Paul Industries designs, fabricates, installs and tests process piping in New Hampshire for biologics plants on the Seacoast and in the Upper Valley, compound semiconductor and electronics fabs in Nashua and the Merrimack Valley, medical device and precision manufacturers, food and beverage plants, hospitals and university campuses. Each line is built to the code its fluid calls for, usually ASME B31.3, with ASME BPE for hygienic service and B31.1 for boiler external piping, and handed over with weld logs, examination reports, material certificates and pressure test records. Paul Industries, headquartered at 256 Shore Drive, Kilmarnock, Virginia, offers supply-only spools, design-build packages and complete installation for New Hampshire plants.
Request a quote or call 201-450-8280
Which New Hampshire plants run process piping, and what flows through it?
New Hampshire plants that run process piping fall into five groups: biologics and cell therapy producers, compound semiconductor and electronics fabs, medical device and precision component makers, food and beverage processors, and the steam and chilled water plants of hospitals and universities. The fluids differ sharply between them. A biologics suite moves culture media, buffers, water for injection and clean steam; a gallium arsenide fab moves ultrapure water, high-purity gases and acid waste; a device plant moves clean dry air, nitrogen and rinse water; a food plant moves product, cleaning chemicals and glycol.
The national process piping page covers codes, materials and methods in general. This page works through what is particular to process piping new hampshire owners commission: where the state’s mechanical licensing law draws its plumbing line, how fuel gas fitting is regulated, which building, fire, boiler and air rules surround a piping job, and how pipe is built inside the clean, occupied and validated buildings that make up so much of the state’s industry.
| Plant group and region | Lines in the rack | Material and joining | Governing code |
|---|---|---|---|
| Biologics and cell therapy: Portsmouth and the Pease Tradeport, West Lebanon | Water for injection, clean steam, media, buffers, CIP supply and return, process drains | 316L tubing, orbital welds, electropolished where specified | ASME BPE and B31.3 |
| Compound semiconductor and electronics: Nashua, Merrimack, Hudson | Ultrapure water, nitrogen, specialty gases, acid and solvent waste, process cooling water | PVDF and polypropylene, double-contained waste, electropolished stainless gas lines | B31.3 and the owner’s fab specification |
| Medical device and precision parts: Salem, Londonderry, Manchester, Keene | Clean dry air, nitrogen, rinse water, chilled water, vacuum | Stainless, aluminum and copper, welded or brazed | B31.3 or the plant’s utility standard |
| Food and beverage: Seacoast, Merrimack Valley, Lakes Region | Product, CIP chemicals, hot water, glycol, ammonia, wastewater | Sanitary stainless, carbon steel for refrigeration | 3-A practices, B31.3, B31.5 and IIAR 2 |
| Hospitals and universities: Manchester, Lebanon and Hanover, Durham, Concord | Steam, condensate, heating hot water, chilled water, lab gases | Carbon steel, copper, stainless for lab services | B31.1, B31.9 and B31.3 by service |
Gallium arsenide and electronics fabrication in Nashua
Nashua holds the state’s clearest example of semiconductor manufacturing. BAE Systems runs its Microelectronics Center there, a six-inch gallium arsenide foundry that designs and makes microelectronics for defense and aerospace programs, and the company describes a $35 million federal grant to modernize the facility and raise its wafer output 300 percent. BAE reports about 3,700 employees in Nashua across two campuses. Plants of that kind are named here to describe the market. A compound semiconductor fab depends on ultrapure water in PVDF or high-purity polypropylene, inert and specialty gases in electropolished stainless tube with orbital welds and helium leak checks, and double-contained acid and solvent waste lines with leak detection in the annulus. Expansion work in an operating fab is built in segments behind isolation valves so the existing tools keep running. The water side of that work sits on the ultrapure water systems in New Hampshire page.
Biologics on the Seacoast and in the Upper Valley
Portsmouth and West Lebanon anchor the state’s biologics manufacturing. Lonza lists its Portsmouth site among its mammalian clinical-to-commercial plants, and Lonza and Vertex have announced a dedicated facility of about 12,000 square meters in Portsmouth for Vertex’s donor-derived cell therapies for type 1 diabetes. In West Lebanon, Novo Nordisk runs a 215,000 square foot plant, established in 1989 and acquired in 2014, that produces hemophilia and growth hormone disorder products by mammalian cell culture. Plants like these need hygienic piping that drains completely, holds slope through every support, avoids dead legs and passes borescope inspection of its welds. After installation the stainless surface is cleaned and passivated, covered on the passivation services in New Hampshire page, before the system enters qualification.
What is industrial process piping under New Hampshire law?
Industrial process piping is the pipe, tubing, valves, fittings and supports that carry raw materials, intermediates, products, chemicals and plant utilities between the equipment of a manufacturing process. New Hampshire never names process piping in its licensing statute; it defines plumbing instead, and what falls outside that definition is the starting point. RSA 153:27 XIV defines plumbing as the practice, materials and fixtures used to install, maintain, extend and alter piping, fixtures, plumbing appliances and appurtenances within or adjacent to a structure in connection with sanitary drainage, storm drainage, venting systems and public or private water systems, and it stops the definition at the first fitting beyond the foundation wall or 5 feet of pipe from the building.
A buffer transfer line, a solvent header, an ultrapure water loop or a compressed nitrogen main serves the process, not the building’s drainage, venting or water supply, so it is designed, built and tested to the code the owner assigns, almost always ASME B31.3. The domestic water service that feeds the plant, the backflow assembly that protects it, and the sanitary drain that leaves it are plumbing, and they stay under the plumbing code and the board’s rules.
Plumbing or process pipe: when the NH plumbing license applies
The NH plumbing license applies to work that meets the RSA 153:27 definition: the potable water distribution, sanitary and storm drainage, and venting inside or next to a building. The Mechanical Licensing Board, a unit of the Office of Professional Licensure and Certification created by RSA 153:27-a, sets the license standards and rules for that work, and the 2024 International Plumbing Code, part of the State Building Code under RSA 155-A, sets the technical requirements. Plumbing permits and inspections follow the municipality’s building department where one exists.
Two statutory exceptions matter on plant projects. RSA 153:36 VII says the plumbing license requirements do not apply to plumbing done in connection with installing heating, cooling, air conditioning or domestic water heating systems, or water treatment systems, while still requiring that work to meet the technical standards and the code, application and inspection requirements. RSA 153:36 II exempts work on gas utility facilities regulated under 49 CFR Part 192 and the Public Utilities Commission’s rules. Everything else that touches potable water or drainage is plumbing in the statutory sense.
On drawings, Paul Industries marks the break points explicitly: the outlet of the backflow assembly where a process water line begins, the indirect waste receptor where a process drain ends, the point where a water treatment system hands treated water to a purified water generator, and the outlet of a gas meter where fuel gas fitting begins. Each segment then carries the code, permit and inspection record that belongs to it.
| Line | Classification under RSA 153 | Technical code | Inspection and record |
|---|---|---|---|
| Domestic water service and backflow assembly feeding a skid | Plumbing | 2024 IPC as adopted | Plumbing permit and inspection; backflow test record |
| Purified water or WFI loop downstream of the generator | Process piping, outside the plumbing definition | ASME BPE and B31.3 | Weld log, borescope record, pressure test, qualification protocols |
| Pretreatment softener and filter train ahead of the generator | Water treatment system, RSA 153:27 XVI | Manufacturer data and the plumbing code where it connects | Technical standards and inspection requirements of RSA 153:36 VII |
| Process drains to an indirect waste receptor | Process piping up to the receptor; plumbing beyond it | B31.3 or the owner’s drain specification | Receptor and building drain under the plumbing permit |
| Natural gas or propane from the meter to a boiler, oven or dryer burner | Fuel gas fitting, RSA 153:27 IV | NFPA 54 or NFPA 58 through the state fire code | Pressure test and inspection before the appliance is fired |
| Ammonia or halocarbon refrigeration piping | Mechanical system | ASME B31.5 through the 2024 IMC; IIAR 2 for ammonia | Mechanical permit, pressure test, charging record |
| Steam from a power boiler to its stop valves | Boiler external piping | ASME Section I jurisdiction, built to B31.1 | Tied to the boiler’s RSA 157-A certificate inspection |
Fuel gas lines and the NH gas fitter license
Fuel gas fitting in New Hampshire is defined by RSA 153:27 IV as the installation, repair, alteration, service, demolition or removal of the pipes, fittings, appliances and equipment that supply natural gas or propane, from the point of delivery through all gas piping before the combustion zone, including flue venting and the provisions for combustion and ventilation air. The NH gas fitter license comes in several specialties, among them the fuel gas piping installer, whom the statute ties to NFPA 54, the National Fuel Gas Code, as adopted through the state fire code. Under RSA 153:28 the board sets field experience standards for each specialty, 1,000 hours within 60 months for a fuel gas piping installer.
For a plant, that means the gas train on a boiler burner, the supply to a direct-fired makeup air unit, the line to a thermal oxidizer and the propane vaporizer at a rural food plant all sit under the fuel gas rules, with sizing, regulators, vent lines and the pressure test done to NFPA 54 or NFPA 58. Paul Industries packages fuel gas work with the process and utility piping it serves, so the burner, its gas train and the steam or hot water piping it heats are designed, tested and turned over together. Burner and boiler work is covered on the boiler repair in New Hampshire page.
Which codes and state rules surround a New Hampshire piping job?
Codes and state rules around a New Hampshire piping job come from six places: the owner’s piping code, the mechanical licensing statute, the State Building Code, the State Fire Code, the boiler and pressure vessel law, and the Department of Environmental Services air rules. The owner, usually through its engineer of record, assigns each line its code and fluid service category; the state rules decide which permits, inspections and records go with the work.
| Rule | Administered by | What it reaches | Effect on the piping job |
|---|---|---|---|
| RSA 153:27 to 153:36 | Mechanical Licensing Board, Office of Professional Licensure and Certification | Plumbing and fuel gas fitting | Defines where plumbing and gas rules start and stop |
| RSA 155-A, 2024 IBC, IPC and IMC | Municipal building officials; the State Fire Marshal where a town has no enforcement | Buildings, plumbing and mechanical systems | Permits for supports, racks, penetrations, plumbing and refrigeration |
| RSA 153:1, NFPA 1 and NFPA 101, 2024 editions | State Fire Marshal and municipal fire chiefs | Hazardous materials, hot work, fuel gas, egress | Hot work permits, gas code, storage and use of flammable and toxic gases |
| RSA 157-A and Lab 1200 | Department of Labor, boiler and pressure vessel program | Boilers and pressure vessels above the RSA 157-A:6 exemptions | Vessel conformity and certificate before operation |
| Env-A 600 | NHDES Air Resources Division | New and modified emission sources | Temporary permit before construction or installation of the source |
| 29 CFR 1910.119 | OSHA | Processes above threshold quantities of listed chemicals | Management of change and pre-startup safety review |
The 2024 building code and the structure around the pipe
New Hampshire’s State Building Code moved to the 2024 International Building, Plumbing and Mechanical Codes on July 1, 2026, with new permit applications on the 2024 editions from January 1, 2027. Process piping inside an industrial building answers to B31.3 and the owner’s engineering, but supports anchored to existing steel, new pipe racks, roof and wall penetrations, mezzanines and fire-rated assemblies all touch the building code. In older brick mill buildings in Manchester, Nashua and Dover, where many device and technology tenants operate, the load path for a new rack is checked against the existing structure before anything is hung from it.
Vessels on the line: what RSA 157-A covers
New Hampshire’s boiler and pressure vessel law, RSA 157-A, reaches the vessels a piping job often adds: receivers, separators, filter housings, heat exchanger shells and blowdown tanks. RSA 157-A:6 exempts several common categories, including vessels operating at 15 psig or less, water-containing vessels up to 125 psig, tanks of air and liquid kept under pressure by pumps, Group I refrigerant receivers, and small vessels such as those of 6 inches inside diameter or less up to 3,000 psig. A vessel above those limits must conform to the ASME code before it is installed and operated, so its data report and nameplate are checked before tie-in, and the vessel itself is covered on the pressure vessel fabrication in New Hampshire page.
Air permits and new emission points
The Department of Environmental Services issues a temporary permit under Env-A 600 before construction or installation of a new or modified emission source, and that permit is the first step toward a state permit to operate or a Title V permit. Piping rarely emits by itself, but a new process vent, a thermal oxidizer feed, a solvent recovery line or a larger burner changes what a unit releases. Paul Industries sequences fabrication around the permit status the owner confirms, so lines outside the permitted change keep moving while the permit is pending.
New Hampshire pipeline safety and plant piping inspection intervals
New Hampshire pipeline safety for gas utility mains and services runs under 49 CFR Part 192 and the Public Utilities Commission’s rules for gas service, while piping inside the plant fence follows the owner’s inspection program, usually built on API 570. The two answer the question of how often are pipelines inspected in different ways. Part 192 requires a gas distribution operator to leak-survey business districts at intervals not exceeding 15 months and at least once each calendar year, and other areas at least once every five calendar years at intervals not exceeding 63 months.
Plant process piping is inspected on intervals set by consequence and corrosion rate. API 570 sorts lines into classes: Class 1 for services where a leak creates an immediate emergency, such as flammable gases or toxic liquids, with thickness measurement and external visual inspection every five years; Class 2 for most other process lines, with thickness every ten years and visual every five; and Class 3 for flammable but low-hazard services, at ten years for both. Injection points, soil-to-air interfaces and insulated lines where water collects under jacketing get closer attention. Paul Industries replaces sections that inspection condemns, records new baseline thicknesses and updates the line list so the next inspection begins from accurate data.
Building pipe inside clean and occupied New Hampshire plants
Pipe built inside an operating New Hampshire plant is planned around three constraints: cleanliness, continuity of production and the paperwork a regulated product needs. A device cleanroom in Salem, a gallium arsenide fab in Nashua and a cell culture suite at Pease each restrict what enters the room, when hot work happens and how much dust, noise and vibration the space tolerates.
Paul Industries meets those constraints by moving welding, examination and hydrotesting off site. Spools are cut, fitted, welded, examined, tested, cleaned and capped under controlled conditions, labeled to the isometrics and delivered in installation order. Inside the building, the work is limited to setting supports, bolting flanges and making the closing welds, each with purge records, borescope video where the code calls for it and a weld log entry tied to the welder’s identity. Tie-ins to live systems are made in planned windows after isolation, draining and purging under the plant’s lockout procedures, and plants covered by process safety management run the change through management of change before work and a pre-startup safety review before chemicals are introduced. Weld procedures and welder qualification for that work are covered on the industrial welding services in New Hampshire page.
Testing follows B31.3: a hydrostatic test at 1.5 times design pressure is the default, and a pneumatic test at 1.1 times design pressure is used where water would harm the service, as in instrument air, specialty gas or refrigerant lines, under a written plan with exclusion zones and staged holds. High-purity gas lines add helium leak testing and particle and moisture checks against the owner’s acceptance criteria. Hygienic systems go from test to cleaning, passivation and then commissioning and qualification, described on the validation and commissioning in New Hampshire page.
What does process piping in New Hampshire cost?
Process piping in New Hampshire is priced on fluid service, material, pipe or tube size, weld count, examination level, cleanliness class, access and the outage windows production allows, far more than on linear footage. An orbital-welded 316L water for injection loop with borescope inspection of every weld costs several times what a carbon steel compressed air header of the same diameter costs, and a closing weld made inside a gowned cleanroom costs more than the same weld made in a fabrication bay.
Labor rates on public projects follow a different rule from neighboring states. New Hampshire repealed its public works minimum wage law, RSA chapter 280, in 1985, so state-funded piping work carries no state prevailing wage schedule; federally funded construction contracts over $2,000 still carry Davis-Bacon wage determinations. Paul Industries prices from a line list or P&IDs, gives a budget range from comparable scope early, and fixes the price once the specification, tie-in points and work windows are defined.
Who installs process piping in New Hampshire?
Paul Industries installs process piping in New Hampshire, carrying each project from design and material procurement through fabrication, installation, examination, testing and turnover under one contract. The company is headquartered at 256 Shore Drive in Kilmarnock, Virginia, was formerly based in northern New Jersey, then Pennsylvania, and takes plant piping work across New Hampshire, in all 50 states and at plants outside the United States. Owners with plants in more than one state find the same approach on the process piping in Virginia page for the headquarters state, on the process piping in Massachusetts and process piping in Connecticut pages, and across the region on the New England page.
When plant engineers weigh the mechanical contractors New Hampshire projects draw on for regulated piping, the deciding evidence is the record set at the end of the job: as-built isometrics, a line list with fluid service categories, material test reports traced to heat numbers, weld procedure specifications and welder qualifications under ASME Section IX, examination and borescope records, pressure test packages, and the plumbing, fuel gas and vessel paperwork each connection needs. Paul Industries hands that full set over for every line it builds.
Process piping from Paul Industries for New Hampshire plants
Paul Industries designs, fabricates, supplies, installs, tests, starts up, services and repairs process piping in New Hampshire for biologics and cell therapy plants, compound semiconductor and electronics fabs, device and precision manufacturers, food and beverage processors, hospitals and universities, from Portsmouth and the Seacoast to Nashua, Manchester, Concord, Keene, Lebanon and the North Country. More about the state sits on the New Hampshire page. Send a line list or P&IDs, the piping specification and your shutdown windows, call 201-450-8280 or request a quote.
Standards referenced: ASME B31.3 Process Piping · ASME B31.1 Power Piping · ASME B31.5 Refrigeration Piping · ASME BPE Bioprocessing Equipment · ASME Boiler and Pressure Vessel Code Section VIII and Section IX · NFPA 54 National Fuel Gas Code · NFPA 1 Fire Code and NFPA 101 Life Safety Code, 2024 editions · API 570 Piping Inspection Code · 49 CFR Part 192 · OSHA 29 CFR 1910.119 process safety management · RSA 153:27 to 153:36 (New Hampshire mechanical licensing: plumbing and fuel gas fitting) · RSA 155-A (New Hampshire State Building Code: 2024 IBC, IPC, IMC) · RSA 157-A and Lab 1200 (New Hampshire boilers and pressure vessels) · Env-A 600 (NHDES air permits)
Frequently asked questions
Which piping work do Seacoast cell therapy and biologics producers in Portsmouth, Dover and Stratham need?
Paul Industries builds water for injection, clean steam, media, buffer and CIP piping for biologics and cell therapy plants in Portsmouth, at the Pease Tradeport and across the Seacoast, including Dover and Stratham. Tubing is orbital welded in 316L, sloped to drain, inspected by borescope, cleaned and passivated, and turned over with weld maps and test records that line up with the plant’s qualification protocols and change control.
Does Paul Industries take process piping work in Nashua, Merrimack and Hudson electronics plants?
Yes. Paul Industries builds ultrapure water, nitrogen, specialty gas, process cooling water and double-contained acid waste piping for semiconductor, electronics and precision plants in Nashua, Merrimack and Hudson. Gas lines are electropolished stainless with orbital welds and helium leak checks; water and waste lines are PVDF or polypropylene, joined and tested to the owner’s fab specification.
Who handles plant piping in Manchester mill buildings and the Millyard?
Paul Industries designs and installs process and utility piping in Manchester’s converted mill buildings, including the Millyard, for device, biotechnology and technology tenants. Routing, supports and penetrations are planned around brick bearing walls, timber or steel floors and limited shaft space, and branch connections are left valved and capped so the next tenant fit-out ties in without shutting down the main.
Does Paul Industries build piping for plants in Lebanon, Hanover and the Upper Valley?
Paul Industries takes process piping work in Lebanon, West Lebanon, Hanover and the wider Upper Valley, from biologics production piping to hospital and university steam, chilled water and laboratory gas systems. Projects inside occupied hospitals and research buildings are phased around patient care and research schedules, with isolation and restoration of each system written into the plan before work begins.
Process piping vs plumbing: which is a CIP return line in a New Hampshire dairy?
A CIP return line is process piping. It carries cleaning solution between product equipment and the CIP skid, so it falls outside the RSA 153:27 plumbing definition, which covers drainage, venting and water systems. The potable water feeding the CIP tank through its backflow assembly, and the floor drain that receives spent solution through an air gap, are plumbing and stay under the plumbing code and permit.
What are the NH plumbing license requirements for piping inside an industrial plant?
NH plumbing license requirements apply to the work the RSA 153:27 definition covers: potable water, sanitary and storm drainage and venting within or next to the building. The Mechanical Licensing Board sets the license rules for that work. Process lines carrying product, chemicals, gases or purified water fall outside the definition and are built to ASME B31.3 or BPE under the owner’s specification.
Do you need a plumbing license in New Hampshire to install a water treatment system feeding a process?
RSA 153:36 VII says the plumbing license requirements do not apply to plumbing done in connection with installing or servicing water treatment systems, but the same paragraph still requires the work to meet technical standards and every code, application and inspection requirement. Paul Industries installs softeners, filters and reverse osmosis pretreatment to those standards and documents the connection to the potable supply.
Which work on a boiler gas train falls under the NH gas fitter license rules?
Everything from the gas meter outlet or first-stage regulator to the burner’s combustion zone, including the regulators, safety shutoff valves, vent lines, flue venting and combustion air provisions, is fuel gas fitting under RSA 153:27 IV. That work follows NFPA 54, or NFPA 58 for propane, as adopted through the state fire code, and is pressure tested and inspected before the boiler is fired.
What should a plant expect from mechanical contractors NH manufacturers rely on for process piping?
A plant should expect one contract covering design, material procurement, fabrication, installation, examination, testing and turnover, with a single schedule and point of contact. It should also expect sample weld logs, procedure qualifications and test packages before award. Paul Industries works that way on every New Hampshire project, from one replacement spool to a complete utility expansion.
What is a piping contractor responsible for on a New Hampshire biologics or fab project?
A piping contractor is responsible for delivering a pressure-tight, clean system that matches the drawings and the code, and for proving it with records. On a biologics or fab project that means material traceability to heat numbers, qualified procedures and welders, examination and borescope results, pressure and leak tests, cleaning and passivation records, and as-built isometrics the validation group can verify against.
Which mechanical contractors in New Hampshire handle ammonia refrigeration piping?
Paul Industries designs and installs ammonia refrigeration piping for New Hampshire food, beverage and cold storage plants to IIAR 2 and ASME B31.5, which the 2024 International Mechanical Code references for refrigeration piping. Relief headers are routed to a safe discharge, piping and valves are labeled to match the system diagrams, and systems above the federal threshold quantity run through process safety management before charging.
How is a new branch added to a live utility main without shutting a New Hampshire plant down?
A new branch goes onto a live main by hot tapping: a reinforced fitting is welded to the pressurized pipe under a qualified in-service welding procedure, a valve is bolted on, and a tapping machine cuts through the wall behind the closed valve. Paul Industries checks wall thickness, flow and contents first, and uses a planned outage instead where the service makes hot work on the line unsafe.
How does the 2024 State Building Code change piping work starting in 2026?
The State Building Code took up the 2024 International Building, Plumbing and Mechanical Codes on July 1, 2026, with new permit applications on the 2024 editions from January 1, 2027. For piping, the change shows up in plumbing and refrigeration provisions and in the structural and fire-rated work around the pipe. Paul Industries prepares drawings to whichever edition the permit application falls under.
Do state-funded piping projects in New Hampshire pay prevailing wages?
New Hampshire repealed its public works minimum wage law, RSA chapter 280, in 1985, so state-funded piping work has no state prevailing wage schedule. Projects paid for with federal money are a different matter: federally funded construction contracts over $2,000 carry Davis-Bacon wage determinations, which Paul Industries prices into the bid when the documents include them.
How is ultrapure water piping tested before it goes into service at a fab?
Ultrapure water piping is pressure tested, then flushed and rinsed until resistivity, total organic carbon, particles and other parameters meet the owner’s acceptance criteria at the points of use. Components are selected against SEMI F57 where the specification calls for it, and joints are made by the method the owner specifies for the plastic, with each joint logged and identified.
What happens to piping work when a New Hampshire plant needs an NHDES air permit change?
When a piping change is part of a new or modified emission source, such as a new process vent, an oxidizer feed or a larger burner, the NHDES temporary permit under Env-A 600 must be in place before that source is constructed or installed. Paul Industries supplies the equipment and piping data the owner’s permit application needs and sequences related field work to the permit.
Which delivery routes does Paul Industries offer for process piping in New Hampshire?
Paul Industries offers three routes: supply-only fabricated spools and rack modules, examined, tested, cleaned and labeled to the isometrics; design-build packages that start from a process description and end with a tested system; and complete installation from field survey through turnover. Routes are often mixed on one project, for example spools supplied for a fab shutdown and complete installation for a new utility loop.
What should a New Hampshire plant send to get process piping priced?
Send P&IDs or a line list, the piping and cleanliness specifications, fluid service categories, tie-in locations with photos, shutdown windows, cleanroom and hot work rules, and whether federal funds, an air permit change or fuel gas work are involved. Paul Industries returns a budget range from comparable scope first and a firm price once those details are fixed.
Adding process lines at a New Hampshire plant?
Send a line list or P&IDs, the piping specification, tie-in photos and your shutdown windows. Call 201-450-8280 or request a quote.
