Paul Industries designs, builds and services ultrapure water systems in New Hampshire for semiconductor and compound-semiconductor fabs, biologics and pharmaceutical labs, precision optics and device makers, university research buildings and high-pressure boiler plants. Each plant starts from a feed that differs sharply across the state, from chloraminated, low-hardness Lake Massabesic water in Manchester to a Seacoast blend of reservoir and well water whose hardness and chloride swing several-fold. Paul Industries supplies skids, designs and builds complete systems, and installs, starts up and maintains them.
Request a quote or call 201-450-8280
What is ultrapure water used for in New Hampshire plants?
Ultrapure water in New Hampshire is used for wafer and substrate rinsing at compound-semiconductor and microelectronics fabs, for analytical and cell culture labs at biologics companies and universities, for cleaning precision optics and medical device parts before coating or assembly, and as makeup to high-pressure boilers and steam generators. Each use sets its own limits for resistivity, total organic carbon, particles, silica, bacteria and dissolved oxygen.
The state’s market has a few anchors. In Nashua, BAE Systems runs a microelectronics center that fabricates gallium arsenide and gallium nitride wafers and won one of the first CHIPS Act awards, about $35 million, to modernize its tools. In Portsmouth, Lonza produces mammalian biologics in cell culture trains up to 20,000 liters, and its quality and development labs, like those across the Seacoast and the Upper Valley, run on ultrapure water even where the production water is compendial. Around them sit optics, sensor and device makers in the Merrimack Valley and the research buildings at the state’s universities. The broader guide to grades and treatment stages is the ultrapure water systems page; this page deals with what New Hampshire water and New Hampshire rules do to the design.
| User | Typical reference | Limits that drive the design | Design emphasis |
|---|---|---|---|
| Compound-semiconductor and microelectronics fabs | SEMI F63, ASTM D5127 | 18 megohm-cm class resistivity, low ppb TOC, particles, silica, dissolved oxygen, metals | Double-pass RO, EDI, UV TOC reduction, degasification, final ultrafiltration, PVDF loop |
| Biologics and pharmaceutical labs | CLSI CLRW, ASTM D1193, USP for process water | Resistivity, TOC, bacteria and endotoxin at lab points of use | Central loop with point-of-use polishers; sanitizable materials; separate compendial systems |
| Optics, sensor and device makers | Plant specifications | Residue-free rinsing, particles, nonvolatile residue | Polished rinse loops, filtration at the tool, resistivity monitoring |
| University research buildings | CLSI and ASTM lab grades | Consistent quality to many labs on several floors | Building loop with polishing, flexible taps for changing tenants |
| High-pressure boilers and steam generators | Boiler manufacturer and ASME guidance | Silica, sodium and conductivity | RO with mixed bed or EDI polishing |
Designing ultrapure water systems in New Hampshire around the feed
Designing ultrapure water systems in New Hampshire starts with a water analysis, because the three largest municipal feeds in the south of the state differ in disinfectant, mineral content and seasonal behavior. A train that runs well on Manchester water needs changes before it runs well in Portsmouth, and a plant on Nashua’s Pennichuck system sees its own seasonal shift when the Merrimack River supplements the brook.
| Parameter | Manchester Water Works (2022 results) | Portsmouth Water System (2025 average and range) | What it means for the train |
|---|---|---|---|
| Source | Lake Massabesic | Bellamy Reservoir plus wells in Madbury, Portsmouth and Greenland | Surface water is steadier; well blending causes swings |
| Disinfectant | Monochloramine, about 2.46 mg/L | Free chlorine from sodium hypochlorite | Chloramine needs longer carbon contact and leaves ammonia; free chlorine is easier to remove |
| Hardness | About 18 mg/L as CaCO3 (calcium 5.18, magnesium 1.2 mg/L) | 44 mg/L, from 13 to 204 | Low scaling risk in Manchester; antiscalant or softening sized for the Portsmouth high end |
| Sodium and chloride | Sodium 54.1, chloride 52.75 mg/L | Sodium 44 (22 to 178), chloride 73 (33 to 325) mg/L | Higher ionic load on RO and EDI than hardness alone suggests |
| Conductivity | Calculated from ions | 343 microsiemens/cm, from 171 to 1,323 | RO and EDI sized for the peak, with alarms set on the range |
| Iron and manganese | Manganese 5.8 micrograms/L | Iron up to 470, manganese up to 172 micrograms/L | Fouling control ahead of the membranes at the Seacoast |
| Organics | TOC 1.97 mg/L | TOC removal averaged 63 percent at the plant | Organic load on carbon, RO and UV |
| Corrosion control | Phosphoric acid; soda ash for pH | Poly and orthophosphate, 1.13 mg/L ortho | Phosphate scaling potential in RO concentrate |
Where does Manchester NH get its water, and what does that mean for an ultrapure plant?
Manchester gets its water from Lake Massabesic, which has supplied the city since 1874 and is treated at a plant beside the lake by coagulation, settling, ozone and biologically active granular carbon filtration, before monochloramine, pH adjustment, phosphoric acid and fluoride are added. The utility also serves parts of surrounding towns and parts of Salem, Hampstead, Atkinson and Plaistow, so plants well outside the city receive the same feed.
Manchester NH water hardness is low, about 18 milligrams per liter as calcium carbonate from the reported calcium and magnesium, so scaling is a minor problem. The design challenges lie elsewhere. Monochloramine at about 2.5 milligrams per liter destroys polyamide RO membranes if it reaches them, and it breaks down to free ammonia, which passes through RO and loads the EDI stack. Catalytic carbon sized for chloramine contact time, followed by monitoring of total chlorine ahead of the membranes, protects the train. Sodium and chloride near 50 milligrams per liter, higher than the hardness would suggest, put more ions on the RO and the polishing stages, and a TOC near 2 milligrams per liter gives the UV and polishing resin real work. Two-pass RO ahead of EDI is the usual answer for fab-grade water from this feed.
Portsmouth NH water source and the Seacoast swing
The Portsmouth NH water source is a blend: the Bellamy Reservoir in Madbury and Dover, treated at the Madbury plant by coagulation, dissolved air flotation and dual media filtration, plus groundwater from four Madbury wells and wells in Portsmouth and Greenland. The 2025 report shows how much that blend moves: conductivity ranged from 171 to 1,323 microsiemens per centimeter, chloride from 33 to 325 milligrams per liter, and iron and manganese up to 470 and 172 micrograms per liter.
Portsmouth NH water hardness averaged 44 milligrams per liter as calcium carbonate in 2025, with a range from 13 to 204, so a plant can see soft reservoir water one week and moderately hard well water the next. An ultrapure plant on this feed is designed for the worst case rather than the average: RO recovery and antiscalant chosen for the hard end, iron and manganese removal or greensand filtration where the well share is high, and online conductivity at the inlet to show operators when the supply changes. The disinfectant here is free chlorine, which ordinary activated carbon or sodium bisulfite removes readily.
The Pease Tradeport, home to Lonza and other biotech and manufacturing tenants, runs on a separate city-managed system. Its Harrison, Smith and Haven wells are treated for PFAS at the Grafton Road facility with ion exchange resin and granular activated carbon, fully in service since August 2021, after the Haven well was shut in 2014 when PFAS were found in it.
Is New Hampshire water hard or soft?
New Hampshire water is generally soft where it comes from lakes and reservoirs and variable where it comes from wells, which is why an ultrapure design never assumes a statewide value. Manchester’s lake water reports about 18 milligrams per liter of hardness as calcium carbonate, while Portsmouth’s mixed supply averaged 44 and reached 204 when well water dominated.
Private and industrial wells across the state vary further, and some carry iron, manganese, arsenic or radon from the bedrock. A plant on its own well needs a full analysis across seasons before the pretreatment is fixed. Soft water does not mean easy water for an ultrapure plant: low-hardness surface water often carries organics and road salt, and both reach the RO.
PFAS in New Hampshire water and the ultrapure train
PFAS in New Hampshire water matter to an ultrapure plant twice: once as a contaminant the treatment train must remove, and again as a concentrate in the RO reject that leaves the building. The New Hampshire PFAS drinking water standards cover four compounds: NHDES sets maximum contaminant levels of 12 parts per trillion for PFOA, 15 for PFOS, 11 for PFNA and 18 for PFHxS, measured as annual rolling averages.
Municipal supplies that meet those limits still carry low levels; Manchester reported PFOA at about 5 parts per trillion in its 2022 results. EPA identifies activated carbon, ion exchange resins and high-pressure membranes such as reverse osmosis as effective PFAS treatment, so the RO stage of an ultrapure system removes most of what arrives. The flip side is that membranes concentrate PFAS in the reject stream. A plant discharging RO reject to a municipal sewer reports its industrial wastewater through the NHDES pretreatment program, and the sewer authority may ask what the reject contains. Paul Industries designs reject handling with that question answered in advance, including recovery of reject for cooling tower makeup or other non-product uses where the chemistry allows.
RO reject, regeneration waste and the NHDES indirect discharge request
RO reject, EDI concentrate and any chemical regeneration waste from a New Hampshire ultrapure plant are industrial wastewater, and NHDES Env-Wq 305 governs their discharge to a publicly owned treatment works. A new industrial discharge goes through an Industrial Wastewater Indirect Discharge Request on the NHDES form, and once NHDES approves it, the municipality issues the discharge permit under its sewer use ordinance.
Adding a new pollutant to an approved discharge calls for a new request, which matters when a plant adds cleaning chemicals, antiscalants or a resin regeneration step to an existing system. The application asks for flows, chemicals used on site and pretreatment details, so Paul Industries prepares a discharge summary with the system design: reject flow at each recovery setting, expected concentrations from the feed analysis, and the cleaning chemicals and their neutralization.
Cold feed water and the New Hampshire winter
Cold feed water is the main seasonal design load for a New Hampshire ultrapure plant, because surface supplies reach the plant only a few degrees above freezing in mid-winter and RO membranes pass far less water when cold. A widely used correction factor puts the membrane area or pressure needed at 5 degrees Celsius at about 2.6 times what the same output needs at 25.
The plant has three answers: size the RO for the coldest feed, preheat the feed with a heat exchanger using waste heat from compressors, chillers or condensate, or accept lower winter output and size storage for it. Preheating often costs less over the life of the plant, but it raises bacterial growth risk in pretreatment, so the heat exchanger, carbon beds and softeners are designed for sanitization. Concord’s average January low of about 13 degrees Fahrenheit also puts any outdoor piping, reject lines and tank vents at freeze risk, and they are insulated and traced or routed indoors.
An ultrapure water system for laboratory buildings and fabs
An ultrapure water system for laboratory buildings in New Hampshire is usually a central RO and EDI plant feeding a recirculating loop, with polishers at the benches that need the top grade, while a fab or compound-semiconductor line takes a full polishing train and a distribution loop held to ASTM D5127 or SEMI F63 targets. The difference is where the final polishing happens and how much of the building sees the top grade.
A laboratory ultrapure water system in a university or biotech building has to serve many users whose demands change with each grant or program, so the loop is sized with spare taps, isolation valves at each branch and flow balancing that survives new connections. A fab loop runs at constant velocity in PVDF or another high-purity polymer, with ultrafiltration and particle monitoring at the return. For an ultrapure water system, semiconductor applications also add dissolved oxygen removal by membrane contactors and online silica and boron monitoring. Paul Industries builds both, with sanitary process piping in New Hampshire and storage tanks from tank fabrication in New Hampshire; the related rinse water systems for device and precision plants are covered on high-purity water systems in New Hampshire.
Adding points of use to an operating New Hampshire loop
Adding points of use to an operating ultrapure loop is a frequent job in New Hampshire, where fabs add tools, biotech tenants fit out new lab floors and universities reassign buildings to new research groups. The risk is contamination: every cut into a running loop opens it to particles, bacteria and organics that can take days of flushing to clear.
The safer sequence prefabricates the new branch from cleaned and bagged components, flushes and tests it as an isolated section, and makes the final connection through valves or tees installed during an earlier shutdown, so the live loop is open for the shortest possible time. Velocity at the end of the new branch is checked against the loop design, dead legs are kept within the allowed length, and resistivity, TOC, particle and bacteria results at the new outlets are compared with the loop return before users draw from them. Paul Industries plans each tie-in with the plant’s quality group and leaves the test results in the system file.
Do ultrapure water vessels fall under New Hampshire’s pressure vessel law?
Ultrapure water vessels fall under RSA 157-A only when they exceed its exemptions, and most storage and polishing vessels sit inside them. The exemption list in section 157-A:6 covers vessels holding water at up to 125 psig working pressure (hot water heaters excluded), vessels operating at 15 psig or less, and any vessel of 5 cubic feet or less at 250 psig or less.
RO membrane housings are the vessels to check, because second-pass and seawater-rated housings often operate above 125 psig, and long multi-element housings exceed the small-vessel volume. Paul Industries lists the working pressure, volume and exemption basis of every vessel in the system file, supplies ASME-built housings and tanks where the code requires them, and coordinates certificate inspections for any vessel inside the chapter; pressure vessel fabrication in New Hampshire covers that side.
How pure is ultrapure water compared with New Hampshire tap water?
Ultrapure water at 18.2 megohm-centimeters has a conductivity of about 0.055 microsiemens per centimeter, while Portsmouth’s 2025 tap water averaged 343, so the tap water is roughly 6,200 times more conductive. Total organic carbon falls from about 2 milligrams per liter in Manchester’s finished water to single-digit parts per billion in a fab loop.
Is ultrapure water dangerous? Ultrapure water is safe to touch and is no hazard in normal handling, but it is aggressive toward materials: it leaches ions from metals, glass and some plastics, which is why loops use PVDF, high-purity polypropylene or electropolished stainless steel and why its quality is lost in the wrong pipe.
Running an ultrapure plant at New Hampshire power prices
Industrial power in New Hampshire averaged 16.82 cents per kilowatt-hour in 2025, nearly twice the national 8.51 (EIA), and an ultrapure plant runs pumps, UV lamps and EDI power around the clock. A plant drawing 25 kilowatts continuously uses about 219,000 kilowatt-hours a year, roughly $36,800 at the state average against $18,600 at the national one.
Variable speed loop pumps, high-recovery RO, energy-efficient UV and right-sized polishing cut that bill, and so does reusing reject and recovering heat for winter feed water. Paul Industries runs the energy case on the owner’s tariff when it sizes the system.
Who installs ultrapure water systems in New Hampshire?
Paul Industries installs ultrapure water systems in New Hampshire, from pretreatment and RO through EDI, polishing, storage and the distribution loop, and starts up, qualifies and services them. From its headquarters at 256 Shore Drive in Kilmarnock, Virginia (the company’s earlier homes were northern New Jersey and then Pennsylvania), Paul Industries builds ultrapure systems for plants throughout New Hampshire, New England and all 50 states.
Owners can buy a skid supply-only, have Paul Industries design and build the whole system, or have it install a system engineered by their own consultant. Startup includes rinse-up to the specified quality, analyzer calibration and the documentation that validation and commissioning in New Hampshire builds on. The same work is described for ultrapure water systems in Massachusetts, Connecticut ultrapure water systems and, in the company’s headquarters state, ultrapure water systems in Virginia; fab-specific practice appears on the semiconductor industry page.
What sets an ultrapure water system price in New Hampshire?
An ultrapure water system price in New Hampshire is set by flow and storage, the quality grade at the point of use, the feed water and the pretreatment it demands, the loop length and material, redundancy, sanitization method, instrumentation and the installation conditions inside an operating building. The table below sets out how each moves the number.
| Factor | Why it moves the price | Information that firms up the price |
|---|---|---|
| Flow, peak demand and storage | Sets RO, EDI and tank sizes | Average and peak use by point of use |
| Quality grade | Fab grades add degasification, UV TOC reduction, ultrafiltration and analyzers | The specification or standard each user follows |
| Feed water | Chloramine, hardness swings, iron and manganese, and PFAS change the pretreatment | The utility report or a recent analysis, with the well share if blended |
| Winter feed temperature | Cold water enlarges the RO or adds a preheater | Lowest expected feed temperature and any waste heat source |
| Loop length and material | PVDF and electropolished stainless cost more per foot than general piping | Floor plans and point-of-use locations |
| Redundancy and sanitization | Duplex trains and hot water or ozone sanitization add equipment | Uptime target and sanitization preference |
| Reject and discharge | Recovery equipment and discharge permitting | Sewer authority and any reuse targets |
How much does ultra pure water cost to make once the plant is running? The operating cost is the sum of power, membranes, resin and filters, UV lamps, chemicals, sewer charges and labor, divided by the volume produced; on a running plant Paul Industries calculates it from the owner’s tariff and usage.
Ultrapure water from Paul Industries across New Hampshire
Paul Industries delivers ultrapure water new hampshire plants and labs can rely on: feed water analysis, design of the pretreatment, RO, EDI and polishing train, fabrication of skids and loops, installation in operating buildings, rinse-up, startup, qualification records and ongoing service. Each design accounts for the feed it will receive, the winter it will run through and the discharge permit it will need. For the wider picture of the state’s plants, see the New Hampshire overview, and for neighboring states the New England page. To plan a new system or an expansion, request a quote or call 201-450-8280.
Standards referenced: SEMI F63 · ASTM D5127 · CLSI CLRW · USP Purified Water and Water for Injection · ASME BPE · NHDES Env-Wq 305 (pretreatment of industrial wastewater) · NHDES PFAS maximum contaminant levels · New Hampshire RSA 157-A (pressure vessels)
Frequently asked questions
Which contractor builds ultrapure water systems for fabs and optics plants in Nashua, Hudson and Merrimack?
Paul Industries builds ultrapure water systems for compound-semiconductor, optics and precision plants in Nashua, Hudson, Merrimack and Salem, from RO and EDI through polishing and the PVDF loop. Plants on Pennichuck water see seasonal shifts when Merrimack River water supplements the brook, so the pretreatment is sized for the range rather than one sample. Call 201-450-8280 or request a quote.
Does Paul Industries install ultrapure water for biotech labs at the Pease Tradeport and in Portsmouth?
Yes. Paul Industries installs ultrapure water plants and lab loops for biotech and manufacturing sites at the Pease Tradeport and across Portsmouth, Dover and Durham. Pease runs on its own city-managed system, with PFAS treatment at the Grafton Road facility, while Portsmouth proper receives a reservoir and well blend, so each site’s pretreatment starts from its own water analysis.
Who builds ultrapure water systems in Manchester and the Millyard?
Paul Industries builds ultrapure water systems for labs, regenerative manufacturing tenants and plants in Manchester, Bedford and the Millyard. On Manchester Water Works feed the design centers on chloramine removal ahead of the membranes and ammonia control ahead of EDI. In converted mill buildings, loop routing, floor loads and riser space shape the layout as much as the water does.
Does Paul Industries take ultrapure water projects in Lebanon, Hanover and the Upper Valley?
Paul Industries takes ultrapure water work in Lebanon, Hanover and the rest of the Upper Valley, including university research buildings, hospital labs and life science plants. Sites on their own wells get a seasonal water analysis before design, since bedrock wells can carry iron, manganese, arsenic or radon, and the pretreatment is chosen to remove what the analysis finds.
Why does Manchester's chloramine matter to an ultrapure water system?
Monochloramine at about 2.5 milligrams per liter oxidizes polyamide RO membranes, and when carbon breaks it down, the ammonia released passes through RO and adds load to the EDI. A Manchester design uses catalytic carbon with enough contact time, monitors total chlorine before the membranes, and accounts for ammonia in the EDI and polishing design.
How much does Portsmouth's well water change an ultrapure plant's design?
Considerably. Portsmouth’s 2025 report shows hardness from 13 to 204 milligrams per liter, chloride from 33 to 325 and conductivity from 171 to 1,323 microsiemens per centimeter, depending on how much well water is in the blend. RO recovery, antiscalant dose and EDI capacity are therefore sized for the hard, salty end, with inlet conductivity alarms to flag the change.
What are the New Hampshire PFAS drinking water limits?
NHDES sets maximum contaminant levels of 12 parts per trillion for PFOA, 15 for PFOS, 11 for PFNA and 18 for PFHxS, based on annual rolling averages. Utilities sample their sources and report results in their annual water quality reports. For an ultrapure plant, those levels are low enough that RO removes them easily, with the PFAS ending up in the reject stream.
Does RO reject from a New Hampshire ultrapure plant need a discharge approval?
RO reject and other process wastewater discharged to a municipal sewer fall under NHDES Env-Wq 305. A new industrial discharge goes through an Industrial Wastewater Indirect Discharge Request, and after NHDES approval the municipality issues the permit under its sewer use ordinance. Adding a new pollutant later, such as a new cleaning chemical, needs a new request.
Can RO reject be reused at a New Hampshire plant?
Often, yes. RO reject from soft lake water is low enough in hardness to serve as cooling tower makeup, scrubber water or toilet flushing in many plants, and reuse cuts both water purchases and sewer charges. The feed chemistry, antiscalant choice and any PFAS concentration in the reject decide which uses fit. Paul Industries designs the reuse piping and controls with the main system.
How cold does feed water get in a New Hampshire winter, and what does it do to RO output?
Surface supplies arrive only a few degrees above freezing in mid-winter, and RO output falls steeply as water cools; a widely used correction factor puts the requirement at about 2.6 times the membrane area or pressure at 5 degrees Celsius compared with 25. Plants size the RO for winter, preheat the feed with waste heat, or carry enough storage to cover reduced winter output.
Which loop material suits a New Hampshire fab or biotech lab?
Fabs usually choose PVDF or another high-purity polymer for the distribution loop because it leaches very little and suits ozone or chemical sanitization. Biotech labs often choose PVDF or polypropylene for lab loops and electropolished stainless where hot water sanitization or compendial requirements apply. The choice follows the grade, the sanitization method and the temperature the loop must hold.
Do RO housings on a New Hampshire ultrapure skid need state pressure vessel certificates?
Housings operating at or below 125 psig fall under RSA 157-A’s water-containing vessel exemption, and small housings within 5 cubic feet at 250 psig are exempt by size. Larger housings working above 125 psig, common on second-pass RO, need a closer look against the chapter. Paul Industries lists each vessel’s pressure, volume and exemption basis in the system file.
What does an ultrapure water system for laboratory use need in a New Hampshire research building?
A central RO and EDI plant with storage, a recirculating loop at constant velocity, polishers at benches needing the top grade, UV and final filtration, and resistivity and TOC monitoring at the loop return. Spare taps, branch isolation valves and sanitization access let the loop grow as labs change, which matters in buildings shared by many research groups.
How much does ultra pure water cost to produce in New Hampshire?
The cost per gallon comes from power, membranes, resin, filters, UV lamps, chemicals, sewer charges and labor, divided by production. Power weighs more here than in most states: New Hampshire industrial electricity averaged 16.82 cents per kilowatt-hour in 2025, about twice the national figure. Paul Industries calculates the figure for a specific plant from its tariff, usage and consumables.
Should a New Hampshire ultrapure plant have redundant trains?
Plants that cannot stop for a membrane cleaning or EDI repair, such as fabs and labs with continuous experiments, usually choose duplex RO and EDI or enough storage to ride through maintenance. Smaller labs often accept a single train with a service plan. Redundancy, storage and cleaning frequency are weighed together against the cost of a stoppage.
What does ongoing service on a New Hampshire ultrapure water plant include?
Service covers membrane cleaning and replacement, EDI and resin changes, UV lamp and filter replacement, analyzer calibration, loop sanitization, feed water checks when the utility blend or season changes, and trending of resistivity, TOC and bacteria results. Paul Industries keeps the records in one file, so an auditor or quality group sees the full history of the system.
Can Paul Industries supply an ultrapure water skid for a New Hampshire site without installing it?
Yes. Paul Industries supplies RO, EDI and polishing skids supply-only, factory tested and delivered with drawings, material certificates and test records. The same skids are available with installation, loop construction, startup and qualification, or as part of a design-build system. Supply-only buyers receive the same documentation as installed systems.
What should a New Hampshire lab or plant send to price an ultrapure water system?
Send the required grade or specification at each point of use, average and peak demand, the water utility or well and its latest analysis, floor plans with point-of-use locations, the sanitization preference, uptime needs and the sewer authority for the reject. For expansions, add drawings of the existing system. Call 201-450-8280 or request a quote.
Planning ultrapure water for a New Hampshire fab, lab or plant?
Send the grade at each point of use, peak demand, your water utility or well analysis and floor plans. Call 201-450-8280 or request a quote.
