Paul Industries designs, installs and maintains data center liquid cooling in South Dakota: coolant distribution units, cold plate and rear door loops, row manifolds and the warm-water facility plants that reject rack heat through dry coolers for most of the year. A South Dakota hall can hold liquid-cooled racks on outdoor air alone for the great majority of hours, provided the facility loop survives subzero nights and the rack loop is filled with water clean enough for microchannel cold plates. Paul Industries builds both loops and proves them before the first server connects.
Request a quote or call 201-450-8280
Where data center liquid cooling in South Dakota starts: the facility water temperature
Data center liquid cooling in South Dakota starts with the facility water supply temperature, because that one number decides how many hours a year the hall runs without compressors. ASHRAE’s liquid cooling classes, renamed in the fifth edition of its thermal guidelines, are labeled by the upper limit of facility supply temperature in each class: W17, W27, W32, W40, W45 and W+, in degrees Celsius. The warmer the class the server maker approves, the more of the prairie’s cool hours the plant can turn into free cooling.
Paul Industries confirms the class with the IT vendor before anything else is sized, then designs the coolant distribution unit, the facility piping and the heat rejection around it. Methods that apply in every state, including cold plate construction and CDU types, are explained on the national data center liquid cooling page; this page follows the South Dakota numbers.
How many hours can dry coolers alone carry a liquid-cooled hall?
Dry coolers alone can carry a liquid-cooled South Dakota hall for nearly every hour of an average year once the facility supply reaches 32 degrees Celsius, which is about 90 degrees Fahrenheit. The table counts NOAA’s 1991 to 2020 hourly normals at four stations and assumes a dry cooler holds supply water about 10 degrees Fahrenheit above the outdoor dry bulb, which is a common design approach.
| ASHRAE class (supply limit) | Outdoor air needed | Sioux Falls | Rapid City | Aberdeen | Watertown |
|---|---|---|---|---|---|
| W17 (about 63 F) | Below about 53 F | 4,641 h or more | 4,900 h or more | 4,917 h or more | 4,972 h or more |
| W27 (about 81 F) | Below about 70 F | 7,384 h | 7,600 h | 7,587 h | 7,713 h |
| W32 (about 90 F) | Below about 80 F | 8,526 h | 8,328 h | 8,563 h | 8,709 h |
| W40 (104 F) | Below about 94 F | All 8,760 normal hours | All 8,760 normal hours | All 8,760 normal hours | All 8,760 normal hours |
A normal year is only part of the story. NOAA’s 90th percentile hourly values reach 85 degrees or higher in about 725 hours of the Sioux Falls year and 848 hours in Rapid City, and Rapid City’s 90th percentile peaks near 98 degrees. A W32 hall therefore needs trim cooling, evaporative assistance or extra dry cooler surface for a hot week, while a W40 or warmer hall can be designed for heat rejection with no chillers at all if the owner accepts the larger coil area. Paul Industries sizes the trim plant to the hot tail rather than the average, so a July heat wave never becomes a throttling event.
Can liquid cooling freeze in a South Dakota winter?
Liquid cooling can freeze in a South Dakota winter wherever plain water sits in an outdoor coil or an unheated pipe, and with Aberdeen averaging 38.5 nights a year at or below zero, the facility loop must be protected by design. The technology cooling loop that feeds the racks stays inside the heated building, so it freezes only if the building loses heat entirely; the facility loop that runs to the dry coolers is the one at risk.
Paul Industries protects the facility side in one of two ways. The first runs propylene glycol through the outdoor coils and the whole facility loop, at a strength chosen for the site’s coldest expected air, accepting some loss of heat transfer and higher pumping energy. The second puts a plate exchanger between a glycol circuit outdoors and a plain treated water circuit indoors, so the CDUs and any heat recovery coils see water rather than glycol. The second costs more up front and gives the hall better heat transfer and simpler chemistry. Either way, outdoor piping is laid out to drain, isolation valves sit where they can be reached in snow, and low-temperature alarms watch the coil return.
Winter also brings the opposite problem: too much cooling. On a minus 15 degree morning a dry cooler bank can drive facility water below the dew point of the white space or below the IT vendor’s minimum inlet temperature. Mixing valves, fan staging and a supply temperature floor in the controls stop that from happening, and the CDU’s own control loop keeps the rack side steady as the facility side swings.
What liquid is used for cooling the racks?
The liquid used for cooling the racks in most South Dakota halls is either treated water or a mix of propylene glycol and water, usually at about 25 percent glycol, with corrosion inhibitors and a biocide, and immersion tanks use a dielectric fluid instead. The server manufacturer names the approved coolant and its limits, and the warranty depends on keeping to them, so the coolant is a specification item rather than a site choice.
The technology loop is small in volume, often a few hundred gallons per row, but its cold plates have fine internal channels that a few grams of scale or debris can block. That is why the fill water matters as much as the coolant concentrate, and why every new loop is flushed, filtered and sampled before servers connect. The ultrapure water systems in South Dakota page covers the purification side of making that fill water at scale.
Fill water from Sioux Falls and Lewis and Clark supplies
Fill water drawn straight from a Sioux Falls tap is far too hard for a cold plate loop, because the city reported 2025 average total hardness of 250 parts per million from its own treatment plant and 168 from the Lewis and Clark Regional Water System. Both supplies also carry sulfate near or above 200 parts per million and a chlorine-based disinfectant residual. Each of those would foul or attack a microchannel cold plate over time.
| Parameter | City plant | Lewis and Clark | Why it matters in a rack loop |
|---|---|---|---|
| Total hardness (as CaCO3) | 250 ppm | 168 ppm | Calcium and magnesium scale on hot cold plate surfaces |
| Sulfate | 193 ppm | 230 ppm | Adds conductivity and supports sulfate-reducing bacteria in stagnant branches |
| Chloride | 34 ppm | 15 ppm | Pitting risk on stainless and brazed joints at higher temperature |
| Sodium | 34 ppm | 82 ppm | Raises conductivity, which matters for leak sensing and galvanic action |
| pH | 8.3 | 8.8 | Shifts scaling tendency and inhibitor performance |
| Total chlorine residual | 2.63 ppm system average | Oxidizes copper and degrades some elastomers and inhibitors | |
For that reason Paul Industries fills technology loops with deionized or reverse osmosis water blended with the approved inhibitor package or glycol concentrate, delivered by a skid on site or as premixed coolant. Facility loops are less sensitive, but they still benefit from softened, inhibited water, because Sioux Falls hardness at the warm temperatures of a W32 or W40 loop scales plate exchangers quickly. Owners on rural water systems or private wells elsewhere in the state get a sample analysis first, since groundwater chemistry changes from county to county.
Which types of liquid cooling in data centers suit South Dakota halls?
The types of liquid cooling in data centers that suit South Dakota halls are the same four found everywhere, but the cold climate changes which ones pay back fastest: rear door heat exchangers, single-phase cold plates, two-phase cold plates and immersion. The table sets out what each asks of the building.
| Type | Heat path | Facility water it suits | South Dakota note |
|---|---|---|---|
| Rear door heat exchanger | Liquid to air at the rack exhaust | Chilled or cool water, often W17 to W27 | Fits existing air-cooled rooms; benefits most from long winter economizer hours |
| Single-phase cold plate (direct to chip) | Liquid to liquid through a CDU | W27 to W40 | Dry coolers carry nearly all hours at W32 and above |
| Two-phase cold plate | Refrigerant boils at the chip; condenser in the CDU | W27 to W40 on the condenser side | Same facility benefits; refrigerant handling added to service |
| Single-phase immersion | Dielectric fluid in tanks to a liquid exchanger | W32 to W45 | Warm return water suits heat recovery in a long heating season |
A rear door is a liquid to air cooling system: water in the door coil absorbs heat from rack exhaust air, so the room stays air-cooled while the door removes most of the heat at the rack. A direct to chip liquid cooling data center moves the bulk of the heat straight into water at the processor, leaving a smaller air load for the room’s CRAHs or fan walls. An immersion liquid cooling data center removes nearly all heat into fluid, and HB 1038’s definition of a data center expressly includes digital currency mining, a use where immersion tanks are common. A cold plate liquid cooling data center, single-phase or two-phase, is the arrangement most new high-density halls specify, and Paul Industries builds the facility side for any of them. The data center immersion cooling page covers tank systems in more depth.
Liquid to liquid cooling systems and the coolant distribution unit
Liquid to liquid cooling systems separate the rack loop from the facility loop with a coolant distribution unit, which holds a plate exchanger, pumps, filters, an expansion tank and the controls that keep rack supply temperature steady. The CDU is the boundary between two water qualities and two pressure regimes, so its placement and isolation decide how the hall can be maintained.
A data center liquid cooling system in South Dakota usually places in-row or end-of-row CDUs on the white space floor, or larger CDUs in a mechanical gallery with secondary piping to row manifolds. Paul Industries runs the facility water headers in welded carbon steel or stainless to ASME B31.9 or B31.3 as the project specifies, runs the technology loop in stainless or approved polymer with filtration to the server vendor’s micron rating, and installs isolation valves so any CDU can be serviced while its neighbors carry the row. Pressure tests, flushing and coolant sampling are recorded loop by loop, and those records go to the commissioning team covered on the data center commissioning in South Dakota page.
Water reporting for a closed loop liquid cooling data center under SB 135
A closed loop liquid cooling data center in South Dakota with a peak demand of 10 megawatts or more still falls under SB 135’s water sections, even though its loops consume very little water after the first fill. The operator gives each water provider notice of projected consumption before the hall starts operating, the Board of Water Management issues its statement once the providers agree, and semi-annual reports of average water use follow and become public.
For a liquid-cooled hall on dry coolers, the projection is mainly the initial fill, periodic top-ups, coolant replacement and any domestic use, which makes the notice short and the reports uneventful. Paul Industries meters the makeup to each closed loop so the reported figure comes from a meter rather than an estimate, and logs every coolant drain and refill. Where a hybrid plant adds evaporative assistance for hot afternoons, the meters separate that seasonal use so the semi-annual report shows exactly when and why water was consumed.
Putting server heat to work through a South Dakota heating season
Server heat captured by liquid cooling is warm enough to heat buildings, and South Dakota has a long heating season to use it: Sioux Falls averages about 7,249 heating degree days a year and Aberdeen about 8,222. Return water from a W40 or W45 loop leaves the racks well above the temperatures a low-temperature hot water heating system or a snow-melt slab needs.
A heat recovery design takes facility return water through a plate exchanger to the heating loop of offices, a warehouse, a greenhouse or a neighboring building, and returns cooler water to the CDUs, cutting the load on the dry coolers in exactly the months they need it least. The economics depend on having a steady heat customer close to the hall and on the heating system’s supply temperature. Paul Industries models the recoverable heat month by month from the IT load profile, so the owner sees what a heat reuse loop delivers before deciding to build it.
Liquid cooling data center design inside an operating South Dakota hall
Liquid cooling data center design inside an operating hall starts with a survey of floor loading, ceiling space, existing chilled water capacity and the redundancy the room already has, because the new loops must be built without disturbing live racks. Many enterprise rooms and colocation suites were built for air-cooled loads and run chilled water in the mid 40s Fahrenheit, which is cooler than most cold plate systems need.
The first step is often a CDU fed from the existing chilled water through a mixing arrangement, giving the new racks warm supply while the old plant keeps running. The second step adds a dedicated dry cooler loop at a warmer temperature once enough racks justify it, which frees the chillers for the remaining air-cooled load. Paul Industries prefabricates manifold spools and CDU connection kits off site, pressure tests them, then installs during agreed windows with hot work kept away from the white space wherever mechanical joints are approved. Owners planning the wider campus around those loops will find the yard and piping main sequence on the data center mechanical contractor in South Dakota page.
Leak detection, maintenance and records
Leak detection on a South Dakota liquid cooling loop uses rope or spot sensors under manifolds and CDUs, pressure and flow monitoring in the CDU controls, and automatic isolation valves that close a branch when a leak is confirmed. Quick disconnects at the rack are the joints that see the most handling, so they are inspected at every server change.
Owners often ask how often does liquid cooling need maintenance, and the answer depends on the loop. Technology loops typically get monthly checks of pressure, flow and filter differential, quarterly coolant samples for inhibitor, glycol strength, pH and bacteria, and filter changes as the differential rises. Facility loops add glycol strength checks before each winter, dry cooler coil cleaning in spring and fall, and valve exercising. Paul Industries runs that schedule under a service agreement and keeps the sample history, so a trend in copper or bacteria shows up long before a cold plate does.
How much does liquid cooling cost in a South Dakota hall?
How much liquid cooling costs in a South Dakota hall depends on the number of racks and their heat load, the CDU arrangement, the facility water class, the heat rejection plant, freeze protection, and whether the work is a new build or a retrofit in an occupied room. A warmer water class lowers operating cost but can raise first cost if it needs more dry cooler surface, while a retrofit adds phasing, temporary isolation and night work.
Operating savings come from pumps replacing fans and from dry coolers replacing compressor hours. At South Dakota’s 2025 average commercial electricity price of 10.61 cents per kilowatt-hour, every 200 kilowatts of fan and compressor power removed continuously is about $186,000 a year. Paul Industries prepares an early budget from comparable loops once the rack count and density are known, then a firm price after a site survey, and offers supply-only CDUs and manifolds, design-build or complete installation.
Who installs data center liquid cooling in South Dakota?
Paul Industries installs data center liquid cooling in South Dakota: coolant distribution units, row manifolds, rear door connections, immersion tank piping, facility water headers, dry coolers, glycol and plate exchanger systems, leak detection and the controls that tie them together. Liquid cooling for data centers in Sioux Falls, Rapid City, Brookings and Aberdeen is designed around the same two questions, water class and freeze protection, and built to the server vendor’s water quality limits.
Buyers comparing data center liquid cooling companies for a South Dakota project should look for one contract that covers the facility loop, the technology loop, flushing, filling and documentation, because most problems arise at the boundary between them. Paul Industries carries both sides under one schedule and one set of records.
Published lists of liquid cooling data center companies tend to mix equipment makers, coolant suppliers and installers, which makes it hard to see who answers for the finished loop. Paul Industries answers for it end to end: the dry coolers and pumps outside, the headers through the building, the CDUs, the manifolds at the rack and the water inside them. That single line of accountability matters most at three moments: the first fill, the first winter and the first time a server vendor asks for a coolant sample history to support a warranty claim.
Schedules in South Dakota have one more variable than in milder states. Outdoor work on dry cooler yards and roof headers is easiest from May to October, while indoor manifold and CDU work continues through the winter. Paul Industries sequences the outdoor scope into the warm months and keeps prefabricated indoor work moving through the cold ones, so a hall ordered in autumn can still reach its first liquid-cooled rows early the following year without pouring concrete or filling outdoor coils in January.
Liquid cooling from Paul Industries across South Dakota
Paul Industries delivers data center liquid cooling in Sioux Falls and across South Dakota as supply-only skids and manifolds, design-build packages or complete installations, followed by coolant monitoring and service. From its Kilmarnock, Virginia headquarters at 256 Shore Drive, home base for its data center liquid cooling in Virginia retrofits, Paul Industries takes projects across South Dakota, in all 50 states and abroad. Lessons from data center liquid cooling in Illinois on winter fills and live-hall phasing apply directly here.
The facility plant that serves these loops is described on the data center cooling in South Dakota page, closed facility loops on the closed loop cooling systems page, and the state’s wider plant work on the South Dakota and Midwest pages. Send rack counts, heat loads and the server vendor’s water requirements, or request a quote for a liquid cooling scope.
Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments, liquid cooling classes · South Dakota SB 135 (2026) · South Dakota HB 1038 (2026) · SDCL 11-10-5, 2024 International Building Code · ASME B31.9 · ASME B31.3
Frequently asked questions
Who builds data center liquid cooling in Sioux Falls and the I-29 corridor?
Paul Industries builds data center liquid cooling in Sioux Falls, Brookings and along the I-29 corridor: CDUs, manifolds, facility water headers and dry cooler plants. Halls there face humid Julys and hard municipal water, so designs pair warm-water loops with treated fill and a trim plant for heat waves. Send the rack count and heat load, and Paul Industries scopes the loops.
Does Paul Industries handle liquid cooling in Rapid City and western South Dakota?
Paul Industries handles liquid cooling in Rapid City and across western South Dakota. The dry western air makes adiabatic assistance on dry coolers very effective for the hottest afternoons, which lets a W32 facility loop run with little or no chiller capacity. Plants there are still protected for subzero nights, with glycol or an intermediate exchanger on every outdoor coil.
Who installs liquid-cooled racks in Aberdeen, Watertown and Huron?
Paul Industries installs liquid-cooled racks and the loops behind them in Aberdeen, Watertown, Huron and the northeast corner of the state. With close to 40 subzero nights in a typical Aberdeen year, facility loops there are designed first for freeze protection and overcooling control, then for capacity. Technology loops stay indoors on treated water within the server vendor’s limits.
What does a data center liquid cooling system need from a South Dakota building?
The building must provide structural capacity for heavier racks and CDUs, space for facility water headers and manifolds, a heat rejection plant sized for the chosen water class, freeze protection for every outdoor component, power for pumps on redundant feeds, and a source of treated fill water. Paul Industries surveys the building against each item before the design is fixed.
Can a direct to chip liquid cooling data center run without chillers in South Dakota?
At a facility supply of 40 degrees Celsius, dry coolers can hold the loop through every normal hour of the year at the four stations studied, and at 32 degrees Celsius through all but a few hundred hours. Hot spells above the normals still need a plan, which can be extra coil area, evaporative assistance or a small trim chiller. Paul Industries sizes that reserve to the site’s hot tail.
How often does liquid cooling leak, and how is a leak contained?
Well-built loops leak rarely, and most leaks start at quick disconnects, hoses or threaded fittings disturbed during maintenance. Containment relies on sensors under manifolds and CDUs, pressure and flow alarms, drip trays, and automatic valves that isolate a branch. Paul Industries pressure tests every joint before filling, labels isolation points, and trains staff on the response sequence at turnover.
Can tap water from Sioux Falls fill a cold plate loop?
Sioux Falls water met every health-based drinking water standard in 2025 but is unsuited to a cold plate loop: the city reported 250 parts per million of hardness from its own plant and 168 from Lewis and Clark in 2025, plus sulfate near 200 and a chlorine residual. Those minerals scale fine channels and the residual attacks copper. Paul Industries fills loops with deionized water and the approved inhibitor or glycol concentrate.
What glycol strength should a South Dakota facility loop use?
Glycol strength is chosen for the coldest air the outdoor coils will meet, with burst and slush protection compared against the site’s record lows rather than the averages. Northeastern sites such as Aberdeen need stronger protection than milder western sites. Higher concentrations cost heat transfer and pump energy, which is why many owners put an exchanger between outdoor glycol and indoor water. Paul Industries sets the strength per site.
What liquid cooling data center design suits a hall that also needs building heat?
A design with a W40 or W45 facility loop and a plate exchanger to the building heating system suits a hall with an adjacent heat customer, because return water leaves the racks warm enough for low-temperature heating and snow melt. With about 7,249 heating degree days a year in Sioux Falls, the heat has a long season of use. Paul Industries models recoverable heat from the IT load profile.
Does a liquid-cooled hall in South Dakota need to report its water use?
Under SB 135, any hall whose peak demand reaches 10 megawatts notifies its water providers of projected consumption before it opens and files semi-annual water use reports with the Board of Water Management, whatever its cooling method. A closed liquid loop on dry coolers keeps those figures small. Paul Industries installs makeup meters on each loop so the reported numbers are measured.
How should a buyer compare data center liquid cooling companies for a South Dakota project?
Compare who carries the facility loop, the CDUs and the technology loop under one contract, how flushing, filling and coolant sampling are documented, how freeze protection is designed, and what service follows turnover. Ask for the water class assumption behind each energy figure. Paul Industries prices the whole path from dry cooler to cold plate and keeps one set of records.
Are rear door heat exchangers a good first step for a Sioux Falls server room?
Rear doors suit rooms that already have chilled water and need more capacity per rack without rebuilding the room. Each door adds a coil at the rack exhaust, fed by water from a CDU or a tempered branch of the chilled water system. In South Dakota the long winter lets that water come from an economizer for much of the year. Paul Industries pipes, tests and balances the doors.
What does HB 1038 mean for a liquid-cooled mining or compute facility?
HB 1038 lets the Public Utilities Commission charge a data center with a peak demand of 10 megawatts or more the actual cost of reviewing its electric service agreement, and its definition of a data center expressly includes digital currency mining. Immersion-cooled mining halls of that size are therefore treated like other large data centers for that review. Paul Industries provides the cooling load data that review uses.
Can liquid cooling be added to a South Dakota hall without shutting it down?
Liquid cooling is added to operating halls regularly. The work is staged: hot taps or valved tie-ins on chilled water, prefabricated manifold spools set during agreed windows, and new CDUs commissioned before any rack is moved onto them. Paul Industries writes a method of procedure for each step and keeps existing redundancy intact until the new loop is proven.
Which filters does a South Dakota technology cooling loop need?
The server vendor sets the filtration rating, often in the range of tens of microns or finer for microchannel cold plates. Loops get a fine filter at the CDU, temporary strainers during flushing, and differential pressure monitoring so filters change on condition. Paul Industries removes flushing strainers before turnover and records the final filter state in the handover file.
Does Paul Industries supply CDUs and manifolds without installing them in South Dakota?
Paul Industries supplies coolant distribution units, row manifolds, prefabricated spools and dry coolers for South Dakota projects on a supply-only basis, with drawings, pressure test records and fill procedures. Owners can also choose design-build or complete installation. Every route meets the same documentation standard.
What should a South Dakota operator send to price liquid cooling?
Send rack counts and heat loads, the server vendor’s coolant and water quality requirements, the facility water class, existing plant drawings, the site location and the target date. Paul Industries returns an early budget and then a firm price after a survey. Call 201-450-8280 or request a quote to start.
Bringing liquid-cooled racks into a South Dakota hall?
Send rack loads, the server vendor’s water class and coolant limits, and drawings of the existing plant. Call 201-450-8280 or request a quote.