Paul Industries delivers pressure vessel fabrication in Wisconsin, designing and building ASME Section VIII vessels for dairies, breweries, paper mills, chemical and food plants, data centers and campuses, and taking each vessel through the registration, inspection and permit steps of chapter SPS 341. The scope runs from the data sheet and calculations through fabrication, examination, hydrostatic testing, delivery, setting and connection. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and builds vessels for Milwaukee, Madison, the Fox Valley and every other part of the state.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Vessel code SPS 341, Department of Safety and Professional Services
National Board Data report registration required, UM vessels exempt (SPS 341.42)
Periodic inspection Every 36 months for vessels SPS 341.18 does not exempt
Brewing exemption Fermented beverage vessels at 140 F or less (SPS 341.45)
Reviewed November 2026

What is considered a pressure vessel in Wisconsin?

A pressure vessel in Wisconsin is any container built to contain pressure, internal or external, whether the pressure comes from an outside source such as a compressor or from heat applied directly or indirectly, under the definition in SPS 341.04. External pressure counts, so a vacuum vessel or a jacketed kettle falls inside the definition just as an air receiver does. The chapter applies at places of employment and in public buildings, which covers practically every plant, hospital, campus and commercial building in the state.

The chapter also reaches vessels that store or transport flammable liquids, liquefied petroleum gas, liquefied and compressed natural gas, anhydrous ammonia and refrigerants, unless another Wisconsin or federal code covers them. Two groups sit elsewhere. Vessels and piping for fuel gases used for heating appliances or engines fall under chapter SPS 340, and pressure vessels inside mechanical refrigeration systems are governed by chapter SPS 345, with only the repair and alteration subchapter of SPS 341 applying to them.

Being a pressure vessel and being inspected are separate questions. SPS 341.18 lists the vessels exempt from periodic inspection by size, pressure and service, and SPS 341.45 lists vessels that need not be built to the ASME code at all. The table below sets out where common plant vessels land.

Where common vessels fall under the Wisconsin pressure vessel code
VesselBuilt toPeriodic inspectionRule
Process reactor, jacketed tank or heat exchanger shell above 15 psigASME Section VIII, National Board registeredEvery 36 monthsSPS 341.17(2), 341.42
Air receiver of 90 gallons or more, or rated 200 psig or moreASME Section VIIIEvery 36 monthsSPS 341.18(1)(L)
Small vessel: 6 in inside diameter or less, or under 1.5 cu ftASME codeExemptSPS 341.18(1)(e), (g)
Vessel under 5 cu ft operating below 250 psigASME codeExemptSPS 341.18(1)(f)
Vacuum or low-pressure vessel at 15 psig or lessASME code where it appliesExemptSPS 341.18(1)(h)
Brewery fermenter or bright tank at 140 F or lessASME code optional; identified and relievedExemptSPS 341.18(1)(m), 341.45(1)(e)
Water softener, filter or conditioning vesselASME code optional; identified and relievedExempt as cold water serviceSPS 341.45(1)(d), 341.18(1)(j)
Ammonia receiver or refrigeration vesselASME Section VIII via SPS 345Through refrigeration system rulesSPS 341.02(1)(b), SPS 345

What does the Wisconsin pressure vessel code require of a new vessel?

The Wisconsin pressure vessel code, SPS 341.42, requires new boilers and pressure vessels to be constructed, installed, operated and maintained to the ASME code, ASME CSD-1 where it applies and the National Board Inspection Code. Vessels designed to other national or international standards can be approved when the department accepts the design or the standard, and the code’s note records that Canadian standard CSA B51 is accepted.

Registration with the National Board is the second requirement. Every boiler and pressure vessel inside the chapter carries a manufacturer’s data report registered with the National Board and a National Board number, and copies go to DSPS on request. Vessels stamped UM and cast iron or cast aluminum boilers stamped H are the exceptions. Vessels for human occupancy, such as hyperbaric chambers, are built to ASME PVHO-1, and compressed gas and cryogenic vessels, including those for gaseous and liquefied hydrogen, must also meet NFPA 55.

Paul Industries designs to Section VIII Division 1 for most Wisconsin process and utility service, and specifies the edition, the National Board registration and any NFPA 55 or PVHO requirement on the data sheet before material is ordered. The national overview of design, materials and stamping sits on the pressure vessel fabrication page; this page covers what Wisconsin adds.

Wisconsin special vessels and noncode equipment

Wisconsin special vessels are boilers or pressure vessels that DSPS allows to be installed without strict compliance with SPS 341.42, under a petition for variance, when ASME construction is impossible or impractical. SPS 341.43 recognizes three routes: a design or construction method the ASME code does not cover, with proof of comparable safety; a vessel built by an owner for its own use; and a small number of vessels built by a manufacturer. In each case complete plans, calculations and specifications go to DSPS in duplicate and are approved before installation, the vessel is stamped Wisconsin Special, and every other applicable ASME requirement still applies.

Noncode vessels are a different group. SPS 341.45 lets water heaters and hot-water storage tanks at 210 F or less, domestic water vessels, water processing vessels at 210 F or less, water conditioning and filtration vessels, and vessels for processing and storing fermented beverages at 140 F or less be built without the ASME code. Those vessels still carry the manufacturer’s name, a serial number, the allowable working pressure and the year built, and they still need pressure relief that meets ASME requirements. For a Milwaukee brewery or a craft brewer in the Driftless, that rule decides how fermenters and bright tanks are specified; Paul Industries builds them either way and records the choice on the data sheet. Brewing systems are covered further on the distilling and brewing page.

How are pressure vessels manufactured, from data sheet to Wisconsin registration number?

Pressure vessels are manufactured in a fixed sequence of design, material control, forming, welding, examination, testing and documentation, and in Wisconsin the sequence ends with an installation inspection and a state registration number. Each step below leaves a record that the inspector or the owner will later ask for.

From order to permit to operate for a new vessel in Wisconsin
StepWhat happensGoverning ruleRecord
1. Data sheet and designPressure, temperature, minimum design metal temperature, corrosion allowance, nozzles and supports fixed; calculations runASME Section VIII Division 1Design calculations and drawings
2. MaterialsPlate, heads, nozzles and forgings received with mill test reports and tracedASME Section IIMaterial traceability log
3. Forming and weldingShells rolled, heads fitted, seams and nozzles welded to qualified proceduresASME Section IXWPS, PQR and welder qualification records
4. Examination and testRadiography or ultrasonic examination as the design requires; hydrostatic or pneumatic test witnessedASME Section V and VIIINDE reports, test record
5. Data reportManufacturer’s data report signed and registeredSPS 341.42(2)National Board number on the nameplate
6. Registration and installation inspectionInstallation registered with DSPS before operation; inspection by a credentialed inspectorSPS 341.41, 341.16Form SBD-6314-E, inspection report within 30 days
7. Permit to operateWisconsin registration number affixed; permit issued and postedSPS 341.36, 341.24Permit showing MAWP and expiration

Every pressure vessel fabrication shop building to Section VIII works under a quality control system accepted by ASME, with an authorized inspector reviewing the design and witnessing key points. Paul Industries plans hold points so the owner’s engineer can attend the hydrostatic test, and assembles the final package with drawings, calculations, material reports, NDE results, the data report and the hydrostatic test record. Testing practice is covered on the hydrostatic testing page.

The installation step is where Wisconsin is specific. Before the vessel first operates, its installer files form SBD-6314-E with DSPS; vessels exempt under SPS 341.18 and installations registered with the City of Milwaukee skip that filing. An inspector credentialed by DSPS inspects the vessel under the NBIC before it goes into service and affixes the Wisconsin registration number where it can be easily seen. When an inspector outside DSPS does that work, the report must reach the department within 30 calendar days of completing the installation, or the department performs the inspection itself.

Wisconsin pressure vessel registration and the permit to operate

Wisconsin pressure vessel registration has two layers: the National Board registration of the manufacturer’s data report, which stays with the vessel from the day it is built, and the Wisconsin registration number assigned by DSPS once the vessel is installed and inspected. The Wisconsin number identifies the vessel in the state’s inspection system for the rest of its life, and the permit to operate issued after each compliant inspection shows the maximum allowable working pressure and the date of the next inspection.

A group of vessels of the same design and use that are interconnected or operated as one unit may be covered by a single inspection report that lists each vessel’s number, description and use. That matters in dairy and food plants with banks of identical receivers, accumulators or filter housings, and in data centers with multiple expansion tanks and air separators. Paul Industries prepares the nameplate schedule so the inspector can match vessels to the report in one visit.

Campus and data center owners often ask which of their vessels the state will visit at all. Expansion tanks on hot-water heating boilers are exempt from periodic inspection under SPS 341.18, as are vessels that store or process cold water, including those with an air cushion, and hot-water storage tanks at 210 F or less. Air and dirt separators, buffer tanks and filter housings on chilled water or condenser water loops therefore often sit outside the inspection cycle, while the same equipment on a steam or high temperature hot water system does not. Paul Industries notes the expected status of each vessel on the schedule, so the owner’s inspection budget matches what the inspector will actually see.

Jacketed and sanitary vessels need one more decision on paper. A jacket on a stainless kettle or a cheese vat is often the single component rated above 15 psig, so the jacket drives the code status of the whole vessel, and its design pressure, relief device and nameplate data are set out separately from the product side. Paul Industries designs the product side for drainability and CIP coverage and the jacket side for the steam or glycol supply it will see, and records both on one data report.

How often does a pressure vessel need to be inspected in Wisconsin?

A pressure vessel in Wisconsin needs a regular internal or external inspection at least once every 36 months by a credentialed inspector, under SPS 341.17, unless SPS 341.18 exempts it. Rupture disks get a visual inspection on the same 36-month cycle, and relief and safety valves need an operating check or a bench test at least once a year. An owner can ask DSPS in writing for an extension of up to six months when operating conditions require it, with the inspector’s written agreement.

A state of Wisconsin pressure vessel inspection follows the NBIC, and the inspector may order changes or repairs that return the vessel to a safe condition. Air receivers have one extra Wisconsin rule: the gage must be easy to see and its dial graduated to about double the safety valve set pressure, and never less than one and a half times it. Vessels in petroleum refinery service follow API 510 instead of the general cycle.

Relief protection on Wisconsin vessels fed from higher-pressure steam

Relief protection on Wisconsin vessels fed through a pressure-reducing station is sized by a state formula in SPS 341.33, which covers vessels such as pressure cookers, indirect water heaters and heating system equipment supplied from boilers at a higher steam pressure. The safety valve on the low-pressure side must handle the larger of two flows: full flow through the reducing valve, calculated from its orifice capacity and the valve’s pipe area, and full flow through the bypass if the bypass is left open. The capacity calculation uses the maximum trim the reducing valve can accept, and the low-side valve capacity need not exceed the boiler’s capacity.

The rule catches retrofit work. A plant that adds a jacketed kettle or a hot water heater to an existing reducing station, or replaces a reducing valve with a larger one, must check that the downstream relief still covers the bypass case. Paul Industries runs that check whenever a new vessel connects to reduced-pressure steam, and sizes the relief device on the same data sheet as the vessel. Boilers feeding those stations are covered on the page for boiler repair in Wisconsin.

Pressure vessels for Wisconsin dairy, brewing, paper, data center and refrigeration service

Wisconsin’s vessel demand follows its industries, and dairy leads: the state makes about a quarter of all US cheese, with output of 3.64 billion pounds in 2025, per DATCP. Cheese and whey plants run pressure vessels on steam, hot water, compressed air and refrigeration, and their evaporators and vacuum pans add external-pressure design. Breweries run fermenters, bright tanks and CO2 receivers, paper mills run steam accumulators, flash tanks and chemical vessels, and new data center campuses such as the one Microsoft introduced in Mount Pleasant in 2025 use expansion tanks, air separators and filtration vessels in their cooling systems.

Vessel types Paul Industries builds for Wisconsin plants, with the code points that shape them
IndustryTypical vesselsCode points in WisconsinDesign notes
Dairy and cheeseHot water sets, steam accumulators, air receivers, evaporator bodies, CIP heatersSection VIII with National Board registration; 36-month inspection above exemption limitsSanitary finish on product contact; vacuum rating for evaporators
Brewing and beverageFermenters, bright tanks, CO2 receivers, hot liquor tanksFermented beverage vessels at 140 F or less noncode and exempt; CO2 receivers inspected above limitsRelief devices and identification still required on noncode vessels
Paper and pulpFlash tanks, steam accumulators, blow tanks, chemical vesselsSection VIII; boiler-side vessels inspected with the boiler plantCorrosion allowance and alloy choice for liquor service
Food and chemicalJacketed reactors, kettles, pressure filtersSection VIII; relief sizing under SPS 341.33 on reduced-pressure steamJacket design for steam and cooling media
Data centers and campusesExpansion tanks, air and dirt separators, filter housingsSection VIII; water service vessels may qualify for exemptionsGroups of identical vessels reported together
Ammonia refrigerationHigh-pressure receivers, recirculators, intercoolersSPS 345 with ASHRAE 15 and IIAR 2; repairs under SPS 341 subchapter VISystem registration before start-up

Refrigeration vessels follow their own path. Chapter SPS 345 adopts ASHRAE 15-2007 and IIAR 2-2008, references ASME Section VIII Division 1 for vessels and ASME B31.5 for piping, and requires systems using Group B2 refrigerants such as ammonia at 10 tons or more to be registered with DSPS on form SBD-34 at least 20 business days before they operate, with a state inspection within 45 business days of completion. Paul Industries builds and installs receivers and recirculators for those systems; see ammonia refrigeration.

Designing for Wisconsin cold and outdoor service

Outdoor vessels in Wisconsin are designed for winter design temperatures that the state energy code sets at minus 10 F in Milwaukee, Racine and Kenosha, minus 15 F in Dane and Brown counties, minus 20 F around Wausau, Eau Claire and La Crosse, and minus 25 F in Douglas, Ashland and Vilas counties. Those numbers feed the minimum design metal temperature on the data sheet, which decides whether carbon steel plate, welds and bolting need impact testing or a tougher material under Section VIII.

Cold also changes testing. Wisconsin’s guidance for hydrostatic tests calls for test water of at least 70 F, with the metal no hotter than 120 F during close examination, so a winter test on an outdoor vessel needs heated water or a sheltered test area. Paul Industries plans tests indoors before delivery wherever the size allows, and includes insulation supports, heat tracing clips and nameplate brackets that stay readable under insulation.

Used, relocated and refinery vessels in Wisconsin

A used vessel moved within Wisconsin or brought in from another state is a secondhand vessel under SPS 341 subchapter VII, and the rules differ by origin. An out-of-state vessel qualifies when some edition of the ASME code governed its construction and stamping, and a copy of its manufacturer’s data report, plus any welded repair or alteration report, goes to DSPS. A pre-ASME vessel originally installed in Wisconsin can be reinstalled only with its maximum allowable working pressure recalculated at a factor of safety of 6.

Every secondhand vessel is inspected and then hydrostatically tested at 1.5 times its MAWP where it will now operate, with a credentialed inspector watching, unless that inspector accepts an alternative method. Reinstalled vessels must meet the ASME code for fittings, valves, connections, settings and supports. Paul Industries evaluates used vessels against those rules before a plant commits to buying one, and rerates or alters them under the NBIC where the numbers support it. Vessels in petroleum refinery service follow API 510 under SPS 341.80.

How much does pressure vessel fabrication in Wisconsin cost?

The cost of pressure vessel fabrication in Wisconsin is set by size, design pressure and temperature, material, wall thickness, the number and size of nozzles, jackets and internals, the level of examination, surface finish for sanitary service and the delivery and setting conditions at the plant. A carbon steel air receiver and a jacketed stainless reactor for the same volume differ several times over in price because of material, finish and welding hours.

Wisconsin adds smaller items: low-temperature impact testing for outdoor vessels, NFPA 55 features for gas and cryogenic service, and inspection and registration time at installation. Paul Industries gives a budget range from comparable vessels once the data sheet is drafted, then a firm price with drawings. Request a quote with the service conditions, volume, nozzle list and site constraints.

Who fabricates pressure vessels in Wisconsin?

Paul Industries fabricates pressure vessels for Wisconsin plants, designing and building ASME Section VIII vessels in carbon steel, stainless steel and alloys, then delivering, setting, piping and starting them up. The range covers air receivers, accumulators, flash and blowdown tanks, jacketed reactors, filter housings, expansion tanks, ammonia receivers and sanitary process vessels, supplied as single vessels or mounted on skids with piping and controls.

Plants comparing pressure vessel fabricators for Wisconsin work should look at the data report and National Board registration, the hold points offered for witness, the quality of the turnover file and the plan for registration and installation inspection under SPS 341. Paul Industries covers those under one contract, along with the piping and welding that tie the vessel into the plant, described on process piping in Wisconsin and industrial welding services in Wisconsin. Atmospheric and storage tanks are covered on tank fabrication in Wisconsin.

Pressure vessels from Paul Industries for Wisconsin plants

Headquartered at 256 Shore Drive in Kilmarnock, Virginia, and formerly based in northern New Jersey, then Pennsylvania, Paul Industries is an East Coast contractor that designs, fabricates, supplies and installs pressure vessels for Wisconsin plants, for owners in all 50 states and for plants outside the United States. The headquarters state’s requirements appear on pressure vessel fabrication in Virginia, a comparison with a Northeast program on pressure vessel fabrication in New York, and the state’s broader industrial picture on the Wisconsin and Midwest pages. Send the service conditions, volume, materials, nozzle schedule, code requirements and delivery date. Call 201-450-8280 or request a quote.

Standards referenced: Wisconsin Administrative Code ch. SPS 341, Boilers and Pressure Vessels · Wisconsin Administrative Code ch. SPS 345, Mechanical Refrigeration · ASME Boiler and Pressure Vessel Code, Section VIII Division 1 · ASME Section IX · National Board Inspection Code (NBIC) · API 510 Pressure Vessel Inspection Code · NFPA 55 Compressed Gases and Cryogenic Fluids Code · ASME PVHO-1 · ANSI/IIAR 2 and ASHRAE 15

Frequently asked questions

Who handles pressure vessel fabrication, Wisconsin dairy and food plants included?

Paul Industries handles pressure vessel fabrication for Wisconsin dairies, cheese and whey plants, food processors and beverage plants, building ASME Section VIII vessels with National Board registration and taking them through installation registration and inspection under SPS 341. Sanitary vessels get product-contact finishes and drainable designs suited to CIP. Send the service conditions and nozzle list for a budget price.

Who builds pressure vessels for Milwaukee, Racine and Kenosha plants?

Paul Industries builds pressure vessels for plants in Milwaukee, Racine, Kenosha, Waukesha and the rest of Southeast Wisconsin, including air receivers, accumulators, jacketed reactors and expansion tanks. Vessels installed inside the City of Milwaukee can be registered with the city rather than DSPS, since the code records Milwaukee as enforcing the chapter there. Outdoor vessels in that area are designed for a minus 10 F winter design temperature.

Does Paul Industries supply vessels to Green Bay, Appleton and Oshkosh plants?

Yes. Paul Industries supplies vessels to paper mills, food plants and manufacturers in Green Bay, Appleton, Oshkosh, Neenah and across the Fox Valley, where the winter design temperature is minus 15 F. Typical work includes flash tanks, steam accumulators, condensate receivers, chemical vessels and replacement air receivers, delivered ready to set and connected during the plant’s outage window.

What constitutes a pressure vessel under Wisconsin law?

Under SPS 341.04, a pressure vessel is a container for the containment of pressure, internal or external, whether the pressure comes from an outside source or from heat. Vacuum vessels and jacketed equipment qualify along with air receivers and reactors. Whether the vessel is inspected is a separate test under SPS 341.18, which exempts small, low-pressure and certain service-specific vessels from periodic inspection.

What does a Wisconsin pressure vessel inspection look at?

A Wisconsin pressure vessel inspection follows the National Board Inspection Code: the inspector examines the shell, heads, nozzles and supports, checks for corrosion, cracking and deformation, confirms the nameplate and registration number, and verifies that safety valves were operated or tested within 12 months and rupture disks are in good condition. The inspector can order repairs needed to restore a safe condition, and the result is reported to DSPS.

Does every Wisconsin pressure vessel need a National Board number?

Nearly every one does. SPS 341.42 requires the manufacturer’s data report for each boiler and pressure vessel to be registered with the National Board, with the National Board number on the vessel. Vessels stamped UM and cast iron or cast aluminum boilers stamped H are exempt. Vessels exempt from periodic inspection still need registration when they are built to the ASME code within the chapter.

Can a vessel built to a non-ASME standard be installed in Wisconsin?

Yes, on two routes. SPS 341.42 allows vessels designed to other national or international standards when DSPS accepts the design or the standard, and the code notes that CSA B51 is accepted. Otherwise SPS 341.43 allows a Wisconsin Special by variance, with plans, calculations and specifications approved in duplicate before installation and every other applicable ASME requirement met.

How often do pressure vessels need to be tested after they enter service in Wisconsin?

Wisconsin sets a 36-month inspection cycle rather than a routine pressure test. The inspector decides whether a hydrostatic test is needed after a finding or a repair, and secondhand vessels are always tested at 1.5 times MAWP once they reach their new site. Safety valves are operated or tested every 12 months, and rupture disks are inspected visually every 36 months.

Are compressed air receivers inspected in Wisconsin?

Air receivers of 90 gallons or more, or rated at 200 psig or more on the nameplate, are on the 36-month inspection cycle. Smaller receivers below both limits are exempt from periodic inspection under SPS 341.18. Every air receiver needs a pressure gage that is easy to see, with a dial graduated to about double the safety valve setting and never less than one and a half times it.

Do brewery fermenters need ASME construction in Wisconsin?

Vessels used for processing and storing fermented beverages at temperatures of 140 F or less may be built without the ASME code under SPS 341.45 and are exempt from periodic inspection. They must still carry the manufacturer’s name, serial number, allowable working pressure and year built, and their relief devices must meet ASME requirements. Hot liquor tanks and CO2 receivers outside those limits follow the general rules.

Which rules apply to ammonia receivers in Wisconsin?

Ammonia receivers and other refrigeration vessels fall under chapter SPS 345, which adopts ASHRAE 15 and IIAR 2 and references ASME Section VIII Division 1. Only the repair and alteration subchapter of SPS 341 applies to them. Systems using Group B2 refrigerants such as ammonia at 10 tons or more are registered on form SBD-34 at least 20 business days before operation and inspected by the state.

Do hydrogen and cryogenic vessels have extra requirements in Wisconsin?

Yes. Under SPS 341.42(4), vessels, piping and components for compressed gases and cryogenic fluids, including gaseous and liquefied hydrogen, must meet NFPA 55 in addition to the ASME code and National Board registration. That brings requirements on location, separation, venting and relief that are set on the data sheet. Fuel gas vessels for heating appliances or engines are covered by SPS 340 instead.

Can a pre-ASME vessel already in a Wisconsin plant be moved and reused?

A vessel originally installed in Wisconsin and never built to an ASME edition can be reinstalled only after its maximum allowable working pressure is recalculated with a factor of safety of 6 under SPS 341.71. It then needs an inspection and a witnessed hydrostatic test at 1.5 times the recalculated pressure, and must meet ASME requirements for its fittings, valves and supports at the new location.

What happens when a Wisconsin vessel needs a weld repair or rerate?

Weld repairs and alterations follow the NBIC under SPS 341 subchapter VI and are made under the National Board R program, with the inspector consulted on the method. The work is registered on an R-1 for a repair or an R-2 for an alteration such as a rerate, and the stamping or nameplate is verified before the inspector signs. A rerate changes the pressure shown on the next permit to operate.

How long does a new ASME vessel take for a Wisconsin project?

Lead time depends on material availability, size, alloy, finish and the drawing approval cycle, so carbon steel receivers move faster than large jacketed stainless reactors. Plate and forgings for alloy vessels often set the schedule. Paul Industries gives a delivery date with the quote and plans registration and the installation inspection in parallel, so the vessel’s paperwork is ready when it is set.

What should a Wisconsin plant send to get a pressure vessel quoted?

Send the design pressure and temperature, vacuum rating if any, minimum design metal temperature, volume, process fluid, materials and corrosion allowance, the nozzle schedule, jacket or internals, finish requirements, code and registration needs, and the site’s delivery and setting constraints. A sketch or the vessel being replaced helps. Paul Industries returns a budget range, then a firm price with drawings.

Specifying a pressure vessel for a Wisconsin plant?

Send the design conditions, volume, materials, nozzle schedule and delivery date. Call 201-450-8280 or request a quote.