industries builds and maintains liquid cooling for Arkansas data halls, research computing rooms and edge sites, with the warm-water loops, freeze protection and documentation the state’s climate and tax rules call for. The work sits alongside the other Arkansas services on the Arkansas page and the company’s projects across the Southeast. Send the rack plan, densities and the server vendor’s water limits, or request a quote.

Standards referenced: ASHRAE TC 9.9 liquid cooling guidelines (facility water classes W17 to W+) · ASHRAE TC 9.9 thermal guidelines for data processing environments · 2021 International Mechanical Code as adopted in Arkansas · 2021 Arkansas Fire Prevention Code · 2018 Arkansas Plumbing Code · Arkansas Code 26-52-456 (Act 548 of 2025) · ASME B31.9

Frequently asked questions

Who installs liquid cooling for dense racks in West Memphis and the Arkansas Delta?

Paul Industries installs liquid cooling for dense racks in West Memphis, Marion, Jonesboro and the wider Arkansas Delta, including CDUs, rack manifolds, facility water piping and dry coolers. Delta summers are humid, but at Pine Bluff, the Delta-edge station Paul Industries checked, the dry bulb sits below 80 degrees for about 84 percent of hourly normals, so warm-water loops reject heat with fans much of the year and save water over aquifers the state already reports as heavily drawn.

Does Paul Industries add liquid-cooled rows to halls in Little Rock and North Little Rock?

Yes. Paul Industries adds liquid-cooled rows to operating halls in Little Rock, North Little Rock, Conway and Benton, tying new CDUs into existing chilled water or new dry coolers. The work is phased under written procedures so existing racks keep cooling, and every new loop is pressure tested, flushed and load tested before servers connect.

Who builds warm-water liquid cooling for halls in Bentonville, Rogers and Fayetteville?

Paul Industries builds warm-water liquid cooling for halls in Bentonville, Rogers, Springdale and Fayetteville. Northwest Arkansas has the coolest summers in the state, with only about 330 hourly normals at or above 85 degrees at Fayetteville, so dry coolers carry nearly the whole year; the design work goes into glycol strength and freeze sequences for roughly 90 freezing nights.

Can Paul Industries handle liquid cooling for sites in Fort Smith, Texarkana and El Dorado?

Paul Industries designs and installs liquid cooling for sites in Fort Smith, Texarkana, El Dorado and the rest of western and southern Arkansas. These are the hottest parts of the state, with Texarkana and El Dorado above 85 degrees for about 820 hourly normals a year, so Paul Industries sizes trim cooling for those afternoons or pushes the facility water temperature up to avoid it.

Which facility water temperature suits an Arkansas liquid cooling loop?

The warmest temperature the server vendor accepts suits an Arkansas loop best. With facility water in the high 80s or low 90s Fahrenheit, dry coolers carry the load for all but a few hundred hours a year almost anywhere in the state; with water in the 60s or low 70s, chillers run much of the summer. Paul Industries confirms the vendor’s limit before sizing the yard.

Should an Arkansas technology loop use glycol or treated water?

The server vendor’s specification decides, and vendors often call for a propylene glycol mixture with inhibitors. Glycol adds freeze margin during shipping, drain-down or a winter outage in northern Arkansas; treated deionized water transfers heat slightly better but needs a biocide program. Paul Industries fills with the specified fluid and samples it on a schedule.

Can an existing Arkansas chilled water plant feed new CDUs?

An existing chilled water plant can feed new CDUs when it has spare capacity and the CDU heat exchangers are selected for its supply temperature. The drawback is that cold chilled water wastes the warm-water advantage. Paul Industries often feeds pilot rows from the existing plant and adds dedicated dry coolers when the liquid-cooled load grows.

How are dry cooler coils protected in a hard Arkansas freeze?

Dry cooler coils are protected with glycol at a strength matched to the site’s design low, controls that keep flow through idle coils, and drain-down routines for equipment taken out of service. Paul Industries checks glycol concentration by refractometer each autumn and tests the freeze sequences before the first winter, for southern sites as well as Ozark ones.

How much closed loop data center cooling water usage should an Arkansas owner expect?

A liquid-cooled hall on dry coolers uses almost no water for heat rejection, because both loops are closed and only small top-ups replace losses. Water use rises only if the design adds evaporative trim for hot afternoons. Paul Industries models how many hours each stage runs in the site’s climate so the owner can size the water service and plan for any state reporting.

Does Act 548 cover liquid cooling equipment in Arkansas?

Act 548 of 2025 lists cooling and mechanical equipment, racks, modular data centers and preassembled components, and labor to install and maintain them as data center equipment for qualified data centers under Arkansas Code 26-52-456. Qualification is decided by the owner’s investment and the state’s tests; Paul Industries itemizes CDUs, skids, piping and labor so the record matches the claim.

Which Arkansas codes apply to liquid cooling piping?

Liquid cooling piping in Arkansas falls under the 2021 International Mechanical Code for hydronic work, enforced through the state’s mechanical program, and the 2021 Arkansas Fire Prevention Code for building and fire provisions; makeup water connections fall under the Arkansas Plumbing Code. Paul Industries builds facility mains to ASME B31.9 and submits drawings for whatever permits the jurisdiction requires.

Where do leaks occur on cold plate systems, and how does Paul Industries catch them?

Leaks most often appear at quick disconnects, hose fittings, manifold joints and CDU connections, usually after a server change or from a fitting never tested under pressure. Paul Industries pressure tests every joint before fill, installs leak detection under manifolds and CDUs, adds drip trays over electrical gear, and writes procedures for making and breaking disconnects during rack changes.

Do liquid cooling pumps need backup power in an Arkansas hall?

Liquid cooling pumps need backup power whenever the racks they serve stay online during a utility outage, because cold plates lose cooling within seconds of flow stopping. Paul Industries puts CDU pumps and the controls on uninterruptible power or generator-backed circuits to match the owner’s redundancy target and tests the transfer during commissioning.

How heavy are liquid-cooled racks, and can an older Arkansas floor carry them?

Liquid-cooled racks with manifolds and coolant can weigh far more than the air-cooled racks an older floor was rated for, so raised floors in older Arkansas rooms need reinforcement or slab-mounted rows. Paul Industries checks the floor rating, pipe support loads and the delivery route with the owner’s structural engineer before rows are set.

What does Paul Industries need to price liquid cooling for an Arkansas hall?

Paul Industries needs the rack count and density by phase, the server vendor’s coolant and water temperature limits, the redundancy target, drawings of the hall and the yard, the existing chilled water capacity if it will be used, and whether the room stays live during the work. A budget range follows from those; a firm price follows from a fixed design.

Is direct liquid cooling for data centers worth it at Arkansas power prices?

Direct liquid cooling for data centers earns its place in Arkansas on density more than on power price. Cheap electricity, 10.76 cents per kilowatt hour on the 2025 commercial average, lengthens the payback of efficiency alone, but racks beyond the reach of air need liquid regardless, and warm-water loops cut fan, compressor and water use at the same time. Paul Industries compares annual energy and water for air, rear door and cold plate options at the site.

What changes in a data center direct liquid cooling hall when servers are swapped?

A data center direct liquid cooling hall breaks and remakes quick disconnects on the technology loop every time a server is changed, which adds air and small fluid losses to the loop. Paul Industries writes the swap procedure, sets the top-up and venting steps, trains the operators and samples the coolant after large rack moves so the chemistry stays inside the vendor’s limits.

Can Paul Industries supply CDUs and manifolds without installing them?

Yes. Paul Industries supplies CDUs, manifolds, dry coolers, prefabricated pipe spools and skid assemblies as supply-only packages for owners whose teams will set them, along with design-build and complete installation routes. Supply packages arrive with test records from the off-site build, and startup support is available when the equipment is connected.

Bringing dense liquid-cooled racks into an Arkansas hall?

Send the rack plan and densities, the server vendor’s water limits, drawings of the hall and yard, and whether the room stays live. Call 201-450-8280 or request a quote.