Paul Industries designs, supplies, installs and starts up data center cooling in Arkansas: chilled water plants, cooling towers, dry coolers, water-side economizers, pumps, piping and controls for data halls in West Memphis, Little Rock, Northwest Arkansas, Fort Smith and the south of the state. Arkansas hands a cooling designer a humid southern summer, a winter cool enough to run long economizer seasons, aquifers the state already reports as overdrawn in the east and south, and a 2025 tax statute that names chillers and cooling towers line by line. Paul Industries, whose headquarters sit at 256 Shore Drive, Kilmarnock, Virginia, is an East Coast contractor taking this work across Arkansas, in all 50 states and at plants outside the United States.
Request a quote or call 201-450-8280
Data center cooling in Arkansas: the plant from rack inlet to outdoor air
Data center cooling in Arkansas is the chain of equipment that carries server heat from the hall to the atmosphere: computer room air handlers or fan walls, chilled water or facility water piping, chillers, pumps, and the heat rejection in the yard, which is a cooling tower, a dry cooler, an adiabatic cooler or an air-cooled chiller depending on the site. Paul Industries builds every link in that chain and the controls that run it. The national picture of plant types and rack densities is on the data center cooling systems page; this page covers what changes when the site is in Arkansas.
For anyone asking how does data center cooling work in plain terms, the answer is a heat balance. Almost every kilowatt a server draws becomes heat, so a 10 MW hall needs about 10 MW of cooling, plus the heat from fans, pumps and lighting. Chilled water plants move that heat through a refrigeration cycle before rejecting it; economizers skip the refrigeration step whenever the outdoor air or the tower water is cold enough to do the job directly. The Arkansas question is how many hours a year that free cooling is available, how much water the heat rejection uses, and what the power to run the compressors costs during the rest of the year.
The data center cooling requirements that govern an Arkansas design are the same ones every hall uses: server inlet air inside the ASHRAE recommended band of 64.4 to 80.6 degrees Fahrenheit (18 to 27 degrees Celsius), humidity held within the equipment’s limits, redundancy matched to the owner’s tier target, and energy performance measured against ASHRAE 90.4. What differs is the weather that sits behind those numbers and the water that feeds the towers.
How many economizer hours does an Arkansas data hall get?
An Arkansas data hall gets between about 2,850 and 4,200 hours a year with outdoor temperatures at or below 55 degrees Fahrenheit, depending on where in the state it sits, based on a count of NOAA’s 1991 to 2020 hourly normals. Fayetteville, in the Ozark Plateau, leads that count; Texarkana, in the southwest corner, trails it. Those hours decide how long a water-side economizer or a dry cooler can carry the load without starting a compressor.
| Station | Hours at or below 50 F | Hours at or below 55 F | Hours at or below 60 F | Share of the year at or below 60 F |
|---|---|---|---|---|
| Fayetteville (Drake Field) | 3,442 | 4,222 | 4,925 | 56% |
| Fort Smith | 2,557 | 3,344 | 4,084 | 47% |
| Little Rock (Adams Field) | 2,372 | 3,232 | 3,997 | 46% |
| Pine Bluff | 2,274 | 3,149 | 3,934 | 45% |
| El Dorado | 2,037 | 3,044 | 3,873 | 44% |
| Texarkana | 1,804 | 2,850 | 3,675 | 42% |
Hourly normals are smoothed long-term averages, so real years bring hotter afternoons and colder nights than the table shows, but the ranking holds. The practical reading is that a chilled water plant with a water-side economizer, designed for a 60 to 65 degree chilled water supply, has roughly half the year in its favor in Northwest Arkansas and a little over 40 percent in the south. Raising the supply water temperature toward what the servers accept widens that window more than any equipment choice, which is why Paul Industries starts an Arkansas plant design with the warmest water the IT equipment and air handlers will tolerate.
Summer runs the other way. NOAA’s normals give El Dorado about 88 days a year at or above 90 degrees, Texarkana about 83, Fort Smith about 78 and Little Rock about 76, against about 45 at the Northwest Arkansas Regional Airport. The chillers and towers are sized for those afternoons, and the yard layout has to keep hot discharge air from short-circuiting back into the intakes on still July days.
Humidity and the evaporative choice in south and east Arkansas
Humidity in south and east Arkansas limits what evaporative heat rejection can do, because a cooling tower or adiabatic cooler can only bring water down toward the outdoor wet bulb, and wet bulb tracks the dew point. NOAA’s hourly normals put the dew point at or above 70 degrees Fahrenheit for about 1,511 hours a year at El Dorado, 1,260 at Pine Bluff, 998 at Texarkana and 925 at Little Rock, against about 503 at Fort Smith. Those are the hours when tower water runs warm and the chillers carry the most lift.
Dew point matters inside the hall as well. Every pipe, valve body and coil carrying water below the room’s dew point will sweat, so chilled water piping in Arkansas gets full vapor-sealed insulation, and any air handler that brings in outdoor air needs dehumidification capacity sized for July rather than for an average day. Plants that run warm water at the racks reduce both problems at once. Where an owner wants outdoor air economizers on the air side, Paul Industries checks each hour against both the dry bulb and the dew point limit, because a cool but saturated Arkansas morning can bring in more moisture than the hall can tolerate; in the Delta and the south, water-side economizers usually give the owner the same savings with less humidity risk inside the white space.
Water for cooling towers: Arkansas aquifers, registration and reuse
Water for cooling towers in Arkansas comes from three kinds of supply: municipal systems fed by reservoirs, such as Beaver Lake for Northwest Arkansas and Lakes Maumelle and Winona for Little Rock; the Mississippi River Valley alluvial aquifer and the Sparta aquifer in the east and south; and on-site wells. The state’s 2025 groundwater report says Arkansas is withdrawing from the alluvial and Sparta aquifers in eastern and southern Arkansas at a rate above what has been estimated as sustainable, and the Cache, Grand Prairie and South Arkansas areas are designated critical groundwater areas.
Under Act 1051 of 1985, every well in Arkansas able to produce 50,000 gallons a day must be registered with the Arkansas Department of Agriculture, and the quantity used must be reported by March 1 of the following year; domestic wells are exempt. A data center that drills its own makeup well therefore enters the state’s water use record from its first year. The critical groundwater area label itself is non-regulatory, but it marks where scrutiny of a large new withdrawal will be sharpest.
Arkansas data center water usage depends almost entirely on the heat rejection choice. A tower rejects heat by evaporating water, roughly 1,000 Btu per pound evaporated, so each megawatt rejected by evaporation consumes on the order of 400 gallons an hour before blowdown is counted. Do data centers use a lot of water? A tower-cooled hall in an Arkansas summer can; a hall on dry coolers with a closed loop uses almost none for heat rejection. Most Arkansas designs land between those poles, using evaporation only on the hottest hours.
| Heat rejection | Water use | Arkansas strength | Arkansas watch point |
|---|---|---|---|
| Open cooling towers with water-cooled chillers | Highest; evaporation plus blowdown | Lowest compressor energy on humid August afternoons | Makeup source, blowdown permit and treatment program; aquifer scrutiny in the east and south |
| Closed-circuit fluid coolers | Moderate; spray only when needed | Clean process loop, dry operation through a long winter | Spray water treatment and freeze protection in the Ozarks |
| Dry coolers with trim chillers | Near zero for heat rejection | Data center cooling without water on roughly half the year’s hours in Northwest Arkansas | Larger yard area; trim chiller capacity sized for 90 F afternoons |
| Adiabatic coolers | Low; pads or spray on peak hours only | Shaves the hottest hours in Little Rock and the south | Pad media and water quality; high dew points blunt the benefit |
| Air-cooled chillers with free cooling coils | None for heat rejection | Simple yard, no tower water program | Higher compressor energy at peak; condenser coil spacing to stop recirculation |
A data center air cooled chiller plant is the simplest answer to the water question and suits smaller halls and edge sites across the state. For campus loads, Paul Industries often pairs dry coolers or closed-circuit coolers for most of the year with a smaller evaporative stage that runs only on peak afternoons, so the plant’s annual water draw stays small without paying for compressor energy every summer hour.
Arkansas makeup water quality and the tower treatment program
Arkansas makeup water quality varies with the source, and the tower treatment program has to follow it. Beaver Water District, which supplies the cities of Northwest Arkansas from Beaver Lake, reported finished water averaging 75 parts per million of hardness and 115 parts per million of total dissolved solids in 2025: soft, low-mineral water that lets a tower run at high cycles of concentration. Little Rock’s supply also comes from reservoirs. Groundwater in the Delta and the south is a different starting point and needs its own analysis before cycles, softening and blowdown are set.
Paul Industries designs the makeup, softening, filtration and blowdown side of the plant along with the towers, sized from a water analysis of the actual source rather than a generic assumption. Act 548 of 2025 lists water softeners among data center equipment and adds water conservation systems that collect, conserve and reuse water, so a reuse loop or a rainwater capture tank can be part of the same tax picture as the chillers.
Power for the cooling plant: Entergy, MISO and the Southwest Power Pool
Power for an Arkansas cooling plant comes through two regional grid operators: Entergy Arkansas is a member of MISO, which manages the flow of power on the transmission grid and runs the wholesale markets in its footprint, while SWEPCO, which serves western Arkansas, works within the Southwest Power Pool, headquartered in Little Rock. Which side of that line a site falls on shapes the interconnection process, the tariff, and the demand charges the cooling plant adds to every summer bill.
Electricity in Arkansas is inexpensive by national standards. The EIA reports an Arkansas industrial average of 6.69 cents per kilowatt hour in 2025 against a US average of 8.51, and a commercial average of 10.76 cents against 13.37. A megawatt of cooling power running all year draws 8,760,000 kilowatt hours, about $586,000 at the state’s 2025 industrial average. Cheap power narrows the payback on some efficiency measures, but the cooling plant still sets the peak that the utility interconnection is sized around, so trimming compressor hours with economizers and warmer water keeps both the bill and the interconnection request smaller.
Arkansas data center development and the cooling equipment in Act 548
Arkansas data center development changed pace in 2025, when Act 548 rewrote the sales and use tax exemption in Arkansas Code 26-52-456 and Google announced its first data center in the state, in West Memphis. The Department of Finance and Administration lists Act 548 as effective October 1, 2025. For a cooling designer, the useful part of the statute is its equipment list: equipment necessary to cool and maintain a controlled environment for the servers, including a chiller, mechanical equipment, refrigerant piping, adiabatic and free cooling systems, cooling towers, water softeners, air handling units, indoor direct exchange units, fans, ducting and filters.
The exemption applies to qualified data centers, which need a positive cost-benefit analysis from the Arkansas Economic Development Commission and a qualified investment the amended law sets at $100 million, among other tests. Whether a project qualifies is a matter for the owner and its tax advisers; Paul Industries prepares equipment schedules and invoices that separate the cooling equipment and the labor on it clearly, so that the owner’s claim is easy to document.
When an owner plans a data center, Arkansas now offers a defined route through that statute, and the cooling plant is often one of the biggest mechanical lines in the qualified investment. More on how the package is bought and built is on the data center mechanical contractor in Arkansas page.
Where data centers in Arkansas are being planned
Data centers in Arkansas follow power, fiber and land, and the state’s three main cooling climates line up with the places owners look: the Delta at West Memphis across the river from Memphis, central Arkansas around Little Rock, and the Bentonville, Rogers, Springdale and Fayetteville corridor in the northwest. Google lists West Memphis, Arkansas as a data center location in development; the Arkansas Economic Development Commission describes a campus on more than 1,000 acres with a data center facility, office buildings and a substation, and Google describes a $4 billion investment in the state through 2027. These are market facts about the state; Paul Industries names them to describe the market, and has no role in them to report.
Each region brings its own cooling brief, and the three that draw the most attention differ more than their distance apart suggests.
Data center, West Memphis, Arkansas: water strategy first
A Delta site sits over the eastern aquifers in humid country, so the makeup source, the blowdown route and the balance between towers and dry coolers are settled before equipment is chosen.
Data center, Little Rock, Arkansas: reservoir water and a central grid position
Central Arkansas sites draw reservoir water from Lakes Maumelle and Winona and sit in the middle of the state’s weather range, which suits a hybrid plant with a water-side economizer.
Data center, Northwest Arkansas: the longest economizer season
The Ozark Plateau gets the most free cooling hours and the coldest winter nights in this list, with NOAA counting about 92 days a year at or below freezing at the regional airport, so freeze protection on idle coils and tower basins is part of the base design.
Who installs data center cooling in Arkansas?
Paul Industries installs data center cooling in Arkansas, from the first load calculation to the last commissioning record. The company sizes and selects chillers, towers, dry coolers, pumps and air handlers, prefabricates piping off site where that shortens the field schedule, sets and pipes the equipment, wires the controls, flushes and passivates the loops, and starts up and tests the plant through utility and generator transfers. Owners choose the route: supply-only equipment packages, design-build plants with Paul Industries carrying the engineering, or complete installation to an owner’s design.
Data center cooling contractors are judged on what they hand over, so Paul Industries delivers the as-built drawings, test reports, controls sequences and maintenance plan with the plant. Testing is covered in depth on the data center commissioning in Arkansas page, and rack-level loops on the data center liquid cooling in Arkansas page. Compared with the headquarters state, where the same work is described on the Virginia data center cooling page, Arkansas trades Virginia’s water-rich, grid-constrained setting for cheaper power and a water question that depends on the aquifer under the site; the Tennessee data center cooling page covers the Memphis side of the river.
What does data center cooling in Arkansas cost?
The cost of data center cooling in Arkansas is set by the IT load, the redundancy target, the heat rejection choice, the supply water temperature, the site’s water source and the schedule, with equipment lead times often controlling the last of these. A tower plant costs less in equipment and more in water and treatment; a dry cooler plant costs more in yard area and coils and less in operating water; adiabatic and hybrid plants sit between. Electrical service, generator capacity for the cooling plant and controls integration are often as large as the mechanical equipment itself.
Paul Industries gives a budget range once the IT load by phase, the redundancy target and the site are known, and a firm price once the design is fixed. Where Act 548 applies, the price is broken out so exempt equipment and labor are clear.
Running an Arkansas cooling plant through the year
An Arkansas cooling plant runs through three seasons that each demand different attention: a long humid summer, short shoulder months when the plant switches between economizer and mechanical cooling, and a winter that is mild in the south and freezing in the Ozarks. Maintenance follows those seasons.
| Season | Plant condition | Paul Industries maintenance focus |
|---|---|---|
| Late spring (April to May) | Economizer hours shrinking; first humid weeks | Tower cleaning and fill inspection, condenser tube cleaning, chiller oil and vibration checks before peak |
| Summer (June to September) | Peak wet bulb and dew point; chillers at full lift | Approach temperature trending, treatment program checks, fan and motor inspection, insulation and condensation patrols |
| Autumn (October to November) | Economizer hours returning | Economizer valve and heat exchanger checks, controls tuning for changeover, adiabatic pad and spray service |
| Winter (December to February) | Freezing nights in the northwest; mild days in the south | Glycol strength, heat tracing, basin heaters and drain-down sequences on idle equipment |
Plants that also serve process loads draw on the same skills used on the chiller repair in Arkansas page, and the water side on the Arkansas high-purity water systems page. Paul Industries keeps maintenance records in the same format as the commissioning record, so a trend in approach temperature or vibration can be compared against the day the plant was handed over. Service agreements can cover the whole plant or a defined part of it, such as the towers and treatment program, with quarterly visits timed to the seasonal changeovers above.
Paul Industries and data center cooling across Arkansas
Paul Industries designs, supplies, installs, tests and maintains the cooling plants behind Arkansas data halls, from a single enterprise room in Little Rock to a multi-phase campus in the Delta, and documents each plant for the owner, the tax record and the operator. It is one of the Arkansas services listed on the Arkansas page, and part of the company’s work across the Southeast. To start, send the IT load by phase, the site, the water source and the target in-service date, or request a quote.
Standards referenced: ASHRAE TC 9.9 thermal guidelines for data processing environments · ASHRAE 90.4 · Arkansas Code 26-52-456 (Act 548 of 2025) · Arkansas Groundwater Protection and Management Act (A.C.A. 15-22-906) · Act 1051 of 1985 (well registration and water use reporting) · 2021 Arkansas Fire Prevention Code · 2021 International Mechanical Code as adopted in Arkansas
Frequently asked questions
Who builds cooling plants for data halls around West Memphis and Crittenden County?
Paul Industries builds cooling plants for data halls around West Memphis, Marion and the rest of Crittenden County, including chillers, towers or dry coolers, pumps, piping and controls. The Delta site brings humid summers and sits over the eastern aquifers that the state reports as heavily drawn, so Paul Industries settles the water strategy, from makeup source to blowdown, before equipment is selected. Send the IT load and the site plan to start the scope.
Does Paul Industries design data center cooling in Little Rock, Conway and central Arkansas?
Yes. Paul Industries designs and installs data center cooling in Little Rock, North Little Rock, Conway, Benton and the rest of central Arkansas. Little Rock averages about 76 days a year at or above 90 degrees and about 4,000 hours at or below 60, so a plant with a water-side economizer and warm supply water spends close to half the year with compressors off. Reservoir-fed city water keeps the tower program straightforward.
Who handles data center cooling in Bentonville, Rogers, Springdale and Fayetteville?
Paul Industries handles data center cooling in Bentonville, Rogers, Springdale and Fayetteville, from enterprise rooms to new halls. Northwest Arkansas has the longest free cooling season in the state and the coldest winters, with roughly 90 freezing nights a year, so dry coolers and economizers pay back well there, and glycol, heat tracing and drain-down sequences are designed in from the start.
Can Paul Industries cool a data hall in Fort Smith, Jonesboro or Texarkana?
Paul Industries designs and builds data hall cooling in Fort Smith, Jonesboro, Texarkana and other Arkansas cities, sizing each plant to its own weather. Texarkana has the shortest economizer season of the stations Paul Industries checked, about 2,850 hours at or below 55 degrees, while Fort Smith sits closer to Little Rock. Jonesboro shares the Delta’s humid summers, so tower selection there is checked against high wet bulb afternoons.
How hot does a cooling plant in El Dorado or south Arkansas have to be designed for?
A plant in El Dorado or elsewhere in south Arkansas is designed for long, humid heat: NOAA’s normals give El Dorado about 88 days a year at or above 90 degrees and about 1,500 hours with a dew point at or above 70. Towers are selected for high wet bulb conditions, chillers are checked at the condenser water those towers deliver on the worst afternoons, and all cold piping gets vapor-sealed insulation.
Does a data center well in Arkansas have to be registered with the state?
A well able to produce 50,000 gallons a day or more must be registered with the Arkansas Department of Agriculture under Act 1051 of 1985, and the quantity used must be reported by March 1 of the following year; domestic wells are exempt. Paul Industries sizes the makeup system from the plant’s real evaporation and blowdown so the reported figure matches what the cooling plant actually needs.
Which Arkansas cooling equipment does Act 548 of 2025 name?
Act 548 of 2025, which amended Arkansas Code 26-52-456, names chillers, mechanical equipment, refrigerant piping, adiabatic and free cooling systems, cooling towers, water softeners, air handling units, indoor direct exchange units, fans, ducting and filters as data center equipment, and adds water conservation systems. Qualification rests with the owner and the state; Paul Industries itemizes the cooling plant so the record is clear.
Should an Arkansas data hall use cooling towers or dry coolers?
An Arkansas data hall should choose by water source, climate zone and load. Towers keep compressor energy down on humid afternoons but consume water; dry coolers use almost none and cover roughly half the year’s hours in the northwest on their own. Many Arkansas plants combine them, running dry most of the year and adding evaporation only at peak. Paul Industries models the annual energy and water for each option before a choice is made.
What supply water temperature makes sense for an Arkansas data center?
The warmest temperature the servers and air handlers accept makes the most sense, because each degree of warmer chilled water adds economizer hours. In Little Rock, moving from a 55 degree to a 65 degree basis adds roughly 1,470 hours a year of outdoor air at or below the higher threshold, using NOAA hourly normals. Paul Industries confirms the IT vendor’s inlet and water limits before setting the basis of design.
How does Arkansas humidity affect cooling towers and piping?
Arkansas humidity raises the wet bulb temperature a tower works against, so on humid afternoons condenser water returns warmer and the chillers work harder. Humid air also condenses on any surface colder than its dew point, which at Little Rock sits at or above 65 degrees for about 2,450 hours a year. Paul Industries insulates and vapor-seals cold piping and sizes dehumidification for those hours.
Which utility serves a data center site in Arkansas?
Entergy Arkansas, a member of the MISO grid, serves many Arkansas sites and met the electrical requirements for the West Memphis campus, while SWEPCO serves western Arkansas within the Southwest Power Pool; electric cooperatives and municipal utilities serve other areas. The utility decides interconnection timing and tariffs. Paul Industries supplies the cooling plant’s connected load, peak demand and redundancy figures that the utility’s load study needs.
How high can Arkansas data center water usage run for a tower-cooled hall in summer?
A tower consumes on the order of 400 gallons an hour by evaporation for each megawatt it rejects, before blowdown, because each pound of water evaporated removes roughly 1,000 Btu. A hall rejecting 20 MW on a July afternoon can therefore evaporate around 8,000 gallons an hour. Paul Industries reduces that figure with economizers, warmer water, dry coolers and high cycles of concentration.
Can Paul Industries add cooling capacity to an Arkansas data center that is already running?
Yes. Paul Industries adds chillers, towers, dry coolers, pumps and piping to operating Arkansas halls with hot taps, line stops and staged tie-ins planned under a written method of procedure, so the existing plant keeps its redundancy during the work. Each new unit is tested alone and then with the existing plant before it carries load.
What does Paul Industries need to price data center cooling in Arkansas?
Paul Industries needs the IT load by phase, the redundancy target, the server inlet and water temperature limits, the site plan, the water source and its analysis, the utility serving the site, and the target in-service date. With those, a budget range follows from comparable scope; a firm price follows once the design basis is fixed and equipment is selected.
How is freeze protection handled for data center cooling in the Ozarks?
Freeze protection in the Ozarks is handled with glycol in loops that see outdoor air, heat tracing and insulation on exposed piping, basin heaters on towers, and control sequences that keep water moving or drain idle coils. NOAA counts about 92 nights a year at or below freezing at the Northwest Arkansas Regional Airport, so Paul Industries tests every freeze sequence before the first winter.
Is cheap Arkansas electricity a reason to skip economizers?
Cheap electricity lengthens the payback of some measures, but economizers still earn their place in Arkansas because they cut the peak demand the cooling plant puts on the utility service and the generators, and they reduce compressor run hours and wear. At 6.69 cents per kilowatt hour, the 2025 industrial average, each megawatt of compressor power avoided for a year still saves about $586,000.
What records does an Arkansas cooling plant owner receive from Paul Industries?
The owner receives as-built drawings, equipment submittals, pressure test and flushing records, startup reports, controls sequences and point lists, functional and integrated test results, water treatment setpoints and a maintenance plan. Where the owner claims the Act 548 exemption, Paul Industries also provides itemized equipment and labor schedules that match the invoices.