Paul Industries designs, installs, starts up and services data center cooling in Maine, from chilled water plants, dry coolers and cooling towers to CRAH galleries, containment and the glycol piping that keeps outdoor equipment running through a Maine January. Maine hands a cooling plant months of cold air and commercial electricity that cost about 63 percent more than the national average in 2026, so the plant that earns its keep here is the one that turns its compressors off for most of the year. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes cooling work across Maine, in all 50 states and at sites abroad through its international projects.
Request a quote or call 201-450-8280
Why data center cooling in Maine starts with winter
Data center cooling in Maine starts with winter because outdoor air in Portland sits at or below freezing for about 1,800 hours a year, and in Caribou for more than 2,800, so heat rejection equipment spends a fifth to a third of its working life in weather that freezes water and buries fans in snow. Every coil, basin, valve and sensor outdoors has to be chosen for that duty before anyone looks at the summer peak.
The same cold is the plant’s biggest asset. A hall that runs warm chilled water can carry its full load on outdoor air and water for half the year or more, and with Maine commercial power averaging 22.83 cents per kilowatt-hour over January through August 2026, against 14.04 nationally (EIA), each compressor-free hour is worth considerably more than it would be in an average state. A Maine plant has to be designed for deep cold and costly power at the same time, which is the difference between a plant built for this state and one copied from a warmer market.
The national methods for chilled water, CRAH units, containment and liquid loops are explained under data center cooling systems. What follows is particular to Maine: the hourly weather record at the Portland, Bangor and Caribou airports, the state’s power prices and its two grids, the 2026 debate over large new facilities, and the cold-climate details that decide whether a plant behaves in February.
Where are data centers in Maine, and what do they cool?
Data centers in Maine are mostly enterprise rooms and small colocation buildings rather than large campuses: one industry tracker lists 13 facilities run by 10 providers, and the largest of them, a Portland building, is rated at about 3 megawatts. Enterprise rooms sit inside hospitals, offices, campuses and plants, and the University of Maine System runs its high performance computing cluster in the primary system data center on the Orono campus, with backup storage in Portland.
That building stock shapes the cooling work. A typical Maine room carries a few hundred kilowatts to a few megawatts of IT load, was built around 45 degree chilled water or packaged computer room units, and shares a roof or a mechanical room with the rest of the building. Most cooling projects are therefore upgrades: containment, warmer water, economizer coils, chiller replacements and new heat rejection on a roof that also has to shed snow. The wider industrial picture is on the Maine overview.
Larger proposals arrived in 2025 and 2026 and drew statewide attention, almost always at former industrial sites with existing power connections. The table summarizes those reported in enough detail to show what each asks of a cooling plant.
| Site | What was reported | Status as reported | Cooling question it raises |
|---|---|---|---|
| Jay, former Androscoggin Mill | $550 million reuse of the mill buildings, an existing 82 MW power contract, two 3.25 MW diesel standby generators and HVAC equipment in the former rail yard | Amended site location permit and air emission license application filed with Maine DEP in November 2026 | Closed-loop heat rejection reusing about 260,000 gallons, against roughly 300,000 gallons a day in the first plan |
| Limestone, Loring Commerce Centre | Servers immersed in dielectric fluid in a 115,000 square foot warehouse, starting at 5 to 6 MW with a stated ceiling of 50 MW | Announced October 2025; listed as planned | Waste heat captured as hot water for uses such as crop dehydration |
| Brunswick | 180-day moratorium on data centers with a demand of 1 MW or more | Adopted June 2026; rules decision due by December | Sound and water answers engineered before any application |
| Scarborough | 180-day moratorium on data center construction | Adopted June 2026; extension or rules decision due by November | Equipment placement and screening near homes |
| Statewide, LD 307 | Pause on approvals for data centers of 20 MW or more until November 1, 2027 | Passed by the Legislature; vetoed April 24, 2026 | Large campuses only; rooms below the threshold were outside its reach |
The Jay, Maine data center plan shows how closely water is watched. The first version called for about 300,000 gallons a day to replace evaporation, and the version filed in November 2026 moves to a closed loop that reuses about 260,000 gallons, with HVAC equipment on the old rail yard and computing equipment inside the existing mill buildings. Owners planning any Maine data center now arrive at hearings with a water figure, a sound study and a heat rejection layout already worked out.
Is there a Maine data center ban?
Maine has no statewide data center ban in force as of November 2026: the Legislature passed LD 307, which would have paused approvals for data centers with a load of 20 megawatts or more until November 1, 2027, and Governor Janet Mills vetoed it on April 24, 2026. In her letter the Governor said she supported a temporary pause but objected that the final bill made no allowance for the Jay redevelopment, and the Legislature sustained the veto.
Two other state actions shaped the year. LD 713, signed the same week, removes data center projects from the state’s business development tax incentive programs, including the business equipment tax exemption and the Dirigo Business Program. Executive Order 5, announced April 29, 2026, created the Maine Data Center Advisory Council, co-chaired by the commissioners of the Department of Energy Resources and the Department of Environmental Protection, and charged it with protecting ratepayers, keeping the grid reliable, minimizing environmental impacts and supporting responsible siting. Its public report is due to the Governor and the Legislature by January 29, 2027.
Towns have acted on their own. Brunswick and Scarborough each adopted 180-day moratoriums in June 2026, and other municipalities have debated similar steps, so the Maine data center moratorium question now plays out town by town. The 2026 measures aimed at new large facilities; cooling upgrades inside rooms that already operate follow the Maine Uniform Building and Energy Code and the permits any mechanical project needs. For new projects, the council’s charge points toward closed loops, low water use and efficient plants as the designs most likely to clear review.
Portland, Bangor and Caribou design weather for a cooling plant
Portland, Bangor and Caribou give a Maine cooling plant three distinct design years: a coastal one, an inland river-valley one and a northern one where cold, rather than heat, sets most equipment choices. The figures below are computed from five years of hourly National Weather Service observations at the three airports, 2021 through 2025.
| Measure | Portland (PWM) | Bangor (BGR) | Caribou (CAR) | What it sets in the plant |
|---|---|---|---|---|
| Dry bulb exceeded 0.4% of hours | 87 F | 88 F | 86 F | Air-cooled chiller and dry cooler capacity |
| Wet bulb exceeded 0.4% of hours | 75.2 F | 74.7 F | 72.7 F | Cooling tower selection and condenser water temperature |
| Hours per year at or above 90 F | 16 | 18 | 11 | Peak head pressure on air-cooled machines |
| Hours per year at or below 32 F | 1,816 | 2,173 | 2,838 | Basin heat, glycol and heat tracing |
| Hours per year at or below 0 F | 12 | 57 | 171 | Low-ambient fan and valve control |
| Lowest hourly reading | -14 F | -17 F | -28 F | Glycol concentration and burst margin |
| Mean temperature | 48.7 F | 47.2 F | 43.3 F | Annual economizer potential |
Summer barely separates the three stations: their peak dry bulb figures sit within two degrees, and none sees 90 degrees for more than about 18 hours in a typical year. Winter separates them sharply. Bangor logs nearly five times Portland’s hours at or below zero, and Caribou fourteen times as many, so a dry cooler or tower that is well protected on the coast in Cumberland County can still freeze on the same specification in Penobscot or Aroostook County. Coastal sites from Kittery to Bath also carry salt air and fog, which favors coated coils and stainless or coated tower casings over bare aluminum and galvanized steel.
Water-side economizer hours across York County and Aroostook
A Maine data hall gets full water-side free cooling for roughly half to three quarters of the year, depending on which airport record applies and how warm the hall’s chilled water runs. A common working figure is a gap of about 10 degrees between outdoor wet bulb and chilled water supply, which covers a tower approach near 7 degrees and 2 to 3 degrees across a plate exchanger; a dry cooler on glycol needs a larger gap of roughly 15 degrees of dry bulb.
| Chilled water supply | Tower and exchanger, Portland | Tower and exchanger, Bangor | Tower and exchanger, Caribou | Dry cooler alone, Portland | Dry cooler alone, Caribou |
|---|---|---|---|---|---|
| 55 F | 50% | 52% | 58% | 36% | 45% |
| 60 F | 59% | 60% | 66% | 44% | 52% |
| 65 F | 68% | 70% | 75% | 53% | 59% |
Partial economizer hours come on top of those shares, when the tower or dry cooler precools return water and a chiller trims the rest. The full-economizer season arrives in one long block: Portland’s monthly mean temperature sits below 41 degrees from November through March, so a southern Maine data center typically runs free from late autumn into April. May and October, with monthly means in the low to mid 50s at Portland, are the months where changeover logic between free cooling and mechanical cooling gets the hardest workout, and they deserve the most attention when sequences are written and tested.
Raising chilled water supply from 45 to 60 or 65 degrees is where the hours come from, but an older room needs containment, coil checks and server inlet limits under the ASHRAE thermal guidelines before the setpoint moves. Paul Industries resets supply temperature in stages, trending inlet temperatures at each step, and pairs the reset with the economizer additions described under data center cooling towers.
Cooling plant energy at Maine’s 2026 power prices
Maine power costs a cooling plant about $500,000 a year for every 250 kilowatts of continuous plant load at the 2026 commercial average of 22.83 cents per kilowatt-hour, since 250 kilowatts running all 8,760 hours of a year is 2,190,000 kilowatt-hours. At the industrial average of 15.62 cents the same load costs about $342,000 a year; the national averages over the same months were 14.04 cents commercial and 9.09 cents industrial (EIA, January through August 2026).
Small efficiency gains become large sums at those prices. Trimming average plant power by 30 kilowatts, through warmer water, variable speed pumps and fans, or a few more weeks of free cooling, saves about 262,800 kilowatt-hours a year, worth roughly $60,000 at the commercial average. Actual tariffs, supply contracts and demand charges vary by account and utility, so Paul Industries runs the arithmetic on the site’s own bills before recommending an upgrade.
The 2021 International Energy Conservation Code, part of the Maine Uniform Building and Energy Code since April 7, 2025, sends data center systems to Sections 6 and 8 of ASHRAE 90.4, which limit the mechanical load component a cooling design may carry. Plants that use their economizer hours well carry the most margin against that limit, and the calculation is part of every new plant or major replacement Paul Industries designs.
Central Maine Power, Versant Power and Maine’s two grids
Central Maine Power delivers electricity across about 11,000 square miles of central and southern Maine, while Versant Power serves northern and eastern Maine through its Bangor Hydro and Maine Public districts. Most of the state trades power in the ISO New England market, but Versant’s Maine Public District, about 3,600 square miles of northern Maine, sits in the Canadian Maritimes control area under the Northern Maine Independent System Operator and connects to ISO New England through New Brunswick.
The utility shapes a cooling plant in three ways. Service capacity limits how much chiller, pump and fan load a building can add before a transformer or feeder upgrade, which is one reason Maine retrofits favor efficiency over added capacity. Tariff structure decides whether chilled water storage or demand limiting pays back. And outage exposure drives ride-through design: chilled water pumps and CRAH fans on UPS, chillers with fast restart, and enough stored chilled water or thermal mass to hold server inlet temperatures while generators start and compressors reload. Executive Order 5 also directs the Department of Energy Resources and the Public Utilities Commission to protect other ratepayers from costs that data centers create, including mechanisms that place those costs on the facilities responsible, so large new loads should plan to carry the upgrades they trigger.
Dry coolers, towers or hybrid units on a Maine pad
Heat rejection for a Maine data center is chosen against four conditions: water use, winter operation, sound at the property line and the snow and ice the equipment must shed. The table compares the common options for this climate.
| Option | Water use | Maine winter behavior | Where it fits |
|---|---|---|---|
| Open cooling tower with plate heat exchanger | Evaporation and blowdown all year that the tower runs | Needs basin heat, bypass to the basin, fan cycling or reversal and drained outdoor risers | Larger plants where peak summer efficiency matters |
| Closed-circuit fluid cooler | Spray water in warm weather, dry operation in winter | Glycol in the coil; spray section drained and heated in cold months | Mid-size plants that want tower performance with a sealed process loop |
| Dry cooler on glycol | Fill and top-up only | Runs all winter; concentration set by the site’s coldest hour | Sites where water or permitting is the main concern; northern Maine |
| Adiabatic or hybrid dry cooler | Water on the hottest days only | Wetting system drained in winter; dry coil carries the load | Plants that want dry operation with help at the 87 F peak |
| Air-cooled chiller with free cooling coil | None at the unit | Glycol in the coil; low-ambient head pressure control | Rooms with roof space and limited mechanical room area |
Maine’s short, mild peak changes the usual trade-off. Because the 0.4 percent dry bulb is 86 to 88 degrees and the hours above 90 are few, a dry or adiabatic plant gives up less summer efficiency here than in the Mid-Atlantic, and it avoids winter tower operation entirely. Where a tower is still the right answer, Paul Industries pairs it with glycol cooling systems on the outdoor side and keeps the plate exchanger and condenser water piping inside heated space.
Glycol, snow and ice on Maine heat rejection
Freeze protection on Maine heat rejection begins with the glycol concentration, because an outdoor loop has to survive the coldest hour its site will see, which in the 2021 to 2025 record reached minus 14 degrees Fahrenheit in Portland, minus 17 in Bangor and minus 28 in Caribou. Published tables put the freezing point of propylene glycol near 7 degrees at about 30 percent by volume, minus 8 degrees at 40 percent and minus 29 degrees at 50 percent.
A 40 percent loop protects most coastal and central Maine sites against slush on all but a handful of hours, while a Caribou or Presque Isle plant usually needs close to 50 percent. Every step up in concentration costs heat transfer and pump energy, so the outdoor loop is kept as small as possible and isolated from the indoor chilled water by a plate exchanger, with water rather than glycol inside the building. Concentration is checked with a refractometer at startup and every autumn, since make-up water added over a season dilutes the mix.
Snow and ice add their own design items. Dry coolers and condensers sit on dunnage high enough to clear drifting snow, with air paths kept away from parapets and screens where drifts build. The roof structure under new equipment is checked for the added dead load and for drift loads under ASCE 7-16, which the 2021 International Building Code references. Fans run low-speed or reverse cycles to keep ice off coils, tower louvers and air inlets get heat or covers, and controls hold a minimum leaving fluid temperature so a cold night never freezes water downstream of a plate exchanger.
How much water does a data center use for cooling in Maine?
A data center’s cooling water use in Maine depends almost entirely on the heat rejection choice: evaporative towers consume water continuously through evaporation and blowdown whenever they carry load, while closed loops with dry coolers use water mainly for the first fill and occasional top-ups. The two Jay figures, about 300,000 gallons a day for the evaporative first plan against about 260,000 gallons held in a closed loop for the redesign, show the scale of the difference for a large site.
Maine’s climate narrows the gap in favor of dry designs. With the wet bulb at or below 50 degrees for about 59 percent of Portland hours and 66 percent of Caribou hours, a tower spends much of its year at low evaporation anyway, and a dry cooler loses little by giving up evaporation on the few hot afternoons. For owners facing town hearings, Paul Industries prices both a wet and a dry option against the site’s water source, sound limits and energy bills so the trade-off is explicit.
Retrofitting cooling in a Maine room that stays live
Retrofitting cooling in a Maine room that stays live follows a staged sequence: survey and trend the existing plant, add containment and raise supply temperatures, then add economizer capacity and replace the least efficient machines one at a time. Each stage keeps redundancy intact, and each is tested before the next begins.
Maine’s calendar helps. From November into April the economizer can carry most or all of the load, which frees chillers for replacement or overhaul with far less risk than a summer outage, so mechanical work on the compressor side is usually scheduled for winter while outdoor tie-ins on roofs and pads wait for frost-free months. Rooms placed in converted mill and industrial buildings, as the Jay proposal would be, bring large structural bays and existing water connections but old piping and limited roof capacity, so the survey covers structure and utilities as well as the cooling plant. Chiller service in those rooms is covered under chiller repair in Maine, and the piping that ties new equipment in follows process piping in Maine.
What does data center cooling in Maine cost?
The cost of data center cooling in Maine is set by IT load and redundancy, the heat rejection type, the winter features the site needs, the building the plant goes into and the price of the energy it will use. Energy is the one figure owners can estimate on day one, using the $500,000 per 250 kilowatts of continuous plant load worked out above at the 2026 commercial average; equipment and installation are priced from the scope.
| Driver | Why it moves the price | What to send for a firm price |
|---|---|---|
| IT load and redundancy | Sets chiller, pump and heat rejection capacity, and N+1 or 2N doubles some of it | Present and planned IT load, rack densities and the redundancy target |
| Heat rejection choice | Towers, dry coolers and hybrids differ in equipment, water treatment and winter features | Site plan, water source and any town sound or water conditions |
| Winter protection | Glycol volume, heat tracing, basin heat and enclosures scale with the site’s coldest hours | Site location and whether equipment sits on a roof or a pad |
| Existing building | Roof structure, rigging paths and live-room phasing add steel, cranes and staged work | Drawings, structural data and photos of the roof and mechanical room |
| Controls and ride-through | Economizer sequences, UPS-fed pumps and fans and thermal storage add hardware and testing | Current sequences, BMS points list and outage history |
Who installs data center cooling in Maine?
Paul Industries installs data center cooling in Maine, designing, supplying, piping, wiring, testing and starting up chilled water plants, dry coolers, towers, CRAH galleries and glycol loops for enterprise, colocation, university and industrial rooms from York County to Aroostook County. Formerly based in northern New Jersey and later in Pennsylvania, the company now runs its work out of 256 Shore Drive, Kilmarnock, Virginia; its data center cooling in Virginia page covers the headquarters state.
Owners choose the route that fits the project: supply-only equipment packages, design-build of the full plant, or complete installation from survey through commissioning. Dense racks are handled under data center liquid cooling in Maine, startup and testing under data center commissioning in Maine, and whole mechanical packages under data center mechanical contractors in Maine. Paul Industries applies the same cold-climate approach across New England, including data center cooling in Massachusetts.
Paul Industries cooling plants for Maine data rooms
Paul Industries builds Maine cooling plants around the state’s cold hours and costly power: warm chilled water, long economizer seasons, glycol and heat rejection sized to Portland, Bangor or Caribou weather, and controls proven through a shoulder-season changeover. Send the IT load, drawings and current plant data, and Paul Industries returns a scope with the energy arithmetic on your own tariff. Request a quote or call 201-450-8280.
Standards referenced: Maine Uniform Building and Energy Code (2021 IBC, IMC, IECC, IEBC) · 2021 International Energy Conservation Code, Section C403.1.2 · ASHRAE 90.4 · ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments · ASCE 7-16 · Maine LD 307 (vetoed) and LD 713 · Maine Executive Order 5 (2026)
Frequently asked questions
Who provides cooling for data centers in Portland, South Portland and Westbrook?
Paul Industries provides data center cooling in Greater Portland, including South Portland and Westbrook, for enterprise rooms, colocation floors and campus computing spaces. Coastal sites there see the state’s mildest winters, about 12 hours a year at or below zero in the 2021 to 2025 record, but also salt air and fog, so coated coils and corrosion-resistant casings are specified alongside the economizer and glycol work. Call 201-450-8280 or request a quote.
Does Paul Industries take data center cooling work in Bangor and Augusta?
Paul Industries takes cooling work in Bangor, Augusta, Waterville and the surrounding river valleys, from chiller replacements to new dry cooler yards. Inland sites run colder than the coast: Bangor averaged 57 hours a year at or below zero from 2021 to 2025, against 12 in Portland, so glycol strength, heat tracing and low-ambient controls get closer attention. Call 201-450-8280 or request a quote.
Can a data room in Lewiston-Auburn run on dry coolers most of the year?
A Lewiston-Auburn room can run on dry coolers for much of the year if its chilled water supply is raised. Using the Portland airport record, a dry cooler alone carries the full load for about 44 percent of hours at 60 degree supply and 53 percent at 65 degrees, and partial free cooling adds more. Paul Industries checks containment and server inlet limits first, then sizes the dry cooler and glycol loop to the site.
Who handles cooling for computing rooms in Aroostook County and Presque Isle?
Paul Industries handles cooling for computing rooms in Presque Isle, Caribou and the rest of Aroostook County. Caribou logged about 2,838 hours a year at or below freezing and a low of minus 28 degrees in the 2021 to 2025 record, so outdoor loops there usually carry close to 50 percent propylene glycol and equipment sits on high dunnage above drifting snow. Power there comes through Versant’s Maine Public District, which affects tariffs and backup planning.
Is a southern Maine data center cooled differently from one in northern Maine?
A southern Maine data center and a northern one use the same equipment types, but the balance shifts. Southern coastal sites have a slightly higher summer wet bulb, salt air and fewer deep-cold hours, so towers and coated coils make sense. Northern sites gain economizer hours, about 66 percent of Caribou hours at a 60 degree supply versus 59 percent at Portland, but need stronger glycol and heavier snow protection.
Are data centers coming to Maine?
Data centers are being proposed in Maine, mostly at former industrial sites such as the Androscoggin Mill in Jay and the former Loring Air Force Base in Limestone, and at a smaller scale than in Virginia or Ohio. Statewide policy is still forming: a 20 megawatt moratorium was vetoed in April 2026, data centers lost access to state business tax incentives, and an advisory council reports in January 2027. Several towns have adopted temporary moratoriums meanwhile.
How many data centers in Maine are operating today?
One industry tracker lists 13 data center facilities in Maine run by 10 providers, the largest a Portland building of about 3 megawatts, and many more computer rooms sit inside hospitals, offices, campuses and plants without appearing on any list. For cooling work, that means most Maine projects are upgrades to existing rooms measured in hundreds of kilowatts to a few megawatts rather than new hyperscale halls.
What is the status of the Jay Maine data center at the old Androscoggin Mill?
The Jay project was paused in June 2026 when its intended operator stepped back, then revived in November 2026 when the mill’s owner filed an amended site location permit and an air emission license application with Maine DEP. The filing describes computing equipment in the existing mill buildings, HVAC equipment in the former rail yard, two 3.25 megawatt diesel standby generators and a closed cooling loop holding about 260,000 gallons.
What will the Maine Data Center Advisory Council review?
The Maine Data Center Advisory Council, created by Executive Order 5 in April 2026, evaluates large-scale data centers proposed or operating in Maine with four goals: protecting ratepayers, keeping the grid reliable, minimizing environmental impacts and supporting responsibly sited development. Water use, energy and siting are central to that review. Its public report, with any proposed legislation, is due to the Governor and the Legislature by January 29, 2027.
What chilled water temperature suits a Maine data hall?
A Maine data hall with good containment usually runs chilled water supply between 60 and 65 degrees, which gives full tower and exchanger free cooling for about 59 to 68 percent of Portland hours and 66 to 75 percent of Caribou hours. Older rooms built for 45 degree water need containment and coil checks before the reset, and the setpoint is raised in steps while server inlet temperatures are trended.
How are cooling towers kept running through a Bangor winter?
Towers that run through a Bangor winter need basin heaters, a bypass that returns water straight to the basin when loads are light, fan speed control or reversal to shed ice, and outdoor risers that drain or carry heat tracing. Many Maine plants avoid the issue by isolating the tower in deep cold and carrying the load on a glycol dry cooler or a closed-circuit cooler running dry, then returning the tower to service in spring.
How much does it cost to cool a data center in Maine each year?
Energy is usually the biggest yearly cooling cost: at the 2026 Maine commercial average of 22.83 cents per kilowatt-hour, every 250 kilowatts of continuous cooling plant load costs about $500,000 a year, and about $342,000 at the industrial average of 15.62 cents. A plant that uses its economizer hours well draws far less than its nameplate for most of the year, which is why warm water and good controls pay back quickly here.
Does the Maine Public District's separate grid change a cooling design in northern Maine?
The grid itself changes little inside the cooling plant, but it changes the commercial terms around it. Versant’s Maine Public District sits in the Canadian Maritimes control area under the Northern Maine Independent System Operator and reaches ISO New England through New Brunswick, so supply pricing and service arrangements differ from the rest of Maine. Ride-through design, generator sizing and the case for thermal storage are checked against that site’s tariff.
Can a Maine data center cool without drawing river or well water?
A Maine data center can cool without a continuous water draw by using dry coolers, adiabatic units that wet their coils only on the hottest afternoons, or air-cooled chillers with free cooling coils. The loop is filled once and topped up occasionally. Maine’s short, mild summer peak means a dry plant gives up little efficiency, and it removes winter tower operation entirely, which suits sites where water use is under scrutiny.
Should snow load be checked before adding dry coolers to a Maine roof?
Snow load should be checked before any heavy equipment goes on a Maine roof, because new dunnage and screens change where snow drifts and add weight to a structure designed for the original roof. Drift loads follow ASCE 7-16, referenced by the 2021 International Building Code that Maine adopted. Paul Industries reviews the structural drawings, adds steel where needed and raises equipment above expected drift depth before setting it.
Which contract routes are available for a Maine cooling project?
Paul Industries offers three routes for Maine cooling projects: supply-only packages of chillers, dry coolers, pumps and CDUs with submittals and startup support; design-build of a complete plant, where one contract covers engineering, equipment and installation; and complete installation to an owner’s design, including piping, controls, testing and turnover records. The route is chosen around the owner’s schedule, engineering team and budget.
Which season suits chiller replacement in a Maine data room?
Late autumn through early spring suits chiller replacement in most Maine data rooms, because the economizer can carry most or all of the load and the room keeps its redundancy while one machine is out. Work on roofs and pads, such as new dry coolers or tower replacements, usually waits for frost-free months. Paul Industries sequences the two so indoor and outdoor work each fall in the right season.
What should a Maine data center send to price a cooling project?
Send the present and planned IT load, rack densities, redundancy target, floor plans and roof drawings, the existing chiller and air handler schedules, current chilled water setpoints, the BMS points list, a year of utility bills and any town conditions on sound or water. Photos of the roof and mechanical room help. Paul Industries uses that package to scope the plant and show the energy savings on your own tariff.