Paul Industries designs, fabricates, installs and maintains ultrapure water systems in Ohio for semiconductor and solar manufacturing, biologics and pharmaceutical sites, research labs and power plants, from pretreatment and reverse osmosis through electrodeionization, polishing and the distribution loop. Ohio feedwater changes sharply from place to place: lime-softened river and well water in Columbus, Ohio River water treated with carbon in Cincinnati, and Lake Erie water in Cleveland and Toledo, where a 2014 algal toxin event shut off drinking water for about 400,000 people. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, builds ultrapure plants across Ohio and in all 50 states.
Request a quote or call 201-450-8280
Ultrapure water systems in Ohio: who uses them and why
Ultrapure water systems in Ohio serve plants and labs that need water far cleaner than drinking water: semiconductor fabs and their suppliers, thin-film solar and electronics makers, biologics and pharmaceutical sites, university and hospital research labs, and power plants that feed high-pressure boilers. Each uses ultrapure water to rinse, formulate, clean or make steam without leaving ions, particles, organics or microbes behind.
What is ultrapure water used for in each of those settings differs in detail. A fab rinses wafers between process steps and needs resistivity near the theoretical limit of 18.18 megohm-centimeters at 25 C, with organics and particles in the parts per billion or lower. A pharmaceutical site makes Purified Water and Water for Injection to United States Pharmacopeia limits. A research lab needs ultrapure water for lab analysis where trace contaminants skew results. The national basics are on the ultrapure water systems page; this page covers the Ohio market, Ohio feedwater and Ohio water rules.
Intel Ohio One and the semiconductor build-out in Licking County
Intel Ohio One, the two-fab campus Intel is building near New Albany in Licking County, has put ultrapure water on Ohio’s industrial agenda while it is still under construction. The Intel Ohio location is in the Licking County part of New Albany, east of Columbus, and the project’s first fab, Mod 1, is expected to finish construction in 2030 and begin operations between 2030 and 2031, according to Intel’s February 2025 timeline update. Mod 2 is expected to finish in 2031 and operate in 2032.
That Intel Ohio plant update, the most recent official schedule Intel has published, replaced an original 2025 target, so the Intel Ohio plant completion date has moved more than once. For the regional supply chain, the Intel Ohio plant delay changes timing rather than direction: chemical suppliers, gas producers, equipment makers and contractors planning around the Intel Ohio site still face the same water quality demands, only later. Intel Ohio construction continues at a slower pace, the company said, with room to speed up if demand warrants, and the Intel Ohio factory sits inside New Albany, which receives its water and sewer service from Columbus under contract. Every semiconductor plant of that scale runs a large ultra pure water facility, and its suppliers often need smaller high-purity systems of their own.
Intel appears here as a market fact about Ohio industry. Owners and suppliers planning work tied to the Intel Ohio chip plant or any other semiconductor project in the state can see the semiconductor scope on the semiconductor industry page.
Thin-film solar, biologics packaging and research labs across Ohio
Thin-film solar, biologics packaging and research labs give Ohio a broad base of high-purity water users beyond semiconductors. First Solar has produced thin-film modules at its original Perrysburg factory since 2002, and in February 2026 JobsOhio described its new 1.3 million square foot research and development center in Wood County. Amgen opened its New Albany assembly and packaging plant for autoinjectors, syringes and vials in February 2024 and announced a $900 million expansion of the site in April 2025.
Those market facts show how varied Ohio’s demand is: glass and coating lines in the northwest, sterile product handling in Central Ohio, and research and hospital labs in Columbus, Cincinnati and Cleveland. Each of those users sets its own ultrapure water quality targets, from the resistivity a coating line needs to the USP limits a pharmaceutical suite works to. Sites that need USP water for pharmaceutical work often pair an ultrapure plant with the systems described on high-purity water systems in Ohio.
How Ohio feedwater changes the treatment train
Ohio feedwater changes the ultrapure water treatment train because each region’s supply carries different hardness, organics, disinfectant and seasonal risks. A plant designed for softened Columbus water needs different pretreatment from one fed by the Ohio River in Cincinnati or by Lake Erie in Toledo. Paul Industries starts every Ohio design with a full water analysis from the site’s own tap, collected over more than one season where possible.
| Supply | Source and treatment | Published figures | Pretreatment emphasis |
|---|---|---|---|
| Columbus | Scioto River and Big Walnut Creek surface plants plus Scioto Valley wellfields; lime softening and ozone | Softened to about 120 ppm hardness; TOC 2.24 and 2.56 mg/L at the two river plants; total chlorine about 1.4 ppm (2025) | Chlorine removal, organics reduction ahead of RO, antiscalant matched to post-softening chemistry |
| Cincinnati (Greater Cincinnati Water Works) | Ohio River at the Miller plant with granular activated carbon; Great Miami Aquifer wells at the Bolton plant | Average hardness 137 mg/L from Miller and 147 mg/L from Bolton | Softening or antiscalant for higher hardness; checks for which plant feeds the site |
| Cleveland (Cleveland Water) | Four offshore intakes in Lake Erie’s Central Basin | About 7 grains per gallon, or 120 mg/L, of hardness | Seasonal organics and temperature swings; robust multimedia and carbon stages |
| Toledo and other Lake Erie western basin supplies | Lake Erie water treated at the Collins Park plant in Toledo | Do-not-drink advisory for microcystin, August 2 to 4, 2014 | Late-summer algal bloom monitoring, organics removal and a plan for interrupted supply |
| Private wells across rural Ohio | Glacial and buried valley aquifers | Site specific; iron, manganese and hardness vary widely | Oxidation and filtration for iron and manganese, softening, then RO |
Lake Erie algal blooms and ultrapure plant reliability
Lake Erie algal blooms matter to ultrapure plants in northern Ohio because they can raise organics in the feedwater and, as Toledo learned in August 2014, interrupt the drinking water supply itself. Toledo told residents not to drink tap water for about two days after microcystin was found in water from the Collins Park plant. An ultrapure plant on that supply needs pretreatment with margin for late-summer organic loading, online TOC monitoring ahead of the reverse osmosis stage, and enough storage or an alternate source to ride through an advisory without halting production.
Chlorine, ozone and organics in Columbus water
Columbus water reaches an ultrapure plant softened, ozonated and chlorinated, with total organic carbon a little above 2 mg/L at the two river plants in 2025. Chlorine must come out before the membranes, usually through carbon or sodium bisulfite with oxidation-reduction potential monitoring, because it attacks polyamide RO membranes. Organics carry through softening and ozone, so the RO and 185 nanometer ultraviolet stages carry the load of bringing TOC down to the parts per billion range. Sites on the Parsons Avenue wellfield supply see lower chlorine, about 0.97 ppm in 2025, and a different organic profile.
How is ultra pure water made for an Ohio fab, lab or plant?
Ultra pure water is made in stages that each remove a different class of contaminant: pretreatment removes particles, hardness and chlorine; reverse osmosis removes most dissolved salts and organics; electrodeionization or ion exchange removes the remaining ions; degassing removes carbon dioxide and oxygen; ultraviolet light breaks down organics and controls bacteria; and polishing resins and ultrafilters finish the water at the point of use. How is ultra pure water made for a specific Ohio site depends on the feedwater and the end use, but the stages stay recognizable.
| Stage | What it removes | Ohio design notes |
|---|---|---|
| Multimedia and carbon or bisulfite | Particles, chlorine, some organics | Sized for Lake Erie and river turbidity peaks; ORP control after chlorine removal |
| Softening or antiscalant | Hardness ions that scale membranes | Hardness of 120 to 147 mg/L across Columbus, Cleveland and Cincinnati supplies |
| Double-pass reverse osmosis | Most dissolved salts, organics, silica | Output falls in winter as feedwater cools; heat exchangers or extra membrane area keep flow |
| Electrodeionization | Remaining ions to high resistivity | Continuous regeneration avoids acid and caustic deliveries in winter weather |
| Membrane degassing | Carbon dioxide and dissolved oxygen | Needed where the end use limits dissolved oxygen, as in semiconductor rinses |
| 185 nm ultraviolet | Organics, measured as TOC | Key stage for Columbus and Lake Erie supplies with TOC above 2 mg/L at the tap |
| Polishing resins, ultrafilters and loop UV | Trace ions, particles and bacteria at point of use | Loop velocity, return and sanitization design hold quality through a long Ohio winter shutdown |
Ultrapure water purification systems for a lab can be a single packaged unit fed by a central RO or DI supply, while an Ohio fab or solar plant needs a full train with storage and a recirculating loop. Paul Industries prefabricates the skids, piping and loop in stainless steel or high-purity polymers matched to the application, and installs them with the welding, cleaning and passivation described on passivation services in Ohio and the sanitary practice on sanitary process piping in Ohio.
Ultrapure water quality targets for Ohio users
Ultrapure water quality targets in Ohio come from the standards each industry follows rather than from Ohio law. Semiconductor plants work to SEMI F63 or their own tighter specifications, electronics and solar plants often reference ASTM D5127, labs reference ASTM D1193 Type I, and pharmaceutical sites work to USP monographs for Purified Water and Water for Injection.
The parameters that matter most are resistivity, total organic carbon, particles, bacteria, silica, dissolved oxygen and, for pharmaceutical water, endotoxin. Ultrapure water TOC targets range from below 1 part per billion in the most demanding fabs to the 500 parts per billion limit in USP Total Organic Carbon testing. USP Stage 1 conductivity for pharmaceutical water is 1.3 microsiemens per centimeter at 25 C, and Water for Injection adds a bacterial endotoxin limit below 0.25 EU per milliliter. Paul Industries designs to the owner’s specification and builds the sample points and online instruments that prove it.
| Ohio user | Usual reference | Parameters that drive the design |
|---|---|---|
| Semiconductor fabs and suppliers | SEMI F63 or the owner’s tighter specification | Resistivity near 18.18 megohm-cm, TOC below 1 ppb, particles, dissolved oxygen, silica, metals |
| Thin-film solar and electronics | ASTM D5127 grade chosen for the process | Resistivity, silica, TOC and particles at rinse and coating steps |
| Research and hospital labs | ASTM D1193 Type I | Resistivity near 18 megohm-cm, low TOC, bacteria and endotoxin where cell work is done |
| Pharmaceutical and biologics sites | USP Purified Water and Water for Injection | Conductivity 1.3 microsiemens/cm at 25 C (Stage 1), TOC 500 ppb, endotoxin below 0.25 EU/mL for WFI |
| Power and campus steam plants | Boiler maker and plant chemistry guidelines | Conductivity, silica and sodium for high-pressure boiler makeup |
Ohio water withdrawal and discharge rules for large ultrapure plants
Large ultrapure plants in Ohio meet water rules on both ends: how much they draw and where their reject water goes. A plant whose intake capacity tops 100,000 gallons a day, counting every source, files a registration with the Division of Water Resources under Ohio Revised Code 1521.16 and sends in yearly withdrawal figures. Inside the Lake Erie watershed, Ohio Revised Code 1522.12 requires a state permit once new or added capacity reaches 2.5 million gallons a day drawn from the lake itself, 1 million gallons a day from tributaries or wells, or 100,000 gallons a day from a stream classed as high quality.
Reject water from RO and regeneration wastes go to a public sanitary sewer under the sewer authority’s pretreatment rules or, where no sewer is available, to a stream under an Ohio EPA NPDES permit, and Ohio EPA lists water treatment systems among the sources such permits cover. A new on-site wastewater treatment system needs an Ohio EPA permit to install. Paul Industries designs RO recovery, reject reuse for cooling towers where the chemistry allows, and metering that supports the reports these rules require.
Supply planning matters in Central Ohio in particular, where industrial parks share the Columbus system. Late in 2025 the New Albany International Business Park was drawing roughly 9 million gallons daily, a little over half of the 16 million its plan allows. Paul Industries sizes recovery and storage so an ultrapure plant uses the least city water its process allows.
When does an Ohio process need ultrapure water rather than RO water?
An Ohio process needs ultrapure water rather than RO water when trace ions, organics or particles would damage the product, the equipment or the measurement: semiconductor and solar rinses, high-pressure boiler makeup, sensitive lab analysis and many pharmaceutical uses. RO water, which still carries a small fraction of the feed’s dissolved salts, suits cooling tower makeup, general rinsing, humidification and many food and beverage uses.
The cost difference is large, so Paul Industries maps each point of use to the grade it actually needs. A plant often runs one RO system with a polishing branch for the few tools or rooms that need ultrapure water, rather than polishing every gallon. Simpler deionized water needs are covered on industrial DI water systems.
Power and campus steam plants show how the grades split in practice. Makeup for low-pressure heating boilers can run on softened or RO water, while high-pressure boilers and steam turbines need demineralized water with very low silica and sodium, because those contaminants carry over with the steam and deposit on turbine blades. An Ohio campus with both kinds of boilers often runs one RO system, polishes a share of its output through EDI or mixed beds for the high-pressure units, and sends the rest straight to the low-pressure plant. Paul Industries designs that split, along with the storage and controls that keep each user on the right grade.
Piping, welding and sanitization on Ohio ultrapure loops
Piping, welding and sanitization decide whether an Ohio ultrapure loop holds the quality the treatment plant makes. Semiconductor and solar loops usually run in PVDF or other high-purity polymers joined by bead-free fusion, because those materials leach very little and keep ions and organics out of the water. Pharmaceutical loops run in 316L stainless steel with orbital welds, smooth or electropolished interior finishes and drainable slopes to ASME BPE, followed by cleaning and passivation.
The loop itself is designed to keep water moving. Velocity is kept high enough to discourage biofilm, every branch is built without dead legs, and return water runs back through UV and polishing before it goes out again. Sanitization depends on the material: hot water or ozone suits stainless pharmaceutical loops, while polymer semiconductor loops are sanitized chemically or with ozone at levels the material accepts. Paul Industries plans sanitization points, drains and sample valves at design, so the loop can be cleaned and proven without cutting into it later.
Ohio winters add one more check. Utility rooms, tank vents and any outdoor sections of feed piping need freeze protection, and long holiday shutdowns at plants and campuses need a plan to keep the loop circulating or to sanitize it before restart.
Tying new tools and suites into a live Ohio loop
Tying new tools or suites into a live Ohio ultrapure loop calls for planning that protects water quality for every user already on the loop. Paul Industries builds tie-in points with zero-dead-leg valves during original construction, schedules connections for planned shutdowns or uses hot-tap methods where the loop material allows, and flushes, sanitizes and samples the new branch before opening it to the main loop.
Qualification follows. For pharmaceutical loops that means documented testing to the site’s validation protocol, which Paul Industries carries out through validation and commissioning in Ohio. For semiconductor and solar loops, the new branch is sampled for resistivity, TOC, particles and bacteria until it matches the rest of the loop. Cleanroom construction around new tools ties in with cleanrooms in Ohio, and the stainless and polymer distribution piping follows the practice on process piping in Ohio.
Ultrapure water cost in Ohio: capital, power and water
Ultrapure water cost in Ohio depends on the flow and quality required, the feedwater, the redundancy level, the loop length and materials, the instrumentation, and the building work around the plant. Feedwater drives more of the cost than most owners expect: a Toledo or Cleveland site planning for seasonal organics needs more pretreatment than a site on softened Columbus water.
Operating cost is mostly power, membranes, resins, UV lamps and filters, plus city water and sewer charges. Ohio’s average industrial electricity price for January through August 2026 was 10.23 cents per kWh, according to the EIA, so a plant drawing a steady 50 kW for pumps, RO and UV spends about $44,807 a year on power at that rate. Paul Industries designs for energy recovery, efficient pumping and high RO recovery where the feedwater allows, and offers design-build delivery, complete installation to an owner’s engineered design, and supply of prefabricated skids and loop modules.
Who builds and services ultrapure water systems in Ohio?
Paul Industries builds and services ultrapure water systems in Ohio, from water analysis and design through fabrication, installation, startup, qualification testing and long-term maintenance. Work covers new plants, expansions, loop extensions, membrane and EDI replacements, sanitization programs and troubleshooting of quality excursions. Paul Industries also builds ultrapure systems across the Midwest, including ultrapure water systems in Pennsylvania and, in the headquarters state, ultrapure water systems in Virginia.
Paul Industries ultrapure plants and loops for Ohio sites
Paul Industries delivers each Ohio ultrapure water system as one accountable project: pretreatment sized to the site’s own feedwater, a treatment train matched to the end use, a loop that holds quality to the last point of use, and records that prove it. Projects run from Toledo and Cleveland to Columbus, New Albany, Dayton and Cincinnati. For a new plant, an expansion or a quality problem, see the Ohio page or request a quote.
Standards referenced: SEMI F63 · ASTM D5127 · ASTM D1193 · USP <645> Water Conductivity · USP <643> Total Organic Carbon · ASME BPE · Ohio Revised Code 1521.16 · Ohio Revised Code 1522.12 (Great Lakes compact) · Ohio EPA NPDES and pretreatment programs
Frequently asked questions
Who builds ultrapure water systems in Columbus, New Albany and Licking County?
Paul Industries builds ultrapure water systems in Columbus, New Albany, Johnstown and across Licking County for manufacturers, suppliers and labs. Columbus feedwater arrives lime softened to about 120 ppm, ozonated and chlorinated, with TOC a little above 2 mg/L at the river plants, so Paul Industries designs chlorine removal and organics reduction into every Central Ohio train.
Does Paul Industries install ultrapure water systems in Cincinnati and Dayton?
Paul Industries installs ultrapure water systems in Cincinnati, Dayton and the Southwest Ohio suburbs, for pharmaceutical, research, electronics and power users. Cincinnati’s water utility puts average hardness at 137 mg/L for river water from the Miller plant and 147 mg/L for well water from the Bolton plant, so Paul Industries confirms which plant feeds the site before sizing softening and antiscalant.
Who installs ultrapure water systems in Toledo, Perrysburg and Northwest Ohio?
Paul Industries installs ultrapure water systems in Toledo, Perrysburg, Findlay and across Northwest Ohio. Lake Erie feedwater brings late-summer algal blooms and organics swings, and Toledo’s 2014 microcystin advisory showed that supply itself can stop. Paul Industries designs extra pretreatment margin, online TOC monitoring and storage to ride through an interruption.
Which Lake Erie and Akron-area sites does Paul Industries build ultrapure plants for?
Paul Industries takes ultrapure water work in Cleveland, Akron, Canton and Northeast Ohio, for hospitals, universities, electronics plants and power users. Cleveland Water draws from four offshore Lake Erie intakes and reports about 7 grains per gallon of hardness, so trains there focus on seasonal organics and temperature swings as much as hardness.
When will Intel Ohio open, and what does that mean for ultrapure water demand?
Intel’s February 2025 update expects its first Ohio fab to finish construction in 2030 and begin operations between 2030 and 2031, with the second fab following in 2031 and 2032. Ultrapure water demand from the fabs and their suppliers will follow that schedule. Paul Industries builds high-purity systems for suppliers and other Ohio manufacturers on their own timelines.
How does Intel Ohio fab progress affect suppliers planning Ohio plants?
Intel Ohio fab progress sets the timing for chemical, gas and equipment suppliers planning Ohio facilities, many of which need ultrapure or high-purity water of their own. With operations now expected from 2030, suppliers can phase their water systems to match. Paul Industries designs phased systems with space and connections for later capacity.
What is ultrapure water used for in Ohio pharmaceutical and biologics plants?
Ultrapure water in Ohio pharmaceutical and biologics plants feeds Purified Water and Water for Injection systems, cleaning in place, buffer and media preparation, and laboratory testing. USP limits set conductivity at 1.3 microsiemens per centimeter at 25 C for Stage 1 and TOC at 500 parts per billion. Paul Industries builds and qualifies those systems.
Why does Columbus water need chlorine removal before an RO system?
Columbus water carried total chlorine of about 1.4 ppm leaving its river plants in 2025, and chlorine damages the polyamide membranes used in most reverse osmosis systems. Carbon beds or sodium bisulfite injection with ORP monitoring remove it ahead of the membranes. Paul Industries sizes that stage for the peak chlorine the supply delivers.
How did the 2014 Toledo water crisis change ultrapure planning in northern Ohio?
The 2014 Toledo advisory, when about 400,000 people were told not to drink tap water for roughly two days because of microcystin from a Lake Erie bloom, showed that a city supply can stop with little warning. Ultrapure plants on Lake Erie water now plan storage, alternate supplies and organics monitoring. Paul Industries designs those safeguards in.
Does a large ultrapure water plant in Ohio need a water withdrawal permit?
A large ultrapure water plant in Ohio registers with the Division of Water Resources if it can withdraw more than 100,000 gallons a day, and in the Lake Erie watershed it needs a withdrawal and consumptive use permit above 2.5 million gallons a day from the lake or 1 million from streams or wells. Paul Industries designs metering that supports those reports.
Where does RO reject water go at an Ohio plant?
RO reject water at an Ohio plant goes to a public sanitary sewer under the sewer authority’s pretreatment rules or, where no sewer exists, to a stream under an Ohio EPA NPDES permit. Many plants reuse reject water as cooling tower makeup when its chemistry allows. Paul Industries designs reject recovery and reuse to cut both water and sewer costs.
How does winter affect an ultrapure water plant in Ohio?
Winter cools Ohio feedwater, and colder water lowers reverse osmosis output at the same pressure, so a plant sized on summer water can fall short in January. Heat exchangers on the feed or extra membrane area keep production steady. Paul Industries sizes membranes for the coldest feedwater the site sees and protects outdoor equipment from freezing.
What does an ultrapure water system for a lab in Ohio involve?
An ultrapure water system for an Ohio lab usually combines a central RO or DI supply with point-of-use polishers that deliver ASTM D1193 Type I water near 18 megohm-centimeters, plus ultrafiltration or UV where the analysis calls for it. Paul Industries builds the central plant and loop and installs the polishing units at each bench.
How much does ultra pure water cost to produce at an Ohio plant?
The cost to produce ultra pure water at an Ohio plant combines power, membranes, resins, UV lamps, filters, labor, city water and sewer charges. Power alone for a steady 50 kW plant runs about $44,807 a year at Ohio’s 2026 industrial average of 10.23 cents per kWh. Paul Industries estimates full operating cost from the site’s water analysis and flow.
What does an ultrapure water service program cover in Ohio?
An Ohio ultrapure water service program covers membrane cleaning and replacement, EDI checks, resin and filter changes, UV lamp replacement, instrument calibration, loop sanitization, sampling and trend reviews. Paul Industries sets the schedule around the site’s production calendar and the seasonal swings in its feedwater.
Which details should an Ohio site send to price an ultrapure water system?
An Ohio site should send the required flow and quality at each point of use, the end-use standard such as SEMI F63, ASTM D1193 or USP, a recent feedwater analysis, the building layout and available space, any existing equipment, and the target schedule. Paul Industries returns a treatment train, a layout, a budget range and a firm price.
Planning ultrapure water for an Ohio fab, lab or plant?
Send the flow and quality required, the end-use standard, a feedwater analysis and the site layout. Call 201-450-8280 or request a quote.