Paul Industries designs, supplies, installs and services data center cooling in Florida: chilled water plants, cooling towers, dry coolers, pumps, piping and white-space cooling for colocation, enterprise and hyperscale halls from Miami-Dade and Broward to Tampa Bay, Orlando, Jacksonville and the Panhandle. Florida asks three things of a cooling plant that most states do not ask together: it must reject heat in a hot, humid climate with almost no free cooling in the south, its outdoor equipment must hold against hurricane wind and flood, and its water and power now come under a 2026 state law written for large data centers. Paul Industries builds plants that answer all three, as supply-only packages, design-build contracts or complete installations.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Economizer rule Not required in Climate Zone 1A, which covers Miami-Dade, Broward and Palm Beach (FBC Energy, C403.3)
HVHZ wind, Miami-Dade 175 mph Risk Category II, 195 mph Risk Category IV (FBC 1620.2)
Large-load law SB 484: loads of 50 MW or more, tariffs filed by October 1, 2026
Industrial power 8.50 cents/kWh, against a US average of 8.13 (EIA, 2024)
Reviewed November 2026

Data center cooling in Florida: climate, wind code and water rules

Data center cooling in Florida is shaped by a climate in which the coldest month in Miami still averages a 61 degree Fahrenheit low, by a building code that sets some of the country’s highest design wind speeds in Miami-Dade and Broward, and by water and power rules that the Legislature rewrote for data centers in 2026. Every Florida cooling plant decision, from chiller type to where the equipment sits on the site, traces back to one of those three conditions.

The national picture of cooling methods, components and design sequence is on the data center cooling systems page. This page covers what changes when the hall is in Florida: the weather the plant must reject heat into, the wind and flood loads its equipment must carry, the permits its towers need, and the utility contracts that now govern a large campus. Owners comparing states will find the headquarters-state view on the Virginia data center cooling page and the Piedmont view on the North Carolina page.

Where are the data centers? Florida metros and the load each one puts on cooling

Florida’s data center capacity is concentrated in four metros, Miami and the rest of South Florida, Jacksonville, Tampa Bay and Orlando, with smaller enterprise, university, hospital and government rooms in Gainesville, Tallahassee, the Space Coast and the Panhandle. Among data centers, Florida’s best-known building is the NAP of the Americas in downtown Miami, which Equinix operates as MI1 and describes as designed to withstand Category 5 hurricane winds, standing about 32 feet above sea level and serving as a main interconnection point for networks between the United States and Latin America.

How many data centers are in Florida depends on who is counting. A tracker that lists only large and hyperscale campuses showed 29 data centers statewide in November 2026, operating, under construction and planned, while colocation directories list three dozen facilities in the Miami market alone. For the cooling designer the count matters less than the mix: South Florida is dominated by multi-tenant colocation in older, dense urban buildings, while new large campuses look at land and power in Central and North Florida.

Cooling a data center: Miami, Fort Lauderdale and Palm Beach

A data center in Miami, Fort Lauderdale or West Palm Beach runs its cooling in Climate Zone 1A, where July normals in Miami are a 91 degree high and a 78 degree low and the coolest month still averages 76 degrees by day. Data centers in South Florida also sit in or beside the High-Velocity Hurricane Zone, which covers Miami-Dade and Broward and sets the toughest wind design values in the state. Many South Florida rooms are colocation suites inside multistory buildings, so cooling upgrades are planned around shared risers, roof space the landlord controls and tenants who expect the room to stay cool throughout the work. A colocation data center Miami tenants share often has chillers on a roof that has been reinforced more than once, and new equipment there starts with a structural check of the existing dunnage.

Cooling a data center: Jacksonville, FL and Northeast Florida

For a data center, Jacksonville offers the most heating-season relief anywhere on the Florida peninsula, with January normals of 66 degrees by day and 47 at night, so a waterside economizer earns real hours there from December through February. A data center in Jacksonville is also outside the High-Velocity Hurricane Zone, which lowers the design wind speed for rooftop and yard equipment compared with Miami-Dade, although the coast still brings salt air and storm surge risk to sites near the St. Johns River and the ocean. Northeast Florida’s municipal utility, JEA, and Florida Power & Light both serve the region, and the utility sets the terms for a large new load.

Florida data center markets and what each one asks of the cooling plant
MarketEnergy code zone and July normalsMain electric utilitiesCooling plant emphasis
Miami-Dade and BrowardZone 1A; Miami 91 F high, 78 F lowFlorida Power & LightHVHZ wind design, rooftop structural checks, coil corrosion protection, no economizer hours
Palm BeachZone 1A; similar to BrowardFlorida Power & LightWind design just outside the HVHZ, humidity control, coastal corrosion
Tampa BayZone 2A; Tampa 91 F high, 77 F lowTampa Electric, Duke Energy FloridaStorm surge mapping near the bay, tower water strategy, large-load contracts
Orlando and Central FloridaZone 2A; Orlando 92 F high, 75 F lowOUC, Duke Energy Florida, Florida Power & LightInland campuses with room for yards, economizer exceptions, dense racks
Jacksonville and Northeast FloridaZone 2A; Jacksonville 92 F high, 76 F lowJEA, Florida Power & LightWinter economizer hours, river and coastal flood zones
Tallahassee, Pensacola and the PanhandleZone 2A; Pensacola 90 F high, 75 F low, 42 F January lowFlorida Power & Light, City of TallahasseeFreeze protection for idle outdoor piping, Gulf storm exposure

Data centers in Florida Panhandle towns such as Pensacola and Tallahassee see January normal lows near 42 degrees, so freeze protection for outdoor piping and idle dry coolers belongs in the design there, which is rarely a concern south of Orlando. Tampa Bay and Orlando projects are covered in more depth on the data center commissioning in Florida and Florida liquid cooling pages.

Why does humidity drive the size of a Florida cooling plant?

Humidity drives the size of a Florida cooling plant because the outdoor wet bulb temperature, which sets how cold a cooling tower can make condenser water, stays high from May into October across the peninsula, and because any outdoor air brought into the building carries moisture that the cooling coils must remove. In Miami the July normal low of 78 degrees means the plant sees little relief at night, so the chillers carry nearly full lift around the clock for half the year.

Three data center cooling requirements follow from that climate. First, chilled water supply temperatures are set as warm as the white space allows, because every degree of warmer supply lowers compressor lift, but the coils still have to hold the room’s dew point within the IT equipment’s allowable range. Second, cooling towers are selected for the high design wet bulb and a realistic approach, with fill and fan capacity sized so the plant holds capacity on the worst humid afternoon rather than the average one. Third, outdoor air for the building is dried at a dedicated unit before it reaches the white space, so the computer room air handlers handle sensible heat and are spared a latent load that would force them to run colder coils than the servers need.

Where IT tenants accept the wider temperature ranges in the ASHRAE thermal guidelines, a Florida plant gains more from raising chilled water temperature than a northern plant does, because the hours that would otherwise be met by an economizer barely exist. That is why Florida cooling designs put their efficiency effort into chiller selection, variable speed pumping and tower performance, and why data center chillers with strong part-load efficiency at high condenser temperatures earn their price there.

Does the Florida energy code require an economizer in a data center?

The Florida Building Code, Energy Conservation, 8th edition (2023), requires an air or water economizer on each cooling system under Section C403.3, but it exempts cooling systems in buildings located in Climate Zones 1A and 1B, and Miami-Dade, Broward, Monroe and Palm Beach counties fall in Zone 1A along with several other south Florida counties under the Florida code. North of that line, in Zone 2A, the economizer rule applies unless one of the listed exceptions fits.

For computer rooms, the Florida code relaxes the water economizer capacity test. A general water economizer must carry 100 percent of the expected cooling load at 50 degrees dry bulb and 45 degrees wet bulb, but a system primarily serving computer rooms qualifies if an evaporative water economizer meets the full load at 40 degrees dry bulb and 35 degrees wet bulb, or if a dry cooler water economizer meets the full load at 35 degrees dry bulb. Those test points are cold for Florida, yet they are design checks rather than operating promises, and a plate heat exchanger sized for them still runs at partial capacity on the many winter nights in Jacksonville, Tallahassee and Pensacola when the air drops into the 40s.

The 9th edition (2026) Florida Building Code, based on the 2024 International Codes, takes effect on December 31, 2026, and the edition in force when the permit application is filed governs the project. A campus whose later phases are permitted after that date should expect its plant to be checked against the newer energy provisions, so Paul Industries designs early phases with the piping connections and plant space a later economizer or heat recovery addition would need.

Hurricane wind loads on chillers, towers and dry coolers

Hurricane wind loads on chillers, towers and dry coolers are set by the Florida Building Code: Section 301.15 of the mechanical code requires equipment, appliances and supports exposed to wind to resist the wind pressures in the building code, and in the High-Velocity Hurricane Zone Section 1620 sets the design wind speed by county and risk category and sends rooftop equipment to Chapter 29 of ASCE 7. The structural design assigns the risk category; the mechanical scope then has to deliver anchorage, curbs and supports that carry the resulting loads.

High-Velocity Hurricane Zone design wind speeds, 3-second gust (FBC Building 1620.2)
Risk categoryMiami-Dade CountyBroward CountyTypical data center relevance
I165 mph156 mphLow-hazard sheds and ancillary structures
II175 mph170 mphOrdinary buildings, including many colocation facilities
III186 mph180 mphBuildings whose failure poses substantial risk, as designated by the design team
IV195 mph185 mphEssential facilities and buildings an owner designates for post-storm operation

Every building in the HVHZ is designed for Exposure Category C unless Exposure D applies, so a waterfront site in Miami Beach or Fort Lauderdale can see higher pressures still. Rooftop air-cooled chillers, dry coolers and cooling towers present large surfaces to the wind, and their weight is often low compared with the uplift and overturning forces. The anchorage path runs from the equipment rails through the curb or dunnage into the roof structure, and each link needs a calculation; manufacturers publish tested anchorage for many units, and Paul Industries installs to those details or to engineered supports where the published ones fall short of the site’s pressure.

Openings matter as much as the equipment. In Miami-Dade, louvers that protect air intake openings are evaluated by the county’s product control section, with wind-driven rain testing under TAS 100(A) or AMCA 550 and structural testing under TAS 202, and impact testing under TAS 201 or AMCA 540 and TAS 203 where the room behind is not designed as open. Generator rooms and mechanical galleries with large intake louvers need approved products, and the louver free area that results has to be checked against the airflow the cooling equipment inside requires.

Flood is the second load. Section 301.16 of the mechanical code requires mechanical systems and equipment in flood hazard areas to sit at or above the elevation Section 1612 sets, or to be designed to keep water out and to resist hydrostatic and hydrodynamic loads, including buoyancy. On a Florida site that usually means chillers, pumps, switchgear for the mechanical plant and the controls panel all go above the design flood elevation, with yard equipment on raised slabs or structural platforms.

Water for cooling towers: permits, reclaimed water and the Florida data center law

Water for Florida cooling towers comes under the state’s five water management districts, which issue consumptive use permits under Chapter 373, Florida Statutes, and under SB 484, the Florida data center law signed in May 2026, which created distinct consumptive use permit requirements for large-scale data centers. The thresholds for an individual permit differ by district: the St. Johns River district, for example, requires a permit where average annual daily withdrawal exceeds 100,000 gallons, and the Southwest Florida district sets its individual permit tiers at 100,000 and 500,000 gallons a day.

The 2026 law adds three points that a cooling design has to respect. Large-scale data centers now apply under their own permit process, a modification to such a permit is treated as a new application, and the districts or the Department of Environmental Protection may require a portion of the water to be reclaimed water as a condition of approval. A tower plant planned for later expansion should therefore be designed and permitted for its full build-out, because adding cells later may reopen the permit.

Florida has more reclaimed water infrastructure than most states, and towers run well on it with the right treatment. Reclaimed water brings higher nutrients, phosphate and dissolved solids, so cycles of concentration, biocide program, side-stream filtration and metallurgy are chosen for it, and a backup potable or well connection is kept for the days when reclaimed supply drops. The trade-off between towers and water-free heat rejection is set out on the data center cooling towers page; in Florida it tilts toward towers more than in cooler states, because air-cooled and dry-cooler plants lose so much efficiency in the long humid summer.

FPL, Duke Energy Florida, TECO and the large-load rules

Florida’s large electric utilities, Florida Power & Light, Duke Energy Florida and Tampa Electric, now serve big data centers under tariffs that SB 484 requires for customers with an anticipated monthly peak load of 50 megawatts or more, with each utility filing its tariff for Public Service Commission approval by October 1, 2026. Municipal utilities such as JEA in Jacksonville and OUC in Orlando set their own terms for large loads in their territories.

FPL told regulators in October 2026 that its rate structure approved in November 2025 already complies, and described what data center applicants agree to: funding an engineering study, funding all of the new generation the project needs, building and operating their own substation, paying up front for new facilities, a minimum bill on the capacity they reserve, and a 20-year minimum contract with an exit fee. Duke Energy Florida filed its own large-load tariff for review.

A minimum bill on reserved capacity turns cooling efficiency into a contract question. Every kilowatt the mechanical plant draws at peak is a kilowatt reserved and paid for whether the IT load arrives or not, so peak mechanical power, not only annual energy, belongs in the plant comparison. Variable speed chillers and pumps, a warmer chilled water design, and towers sized for a close approach all lower the peak draw that sets the reservation.

Chilled water plant choices for Florida halls

Chilled water plant choices for Florida halls come down to water-cooled chillers with towers, air-cooled chillers, or a dry cooler plant with trim chillers for warm-water liquid loops, and the right answer depends more on water rights, roof structure and rack density than on the energy model alone. The table compares them against Florida conditions.

Heat rejection options for a Florida data center and how the state’s conditions affect each
Plant typeFlorida advantageFlorida drawbackWhere it fits
Water-cooled centrifugal or screw chillers with cooling towersLowest peak power in humid heat; compact chiller roomConsumptive use permit, makeup water supply during storms, tower water treatmentLarge campuses with water rights or reclaimed supply
Air-cooled chillersNo tower water, simpler permitting, roof or yard mountingHigher peak power on 90 degree afternoons; large wind-exposed coils; salt corrosion near the coastColocation suites, edge rooms and sites without water capacity
Air-cooled chillers with integral free-cooling coilsSome winter benefit in North FloridaFew useful hours in Zone 1A; added coil pressure drop year-roundJacksonville, Tallahassee and Panhandle halls
Dry coolers with trim chillersWater-free; suits warm-water liquid cooling loopsLarge footprint; trim chillers carry much of the summerDense racks on direct-to-chip cooling at elevated water temperatures
Adiabatic dry coolersExtends dry cooler capacity with limited water useHumid air limits evaporative gain in summer; pad water qualityHybrid plants that cap water use under a permit

Salt air deserves its own line in any coastal Florida specification. Aluminum fins on air-cooled condensers and dry coolers corrode quickly within a few miles of the ocean or the bay, so coil coatings, coated or copper fin options, stainless fasteners and sealed electrical enclosures are specified at purchase, because retrofitting a coating after delivery is costly and less durable. The same exposure affects cooling tower hardware, where stainless or fiberglass construction outlasts galvanized steel.

Keeping a Florida hall cool through a hurricane and the days after

Keeping a Florida hall cool through a hurricane depends on three things the cooling plant controls: how long the white space holds temperature when chillers restart after a transfer to generator, whether the towers have water if the municipal supply loses pressure, and whether outdoor equipment is still standing and dry when the storm passes. Most of the work happens at design, and the rest is a written storm procedure.

Chilled water storage, either a thermal storage tank or a large-volume loop, carries the cooling load through the minutes a chiller needs to restart after a power transfer, and chillers with rapid-restart controls shorten that gap. Cooling towers lose water quickly by evaporation, so a campus that depends on towers keeps enough stored makeup water on site, often in an aboveground tank, to run through an extended interruption of municipal or reclaimed supply. Pumps and controls for that makeup system go on generator power along with the chillers. The tank fabrication in Florida page covers storage tanks built for these duties.

The storm procedure itself covers which equipment is secured and which keeps running as the storm approaches, how setpoints change to build thermal margin before landfall, how the plant is inspected for debris damage before restart, and who checks tower basins, strainers and coil faces after the wind drops. Paul Industries writes that procedure with the operator as part of the cooling plant turnover.

Adding cooling to an operating Florida data center

Adding cooling to an operating Florida data center means connecting new chillers, pumps and piping to a plant that is carrying live IT load in a climate that leaves little spare capacity in summer, so most tie-ins are scheduled between November and April, when lower wet bulb temperatures give the existing plant more headroom. Each step follows a written method of procedure that confirms redundancy before any valve is closed.

Where a tie-in has to happen in summer, hot taps and line stops let new branches join live headers without draining the loop, and temporary chillers or cooling towers can carry part of the load while a permanent unit is out of service. New piping is pressure tested and flushed before it is opened to the live system, so debris and air stay out of the operating loop. The piping work itself is described on the process piping in Florida page, and the commissioning that proves the new capacity is on the Florida commissioning page linked above.

What does data center cooling in Florida cost?

The cost of data center cooling in Florida is set mainly by the cooling capacity required, the plant type, the wind and flood design the site demands, and the water and power arrangements, with HVHZ anchorage, coated coils and elevated equipment platforms adding cost that a similar plant in Georgia or Virginia would not carry. Running cost matters as much as the build: at the Florida industrial average of 8.50 cents per kilowatt hour (EIA, 2024), a 10 megawatt IT load whose plant runs 0.10 worse on power usage effectiveness spends about $744,600 more a year on electricity, before any minimum bill on reserved capacity.

Cost drivers for a Florida data center cooling plant
DriverWhy it moves the price in FloridaWhat to send for pricing
IT load and redundancySets chiller, tower and pump counts; N+1 or 2N decides spare unitsIT load by phase, redundancy target, rack density
Wind designHVHZ and coastal exposure raise anchorage, curb and support costsSite address, risk category, roof structural data
Flood elevationRaised slabs or platforms for chillers, pumps and controlsFlood zone and design flood elevation
Water source and permitReclaimed water treatment, makeup storage, permit conditionsWater supply, permit status, reclaimed availability
Corrosion protectionCoil coatings and stainless hardware within reach of salt airDistance to the coast or bay
Operating buildingHot taps, temporary cooling and phased tie-ins add labor and rentalExisting plant drawings and outage windows

Who installs data center cooling in Florida?

Paul Industries installs data center cooling in Florida, from chilled water plants and cooling tower yards to pumps, piping, coolant distribution and controls integration, for owners, developers and general contractors on new campuses and operating halls. Owners searching for data center cooling contractors in Florida get one contract that covers design, supply, fabrication of piping assemblies off site, installation, pressure testing, flushing, start-up and service, so the plant is accountable to one schedule and one set of records.

Paul Industries is an East Coast contractor headquartered at 256 Shore Drive, Kilmarnock, Virginia, formerly based in northern New Jersey and then Pennsylvania, and it takes data center work across Florida and in all 50 states. For mechanical scope across the whole building, see data center mechanical contractors in Florida; for chiller service on existing plants, see chiller repair in Florida. Projects that span several states in the region are described on the East Coast page.

What Paul Industries builds for Florida data center cooling

Paul Industries designs Florida cooling plants for the humid climate and the wind and flood loads at the site, supplies chillers, towers, dry coolers, pumps and coolant distribution units, fabricates piping assemblies, installs and anchors the equipment, tests and flushes the loops, starts the plant up and maintains it afterward, with routes from supply-only to complete installation. Send the IT load by phase, the site address and the water and power arrangements, and Paul Industries scopes the plant. Call 201-450-8280 or request a quote on Florida data center cooling.

Standards referenced: Florida Building Code, 8th Edition (2023), Building, Mechanical and Energy Conservation volumes · Florida Building Code, 9th Edition (2026) · FBC Building Section 1620, High-Velocity Hurricane Zones wind loads · FBC Mechanical Sections 301.15 and 301.16 · FBC Energy Conservation Section C403.3, economizers · ASCE 7 Chapter 29 · Miami-Dade TAS 100(A), TAS 201, TAS 202, TAS 203 · AMCA 550 and AMCA 540 · Florida SB 484 (2026), large load customers and data center water use · Chapter 373, Florida Statutes, consumptive use permits · ASHRAE Thermal Guidelines for Data Processing Environments

Frequently asked questions

Who installs cooling for a data center in Miami or elsewhere in Miami-Dade?

Paul Industries installs cooling for a data center in Miami, Doral, Hialeah and the rest of Miami-Dade, from rooftop chillers and dry coolers to chilled water piping and white-space units. Every data center Miami-Dade permits sits in the High-Velocity Hurricane Zone, so anchorage for outdoor equipment is designed for 175 to 195 mph depending on risk category, and intake louvers need county product approval. Send the building address, roof data and IT load to start.

Does Paul Industries build cooling plants for data centers in Fort Lauderdale, Broward and Palm Beach?

Yes. Paul Industries builds and upgrades cooling plants for data centers in Fort Lauderdale, Boca Raton, West Palm Beach and the surrounding counties. Broward is in the High-Velocity Hurricane Zone with design wind speeds of 170 mph for Risk Category II buildings, while Palm Beach sits just outside it, and all three counties fall in energy code Climate Zone 1A, so the plant is designed without economizer hours and with strong humidity control.

Who handles cooling for a data center in Jacksonville and Northeast Florida?

Paul Industries handles cooling for data centers in Jacksonville, Orange Park, St. Augustine and the rest of Northeast Florida, including chillers, towers, dry coolers and the piping between them. Jacksonville winters are cool enough, with January normal lows near 47 degrees, that a waterside economizer earns useful hours, and sites near the St. Johns River are mapped for flood elevation before equipment is placed.

Can Paul Industries cool data centers on the Space Coast, in Tallahassee or in the Pensacola area?

Yes. Paul Industries takes data center cooling work in Melbourne, Palm Bay and Cape Canaveral, in Tallahassee and across the Panhandle from Panama City to Pensacola. Space Coast sites face Atlantic hurricane exposure and salt air, while Panhandle plants add freeze protection for idle outdoor piping, since Pensacola’s January normal low is about 42 degrees and hard freezes occur in some winters.

How many data centers are in Florida?

Counts depend on the tracker. One list of large and hyperscale campuses showed 29 data centers statewide in November 2026, including operating, under construction and planned sites, while colocation directories list about three dozen facilities in the Miami market alone. Miami, Jacksonville, Tampa Bay and Orlando hold most of the capacity, and new large campuses are looking at Central and North Florida, where land and transmission are easier to secure.

Who provides cooling for data centers that span several Florida sites?

Paul Industries provides cooling for operators with halls in more than one Florida metro, under one contract and one set of standards. A common pattern is a Miami colocation suite, a Tampa or Orlando enterprise room and a Jacksonville disaster recovery site, each with different wind design, energy code zone and utility. Paul Industries applies the same piping, testing and documentation practice at every site so operations staff see one format.

Is a waterside economizer worth building in Jacksonville or Tallahassee?

Often, yes. North Florida sits in Climate Zone 2A, where the energy code requires an economizer unless an exception applies, and winter nights in the 40s let a plate heat exchanger carry part of the load. The payback depends on chilled water temperature: a plant running warmer water for the white space gains far more partial economizer hours than one held at traditional temperatures.

Why does Florida's dew point matter more than its peak temperature for a cooling plant?

Peak dry bulb temperatures in Florida are similar to much of the Southeast, but high dew points last from late spring into autumn and keep night temperatures near 75 to 78 degrees in many cities. That keeps the wet bulb high, which limits how cold cooling towers can make condenser water, and loads coils with moisture from any outdoor air. The plant runs near full lift around the clock instead of resting at night.

What do Florida data center cooling regulations cover?

Florida data center cooling regulations come from several places: the Florida Building Code for wind and flood design of outdoor equipment and for economizer and efficiency rules in the energy volume, the water management districts for tower water permits, the 2026 large-load law for utility tariffs and data center water permits, and the Department of Environmental Protection for storage tanks and generator air permits that support the cooling plant.

What wind speed must rooftop chillers in Miami-Dade be designed for?

Miami-Dade’s design wind speeds, as 3-second gusts, are 165 mph for Risk Category I, 175 for II, 186 for III and 195 for IV under Section 1620.2 of the Florida Building Code, with Exposure C as the default. Rooftop equipment loads follow Chapter 29 of ASCE 7, and the resulting uplift and lateral forces must be carried through the curbs and dunnage into the structure.

Do louvers on a Broward or Miami-Dade data center need approved products?

Louvers protecting air intake openings in Miami-Dade are approved through the county’s product control section after wind-driven rain testing under TAS 100(A) or AMCA 550, structural testing under TAS 202, and impact testing where the room behind is enclosed. Paul Industries selects approved louver products for mechanical and generator rooms and checks their free area against the airflow the equipment needs.

Where should chillers and pumps sit on a Florida site in a flood zone?

Chillers, pumps, controls and the electrical gear feeding them belong at or above the elevation that Section 1612 of the Florida Building Code sets for the site, as the mechanical code’s Section 301.16 requires. Equipment below that level must be designed to keep water out and to resist hydrostatic, hydrodynamic and buoyant forces. Raised slabs, structural platforms or upper-floor plant rooms are the usual answers.

How does the Florida data center law affect the cooling design?

The Florida data center law, SB 484, affects cooling in two ways. Large-scale data centers now apply for water use under a distinct permit process that may require a share of reclaimed water, and a later permit modification is handled as a new application. Utilities must also file large-load tariffs for customers of 50 megawatts or more, which makes the plant’s peak electrical draw part of the power contract.

Can cooling towers in South Florida run on reclaimed water?

Yes, and many South Florida plants do. Reclaimed water carries more phosphate, nutrients and dissolved solids than potable supply, so the treatment program, cycles of concentration, filtration and tower materials are chosen for it from the start. A potable or well backup and stored makeup water keep the towers running when reclaimed supply is interrupted during or after a storm.

How long can a Florida hall ride through a chiller restart after a power transfer?

Ride-through depends on the stored cooling. A chilled water storage tank or a large-volume loop can carry the white space for the minutes a chiller needs to restart after a transfer to generator, and rapid-restart chiller controls shorten the gap. Paul Industries sizes storage from the IT load, the allowable temperature rise and the measured restart time of the selected chillers.

How does salt air near the Florida coast affect air-cooled chillers and dry coolers?

Salt air corrodes aluminum fins, copper tubes and fasteners on air-cooled condensers and dry coolers, cutting capacity as fins thin and fall away. Within a few miles of the ocean or a bay, factory coil coatings, corrosion-resistant fin options, stainless hardware and sealed enclosures are specified at purchase, and coil washing is added to the maintenance schedule.

How does Florida's power price change the payback on a more efficient cooling plant?

At the Florida industrial average of 8.50 cents per kilowatt hour (EIA, 2024), each 1 megawatt of continuous mechanical load costs about $744,600 a year. A plant improvement that saves a tenth of a point of power usage effectiveness on a 10 megawatt hall saves that amount annually, and under a large-load contract it also lowers the capacity reserved and billed.

What information starts a Florida data center cooling estimate?

Send the IT load by phase, the redundancy target, the site address with its flood zone and wind risk category, the water source and permit status, and drawings of any existing plant. With those, Paul Industries prepares a budget range from comparable scope, then a firm price once the design is defined. Call 201-450-8280 or request a quote.

Cooling a data hall anywhere in Florida?

Send the IT load by phase, the site address and flood zone, the water source and any existing plant drawings. Call 201-450-8280 or request a quote.