Paul Industries designs and installs data center liquid cooling in Kentucky: coolant distribution units, cold plate and rear-door loops, facility water piping, dry coolers and the controls that tie them to the building, for dense racks in Louisville, Lexington, Northern Kentucky and the rest of the state. In Kentucky, which utility serves the site and which wholesale market it sits in shape the power contract, and the power contract decides how many racks a hall can afford to run hot. Paul Industries, headquartered at 256 Shore Drive, Kilmarnock, Virginia, builds liquid cooling across Kentucky and in all 50 states.
Request a quote or call 201-450-8280
Data center liquid cooling in Kentucky: CDUs, facility loops and the yard
Data center liquid cooling in Kentucky has three parts that have to be designed together: the technology cooling system that runs through the cold plates or rear doors at the rack, the coolant distribution unit that separates that clean loop from the building, and the facility water system that carries heat to chillers, cooling towers or dry coolers outside. Paul Industries builds all three, along with the leak detection, the controls and the power feeds that keep the pumps running.
The general case for liquid cooling, from cold plates to immersion, is laid out on the national data center liquid cooling page. This page covers what Kentucky changes: a power market split between a utility outside any regional market and several inside PJM or MISO, large-load rates written with data centers in mind, a climate that supports warm facility water for most of the year, and winters that make glycol a design decision rather than an option.
Why rack density follows the power contract in Kentucky
Rack density in a Kentucky hall is set by how much power the owner can contract and how that power is priced, because liquid cooling exists to let more of the contracted megawatts reach the servers. A hall cooled by air spends a larger share of its power on fans and compressors; a liquid-cooled hall moves most of the heat with pumps and warm water, so more of every contracted megawatt reaches the servers.
That matters more in Kentucky than in many states because the utility map is unusually varied. A site in Louisville or Lexington is served by LG&E or KU, which left the MISO market in 2006 and is the only major Kentucky utility outside a regional transmission organization. A site in Northern Kentucky, eastern Kentucky or a cooperative territory sits inside PJM, with PJM capacity costs flowing through its rates. Western Kentucky cooperatives served by Big Rivers sit in MISO. Each arrangement changes what an extra megawatt costs and how long it takes to get, and so changes how hard the owner should push density.
Which Kentucky utility serves the site, and what does it change?
Kentucky electric service for a data center comes from one of six main arrangements, and the table below summarizes them from a 2026 University of Kentucky Center for Applied Energy Research report. Paul Industries uses this as a starting point when a client brings a site, because the serving utility shapes the phasing of the cooling plant as much as the weather does.
| Utility | Area served | Wholesale market | What it means for a liquid-cooled hall |
|---|---|---|---|
| LG&E and KU | Louisville and 77 counties, about 981,000 electric customers | None; left MISO in 2006 | Generation planned under Public Service Commission oversight; large-load rate terms set the density case |
| Duke Energy Kentucky | Northern Kentucky | PJM since 2011 | PJM capacity prices pass through to rates |
| Kentucky Power (AEP) | Eastern Kentucky | PJM since 2004 | PJM capacity prices pass through to rates |
| East Kentucky Power Cooperative | 16 member cooperatives in 89 counties | PJM since June 2013 | Data Center Power tariff for loads of 15 MW or more |
| Big Rivers Electric | Western Kentucky, 22 counties | MISO since December 2010 | MISO capacity and transmission rules apply |
| TVA distribution cooperatives | Five cooperatives in Kentucky | TVA | Outside Public Service Commission jurisdiction |
PJM capacity prices and the direct liquid cooling data center case in northern and eastern Kentucky
PJM capacity prices rose from $28.92 per megawatt-day in the 2024/2025 delivery year to $269.92 in 2025/2026, $329.17 in 2026/2027 and $333.44 in 2027/2028, according to PJM auction results summarized in the same 2026 report. Customers of Duke Energy Kentucky, Kentucky Power and the East Kentucky Power Cooperative members pay those regional capacity costs through their rates.
For a liquid cooling decision, higher capacity costs reward every kilowatt of peak demand removed from the cooling plant. A direct liquid cooling data center loop running warm water through dry coolers carries a much lower summer peak than a chilled water plant serving the same heat by air, because the compressors stay off for most hours. Paul Industries models the peak and the annual energy of both options against the serving utility’s rate before the hall layout is frozen.
Large-load rates: the LG&E and KU EHLF proposal and the EKPC data center tariff
Large-load electricity rates in Kentucky now ask data centers to commit to their load for years, which pushes owners to build cooling that will still suit the racks they expect later in the contract. LG&E and KU described an extremely high load factor rate in 2025 for new data centers expecting to draw at least 100 megawatts, with a 15-year contract and a minimum payment of 80 percent of expected monthly energy. The Public Service Commission approved the East Kentucky Power Cooperative’s Data Center Power tariff in October 2025 for loads of 15 megawatts or more.
Long minimum-bill commitments change how the cooling plant should be phased. An owner who has contracted for a load has every reason to fill it, and liquid-cooled racks fill a contract with fewer square feet and less mechanical equipment. Paul Industries therefore builds the facility water mains, valves and tie-in points for the full liquid-cooled load in the first phase where the contract supports it, and adds CDUs and rack manifolds as the racks arrive.
What liquid cooling data center temperature can Kentucky weather support?
Kentucky weather supports warm facility water most of the year: outdoor air at Louisville was at or below 80 F for 86 percent of all hours in the 2021 to 2025 record, and a dry cooler with a 10 F approach can deliver 90 F water whenever that is true. That is the supply limit of the ASHRAE W32 class, which many cold plate systems accept. The table shows the share for five stations.
| Station | At or below 75 F | At or below 80 F | At or below 85 F | Hours a year at or below 20 F |
|---|---|---|---|---|
| Northern Kentucky (CVG) | 84% | 92% | 97% | 244 |
| Lexington (LEX) | 83% | 91% | 96% | 177 |
| Paducah (PAH) | 78% | 87% | 94% | 144 |
| Bowling Green (BWG) | 77% | 87% | 94% | 110 |
| Louisville (SDF) | 76% | 86% | 94% | 130 |
The remaining hours are the issue. Louisville, Bowling Green and Paducah all reached 101 F at some point in the record, so a W32 loop on dry coolers alone needs either trim cooling from a chiller or evaporative assist for the hottest afternoons. A W45 loop, at up to 113 F supply, rides through every hour in the Kentucky record on dry coolers, but only some hardware accepts it. Paul Industries confirms the facility water class with the IT vendor’s specification sheet for the exact servers before selecting the heat rejection.
How a direct to chip liquid cooling data center loop is built
A direct to chip liquid cooling data center loop starts at the cold plates on the processors, runs through hoses and quick disconnects to rack manifolds, and returns to a coolant distribution unit, where a plate heat exchanger passes the heat to the facility water. The technology cooling system inside the CDU and racks holds a small volume of treated water or propylene glycol mix, filtered finely because cold plate channels are narrow.
Paul Industries sizes the CDUs on the heat that actually goes to liquid, which is usually most but rarely all of a rack’s load; the remainder still goes to air, so the hall keeps some air cooling. Row-based CDUs suit retrofits with a few dense rows, while larger in-room or facility-level CDUs suit new halls built around liquid. Each CDU needs redundant pumps, power from a source that rides through a utility outage, and a controls link to the building system so that a pump fault raises an alarm before racks throttle.
Closed loop liquid cooling data center piping: joints, tests and inspections
A closed loop liquid cooling data center system is sealed on both sides of the CDU: the rack loop is sealed and the facility loop is a closed hydronic system, with no open contact with outdoor air unless a cooling tower sits on the facility side. Owners often ask: is data center water cooling closed loop? For the rack loop and the facility loop, yes; evaporative water use comes only from cooling towers on the facility side, where a site uses them, and a dry cooler plant evaporates none.
Facility-side pipe is usually stainless steel, carbon steel with grooved joints, or approved polymer systems, chosen for cleanliness, pressure rating and the space over the racks. Paul Industries pressure tests every section before it is insulated, flushes until filters stay clean, and fills with treated water. Where an expansion tank or other vessel runs above 15 psi, Kentucky’s boiler and pressure vessel law, KRS Chapter 236, makes it subject to state inspection at installation unless an exemption applies, so the inspection request is scheduled before insulation work starts.
Glycol and freeze protection on Kentucky liquid cooling loops
A glycol liquid cooling data center loop is the norm in Kentucky wherever facility water runs through outdoor dry coolers, because Northern Kentucky logged about 244 hours a year at or below 20 F and reached minus 8 F in the five-year record. Dow’s engineering data for propylene glycol put freeze protection to 0 F at about 36 percent by volume and to minus 10 F at about 42 percent, while burst protection to minus 10 F needs about 28 percent. Dry coolers that must keep running through the coldest hours need freeze protection; loops that only have to survive standing idle can be set for burst protection. Paul Industries sets the strength from the lowest coil temperature expected at the site, with a margin below it, and confirms it with a refractometer at startup.
Glycol costs heat transfer and pump energy, so Paul Industries often keeps glycol on the outdoor side only, with a heat exchanger between the dry coolers and the facility water loop indoors. The rack loops inside the CDUs stay on the fluid the server vendor specifies. Fill water matters on both sides: Louisville city water averaged 225 ppm of dissolved solids and 33 ppm of chloride in 2025, so loops are filled with purified water and an inhibitor package rather than straight from the tap. Purification options are covered on the ultrapure water systems in Kentucky page.
Liquid cooling data center design for Kentucky retrofits
Liquid cooling data center design in an existing Kentucky hall starts with what the building already has: chilled water temperature, spare pipe capacity, floor loading, ceiling space and electrical capacity for the CDUs. Where an existing hall runs 44 F chilled water with air cooling, an air to liquid cooling data center conversion usually adds a new warm-water loop rather than running cold plates on 44 F water, which would sweat and waste chiller energy.
Weight and space come next. A liquid-cooled rack full of dense servers, plus manifolds and filled hoses, weighs more than the air-cooled racks many raised floors were rated for, and overhead mains need hanger points the slab can carry. Paul Industries checks floor and structure ratings with the building drawings before choosing between underfloor and overhead routing, and keeps drain points and isolation valves where an operator can reach them without lifting tiles across a live aisle.
Paul Industries works through the conversion in a fixed order so the live hall keeps running. The sequence below is what a retrofit looks like on the mechanical side.
| Step | Work | What it protects |
|---|---|---|
| 1. Survey | Existing chilled water temperatures, spare capacity, floor ratings, ceiling space, electrical capacity | Avoids designing around capacity that is already used |
| 2. Facility water source | Heat exchanger off the existing plant, new dry coolers, or a dedicated warm-water plant | Keeps cold plates off 44 F water |
| 3. Mains and valves | Install mains with isolation valves and capped tie-ins during planned windows | Lets later rows connect without a shutdown |
| 4. Test and flush | Pressure test, flush and fill each section before it joins the system | Keeps debris and air out of cold plates |
| 5. CDUs and manifolds | Set CDUs, connect rack manifolds, wire leak detection and alarms | Contains any leak to one row |
| 6. Load test | Run heaters or live racks at design load, record temperatures and flows | Proves capacity before production load |
Tying liquid cooling into an existing Kentucky chilled water plant
An existing Kentucky chilled water plant can usually feed a first group of liquid-cooled rows through a plate heat exchanger, which separates the plant’s cold water from a warmer facility loop for the CDUs. The heat exchanger lets the plant keep its 44 F supply for the air-cooled hall while the new loop runs at the temperature the cold plates want, and it keeps any debris in the old mains away from the new loop.
The question is capacity. A plant that already runs near its limit in a Louisville August has no room for a dense row, while a plant with a spare chiller and towers has room until the next phase. Paul Industries checks the plant’s trend data for the hottest weeks of the past summer, compares it with the added heat, and decides whether the first phase rides on the existing plant or needs its own dry coolers from day one. Where the plant has room, a mixing valve on the warm loop can also return water to the chiller warmer than it was designed for, which raises chiller efficiency as long as the chiller selection allows it.
Pump power, ride-through and controls for Kentucky CDUs
CDU pumps are as critical as the servers they cool, because cold plate racks heat up within seconds of losing flow, so each CDU gets redundant pumps, two power feeds and a ride-through plan for a utility outage. Paul Industries places CDU pumps on power that is backed by the uninterruptible power system or arranged to restart before rack temperatures climb, and adds buffer volume where the server vendor asks for it.
Controls tie the CDUs to the building system so the operator sees supply temperature, flow, differential pressure, filter condition and leak alarms in one place. The CDU holds its secondary supply temperature by modulating facility water, and the facility loop resets its own supply from the warmest CDU demand. Paul Industries writes the sequence, programs the interface and tests each alarm path before the first production rack is energized.
Commissioning a liquid-cooled row in Kentucky
Commissioning a liquid-cooled row in Kentucky proves flow, temperature and alarms at full design heat before the servers depend on them. Paul Industries runs heater load banks or live racks at design load, records supply and return temperatures at each CDU, confirms pump changeover on a simulated failure, trips each leak sensor and checks the isolation valves close.
Two Kentucky-specific checks follow. The first is a summer check of trim cooling on the hottest afternoons, when dry coolers alone run out of capacity in Louisville, Bowling Green and Paducah. The second is a winter check of glycol strength, freeze alarms and dry cooler fan control during a cold spell. Both go in the turnover file with the pressure test and flush records described on the data center commissioning in Kentucky page.
How much does a liquid-cooled row cost to build and run in Kentucky?
Data center liquid cooling cost in Kentucky depends on the number of racks, the heat per rack that goes to liquid, the facility water source and how much of the building has to change, so Paul Industries prices it from the scope rather than a per-rack average. A row added to an existing plant through a heat exchanger costs far less than a new dry cooler yard with its own pumps and electrical service.
Running cost is mostly pumps and any trim cooling. At Kentucky’s January to August 2026 commercial average of 12.64 cents per kilowatt-hour (EIA; the national figure was 14.04), 50 kilowatts of CDU and facility pumps running all year costs about $55,000. That figure is the reason liquid cooling data center PUE improves: the pumps replace much larger fan and compressor loads. Owners receive a budget range from comparable scope first, then a firm price once the rack count and the facility water source are fixed.
Who builds and maintains liquid cooling loops for Kentucky data centers?
Paul Industries builds and maintains liquid cooling loops for Kentucky data centers, from design and CDU supply to piping, pressure testing, flushing, controls, commissioning and data center liquid cooling maintenance after turnover. Owners comparing liquid cooling data center companies in Kentucky get one contract for the rack loop, the facility loop and the heat rejection, which keeps the accountability for leaks, flow and temperature in one place.
The work ties into the rest of a Kentucky campus: data center cooling in Kentucky for the chilled water plant, integrated testing as described above, data center mechanical contractor in Kentucky for full campus scope, and chiller repair in Kentucky for the plants that supply trim cooling. Owners with immersion in mind can read about data center immersion cooling, and the closed loop cooling systems page covers the facility side in more depth. For comparison, the Ohio tariff approach is on data center liquid cooling in Ohio and the headquarters state on data center liquid cooling in Virginia.
Paul Industries liquid cooling for Kentucky racks
Paul Industries designs, supplies, installs, tests and maintains data center liquid cooling across Kentucky, in Louisville, Lexington, Northern Kentucky, Bowling Green, Owensboro, Paducah and every county in between. The scope covers CDUs, rack manifolds, facility water piping, dry coolers and heat exchangers, glycol systems, leak detection and controls, offered as supply-only, design-build or complete installation. Other Kentucky services are listed on the Kentucky hub. Send the rack count, heat per rack and the IT vendor’s facility water class and request a quote.
Standards referenced: ASHRAE TC 9.9 liquid cooling guidelines (facility water classes W17 to W45) · ASHRAE 90.4 · ASME B31.9 · ASME B31.3 · Kentucky boiler and pressure vessel law, KRS Chapter 236 · Kentucky Building Code
Frequently asked questions
Does Paul Industries pipe cold plate racks for Louisville and Jefferson County halls?
Yes. Paul Industries installs coolant distribution units, rack manifolds, facility water piping and dry coolers for dense racks in Louisville and across Jefferson County, which holds most of Kentucky’s data centers. Halls there are served by LG&E, outside any regional wholesale market, so Paul Industries reads the large-load rate terms alongside the hall layout when planning density.
Does Paul Industries build liquid cooling loops in Northern Kentucky?
Yes. Paul Industries builds rack loops, CDUs and dry cooler yards in Boone, Kenton and Campbell counties. Northern Kentucky is served by Duke Energy Kentucky inside PJM, and its weather keeps outdoor air at or below 80 F for 92 percent of hours, which suits warm facility water, while its freezing hours call for glycol on every outdoor coil.
Can Paul Industries add liquid-cooled rows to halls in Lexington and Georgetown?
Paul Industries adds liquid-cooled rows to existing halls in Lexington, Georgetown and the surrounding Bluegrass counties, usually by tapping the chilled water plant through a heat exchanger or adding a warm-water loop. KU serves much of the region, and the Lexington weather record supports warm facility water for about 91 percent of hours.
Who handles liquid cooling for data halls in western Kentucky, from Paducah to Bowling Green?
Paul Industries handles liquid cooling for data halls in Paducah, Calvert City, Owensboro and Bowling Green. Western Kentucky is the hottest and most humid part of the state, so loops there usually pair dry coolers with trim chillers or evaporative assist for summer afternoons, and the serving utility may sit in MISO or buy TVA power.
Is there a count of how many data centers use liquid cooling in Kentucky?
Published Kentucky figures count data centers rather than cooling methods: a 2026 University of Kentucky report counts 37 data centers across nine markets without breaking them down by how they are cooled. New liquid cooling in the state arrives two ways, with dense compute in new halls and with retrofits of rows in existing ones, and Paul Industries designs for both.
Which ASHRAE facility water class suits a Kentucky dry cooler loop?
W32, with facility supply up to about 90 F, suits most Kentucky sites on dry coolers with trim cooling for the hottest hours, since outdoor air is at or below 80 F for 86 to 92 percent of hours across the five stations Paul Industries analyzed. W45 rides through the whole record on dry coolers alone, where the servers accept it.
How does the EKPC Data Center Power tariff affect a cooperative-served site?
The tariff, approved by the Public Service Commission in October 2025, applies to data center loads of 15 megawatts or more in East Kentucky Power Cooperative territory. It is designed so that the data center bears the cost of the infrastructure it causes. Paul Industries plans the cooling phases to match the load schedule the owner commits to under it.
What did LG&E and KU propose for data centers of 100 megawatts or more?
In 2025 LG&E and KU described an extremely high load factor rate for new data centers expecting at least 100 megawatts, with a 15-year contract and a minimum payment of 80 percent of expected monthly energy. Under terms like those, an owner benefits from cooling that lets the contracted load fill quickly, which favors liquid-cooled racks.
Do PJM capacity prices matter to a liquid cooling decision in Kentucky?
For sites served by Duke Energy Kentucky, Kentucky Power or the East Kentucky Power Cooperative members, PJM capacity costs flow through rates, and PJM prices rose from $28.92 per megawatt-day in 2024/2025 to $333.44 in 2027/2028. Lower summer peak demand from warm-water liquid cooling carries more value under those prices.
What glycol strength do Kentucky liquid cooling loops need outdoors?
Strength depends on whether the loop must keep flowing or only survive. Freeze protection to minus 10 F takes about 42 percent propylene glycol by volume (Dow data), burst protection to the same temperature about 28 percent, and Northern Kentucky reached minus 8 F in the 2021 to 2025 record. Paul Industries verifies the strength with a refractometer at startup and records it for annual checks.
Why is Louisville city water purified before it fills a CDU loop?
Straight city water leaves deposits in a CDU loop. Louisville Water averaged 225 ppm of dissolved solids and 128 ppm of hardness in 2025, which would leave scale and chloride in narrow cold plate channels. Paul Industries fills rack and facility loops with purified water and an inhibitor and biocide package matched to the loop metals.
How is a leak caught on a Kentucky liquid-cooled row?
Leak detection cable under manifolds and CDUs, drip trays at quick disconnects, and pressure and flow monitoring in each CDU catch a leak early, and automatic isolation valves can close a branch. Paul Industries wires every sensor to the building management system and tests each alarm during commissioning.
Does an expansion tank on a liquid cooling loop need a Kentucky inspection?
An expansion tank or other vessel operating above 15 psi falls under Kentucky’s boiler and pressure vessel law unless an exemption in KRS 236.060 applies, and pressure vessels are inspected at installation. Paul Industries supplies the vessel data reports and schedules the inspection before insulation covers the piping joints.
What sets the schedule for adding cold plate rows to an operating Kentucky hall?
The schedule depends on row count, how far the facility water has to run and the windows the operator allows for tie-ins. Mains and capped tie-ins go in during planned windows, then each row is tested, flushed and connected in turn. Paul Industries builds the schedule around the operator’s change calendar so production racks stay up.
What does data center liquid cooling maintenance include after startup?
Maintenance covers filter changes, fluid sampling for inhibitor, biocide and particulate levels, glycol strength checks before winter, pump and valve inspection, leak sensor tests and calibration of CDU temperature and flow sensors. Paul Industries offers scheduled service that covers the rack loops, the CDUs and the facility water side together.
How should a Kentucky owner compare liquid cooling data center companies?
Compare who carries the whole loop: rack manifolds, CDUs, facility water piping, heat rejection, controls and commissioning under one contract, with pressure test, flush and fluid records at turnover. Paul Industries delivers that full scope in Kentucky, supply-only, design-build or complete installation, so leaks, flow and temperature have one accountable owner.
Will Paul Industries supply CDUs and manifolds for a Kentucky project as equipment only?
Yes. Paul Industries ships CDUs, manifolds, prefabricated piping assemblies, dry coolers and heat exchangers on supply-only orders with submittals and startup support, and the same equipment is available under design-build or complete installation contracts.
What should a Kentucky owner send to start a liquid cooling estimate?
Send the rack count and heat per rack, the share of heat that goes to liquid, the IT vendor’s facility water class and fluid specification, the existing plant data, floor and ceiling details, and the serving utility. A budget range comes back from that information, and a firm price follows the site survey.