Paul Industries provides tank fabrication in Georgia, designing, fabricating, delivering and installing carbon steel and stainless storage tanks, process tanks and fuel tanks for poultry and food plants, pulp and paper mills, chemical plants, terminals, battery plants and data centers across the state. In Georgia the rules that apply to a tank follow its contents: flammable and combustible liquid tanks need the State Fire Marshal’s plan approval under the Safety Fire Commissioner’s rules, underground tanks fall under Georgia EPD’s Chapter 391-3-15, and oil storage above federal thresholds needs a spill prevention plan. Paul Industries builds each tank to the standard and the approval route its contents call for.
Request a quote or call 201-450-8280
Tank fabrication in Georgia: the rules follow what the tank holds
Tank fabrication in Georgia starts with one question, what the tank will hold, because Georgia splits storage tank regulations by contents and location. Flammable and combustible liquids come under Chapter 120-3-11 of the Safety Fire Commissioner’s rules, which adopt NFPA 30 with Georgia modifications. Underground tanks holding petroleum or hazardous substances come under the Georgia Underground Storage Tank Act and EPD’s rules. Oil storage above 1,320 gallons in aggregate comes under the federal Spill Prevention, Control and Countermeasure rule. Water, food and process tanks are built to their own product standards and the plant’s specification.
Pressure sets the other boundary. A tank that works at 15 psig or less sits outside Georgia’s Boiler and Pressure Vessel Safety Act, O.C.G.A. Title 25, Chapter 15, at any size, while a vessel above that line is a code pressure vessel with National Board registration and a three-year state permit inspection, covered under pressure vessel fabrication in Georgia. The design, materials and fabrication methods common to every tank are on the national tank fabrication page.
| Tank | Georgia or federal rule | Approval or filing before use |
|---|---|---|
| Aboveground flammable liquid tank over 60 gal, or combustible over 120 gal | Chapter 120-3-11; NFPA 30, 2024 edition, with Georgia modifications | Sealed plans approved by the State Fire Marshal, or the city or county fire authority at 660 gal or less where one exists |
| Motor fuel dispensing tank at a fleet or private station | Chapter 120-3-11; NFPA 30A, 2024 edition | Plan approval before construction |
| Underground petroleum or hazardous substance tank | O.C.G.A. 12-13; EPD Chapter 391-3-15; 40 CFR 280 | Notification within 30 days of use, then annual registration by December 31 |
| Oil storage over 1,320 gal aggregate aboveground | 40 CFR 112, SPCC | Written SPCC plan in place, with containment and inspection program |
| Process or storage tank at 15 psig or less | Outside the Boiler and Pressure Vessel Safety Act | Built to API 650, API 620, UL 142 or the plant’s specification |
| Vessel above 15 psig | Georgia Boiler and Pressure Vessel Safety Act | ASME stamp, National Board registration, state permit inspection |
Georgia aboveground storage tank regulations for flammable and combustible liquids
Georgia aboveground storage tank regulations for flammable and combustible liquids sit in Rule 120-3-11-.03 and .06: plans for any new tank installation, or major modification, above 60 gallons of Class I flammable liquid or 120 gallons of Class II or III combustible liquid must be approved by the State Fire Marshal before construction starts, and the installation must meet NFPA 30, 2024 edition, as Georgia has modified it. Installations of 660 gallons or less may go to the city or county fire authority for approval where one exists, and larger ones carry the state plan review fee.
The submission is engineering work. Plans bear the seal and Georgia registration number of the responsible architect or engineer, and they include a scaled site plan with buildings and property lines, tank locations, tank drawings with every piping connection and appurtenance, piping, valve and electrical layouts, corrosion protection and an equipment list with makes and models. Aboveground submissions add a Fire Safety Analysis completed by the city or county fire authority. No construction, tank setting or equipment installation begins until the approved plans are returned, and an approved copy stays on site. Paul Industries prepares the tank drawings and data the submission needs, so the fire marshal’s review and the fabrication schedule run in parallel.
Georgia’s definition of a storage tank matters here: a vessel of more than 60 gallons intended for fixed installation, on fixed or skid supports, and not used for processing. Day tanks, bulk tanks and fuel storage fall inside it; a mix tank or reactor in a process is a process vessel, handled under the plant’s process and fire code review. Temporary installations of 90 days or less, such as construction fuel tanks, are approved by written request to the State Fire Marshal before the tanks arrive.
| Georgia modification | Requirement | Fabrication and installation response |
|---|---|---|
| NFPA 30, 21.3.6 | Aboveground tanks and piping kept painted against corrosion, in a light reflective color | Exterior coating system specified in a light, reflective finish, which also cuts vapor loss in the Georgia sun |
| NFPA 30, 22.13.5 | Gauges or other means to monitor filling, visible and accessible to the delivery operator | Level gauge and overfill alarm located at the fill point |
| NFPA 30, 22.13.6 and 22.13.7 | Tight fill connection for Class I, II and IIIA liquids, with containment for hose drips | Fill spill containers and tight fill fittings built into the tank or fill station |
| NFPA 30, 22.4.1.8 | At bulk and chemical plants, no Class I aboveground tank within 300 ft of a school, church, hospital, theater or public hall | Site layout and tank location fixed before design |
| NFPA 30, 6.10.6 | No drums, barrels or combustibles beneath or within 10 ft of an aboveground tank | Clear zone shown on the site plan and kept at turnover |
| NFPA 30, 22.11.2.7 | Drains from diked areas controlled so liquids other than storm water stay in the dike | Dike valves and drain arrangement included in the containment design |
| NFPA 30, 21.7.1.7 | No gravity filling from tank to tank without an overflow device and an attendant | Transfer piping designed with overfill protection |
How often should above ground storage tanks be inspected in Georgia?
Aboveground oil storage tanks in Georgia that fall under the federal SPCC rule are inspected and integrity tested on the schedule set by the industry standard the plan adopts, usually STI SP001 for shop-built tanks and API 653 for field-erected tanks, with regular visual inspections by plant staff between those formal inspections. The interval depends on tank size, construction and the containment around it, and the professional engineer who certifies the SPCC plan records it.
The answer to how often do tanks need to be inspected also has a Georgia fire code side. The state’s NFPA 30 modifications require every tank to be kept liquidtight, and a leaking tank must be emptied immediately or repaired in a way the fire marshal accepts. Paul Industries designs tanks for inspection: manways where internal inspection is planned, elevated or double bottoms that allow leak detection, and nameplates that record the standard, capacity and design conditions. Repairs, bottom replacements and shell work on existing tanks follow the same standard the tank was built to, and tank cleaning ahead of inspection is covered under industrial tank cleaning.
Georgia underground storage tank regulations: the Act and Chapter 391-3-15
Georgia underground storage tank regulations come from the Georgia Underground Storage Tank Act, O.C.G.A. 12-13-1 and the sections after it, and from EPD’s rules in Chapter 391-3-15, which incorporate the federal UST rules in 40 CFR Part 280 with Georgia dates and additions. The Georgia underground storage tank management program that runs them sits in EPD, which handles notification, registration, compliance inspections and the state’s trust fund.
For a new tank, the federal rule adopted by Georgia requires the owner to notify the agency within 30 days of bringing the system into use. Since April 7, 2008, every new or replaced underground tank, its piping and its dispensers in Georgia must have secondary containment with interstitial monitoring, which is earlier than the federal date. A tank that was installed, removed and is now going back into the ground must be recertified by its manufacturer, the manufacturer’s authorized representative or a Georgia-registered professional engineer, and must meet the secondary containment rule before it is installed again. Moving fuel aboveground is an option many owners weigh, because the tank stays visible and inspection is simpler.
Georgia underground storage tank registration every December 31
Georgia underground storage tank registration is an annual filing: by December 31 each year, every owner or operator of a regulated tank that is in use or capable of use files an UST Registration Form with EPD, listing the facility, the owner and Class A and Class B operators, tank sizes and identification, the financial responsibility mechanism, leak detection methods, spill, overfill and corrosion protection verification, and secondary containment for tanks and piping installed since April 7, 2008. EPD then issues an annual registration certificate, which is posted at the facility.
The certificate controls deliveries. No one may put a regulated substance into a regulated underground tank without first verifying a valid certificate, so a lapsed Georgia annual underground storage tank registration stops fuel deliveries. Registration runs through the Georgia EPD Online System, and the Georgia underground storage tank database that EPD keeps from those filings records each facility’s tanks. Paul Industries hands over the tank, piping and containment data the first notification and each registration form need.
The Georgia underground storage tank trust fund
The Georgia underground storage tank trust fund, the GUST Trust Fund under Rule 391-3-15-.13, is a financial responsibility mechanism that owners can use for releases from petroleum tanks, with the owner showing separate assurance for a $10,000 deductible on the registration form. Eligibility depends on having filed the notification forms and on meeting the design, construction, operation and release detection rules in Chapter 391-3-15. A new tank installed and documented correctly from the start keeps that option open, which is one reason Georgia EPD underground storage tanks records begin with the installer’s data.
Stainless process tanks for Georgia poultry, food and beverage plants
Stainless process tanks in Georgia food plants serve chilling water, hot water, CIP solutions, ingredients, batching and wastewater equalization, and in poultry plants they run through daily sanitation that punishes every crevice and horizontal ledge. USDA figures put Georgia first among broiler-producing states in 2024, so poultry plants are a large share of the state’s stainless tank demand.
For these tanks the specification is about cleanability as much as capacity: sloped or coned bottoms that drain completely, full-penetration welds ground and passivated on product contact surfaces, sloped tops and closed supports that shed water, CIP spray devices sized to the tank, manways and fittings that seal against washdown, and insulation jackets welded closed so water cannot get behind them. Paul Industries fabricates single-wall, jacketed and insulated stainless tanks with agitators, level and temperature instruments and the sanitary connections the process needs, and ties them into the cleaning system covered by CIP and SIP systems in Georgia. Plant-wide needs of protein processors are on the meat and poultry industry page.
Stainless steel tank fabrication, Atlanta and north Georgia plants
Stainless steel tank fabrication for Atlanta, metro Atlanta and north Georgia serves beverage, bakery, dairy, ingredient and life sciences plants, and the poultry processors around Gainesville and Hall County. Tank fabrication Atlanta projects often go into existing buildings, so diameter, height and the rigging path through the building decide the tank’s shape before process needs do. Paul Industries measures the access route, sizes the tank to it, and splits very large tanks into sections where a one-piece delivery will not fit.
Mill, chemical and terminal tanks on the Georgia coast
Coastal Georgia tanks serve pulp and paper mills, chemical plants, bulk terminals and the industries around the ports of Savannah and Brunswick. The Georgia Ports Authority describes the Port of Savannah as the Western Hemisphere’s largest single-terminal container port, and the Brunswick terminals handle forest products, project cargo and bulk commodities that serve Georgia’s biomass industry. Tanks there hold fuels, chemicals, water and process liquors, often in large field-erected sizes.
Mill tanks carry their own history. Seven of Georgia’s eight remaining pulp mills were built before 1961, according to the state forestry task force’s January 2026 report, so many liquor, chemical and water tanks at those sites are replacements for shells and floors at the end of their life. Coastal conditions add hurricane wind and flood loads, salt air corrosion and soft soils that drive foundation design. Paul Industries designs anchorage and shell stiffening for the site’s wind loads, specifies coating systems for salt air in the light reflective finish Georgia requires on flammable liquid tanks, and coordinates foundation design with the site’s geotechnical data.
Tank fabrication, Savannah, Brunswick and the coast
Tank fabrication Savannah and Brunswick plants order ranges from small chemical day tanks to field-erected API 650 storage tanks for fuels, process water and mill liquors. Paul Industries plans field erection around the plant’s operating areas, stages shell courses and floor plates for coastal weather, and tests each tank before it enters service. Mill tanks connected to steam systems tie into boiler repair in Georgia work during the same outages.
Shop-built or field-erected for a Georgia site?
Shop-built or field-erected is decided mostly by diameter: tanks that can be shipped by road in one piece are built complete, tested and coated before delivery, while larger tanks are erected on site from rolled plates. Shop-built tanks cost less per gallon in the sizes they cover and reach the site ready to set; field-erected tanks reach capacities no truck can carry and avoid oversize routing.
| Tank type | Typical standard | Typical Georgia service | Approval route |
|---|---|---|---|
| Shop-built single or double-wall steel tank | UL 142 | Generator fuel, boiler fuel oil, lubricants, chemicals | State Fire Marshal plan approval for flammable and combustible liquids; SPCC where oil totals exceed 1,320 gal |
| Protected aboveground tank | UL 2085 | Fleet fueling, fuel at occupied sites | Plan approval under NFPA 30A for dispensing |
| Field-erected atmospheric storage tank | API 650 | Terminal fuel, mill liquors, process and fire water | Plan approval for flammable and combustible liquids; foundation and building permits from the county or city |
| Low-pressure storage tank | API 620 | Low-pressure chemical and refrigerated storage up to 15 psig | Outside the boiler and vessel Act at 15 psig or less |
| Stainless process or sanitary tank | Plant specification; ASME BPE finishes where required | Poultry, food, beverage and life sciences plants | Plant engineering review; process safety review where hazardous contents apply |
| Underground storage tank | UL 58, UL 1316 or equivalent, double-wall | Fuel at fleets and facilities | EPD notification and annual registration, secondary containment |
Fuel tanks for battery plants, data centers and generators
Fuel tanks for Georgia’s battery plants, data centers and hospitals are mostly diesel tanks for standby generators and boilers: belly tanks under generator sets, double-wall day tanks, and bulk tanks sized for the run time the facility’s design requires. Diesel is a Class II combustible liquid, so any fixed tank over 120 gallons goes through the plan approval route, and sites whose aboveground oil storage passes 1,320 gallons also need an SPCC plan.
Paul Industries fabricates and installs UL 142 double-wall tanks, transfer pumps, piping, leak detection and level instrumentation, and places the level gauge at the fill point where the Georgia modification to NFPA 30 asks for it. Bulk tanks for large campuses are designed with the containment, overfill protection and tight fill connections the state code requires, and the piping between bulk and day tanks is covered under process piping in Georgia.
How a tank project runs at an operating Georgia plant
A tank project at an operating Georgia plant runs in a fixed order: process and site data, design and drawings, the plan approval from the State Fire Marshal or the city or county fire authority where flammable or combustible liquids are stored, fabrication, foundation work, setting or field erection, testing, and the startup records. Paul Industries prepares the tank drawings and calculations, supports the sealed submission, builds the tank while the review runs, and schedules delivery or erection for the plant’s outage or a quiet production window.
Testing closes the job. Shop-built tanks are tested before they ship; field-erected tanks are tested on site to the standard they were built to, with the bottom and shell welds examined first. Welded tie-ins to existing systems are covered under industrial welding services in Georgia. At turnover the plant receives the drawings, material records, weld and test records, nameplate data and the fire marshal’s approval, so the SPCC plan and the next inspection have what they need.
What does tank fabrication in Georgia cost?
The cost of tank fabrication in Georgia is driven by capacity, material, wall and floor thickness, single or double wall construction, coatings or stainless finishes, nozzles, manways and internals, insulation and jackets, foundation and anchorage, and whether the tank is shop-built or erected on site. Approvals add a known amount: the state plan review fee for flammable and combustible liquid tanks over 660 gallons, the engineer’s sealed drawings, and, for underground tanks, the containment and monitoring Georgia requires.
Georgia has no state prevailing wage law, so private and most public tank work is priced at market rates, with federal Davis-Bacon rates only where the contract carries them. Tank fabrication companies quote the same tank differently mostly because of what each quote includes: drawings, approvals, foundation, delivery, setting, coatings and testing. Paul Industries prices the complete scope with those items listed, gives a budget range from comparable tanks once it has capacity, contents and site data, and a firm price once the drawings are agreed.
Who builds storage and process tanks in Georgia?
Paul Industries builds storage and process tanks in Georgia, from stainless CIP and batching tanks in Atlanta and Gainesville food plants to field-erected storage tanks at coastal mills and terminals and fuel systems for battery plants and data centers. With its headquarters at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries, formerly based in northern New Jersey and then Pennsylvania, takes tank work throughout Georgia and the Southeast, across all 50 states and at plants outside the United States. Owners comparing states will find tank fabrication in Virginia, the headquarters state, and tank fabrication in Maryland.
Tanks from Paul Industries for Georgia owners
Paul Industries designs, fabricates, delivers and installs tanks for plants across Georgia: UL 142 and UL 2085 fuel tanks, API 650 and API 620 storage tanks, stainless process and sanitary tanks, and underground tank systems with secondary containment. The work covers the drawings for the fire marshal’s plan approval, the tank, its foundation and anchorage, piping, gauging, leak detection, testing and the records for SPCC plans and EPD registration. Owners can buy on a supply basis, a design-build package or a complete installation. Send the contents, capacity, site location and any existing drawings, and request a quote.
Standards referenced: Rules of the Safety Fire Commissioner, Chapter 120-3-11, Flammable and Combustible Liquids · NFPA 30, 2024 edition, with Georgia modifications · NFPA 30A, 2024 edition · Georgia Underground Storage Tank Act, O.C.G.A. 12-13-1 et seq. · Georgia EPD Rules, Chapter 391-3-15, Underground Storage Tank Management · EPA 40 CFR 280, underground storage tanks · EPA 40 CFR 112, Spill Prevention, Control and Countermeasure · API 650 · API 620 · UL 142 · UL 2085 · API 653 · STI SP001
Frequently asked questions
Who fabricates tanks for plants in Savannah, Brunswick and coastal Georgia?
Paul Industries fabricates and erects storage and process tanks for pulp and paper mills, chemical plants, terminals and port industries in Savannah, Brunswick and along the coast. Coastal tanks are designed for hurricane wind, flood and soft soil conditions, with coating systems for salt air and the light reflective finish Georgia requires on flammable liquid tanks. Paul Industries plans field erection around the plant’s operating areas.
Does Paul Industries build stainless tanks for poultry plants in Gainesville and Hall County?
Paul Industries builds stainless chilling water, hot water, CIP and wastewater tanks for poultry and food plants in Gainesville, Hall County and across north Georgia. Those tanks are designed for daily washdown, with drainable bottoms, sealed insulation jackets and closed supports. Paul Industries ties each tank into the plant’s cleaning and piping systems and schedules installation around production and sanitation shifts.
Which tanks do plants in Augusta, Macon and Columbus order?
Plants in Augusta and along the Savannah River order chemical, water and mill tanks; Macon and Columbus plants order food process tanks, boiler fuel tanks and fire water storage. Hospitals and military-related facilities in middle Georgia add generator fuel systems. Paul Industries designs each tank to its contents, handles the fire marshal plan approval drawings where flammable or combustible liquids are stored, and installs the tank.
What tanks do Dalton, Rome, Albany and Valdosta plants use?
Carpet, flooring and textile plants around Dalton and Rome use hot water, dye and chemical tanks and boiler fuel storage. Food processing and agricultural plants around Albany and Valdosta use process water, ingredient, wastewater and fuel tanks. Paul Industries fabricates steel and stainless tanks for both and installs them with the piping, level instruments and containment the contents require.
What is the Georgia underground storage tank act?
The Georgia Underground Storage Tank Act, O.C.G.A. 12-13-1 and the sections after it, gives EPD authority over underground tanks holding petroleum and hazardous substances. EPD’s rules in Chapter 391-3-15 carry it out, incorporating the federal UST rules in 40 CFR Part 280 and adding Georgia requirements such as annual registration and secondary containment for new and replaced tanks and piping since April 7, 2008.
Who runs the Georgia underground storage tank program?
The Georgia underground storage tank program is run by the Environmental Protection Division of the Department of Natural Resources. It handles new tank notification, annual registration, compliance inspections, release reporting and the GUST Trust Fund. Owners register through the Georgia EPD Online System, and the annual certificate it issues must be verified before any fuel is delivered into a regulated tank.
Where does the Georgia underground storage tank database come from?
EPD builds its underground tank records from the notification forms filed when a tank enters service and from the annual registration forms due every December 31. Those records list the facility, owner, operators, tanks, leak detection, financial responsibility and containment for each site. Paul Industries supplies the tank, piping and containment data the forms ask for when it installs a system.
Does Georgia require a permit for an aboveground diesel tank?
Georgia requires plan approval rather than a separate tank permit: a fixed diesel tank over 120 gallons is a Class II combustible liquid installation, so sealed plans go to the State Fire Marshal before construction, or to the city or county fire authority at 660 gallons or less where one exists. Sites with more than 1,320 gallons of aboveground oil storage also need a federal SPCC plan.
What does the Georgia fire code require at the fill point of an aboveground tank?
Georgia’s modifications to NFPA 30 require gauges or another means of monitoring the fill that the delivery operator can see and reach at the point of delivery, tight fill connections for Class I, II and IIIA liquids, and provisions to contain liquid that drains from the hose at connection and disconnection. Paul Industries builds those features into the tank or a fill station.
Why must aboveground tanks in Georgia be a light color?
Georgia’s modification to NFPA 30 requires aboveground flammable and combustible liquid tanks and their piping to be kept painted against corrosion in a light reflective color. A light finish reflects sunlight, keeps the liquid cooler and reduces vapor loss in Georgia summers. Paul Industries specifies coating systems that meet the color rule and suit the site, including salt air exposure on the coast.
How close can a fuel tank be to a school in Georgia?
At bulk plants and chemical plants, Georgia’s modification to NFPA 30 bars a Class I flammable liquid aboveground tank within 300 feet of a school, church, hospital, theater or public assembly hall, with exceptions requested from the State Fire Marshal. Other installations follow NFPA 30’s separation tables. Paul Industries checks the site layout against those distances before design starts.
Can a used underground tank be reinstalled in Georgia?
A tank that was installed and removed must be recertified by its manufacturer, the manufacturer’s authorized representative or a Georgia-registered professional engineer before it is reinstalled underground, and it must meet the secondary containment requirement. Most owners find a new double-wall tank simpler. Paul Industries prices both so the owner can decide.
Do process tanks in a Georgia plant need fire marshal approval?
Georgia’s rule defines a storage tank as a fixed vessel over 60 gallons that is not used for processing, so plan approval under Chapter 120-3-11 targets storage. Process vessels holding flammable liquids are still reviewed under the fire code with the building or process, and pressure vessels above 15 psig fall under the boiler and pressure vessel rules. Paul Industries confirms the route with the owner during design.
Can temporary fuel tanks be used on a Georgia construction site?
Georgia treats tanks in place for 90 days or less as temporary installations. They are approved by written request to the State Fire Marshal, with a site plan, tank locations, drawings and equipment information, before the tanks arrive, and extensions are requested in writing. Paul Industries prepares the request with the temporary tank data.
How much does a field-erected storage tank cost in Georgia?
The price of a field-erected tank depends on diameter and height, shell and floor thickness, material, roof type, nozzles, coatings, foundation, anchorage for wind loads and testing. Approval costs include sealed drawings and the state plan review fee where flammable or combustible liquids are stored. Paul Industries gives a budget range from comparable tanks and a firm price once the drawings are agreed.
Which details help Paul Industries quote a Georgia tank?
Send the contents and their temperature, capacity or dimensions, shop-built or field-erected preference, material, nozzles and manways, any agitator, jacket or insulation, the site address in Georgia, foundation or soil data if available, and the required in-service date. Existing drawings help for replacements. Paul Industries returns a budget range, the approval route and a schedule.
Planning a new or replacement tank in Georgia?
Send the contents, capacity, site location and whether the tank is above or below ground. Call 201-450-8280 or request a quote.