Paul Industries installs process piping in Washington, designing, fabricating, installing, testing and tying in ASME B31.3 and B31.1 piping for refineries, food and beverage plants, ammonia refrigeration, biotech sites, aerospace manufacturers and utilities across the state. Since December 27, 2024, Washington's five refineries have followed a refinery-only process safety standard, written as Part B of chapter 296-67 WAC, under which every turnaround ends with a pre-startup safety review and every process with a damage mechanism gets its own review, and terminal piping carries its own seismic requirements under Ecology's rules. Paul Industries plans, builds and documents piping work to fit those rules and the plant's schedule.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Refinery rule Chapter 296-67 WAC Part B, in force since December 27, 2024
Turnarounds Pre-startup safety review for all turnaround work (WAC 296-67-339)
Terminal piping B31.3 or B31.4 with seismic isolation measures (WAC 173-180-340)
Refining 5 refineries, 648,200 barrels per day (EIA, January 2026)
Reviewed November 2026

What does process piping in Washington cover?

Process piping in Washington covers the lines that move product, chemicals, gases, steam, condensate, refrigerant, utilities and wastewater inside a plant, built mostly to ASME B31.3 for process service and ASME B31.1 for power piping, with ASME BPE for sanitary and high-purity systems and IIAR 2 for ammonia refrigeration. A piping job runs from design and material takeoff through spool fabrication, field installation, supports, examination, pressure testing, insulation and tracing, tie-ins and turnover records.

The national process piping page describes materials, codes and fabrication methods in general. This page concentrates on what is particular to Washington: the industries that buy piping here, the state's refinery and chemical process safety rules, the seismic and terminal requirements, winter conditions east of the Cascades, and the registration and wage requirements that apply to piping contracts in the state.

Where does process piping in Washington run?

Process piping in Washington runs through four main industrial settings: petroleum refineries and terminals on Puget Sound, aerospace and biotech manufacturing around Seattle, Everett, Bothell and Redmond, food processing in the Columbia Basin and the central valleys, and utilities and campuses statewide. Refining capacity in the state stood at 648,200 barrels per day across five operating plants at the start of 2026, by the EIA's count; frozen french fries were the state's top export in 2025 at $1.09 billion; and biologics manufacturing in the Seattle area includes a continuous-processing cGMP plant in Redmond.

Washington industries and the piping they run
SettingTypical piping systemsGoverning rules and codes
Refineries at Anacortes, in Whatcom County and in TacomaHydrocarbon, hydrogen, amine, sour water, steam and flare linesB31.3, API 570, chapter 296-67 WAC Part B
Marine and pipeline terminalsTank fill and draw lines, transfer headers, dock linesB31.3 or B31.4, WAC 173-180-340 seismic measures, fire code chapter 57
Industrial piping, Seattle and King CountyBiotech clean utilities, laboratory gases, campus steam and chilled waterB31.3, B31.1, ASME BPE, Washington State Building Code
Everett, Renton and Bothell manufacturingCompressed air, nitrogen, process cooling, chemical processing linesB31.3, B31.1, Part A process safety where thresholds are met
Columbia Basin, Yakima and Wenatchee food plantsAmmonia refrigeration, steam, fryer oil, product, CIP and wastewaterIIAR 2, B31.3, B31.1, Part A process safety for ammonia above 10,000 lb
Spokane and the Inland NorthwestManufacturing process lines, hospital and campus utilitiesB31.3, B31.1, heat tracing for winter service

How Washington's refinery process safety rule shapes piping work

Washington's refinery process safety rule, Part B of chapter 296-67 WAC, governs piping work at the state's petroleum refineries through hazard analyses, mechanical integrity, management of change, pre-startup safety review and hot work requirements that go beyond the general process safety standard the rest of industry follows. Part B took effect December 27, 2024, and replaced the general rule at refineries, with damage mechanism reviews, a hierarchy of hazard controls analysis and a safeguard protection analysis among the studies a refinery must perform.

For a piping contractor the rule changes what is delivered as much as how the pipe is installed. Each line has a damage mechanism record behind it, and at least half of the initial damage mechanism reviews must be finished within three years of the effective date, with all of them within five. A replacement that is not in kind is a change, so it runs through management of change, and where a change may introduce a damage mechanism, the review comes before approval. Every turnaround now needs a pre-startup safety review, which confirms that construction, maintenance and repair work met the design specifications before hydrocarbons return to the unit.

Part B elements and the piping deliverables that support them
Part B elementWhat it requiresWhat Paul Industries delivers on a piping job
Damage mechanism review (WAC 296-67-347)A review for each process with a damage mechanism, revalidated every five years and reviewed before a major changeMaterial selection basis, corrosion allowance and examination plan tied to the identified mechanisms
Mechanical integrity (WAC 296-67-343)Inspection and testing to recognized practice, with date, performer and equipment identifier recordedWeld maps, examination reports, pressure test records and material certifications indexed by line number
Management of change (WAC 296-67-355)Review of any change that is not replacement in kindDesign data, isometrics and specifications for the change package
Pre-startup safety review (WAC 296-67-339)Required for new and modified processes and all turnaround workWalkdown punch lists, completion certificates and test records ready before startup
Hot work (WAC 296-67-351)Hot work controls specific to refineriesHot work plans, gas testing and fire watch built into the work sequence
Contractors (WAC 296-67-335)Requirements for contractors who work on or near refinery processesTraining records and procedure acknowledgements for everyone on the job

Process safety at Washington food, chemical and ammonia plants

Process safety at Washington plants other than refineries follows Part A of chapter 296-67 WAC, which applies to any process holding a listed chemical at or above its threshold quantity, including anhydrous ammonia at 10,000 pounds, or 10,000 pounds or more of flammable liquids and gases. Large ammonia refrigeration systems in Columbia Basin cold storage and potato processing plants are the most frequent example, along with chemical storage and processing at manufacturing sites.

Part A carries the familiar elements: process safety information, process hazard analysis, operating procedures, mechanical integrity, management of change and pre-startup safety review for new and modified processes. Piping is at the center of most of them, because valves, relief headers, evaporator and condenser connections and the welds that join them are where releases begin. Paul Industries installs and replaces ammonia piping to IIAR 2 and B31.3, documents welds and tests line by line, and turns over the records a process safety information file needs. The ammonia refrigeration page covers the refrigeration side in more depth.

Transfer piping at Washington oil terminals

Transfer piping at Washington oil terminals and refinery docks follows WAC 173-180-340, which requires pipelines built after the 2023 rule to meet ASME B31.3-2022 or B31.4-2022, to follow the piping flexibility provisions of API 650 Annex E where they connect to storage tanks, to be installed under chapter 57 of the 2021 International Fire Code, and to include seismic protection: flexible devices or adequate flexibility between pipes, supports that protect against seismic motion, automatic emergency isolation valves that close during an earthquake, or another measure Ecology approves. New lines must also resist tsunami loads where the facility's risk area calls for it.

Existing terminal pipelines must carry seismic protection too, chosen from the same list. In practice the work means flexible connections at tank nozzles so the tank can move without shearing its piping, seismic restraints along the header, and isolation valves wired to a seismic trigger. Paul Industries designs, fabricates and installs terminal transfer piping with the flexibility analysis, support design and valve installation documented for the facility's prevention plan and spill risk analysis, and builds the matching tank work through tank fabrication in Washington.

Supporting plant piping for Puget Sound earthquakes

Supporting plant piping for Puget Sound earthquakes means designing hangers, guides, anchors and lateral restraints for the seismic forces the Washington State Building Code assigns to nonstructural components, using ASCE 7 ground motions for the site and the component importance factor for the service. Hazardous material lines, fire protection and systems that must work after an earthquake receive the higher factor. The region's seismic record includes the magnitude 6.8 Nisqually earthquake of February 28, 2001, and the Cascadia subduction zone lies beneath western Washington.

Seismic support design has to agree with thermal flexibility. A steam or hot oil line that is braced too rigidly will overstress nozzles as it heats up, so Paul Industries runs the stress analysis with the seismic restraints in place, sets guides and lateral braces that allow axial growth, and uses flexible connections where piping crosses between structures that move independently. The code editions matter for timing: Washington has applied the 2021 codes since March 15, 2024 and has set May 3, 2027 for the 2024 editions.

Freeze protection for piping east of the Cascades

Freeze protection for piping east of the Cascades is a design item from the first line list, because Columbia Basin, Yakima, Wenatchee and Spokane plants see sustained winter cold, and outdoor water, condensate, CIP and product lines can freeze during a weekend shutdown. The usual measures are electric heat tracing with insulation, drainable routing with low-point drains, steam tracing where steam is plentiful, and moving vulnerable lines indoors or into heated racks.

Seasonal plants add a twist. A potato or fruit plant that stops between production runs leaves full lines standing in the cold, so the shutdown procedure, drain points and tracing controls have to work without operators watching. Paul Industries designs heat tracing, insulation and drain points together, and tests tracing circuits before the first freeze.

Sanitary and high-purity piping for Washington biotech

Sanitary and high-purity piping for Washington biotech serves biologics, cell therapy and research facilities around Seattle, Bothell and Redmond, where purified water, water for injection, clean steam, CIP and process lines are built to ASME BPE with orbital welding, borescope inspection, slope verification and passivation. A continuous-processing biologics plant in Redmond and the Hanford site's vitrification plant, which began treating tank waste in October 2025, show how different the clean and the heavy ends of Washington process piping can be.

The biotech side follows a qualification path rather than a turnover-only path, so the piping package includes weld logs, coupon records, isometrics with slope data and material traceability that feed the installation qualification. Paul Industries builds this piping under sanitary process piping in Washington and carries the records into qualification through validation and commissioning in Washington.

Materials for Washington process lines: marine air, sour service and cold

Material selection for Washington process lines follows the fluid first and the climate second, and Washington's climates differ enough across the Cascades to change the answer for outdoor piping. On the Puget Sound shoreline, chloride-laden marine air and rain drive external corrosion and corrosion under insulation, so carbon steel lines get coating systems rated for marine exposure and insulation jacketing sealed against water entry, and austenitic stainless lines outdoors are checked for chloride stress corrosion cracking risk under wet insulation at elevated temperature.

Inside refineries, sour water, amine, hydrogen and high-temperature sulfidic services set the alloy and the hardness limits for welds, and the damage mechanism review now gives that choice a formal record. East of the mountains, outdoor carbon steel must keep adequate toughness at the coldest metal temperature the line can see, including during winter startups, which affects material grades and impact testing for lines that run cold or start cold. Paul Industries sets the material basis for each line class with these factors written into the piping specification, so the reasoning stays with the line in the plant's integrity records.

Utility piping for Washington aerospace and manufacturing plants

Utility piping for Washington aerospace and manufacturing plants carries compressed air, nitrogen, process cooling water, steam, hydraulic fluids and chemical processing solutions, and it often runs through large, occupied production buildings where work windows are short and overhead access is crowded. Compressed air systems need dry, clean air at the point of use, so header sizing, drop design, drains and filtration matter as much as the compressor; autoclave and curing systems need steam, air and nitrogen supplies sized for the cycle.

Chemical processing and surface treatment lines in these plants handle acids, alkalis and rinse water, and they connect to the plant's wastewater treatment, which answers to discharge permits. Paul Industries routes and supports these lines for seismic loads and building movement, chooses thermoplastic, lined or stainless materials by chemical service, and phases installation around production so lines are switched over with the least disruption to the floor.

Testing piping before a Washington startup

Testing piping before a Washington startup follows the code the line was designed to, most often a hydrostatic leak test under B31.3 at one and a half times the design pressure adjusted for temperature, with a pneumatic test used only where water cannot be tolerated and with the added safety controls a pneumatic test requires. Stainless lines are tested with water low in chloride and drained and dried promptly, and lines in severe cyclic or toxic service receive the additional examination B31.3 calls for.

At refineries and process safety plants, the test record becomes part of the evidence the pre-startup safety review checks, and at biotech sites it becomes part of the installation qualification. Paul Industries writes a test plan by test package, marks test boundaries on the isometrics, records gauge calibration and hold times, and signs each package off with the owner's representative before insulation closes the joints.

Registration and prevailing wage on Washington piping contracts

Washington requires every contractor to register with the Department of Labor and Industries under chapter 18.27 RCW, and makes it a gross misdemeanor to bid or perform work as a contractor without registration or to use an unregistered firm. Public works, including piping at state, county, city, port and utility facilities, also carry prevailing wage requirements under chapter 39.12 RCW, with the posted rates and the filings L&I sets for each project.

Private industrial work follows the owner's contract and safety requirements, and work on boilers and pressure vessels follows chapter 296-104 WAC, which places welded repairs and alterations under the National Board Inspection Code and the R program. Paul Industries prices public and private piping work with the applicable wage basis and filings included, so the bid matches the contract the owner issues.

How is process piping construction tied into operating Washington plants?

Process piping construction is tied into operating Washington plants through planned tie-ins, so that new lines reach the live system with the least possible outage: spools are prefabricated off site, tie-in points are surveyed and verified before the outage, isolation and energy control are agreed with operations, and the testing plan is set for each connection. Refineries tie piping in during turnarounds under Part B's pre-startup safety review, food plants between production runs, and biotech sites between campaigns.

Tie-in methods used at Washington plants
MethodWhen it fitsRecords produced
Cold cut during an outageTurnarounds, seasonal shutdowns, campaign breaksIsolation plan, weld and examination records, pressure test or alternative test record
Hot tap with a fitting and valveLive headers that cannot be shut down, where the fluid and conditions allowHot tap procedure, wall thickness survey, fitting test, welding procedure for in-service welding
Line stop and bypassReplacing a valve or section on a line that must keep flowingBypass design, stop fitting records, pressure test of the new section
Flanged connection to a prepared stubWhere a spare nozzle or capped stub exists from a previous outageBolt torque records, gasket data, leak test

Final tie-in welds that cannot be hydrotested with the system are examined to the alternative requirements B31.3 sets, and the decision is documented for management of change and the pre-startup safety review. Paul Industries plans each tie-in with the plant's operations and maintenance staff and keeps the outage scope to work that is ready before isolation starts.

What does process piping in Washington cost?

Process piping in Washington is priced from the line list, isometrics or a scope description, and the cost drivers are material and pipe size, wall schedule, the share of welds that need radiography or ultrasonic examination, alloy and sanitary requirements, supports and seismic restraints, heat tracing and insulation, access and work in operating areas, outage restrictions, and whether the job is public work with prevailing wages. Refinery work adds the documentation that Part B's reviews call for, and terminal work adds flexibility analysis and seismic isolation valves.

Paul Industries gives a budget range from a scope description and a firm price from isometrics or a defined line list, with fabrication, installation, examination, testing and documentation shown separately. For phased projects, the price is split by area or by outage so each phase can be released on its own.

Washington conditions show up in specific line items rather than in a general premium. Seismic bracing adds support steel and engineering on western Washington jobs, heat tracing and insulation add cost on outdoor lines east of the Cascades, and refinery and terminal jobs carry more examination and documentation than a utility job of the same size. Seasonal food plants concentrate the installation into the window between runs, which favors more prefabrication off site and fewer field welds. Each of those items is priced visibly, so an owner can see which choices move the total and decide where to spend.

Who installs process piping in Washington?

Paul Industries installs process piping in Washington, as a process piping company that designs, fabricates and installs piping for refineries, terminals, food plants, ammonia systems, biotech sites, aerospace manufacturers and utilities, and handles tie-ins, testing and turnover records. Owners choose supply-only delivery of fabricated, tested spools, design-build from process flow diagrams, or complete installation through startup. Paul Industries is based at 256 Shore Drive, Kilmarnock, Virginia, its headquarters after earlier years in northern New Jersey and then Pennsylvania, and as an East Coast contractor it takes piping work throughout Washington, in all 50 states and abroad through its international work.

Buyers can compare the same service at headquarters on process piping in Virginia and under California's refinery and seismic rules on process piping in California. In Washington, piping work links to pressure vessel fabrication in Washington for the vessels it connects, boiler repair in Washington for steam plant work, and industrial welding services in Washington for code welding on equipment and structures.

Process piping from Paul Industries across Washington

Paul Industries designs, fabricates, installs, tests, repairs and replaces process piping for plants from Anacortes, Everett, Seattle and Tacoma to Vancouver, Yakima, Wenatchee, the Tri-Cities, the Columbia Basin and Spokane, with the records each Washington rule asks for at turnover. Send the line list or isometrics, the fluid service and design conditions, the site and outage constraints, and whether the job is public work. Call 201-450-8280 or request a quote. The Washington hub gathers Paul Industries services in the state, and the West Coast page covers the Pacific region.

Standards referenced: ASME B31.3 · ASME B31.1 · ASME B31.4 · Chapter 296-67 WAC Parts A and B (process safety management) · API 570 · API 650 Annex E · Chapter 173-180 WAC · International Fire Code chapter 57 · International Building Code as adopted in chapter 51-50 WAC · ASCE 7 · ASME BPE · IIAR 2 · Chapter 18.27 RCW (contractor registration) · Chapter 39.12 RCW (prevailing wages on public works)

Frequently asked questions

Who installs process piping at Anacortes and Ferndale refineries?

Paul Industries installs process piping at Anacortes and Ferndale refineries and at the Tacoma refinery, from hydrocarbon and hydrogen lines to steam, flare and sour water piping, with turnaround tie-ins planned around Part B's pre-startup safety review. Each job delivers material certifications, weld maps, examination and test records indexed by line, so the refinery's mechanical integrity and damage mechanism files stay current.

Does Paul Industries install ammonia and process piping at Columbia Basin plants in Moses Lake and Pasco?

Yes. Paul Industries installs ammonia refrigeration, steam, product, CIP and wastewater piping at potato, vegetable and cold storage plants in Moses Lake, Othello, Quincy, Pasco and the Tri-Cities. Ammonia systems above 10,000 pounds fall under Washington's process safety rule, so welds, tests and valve data go into the plant's process safety information. Work is scheduled between production runs.

Who builds industrial piping Seattle, Bothell and Redmond biotech sites rely on?

Paul Industries builds sanitary and clean utility piping for biotech sites in Bothell, Redmond, Seattle and Everett: purified water, water for injection, clean steam, CIP and process lines to ASME BPE with orbital welds, borescope records, slope checks and passivation. The documentation feeds the installation qualification directly, so the piping moves from mechanical completion into qualification without a records gap.

Does Paul Industries take piping work in Spokane, Tacoma and Vancouver?

Yes. Paul Industries takes process and utility piping work in Spokane, Tacoma, Vancouver and the rest of Washington, for manufacturers, food plants, hospitals and campuses. Spokane-area work gets winter freeze protection designed in; Tacoma and Vancouver jobs often involve port and terminal piping with seismic restraints. Every job closes with test and weld records for the owner.

What does Washington's Part B refinery rule change for a piping replacement?

Under Part B, a piping replacement that is not in kind is a change, so it goes through management of change, and if the change could introduce a damage mechanism, a damage mechanism review comes before approval. Turnaround work then needs a pre-startup safety review confirming the work met design specifications. Paul Industries supplies the design data, material basis and test records each of those steps relies on.

When must Washington refineries finish their damage mechanism reviews?

Washington refineries must complete at least half of their initial damage mechanism reviews within three years of Part B taking effect on December 27, 2024, and all of them within five years, then revalidate each review at least every five years. Piping replaced or modified in that period should carry a documented material and corrosion basis so the review can account for it.

Does a Washington food plant's ammonia system fall under process safety management?

A Washington food plant's ammonia refrigeration system falls under Part A of chapter 296-67 WAC when it holds 10,000 pounds or more of anhydrous ammonia. Covered systems need process safety information, hazard analysis, operating procedures, mechanical integrity, management of change and pre-startup safety review. Paul Industries installs and replaces ammonia piping with the documentation those elements depend on.

What seismic measures does Ecology require on terminal transfer piping?

Ecology requires transfer piping at regulated oil facilities to include seismic protection: flexible devices or enough piping flexibility, supports that protect against seismic motion, automatic emergency isolation valves that close during an earthquake, or another approved measure. New lines must meet B31.3 or B31.4 (2022), API 650 Annex E flexibility at tank connections and fire code chapter 57. Paul Industries designs and installs each of those measures.

How is plant piping braced for earthquakes in western Washington?

Plant piping in western Washington is braced for the seismic forces the state building code assigns to nonstructural components, using site ground motions and a higher importance factor for hazardous, fire protection and essential lines. Lateral and longitudinal braces are placed so the line can still grow thermally. Paul Industries runs stress analysis with the restraints included and documents the bracing design.

How is piping protected from freezing at a seasonal plant in eastern Washington?

Piping at a seasonal plant in eastern Washington is protected with heat tracing and insulation, drainable routing with low-point drains, and shutdown procedures that empty lines that would otherwise stand full in the cold. Tracing controls and alarms let the system run unattended between production runs. Paul Industries designs tracing, insulation and drains together and tests each circuit before winter.

Do Washington public works piping jobs pay prevailing wages?

Washington public works, including piping at state, county, city, port and utility facilities, pay prevailing wages under chapter 39.12 RCW, with rates set by trade and county and filings made through the Department of Labor and Industries. Every contractor working in the state must also be registered with L&I under chapter 18.27 RCW. Paul Industries prices public work with the prevailing wage basis and filings included.

What should a Washington refinery expect from a process piping company on a turnaround?

A Washington refinery should expect a process piping company to arrive with prefabricated spools, verified tie-in points, hot work and isolation plans, trained people with documented process hazard training, and a records package indexed by line that supports the pre-startup safety review. Paul Industries plans turnaround piping that way and closes each line with weld, examination and test records before startup.

Can new piping be tied into a live header at a Washington plant?

New piping can be tied into a live header at a Washington plant by hot tapping, where the fluid, pressure, temperature and wall condition allow, or by a line stop and bypass where a section must be replaced while flow continues. Each requires a wall thickness survey, an in-service welding procedure and a documented plan. Paul Industries performs hot taps and line stops with those records.

Which records does a Washington plant receive when new process piping is turned over?

A Washington plant receives isometrics marked to as-built condition, the line list, material test reports traced to heat numbers, weld maps with procedure and welder identification, examination reports, pressure test records, support and bracing details, and any management of change data. Biotech projects add slope, borescope and passivation records. Paul Industries indexes the package by line number.

Does Paul Industries supply fabricated spools for a Washington plant to install?

Yes. Paul Industries supplies fabricated, examined and tested pipe spools to Washington plants as a supply-only scope, with isometrics, weld maps, material certifications and test records, and with seismic support and tracing details where the design includes them. Spools can be staged by area or outage so the installation follows the plant's schedule.

What should a Washington plant send to get process piping priced?

Send the line list or isometrics, the fluid service with design pressure and temperature, the piping specification, the site and access conditions, outage windows, and whether the job is public work or falls under a process safety program. Photographs of tie-in points help. Paul Industries returns a scope, schedule and price with fabrication, installation, testing and records broken out.

New lines, a tie-in or a turnaround at a Washington plant?

Send the line list or isometrics, the fluid service and design conditions, the outage window and whether the job is public work. Call 201-450-8280 or request a quote.