Paul Industries provides tank fabrication in Colorado for breweries, dairies, food plants, biotech producers, refineries, utilities and fleet fueling sites, designing, building and installing stainless process tanks, carbon steel storage tanks and fuel tanks to the code that governs each one. Fuel and other regulated-substance tanks fall under the Division of Oil and Public Safety’s Storage Tank Regulations, 7 CCR 1101-14, whose amended rules took effect on January 1, 2025, while process and water tanks are built to API, AWWA, ASME BPE and 3-A standards and permitted through the city or county. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and builds tanks for Colorado plants and for owners in all 50 states.
Request a quote or call 201-450-8280
Which Colorado storage tank regulations apply to a new tank?
Colorado storage tank regulations apply according to what the tank holds, where it sits and how big it is, so the first design decision is to place the tank in the right category. A tank storing gasoline, diesel or another regulated fuel product falls under 7 CCR 1101-14 and under section 8-20-231 of the Revised Statutes, which requires liquid fuel systems, tank farms, refineries and chemical plants using liquid fuels to meet the current NFPA fire code. A stainless fermenter, a milk silo, a process water tank or a chemical day tank sits outside the fuel tank rule and is governed by its own design standard, the fire code adopted where the plant sits and the building permit.
| Tank and contents | Colorado rule | Design standard |
|---|---|---|
| Aboveground fuel tank, 660 to 39,999 gallons | 7 CCR 1101-14, Article 3 | NFPA 30; UL 142 or UL 2085 for shop-built tanks |
| Aboveground fuel tank over 39,999 gallons | Excluded from Article 3; fire code and the authority having jurisdiction still apply | API 650 or API 620 with NFPA 30 |
| Underground fuel tank | 7 CCR 1101-14, Article 2, with registration | Listed underground tank with secondary containment and release detection |
| Brewing, dairy and food process tank | Building and fire code adopted by the city or county | 3-A Sanitary Standards, ASME BPE practice, API 650 for large field tanks |
| Biotech and pharmaceutical tank | Building and fire code; FDA rules for the product | ASME BPE; ASME Section VIII when pressure-rated |
| Potable or fire water storage | Water system and fire code requirements | AWWA D100 for welded carbon steel |
| Wastewater treatment tank in a treatment facility | Excluded from the fuel tank rule | Process and structural design to the treatment system |
Rule 3-1 also reminds owners that every aboveground tank system must meet the fire district’s rules, zoning and the requirements of any other authority having jurisdiction, in addition to the state rule. Paul Industries confirms those layers at the start so the drawings submitted to the fire marshal, the building department and the division describe the same tank. The national scope of tank work is on the tank fabrication page; this page covers what Colorado adds.
Colorado aboveground storage tank regulations: scope and the aboveground storage tank definition
Colorado aboveground storage tank regulations use the aboveground storage tank definition in section 8-20.5-101(2) of the Revised Statutes: one or a combination of containers, vessels and enclosures, with connected structures and appurtenances, built of nonearthen materials such as concrete, steel or plastic, used to contain or dispense fuel products, with 90 percent or more of its volume, including connected piping, above the surface of the ground. Rule 3-1 then narrows the rule’s reach to tanks between 660 and 39,999 gallons and lists the systems the rule excludes.
| Excluded system | What still applies |
|---|---|
| Tanks over 39,999 gallons or under 660 gallons | Fire district, zoning and other authorities, plus NFPA 30 under section 8-20-231 |
| Wastewater treatment tanks within a treatment facility | Treatment system design and the building permit |
| Equipment or machinery holding substances for its own operation | Equipment design and the fire code |
| Farm, residential, horticultural and floricultural tanks | Outside commercial plant work |
| Tanks storing heating oil burned on the same premises | Fire code and building permit |
| Tanks at natural gas pipeline, gas liquids and crude oil production facilities | The oil and gas and pipeline rules for those facilities |
| Tanks storing liquefied petroleum gas that is not liquid at standard conditions | Colorado’s LPG rules |
| Tanks owned and operated by the federal government | The federal owner’s program |
Capacity is counted by aggregate: rule 3-1 states that a tank’s capacity is the total of all primary compartments inside one outer shell, whether or not they share a bulkhead. Its own example is a single concrete-encased UL 2085 tank built from two 500-gallon UL 142 tanks, which counts as a 1,000-gallon tank, with each compartment equipped separately for venting, overfill prevention and release detection. That rule catches owners who split fuel into compartments expecting each to fall below the 660-gallon threshold.
Aboveground storage tank requirements for design and installation
Aboveground storage tank requirements in Colorado start with rule 3-2, which requires every tank to be designed, built and used in accordance with NFPA 30, in a material compatible with the liquid stored. Tanks built for aboveground use may not be buried, and underground tanks may not be set above grade. The remaining requirements cover venting, piping and site security, and they translate into specific items on the fabrication drawings.
- Normal venting. Tanks installed after September 30, 1994 have normal vents sized to NFPA 30, and every vent keeps out water, debris and insects. Tanks holding Class I liquids carry vent devices that meet NFPA 30.
- Emergency relief. Every tank has construction or a device that relieves internal pressure from fire exposure, and the requirement extends to each compartment, the interstitial space of secondary containment tanks and the enclosed space of closed-top dike tanks.
- Piping. Pipe, tubing, valves, fittings and flexible connectors meet NFPA 30. Where an aboveground tank has underground piping, that piping meets the underground tank rules, including secondary containment for piping installed after April 14, 2011.
- Gravity head. On or after October 14, 2012, a tank that produces a gravity head on a motor fuel dispenser has a normally closed solenoid valve or equivalent downstream of the main shutoff valve.
- Security. Tanks outside vaults at motor fuel dispensing sites, and at any facility with 12,000 gallons or more of individual or aggregate capacity, are enclosed by a chain-link fence at least 6 feet high, set at least 10 feet from the tanks with a secured gate, unless the property has a perimeter security fence. The area inside the fence and dike is kept free of vegetation and debris.
Paul Industries builds those items into the tank package: listed shop-fabricated tanks where the volume suits UL 142 or UL 2085 construction, field-built tanks to API 650 where it does not, vents and emergency vents sized and labeled, piping designed to NFPA 30, and secondary containment and overfill protection matched to the site. The process piping in Colorado page covers the transfer piping that connects tank farms to the plant.
Underground tanks, Colorado storage tank registration and the petroleum fund
Underground tanks in Colorado follow Article 2 of 7 CCR 1101-14, which covers design, construction, installation and registration, operation, closure and the special case of field-constructed tanks and airport hydrant systems. Colorado underground storage tank regulations also connect to the release articles, which set site checks, site assessment at closure and the response to suspected and confirmed releases. Colorado storage tank registration is part of that Article 2 process, and the division’s database keeps the record of each registered system.
Article 7 sets financial responsibility requirements for tank owners, and Article 8 governs the Colorado petroleum storage tank fund, including eligibility, reimbursement and allowable and unallowable costs for cleanup. Owners planning a tank replacement at an older fueling site usually want the closure, site assessment and new installation sequenced together, so that any release found at closure is reported and handled under the rule before the new tank is set. Paul Industries plans that sequence with the owner and builds the replacement tank system.
Carbon and stainless steel tank fabrication for Colorado process plants
Carbon and stainless steel tank fabrication for Colorado process plants covers a wider range than fuel storage, and the standards change with the product. Breweries need fermenters, bright tanks, hot and cold liquor tanks and CIP tanks; dairies need silos, balance tanks and cheese vats; biotech plants need media, buffer and water-for-injection tanks; utilities and campuses need fire water, potable water and thermal storage tanks. Each of those is custom tank fabrication, built to the owner’s process data rather than taken from a catalog.
| Service | Material and finish | Standard |
|---|---|---|
| Brewing fermenters and bright tanks | 304 or 316L stainless, sanitary interior finish, glycol jackets | 3-A practice; ASME Section VIII when rated above 15 psi |
| Dairy silos and process tanks | 304 or 316 stainless, polished interiors, CIP spray devices | 3-A Sanitary Standards |
| Biotech and pharmaceutical tanks | 316L stainless, electropolished, drainable, passivated | ASME BPE; ASME Section VIII for pressure ratings |
| Large atmospheric storage | Carbon steel or stainless, coated or lined as service requires | API 650 |
| Low-pressure storage up to 15 psig | Carbon or stainless steel | API 620 |
| Potable and fire water storage | Welded carbon steel with interior coating | AWWA D100 |
| Shop-built fuel tanks | Carbon steel, single or double wall, protected or vaulted | UL 142 or UL 2085 with NFPA 30 |
Brewery tanks Colorado producers buy are a large part of that market. The Coors brewery in Golden and the craft brewers along the Front Range, from Denver and Boulder to Fort Collins, run cellar tanks that are cleaned hot and chilled hard every cycle, so weld quality, finish and drainability decide how long a tank stays clean. Leprino Foods’ cheese plant in Greeley and other Weld County food processors use stainless tanks sized for continuous production and daily cleaning. Suncor’s Commerce City refinery stores product and intermediates in API tanks. These plants are named as market facts only. Paul Industries builds stainless tank fabrication packages with their CIP spray devices, sanitary valves and sanitary process piping in Colorado, and ties them to CIP and SIP systems in Colorado.
Venting and vacuum protection at Colorado elevation
Venting and vacuum protection on a Colorado tank have to be designed for an atmosphere of about 12.1 psia in Denver and 11.7 psia at 6,200 feet in Colorado Springs, because hot liquids boil sooner and vacuum collapses happen from a lower starting point. Water boils near 202 degrees Fahrenheit in Denver and near 201 degrees in Colorado Springs, so a hot liquor tank, a CIP tank held at 185 degrees or a condensate receiver runs much closer to boiling than the same tank at sea level. Vents on those tanks pass more vapor, condensate forms in vent lines and on roofs, and level instruments see foam and flashing that a sea-level design never had.
Vacuum is the other risk. A tank that is steam-cleaned and then sprayed with cold water, or pumped out faster than its vent admits air, collapses under external pressure well below the 12.1 psi the atmosphere can apply. Paul Industries sizes normal and emergency venting to NFPA 30 and API 2000 at the site’s atmospheric pressure, adds vacuum breakers on tanks that are cleaned hot or emptied quickly, and specifies the design external pressure on the drawing so the operating limits are clear. Tanks that need a rating above 15 psi move into pressure vessel territory, covered on the pressure vessel fabrication in Colorado page.
Wind, snow and cold on outdoor Colorado tanks
Outdoor Colorado tanks carry wind, snow and freeze loads that are set by the building code the city or county has adopted, because Colorado leaves the building code for private construction to its cities and counties. Counties that adopt a building code may also license building contractors under section 30-11-125. Paul Industries confirms the jurisdiction’s design wind speed, ground snow load and frost depth before designing the tank, its anchorage and its foundation, then submits calculations with the permit drawings.
Cold is a daily design input on the Front Range: Denver’s 1991 to 2020 normals put the January low at 18 degrees Fahrenheit, with nights below zero about five times a year. Outdoor water tanks, fire water storage and chemical tanks need insulation, heat tracing on nozzles and instrument taps, and freeze-protected drains and overflows. Water storage tank Colorado utilities and campuses buy is usually designed with a heated or circulated supply to keep the contents above freezing, and fuel tanks holding diesel need attention to cloud point in winter. Paul Industries designs those protections with the tank rather than adding them after the first cold snap.
Shop-built or field-erected: getting a tank to a Colorado site
Getting a tank to a Colorado site decides whether it is shop-built or field-erected, because road shipping limits, mountain routes and tight urban sites cap the diameter and length that can move by road in one piece. Shop-built tanks arrive tested and finished, which suits sanitary process tanks and UL-listed fuel tanks. Field-erected tanks are built on their foundation from rolled plate, which suits large API 650 storage and water tanks. Plants on the Western Slope around Grand Junction plan around mountain pass routes, and Front Range plants often around crane access and street permits.
Paul Industries offers industrial tank fabrication in either form as supply-only, design-build or complete installation. A complete installation covers the foundation interface, setting and anchoring, nozzles and piping, insulation and tracing, instruments, ladders and platforms, testing and the turnover records. Field welding on tanks is covered further on the industrial welding services in Colorado page.
How often do tanks need to be inspected in Colorado?
How often tanks need to be inspected in Colorado depends on the tank’s standard and the rule it falls under. Fuel tanks under 7 CCR 1101-14 follow the operation sections of Articles 2 and 3, and section 8-20-231 brings in the NFPA fire code’s testing and inspection requirements for liquid fuel tank systems over 60 gallons, as rule 3-1 notes. Field-erected API 650 tanks are inspected in service under API 653, with intervals set from corrosion rates. Shop-fabricated fuel tanks are commonly inspected to industry standards for that construction. Sanitary process tanks are inspected on the plant’s own schedule, tied to cleaning validation, weld condition and the product’s quality system.
Paul Industries builds each new tank with the access, nozzles and baseline thickness readings that later inspections use, and it repairs tanks found damaged, from floor and shell repairs on API tanks to weld and finish repairs on stainless process tanks. Tank cleaning before inspection is covered on the industrial tank cleaning page.
Commissioning a new tank in an operating Colorado plant
Commissioning a new tank in an operating Colorado plant runs through cleaning, testing, instrument checks and a controlled first fill, and each step is recorded for the owner. Field-erected tanks are hydrostatically tested on their foundation, with settlement readings taken during the fill so any foundation movement shows up before the tank enters service. Shop-built tanks arrive tested and are checked for shipping damage, anchored and leveled. Stainless process tanks are cleaned, passivated and verified with a spray device coverage test, usually riboflavin, so the plant knows every interior surface is reached during CIP.
Fuel tank systems get their own checks: leak and tightness testing of tanks and piping, overfill prevention and release detection function checks, vent and emergency vent inspection, and labeling for the fire marshal. Level transmitters, high-level alarms and temperature probes are calibrated against the tank’s strapping table, and the strapping table itself is supplied with the tank. Paul Industries schedules tie-ins to live systems during planned outages, isolates and locks out the connecting lines, and hands the tank to operations with its procedures and records complete.
What does tank fabrication in Colorado cost?
The cost of tank fabrication in Colorado is driven by volume and dimensions, material and thickness, interior finish, jackets and insulation, nozzles and internals, the code and listing required, whether the tank is shop-built or field-erected, foundations and site access, and the documentation package. A sanitary stainless fermenter with glycol jackets and a polished interior costs far more per gallon than a carbon steel water tank of the same size; a UL-listed fuel tank sits between them. Tank fabrication cost also depends on what is installed with it, so Paul Industries prices the tank, piping, controls and installation separately and as a package.
Public projects add a wage basis: sections 24-92-202 and 24-92-203 set prevailing wages for public projects of $500,000 or more awarded by Colorado state agencies, while city, county and school district work falls outside that part of the code. Paul Industries returns a budget range from comparable tanks once it has a process data sheet or sketch, and a firm price on the approved design.
Who builds tanks in Colorado?
Paul Industries builds tanks in Colorado for process, storage, water and fuel service, from single stainless brewery tanks to tank farms with transfer piping and containment. Owners comparing tank fabricators and tank fabrication companies get design, fabrication, installation and documentation under one contract, with tank fabrication Denver, Aurora, Golden, Boulder, Fort Collins, Greeley, Colorado Springs, Pueblo and Grand Junction plants handled the same way. Colorado is one of the Southwest states where Paul Industries builds tanks, alongside owners in all 50 states; the company’s home-state tank work appears on the tank fabrication in Virginia page, and plants with sites elsewhere can compare tank fabrication in Texas.
Tank fabrication services in Colorado from Paul Industries
For Colorado plants, Paul Industries designs, builds, supplies, installs, tests and repairs tanks and connects them to the piping, controls and utilities they serve. Tank fabrication services run from supply-only tanks to design-build packages and complete installations with foundations, piping, insulation, instruments and startup. Formerly based in northern New Jersey, then Pennsylvania, Paul Industries is headquartered in Kilmarnock, Virginia. The Colorado process systems page gathers the other services Paul Industries offers in the state. Dairy and cheese plants can read more on the dairy processing page. Send the tank’s contents, volume, dimensions, design pressure and temperature, finish, site elevation and setting location, and request a quote.
Standards referenced: 7 CCR 1101-14, Colorado Storage Tank Regulations · C.R.S. 8-20-231 and 8-20.5-101 · NFPA 30, Flammable and Combustible Liquids Code · API 650 · API 620 · API 653 · API 2000 · UL 142 and UL 2085 · AWWA D100 · ASME BPE · 3-A Sanitary Standards
Frequently asked questions
Who handles custom tank fabrication for Colorado breweries and food plants?
Paul Industries handles custom tank fabrication for Colorado breweries and food plants, building fermenters, bright tanks, liquor tanks, CIP tanks, silos and balance tanks to 3-A practice and the owner’s process data. Each tank is designed for the plant’s elevation, with venting and vacuum protection sized for hot cleaning at the lower Colorado boiling point, and installed with its piping and spray devices.
Does Colorado regulate a 500-gallon diesel tank at a plant?
Colorado’s aboveground tank rule in 7 CCR 1101-14 applies to tanks from 660 to 39,999 gallons, so a single 500-gallon tank is below that range. Capacity counts by aggregate within one shell, so compartments add together. A tank below the range still meets the fire district’s rules and NFPA 30, as rule 3-1 notes. Paul Industries designs small fuel tanks to the fire code and the fire marshal’s requirements.
What does stainless steel tank fabrication add for a Colorado biotech plant?
Stainless steel tank fabrication for a biotech plant adds 316L material, electropolished interiors, full drainability, sanitary nozzles and spray devices, orbital welds with documented examination, passivation and a turnover package for qualification. Steam sterilization conditions are set in absolute pressure at the plant’s elevation. Paul Industries builds the tank and its connected piping and supports the plant’s qualification work.
What is required for Colorado storage tank registration of an underground tank?
Colorado storage tank registration for an underground tank is part of Article 2 of 7 CCR 1101-14, which covers design, construction, installation and registration together. Owners also meet the financial responsibility rules in Article 7. Paul Industries sequences the installation with the registration steps and supplies the tank, piping, containment and release detection records the division expects.
What is the Colorado petroleum storage tank fund used for?
The Colorado petroleum storage tank fund, governed by Article 8 of 7 CCR 1101-14, reimburses eligible owners for allowable cleanup costs after a petroleum release, with rules on eligibility, reimbursement, allowable and unallowable costs and committee review. Owners replacing an old fuel tank plan the closure assessment carefully because a release found then is handled under the release articles. Paul Industries builds the replacement tank system.
Do Colorado tank farms over 12,000 gallons need a fence?
Rule 3-2 of 7 CCR 1101-14 requires tanks outside vaults at facilities with 12,000 gallons or more of individual or aggregate capacity to be enclosed by a chain-link fence at least 6 feet high, at least 10 feet from the tanks, with a secured gate. A perimeter security fence around the whole property meets the requirement. Paul Industries lays out containment, fencing and access with the tank design.
Which industrial tank fabrication route suits a Western Slope site near Grand Junction?
Industrial tank fabrication for a site near Grand Junction depends on what the delivery route over the mountains allows. Smaller tanks and sanitary tanks are shop-built, tested and shipped whole; large storage tanks are field-erected on their foundation from rolled plate. Paul Industries checks the route and the site access first, then sets the split between shop and field work.
Who builds storage tank fabrication projects for Denver and Aurora plants?
Paul Industries builds storage tank fabrication projects for Denver and Aurora plants, including fuel tanks for fleets and generators, process tanks for food and beverage producers, and water and fire storage tanks for campuses and data centers. Each tank is designed to its standard and to the code adopted by the city, with permits, foundations and piping included. Call 201-450-8280 with the tank’s contents and size.
How does altitude change a hot CIP tank in Colorado?
At Denver’s elevation water boils near 202 degrees Fahrenheit, so a CIP or hot water tank held at 185 degrees runs only about 17 degrees below boiling, against 27 degrees at sea level. Vents pass more vapor, condensate collects in vent lines and level readings see flashing. Paul Industries sizes vents and condensate drains for those conditions and adds vacuum breakers for the cold rinse that follows.
What tank fabrication standards apply to a fire water tank in Colorado?
A welded carbon steel fire water or potable water tank is commonly built to AWWA D100, with the fire protection requirements of the fire code adopted where the site sits and the building department’s foundation and wind review. Outdoor tanks need freeze protection on the Front Range. Paul Industries designs the tank, foundation interface, coatings, heating and connections and installs them complete.
Can an existing Colorado tank be repaired instead of replaced?
Many tanks can be repaired: shell and floor sections on API 650 tanks are replaced under API 653, and stainless process tanks get weld repairs, finish restoration and passivation. Repair makes sense when the shell and foundation are sound and the remaining corrosion allowance supports the service. Paul Industries inspects the tank, prices repair and replacement side by side and carries out the chosen route.
Does Paul Industries provide water tank fabrication for Colorado Springs and Pueblo?
Paul Industries provides water tank fabrication for Colorado Springs and Pueblo plants, campuses and utilities, along with fuel and process tanks. Colorado Springs sits near 6,200 feet, where water boils near 201 degrees Fahrenheit, so hot water and condensate tanks are vented for that condition. Each tank ships with its design basis, test records and installation drawings.
What should a fermenter specification include for a Fort Collins or Boulder brewery?
A fermenter specification should state the working and gross volume, cone angle, design pressure and vacuum, glycol jacket zones and duty, interior finish, CIP spray device coverage, manway and fittings, carbonation stone and sample valves, and the relief and vacuum devices. Paul Industries sizes jackets for the brewery’s glycol temperature and elevation and builds the tank to suit the cellar layout.
Who inspects new aboveground fuel tanks in Colorado?
New aboveground fuel tanks in Colorado are reviewed under 7 CCR 1101-14 by the Division of Oil and Public Safety, and the fire district and other authorities having jurisdiction review them under their own rules, as rule 3-1 requires. Paul Industries prepares one drawing set and data package that answers both reviews, then installs and tests the tank system.
How are tank vents sized for a Colorado fuel tank?
Normal vents on an aboveground fuel tank installed after September 30, 1994 are sized to NFPA 30, and every tank has emergency relief for fire exposure, extended to each compartment, interstitial space and closed-top dike, as rule 3-2 requires. Vents keep out water, debris and insects. Paul Industries sizes and labels each vent and records the basis in the tank data package.
What drives tank fabrication cost for a Greeley dairy plant?
For a dairy plant, tank fabrication cost is driven by volume, stainless grade and finish, jacketing and insulation, agitation, CIP spray coverage, instruments, outdoor setting and freeze protection, and installation inside an operating plant. Silos set outdoors in Weld County need insulated shells and heated access. Paul Industries prices each tank and its installation separately so the plant can compare options.
What records come with a new Colorado tank?
A new tank comes with design calculations, approved drawings and as-built drawings, material certificates, welding and examination records, the test record, vent and relief data, listing labels for UL tanks, coating or finish records, passivation records for stainless tanks, and installation and anchorage details. Paul Industries indexes the package so inspectors, the fire marshal and the plant’s maintenance team find each item quickly.