Paul Industries designs, supplies and installs data center cooling in Kentucky, building chilled water plants, cooling towers, dry coolers, pumps and CRAH galleries for halls in Louisville, Lexington, Northern Kentucky and the western counties. Kentucky sits where the humid Ohio Valley summer meets winters cold enough to freeze an outdoor coil, so a plant here has to reject heat on an 80 F wet bulb afternoon and stay safe on a subzero night in the same year. From its headquarters at 256 Shore Drive, Kilmarnock, Virginia, Paul Industries takes data center work across Kentucky and in all 50 states.
Request a quote or call 201-450-8280
Data center cooling in Kentucky: the plant from the rack to the river
Data center cooling in Kentucky covers everything that carries heat from the server inlet to the outdoors: CRAH units or fan walls in the hall, chilled water piping and pumps, the chillers, the cooling towers or dry coolers in the yard, the water that feeds the towers, and the controls that hold the hall within the ASHRAE recommended envelope of 64.4 to 80.6 F at the server inlet. Paul Industries builds those systems as one scope, so the hall, the plant and the water side are sized against the same weather file and the same load profile.
Inside the hall, the work is airflow as much as refrigeration. Hot aisle or cold aisle containment, blanking panels, sealed cable cutouts and fan walls with variable speed control decide whether a chilled water plant can run warm, and a warm plant is what unlocks the economizer hours in the Kentucky weather record. Many existing Louisville and Lexington halls were built around 44 F chilled water and open aisles; raising the supply temperature there starts with containment and a rack inlet survey, then a stepwise reset of the plant while the inlet sensors are watched. Paul Industries carries both halves, the air side and the water side, so the reset is planned rather than discovered.
The broad principles of chilled water, economizers and containment are set out on the national data center cooling systems page. This page stays with the Kentucky specifics: how the climate shifts from the Paducah end of the state to the Northern Kentucky end, what Ohio River and Kentucky River water does inside a cooling tower, which state permits touch the water side, how the boiler and pressure vessel law reaches into a chilled water plant, and what Kentucky power prices mean for the energy bill. Liquid-cooled racks get their own treatment on the data center liquid cooling in Kentucky page.
How many data centers are in Kentucky, and where do the data centers in Kentucky sit?
Kentucky hosts 37 data centers across nine markets, and 24 of them are in Jefferson County, according to a June 2026 report from the University of Kentucky Center for Applied Energy Research. Most of the existing stock is enterprise and colocation space in and around Louisville, with smaller groups in Lexington, Northern Kentucky across the river from Cincinnati, and the larger cities to the south and west.
The state’s first hyperscale campus is under construction in southwest Louisville, where the same report puts the first phase at 130 megawatts, targeted for commercial operation in late 2026. Proposals in a dozen other counties are at earlier stages, from zoning to utility studies, and they are covered on the data center mechanical contractor in Kentucky page. For cooling design, the practical point is that new Kentucky capacity is arriving at two very different scales: small and mid-size halls inside existing buildings, and campus plants measured in tens of megawatts per building. The plant choices below apply to both, with different weight on each.
Kentucky weather at five airports, hour by hour
Kentucky weather varies enough across the state that a cooling plant selected for Northern Kentucky is undersized in Paducah. Paul Industries pulled five years of hourly readings, 2021 through 2025, from the airport stations at Louisville, Lexington, Northern Kentucky, Bowling Green and Paducah, and calculated the wet bulb for each hour. The table below is the result.
| Station | Hours a year at 90 F or above | Design wet bulb (0.4% of hours above it) | Economizer share: hours at a 55 F wet bulb or lower | Hours a year at 32 F or below |
|---|---|---|---|---|
| Paducah (PAH) | 224 | 80.8 F | 49% | 745 |
| Bowling Green (BWG) | 240 | 79.4 F | 49% | 664 |
| Louisville (SDF) | 208 | 79.0 F | 51% | 712 |
| Northern Kentucky (CVG) | 60 | 78.1 F | 55% | 1,082 |
| Lexington (LEX) | 112 | 78.0 F | 53% | 903 |
Three things stand out. The design wet bulb, which sizes the cooling towers, spans almost three degrees from Lexington to Paducah, and every degree of wet bulb costs tower capacity. The economizer share is close to half the year everywhere, which means a water-side economizer earns its place across the whole state. And the freeze exposure in Northern Kentucky is about 60 percent higher than in Bowling Green, so the glycol and drain-down decisions change with the address.
Data center Louisville KY sites: an Ohio Valley summer on the cooling towers
A data center in Louisville, Kentucky, works through about 208 hours a year at 90 F or above and about 359 hours at a 75 F wet bulb or higher, based on the 2021 to 2025 airport record. The river valley holds moisture: dew points reached 70 F or more for about 728 hours a year, so outdoor air brought into a hall for pressurization carries a real latent load, and the dehumidification duty belongs in the CRAH and makeup air selections from the start.
For a data center Louisville KY owners plan today, Paul Industries typically selects open cooling towers for a 79 F wet bulb with a 7 F approach, which returns condenser water near 86 F on a design afternoon. Chillers are then picked for that condenser condition at full load, with the economizer heat exchanger sized for the many hours when the towers alone can make chilled water. Where the hall runs warm chilled water, around 60 to 65 F supply, the economizer window widens further, and the chiller compressors carry only the humid summer hours.
Northern Kentucky and the Bluegrass: more hours on the economizer, more nights below freezing
Northern Kentucky and Lexington have the coolest summers of the five stations, with 60 and 112 hours a year at 90 F or above and a design wet bulb near 78 F. More than half of all hours fall at a 55 F wet bulb or below, which is the range where a well-sized plate heat exchanger and towers can carry a hall at a 60 F chilled water supply without the compressors running.
The trade-off is winter. The Northern Kentucky station logged about 1,082 hours a year at or below 32 F, and the lowest hourly reading in the five-year record was minus 8 F. Towers that run through winter need basin heaters, bypass valves that keep warm water on the fill, and fan control that stops ice from forming on the air inlets. Dry coolers and air-cooled chiller coils need glycol at a strength chosen for that minimum, or a drain-down sequence that is tested, not assumed.
Paducah, Bowling Green and Owensboro: the humid western end
Paducah and Bowling Green are the most demanding cooling climates in Kentucky, with design wet bulbs of 80.8 F and 79.4 F and about 572 and 463 hours a year at a 75 F wet bulb or above. Owensboro, on the Ohio River between Louisville and Paducah, sits in the same humid band, with a design wet bulb of 80.6 F and about 554 hours a year at a 75 F wet bulb or above. A plant that would be comfortably sized in Lexington runs out of tower capacity on a still August afternoon in McCracken County.
Paul Industries handles the western end by selecting towers on the design wet bulb for the nearest station rather than a statewide figure, adding a cell of tower capacity where the owner wants margin, and checking the chiller lift at the highest condenser water temperature the record supports. Dew points at or above 70 F for about 1,098 hours a year at Paducah also make condensation on chilled water piping a real risk, so insulation thickness and vapor retarders get specified rather than left to the field.
Kentucky data center water: Ohio River, riverbank wells and the Kentucky River
Kentucky data center water for evaporative cooling usually comes from a municipal system drawing on the Ohio River or the Kentucky River, and the chemistry of that supply sets how many times the water can cycle in a tower before it has to be bled off. Louisville Water’s Crescent Hill plant treats water pumped directly from the Ohio River, while its B.E. Payne plant treats groundwater collected through riverbank filtration. Lexington’s supply comes from the Kentucky River, reinforced by Kentucky American Water’s Kentucky River Station II plant in Owen County and its 31-mile pipeline, which the Public Service Commission approved in 2008 after a drought exposed how thin the old supply margin was.
| Parameter | 2025 average | What it controls in the tower |
|---|---|---|
| Hardness as CaCO3 | 128 ppm (7.5 grains per gallon) | Calcium scale on fill and condenser tubes; the usual limit on cycles |
| Alkalinity as CaCO3 | 76 ppm | Scaling tendency with calcium; sets whether acid feed is needed |
| Chloride | 33 ppm | Pitting risk on stainless steel and copper alloys as it concentrates |
| Sulfate | 56 ppm | Calcium sulfate scale at high cycles; corrosion of concrete basins |
| Total dissolved solids | 225 ppm | Conductivity setpoint for the blowdown controller |
| pH | 8.6 | Starting point for the treatment program’s pH target |
Data center cooling water quality targets come from those numbers. At four cycles of concentration, Louisville tower water would carry about 512 ppm of hardness and about 900 ppm of dissolved solids, which a standard inhibitor program handles; pushing to six or seven cycles saves makeup water but usually needs acid or a stronger scale inhibitor. Paul Industries designs the data center cooling water treatment skid with the plant: chemical feed, conductivity-controlled blowdown, side-stream filtration for the dust a Kentucky summer puts into the basins, and biocide feed for the warm months. Details of the chemistry program sit on the cooling tower water treatment page.
How much water does evaporative cooling use, and where does it go?
Data center evaporative cooling water usage follows a simple balance: makeup water equals the water evaporated plus the water bled off, and the bleed equals the evaporation divided by one less than the cycles of concentration. At four cycles, every three gallons evaporated needs one gallon of blowdown, so makeup runs about four-thirds of evaporation. At six cycles the blowdown falls to one gallon for every five evaporated. Raising cycles saves water at very little capital cost, as long as the makeup chemistry supports it.
The evaporated water leaves as vapor in the tower plume. The blowdown goes to the sanitary sewer in most Kentucky cities, where the utility that accepts it can set pretreatment limits, or, at a campus with its own outfall, to a stream under a discharge permit. Hybrid plants that run dry coolers in winter and towers in summer cut annual water use sharply in Northern Kentucky and Lexington, where more than half the hours are cool enough for dry heat rejection.
Which Kentucky water permits touch a data center cooling plant?
A Kentucky data center that draws its own cooling water from a well, spring or stream needs a water withdrawal permit from the Kentucky Division of Water once the withdrawal averages more than 10,000 gallons per day, under 401 KAR 4:010. A large tower plant passes that threshold quickly. Campuses that buy water from a utility avoid the withdrawal permit but still need the utility’s capacity confirmed in writing before the plant is sized.
Discharges are the second half. Blowdown sent to a stream needs a Kentucky Pollutant Discharge Elimination System permit from the Division of Water, with limits on temperature, pH and the treatment chemicals in the bleed. Blowdown sent to a sewer falls under the receiving utility’s pretreatment rules. Paul Industries lays out the water balance early so the permit applications and the utility letters describe the same flows the plant will actually produce.
Expansion tanks, air separators and the Kentucky boiler and pressure vessel law
Kentucky’s boiler and pressure vessel law, KRS Chapter 236, applies to pressure vessels and their related piping unless a statutory exemption covers them, and that reaches into a chilled water plant. Vessels operating at 15 psi or less are exempt, as are domestic water vessels of 120 gallons or less, but a large chilled water expansion tank or air separator running above 15 psi falls inside the law unless another exemption in KRS 236.060 applies.
Under KRS 236.110, pressure vessels are inspected at the time of installation, and new installations are inspected by a boiler inspector employed by the Department of Housing, Buildings and Construction. The installing contractor notifies the boiler inspection section before welded or mechanical joints on the pressure piping are covered by insulation. On a cooling plant schedule, that means the inspection request goes in before the insulators arrive, and the vessel data reports are on site for the inspector. Paul Industries builds those hold points into the plant schedule, alongside the commissioning steps described on the data center commissioning in Kentucky page.
Freeze protection on Kentucky cooling plants
Freeze protection on a Kentucky cooling plant has to cover every outdoor wet surface for nights well below zero, because all five airport records include readings of minus 3 F or colder in the last five years. Paul Industries specifies glycol strength for the coldest expected coil temperature, not the average winter, and confirms it with a refractometer at startup rather than trusting the fill tickets.
Open towers in winter service get heated basins or indoor sump tanks, and the controls run the fans at low speed or in reverse to clear ice. Chillers mounted outdoors need evaporator heat tape and a flow proof that trips before the barrel freezes. Where a plant runs warm water and free cooling through the coldest months, the economizer heat exchanger isolates the glycol loop from the tower water so that a tower freeze event stays on the tower side.
Commissioning the freeze protection belongs in the first winter, not the first summer. Paul Industries checks basin heater operation, heat tape circuits, low-temperature alarms and the drain-down valves on a cold day, and records the glycol strength in the turnover file so the operator has a baseline for the annual test.
Choosing a plant architecture by Kentucky region
Plant architecture for data center cooling in Kentucky follows the climate gradient: water-cooled plants with economizers suit the whole state, dry coolers earn more north and east, and the humid west needs the most tower capacity per megawatt. The comparison below summarizes how Paul Industries weighs the common options.
| Plant type | Western Kentucky (Paducah, Bowling Green) | Louisville and Owensboro | Lexington and Northern Kentucky |
|---|---|---|---|
| Water-cooled chillers with towers and plate-frame economizer | Strong fit; size towers on an 80 F wet bulb | Strong fit; economizer near half the year | Strong fit; widest economizer window |
| Air-cooled chillers with free cooling coils | Workable; highest summer compressor energy | Good where water supply or permits are tight | Good; free cooling coils earn more hours |
| Dry coolers with trim chillers | Trim capacity runs many hours | Good for warm-water and liquid-cooled halls | Best fit for warm-water loops; strong glycol needed |
| Hybrid tower and dry cooler plant | Saves water in winter only | Balanced water and energy use | Large annual water savings |
| Direct expansion CRAC units | Small rooms and edge sites | Small rooms and edge sites | Small rooms and edge sites |
The table is a starting point. Rack density, the owner’s water policy, the utility’s capacity letter and the building itself all move the choice, and Paul Industries runs the hourly weather file against two or three candidate plants before recommending one. Chillers for these plants are covered on the data center chillers page and the towers on the data center cooling towers page.
What does data center cooling cost to run in Kentucky?
Data center cooling energy in Kentucky is priced off commercial electricity that averaged 12.64 cents per kilowatt-hour between January and August 2026, against a United States average of 14.04 cents, according to the Energy Information Administration. A plant drawing an average of 1,000 kilowatts around the clock at that rate costs about $1,107,000 a year to run. Every tenth of a kilowatt per ton saved across a year of operation shows up directly in that figure, which is why the economizer hours in the weather table matter more than the summer peak.
Capital cost depends on load, redundancy, the plant type, the building and the site work, so Paul Industries prices it from the actual scope: the IT load and its growth path, the target availability, the chilled water temperatures, the water source and the space for yard equipment. Owners receive a budget range from comparable scope early, then a firm price once the design basis is fixed. Supply-only equipment packages, design-build plants and complete installations are all available.
Who builds and services data center cooling in Kentucky?
Paul Industries builds and services data center cooling in Kentucky, from load calculation and plant selection through chillers, towers, pumps, piping, CRAH units, controls, water treatment, startup and turnover. Among data center cooling contractors working in the state, Paul Industries brings the plant and the hall under one contract, so the water side, the air side and the permits are planned together rather than stitched together at the end.
The work connects with the neighboring disciplines on the same campus: chiller repair in Kentucky for existing plants, ultrapure water systems in Kentucky where a campus needs high-purity fill or process water, and the wider data center industry page. Readers comparing climates can see the Ohio approach on data center cooling in Ohio, the hotter Memphis end on data center cooling in Tennessee, and the headquarters state on data center cooling in Virginia.
Paul Industries data center cooling for Kentucky halls and campuses
Paul Industries designs, supplies, installs, starts up and services data center cooling plants across Kentucky, from Louisville and Lexington to Northern Kentucky, Bowling Green, Owensboro and Paducah. The work covers chilled water plants, cooling towers and dry coolers, CRAH galleries and containment, water treatment, freeze protection, controls and the boiler and pressure vessel inspections that come with them. Owners across the Southeast and the rest of the country use the same route. The Kentucky page lists the other services Paul Industries delivers in the state. Send the load, the site and the target temperatures and request a quote.
Standards referenced: ASHRAE TC 9.9 thermal guidelines for data processing environments · ASHRAE 90.4 · ASHRAE 15 · ASME B31.9 · Kentucky boiler and pressure vessel law, KRS Chapter 236 · Kentucky Building Code · 401 KAR 4:010 water withdrawal permits · Kentucky Pollutant Discharge Elimination System (KPDES)
Frequently asked questions
Are there data centers in Louisville, KY, and how are they cooled?
Louisville holds most of the state’s data centers; Jefferson County accounts for 24 of Kentucky’s 37, according to a 2026 University of Kentucky report. Most are enterprise or colocation halls cooled by chilled water plants or direct expansion units, and a hyperscale campus is under construction in southwest Louisville. Paul Industries designs and installs chilled water plants, towers and CRAH systems for Louisville halls of every size.
Who installs data center cooling plants in Northern Kentucky, in Boone and Kenton counties?
Paul Industries installs chilled water plants, cooling towers, dry coolers and CRAH systems for data halls in Boone, Kenton and Campbell counties. Northern Kentucky has the widest economizer window in the state, with more than half of all hours at a 55 F wet bulb or below, and the most freezing hours, so Paul Industries plans the free cooling and the freeze protection together.
Does Paul Industries build data hall cooling plants in Lexington and the Bluegrass?
Yes. Paul Industries designs and builds cooling for data rooms and halls in Lexington, Georgetown, Frankfort and the surrounding Bluegrass counties. The Lexington airport record shows a design wet bulb near 78 F and about 903 hours a year at or below freezing, which favors water-side economizers and dry coolers with glycol sized for subzero nights.
Who builds cooling plants for data halls in Paducah and Bowling Green?
Paul Industries builds cooling plants for data halls in Paducah, Calvert City, Bowling Green and the rest of western Kentucky. Paducah’s design wet bulb of 80.8 F is the highest of the five Kentucky stations Paul Industries analyzed, so towers are sized on the Paducah figure, and chillers are checked at the highest condenser water temperature the record supports.
How many data centers are in Kentucky?
Kentucky hosts 37 data centers across nine markets, according to the University of Kentucky Center for Applied Energy Research in June 2026, and 24 of them are in Jefferson County. Utilities have reported many more projects in their pipelines, most still at the study or zoning stage. Paul Industries designs cooling for both the existing halls and the new campuses.
Where does data center cooling water go after it leaves the tower?
Most of it leaves as water vapor in the tower plume. The rest is blowdown, bled off to keep dissolved solids in check, and in Kentucky it goes to the sanitary sewer under the receiving utility’s pretreatment limits, or to a stream under a KPDES permit at sites with their own outfall. Paul Industries sizes the blowdown and the treatment program together so the discharge stays within those limits.
How do data centers keep cool through a Kentucky July?
Chillers make chilled water, towers or dry coolers reject the heat outdoors, and CRAH units or fan walls move cooled air through the hall. On a July afternoon in Louisville the compressors carry most of the load, while on cool nights and in the shoulder seasons a plate heat exchanger lets the towers make chilled water directly. Paul Industries sizes both modes from the hourly weather record.
What data center cooling water temperature makes sense for a Kentucky hall?
Many new Kentucky halls run chilled water supply between about 60 and 65 F, which keeps server inlets inside the ASHRAE recommended range while widening the hours the economizer carries the load. Older halls built around 44 F supply can move up in steps once airflow and containment are checked. Paul Industries tests the change against the hall’s actual rack inlet temperatures before resetting the plant.
When does the state boiler inspector look at chilled water expansion tanks in Kentucky?
A chilled water expansion tank or air separator operating above 15 psi is a pressure vessel under KRS Chapter 236 unless an exemption applies, and pressure vessels are inspected at installation by a state boiler inspector. Paul Industries supplies vessels with their manufacturer’s data reports and schedules the inspection request before insulation covers the piping joints.
Does a Kentucky data center need a permit to draw cooling water from a well or stream?
A withdrawal that averages more than 10,000 gallons per day from surface water, a spring or groundwater needs a water withdrawal permit from the Kentucky Division of Water under 401 KAR 4:010. Large tower plants pass that threshold, so Paul Industries prepares the water balance that the application needs early in design.
How hard is Louisville water on a cooling tower?
Louisville Water’s 2025 finished water averaged 128 ppm of hardness and 76 ppm of alkalinity, which is moderately hard. Towers on that supply commonly run four to six cycles of concentration with a scale inhibitor, and higher cycles usually need acid feed or a stronger program. Paul Industries sets the cycles from the makeup analysis and the metallurgy of the condenser tubes.
Is a dry cooler plant practical for a data center in Northern Kentucky?
For warm-water and liquid-cooled halls, it often is. More than half of Northern Kentucky’s hours sit at a 55 F wet bulb or below, and dry bulb conditions are cool for most of the year, so dry coolers carry a large share of the load with trim chillers for summer. Glycol strength has to cover the minus 8 F reading in the recent record.
What does a year of cooling plant electricity cost a Kentucky data center?
At Kentucky’s average commercial electricity price of 12.64 cents per kilowatt-hour for January to August 2026 (EIA), a cooling plant drawing an average of 1,000 kilowatts costs about $1.1 million a year in energy. Economizer hours, chilled water temperature and tower approach move that figure most. Paul Industries models the annual energy of each candidate plant before recommending one.
Which season suits a chiller cutover in an operating Kentucky data hall?
Spring and autumn suit most Kentucky halls, because cool weather leaves capacity margin and the economizer can carry part of the load. Paul Industries confirms the remaining capacity against the hall’s load and the weather forecast, installs isolation valves and tie-in points ahead of time, and cuts over during a cool spell, with temporary cooling connected where redundancy is thin.
Will Paul Industries supply cooling equipment for a Kentucky data center as an equipment order?
Yes. Paul Industries supplies chillers, towers, dry coolers, pumps, CRAH units, prefabricated pump skids and water treatment packages as supply-only orders, and also offers design-build and complete installation for the same equipment. Supply-only orders ship with submittals, data reports and startup support.
How do condensation and dew point affect cooling piping in western Kentucky?
Paducah recorded dew points at or above 70 F for about 1,098 hours a year from 2021 to 2025, so any chilled water pipe colder than that sweats unless it is insulated with a continuous vapor retarder. Paul Industries specifies insulation thickness for the dew point record, seals fittings and hangers, and inspects the vapor barrier before ceilings close.
Which project details let Paul Industries price a Kentucky cooling plant?
Send the IT load and its growth path, the target redundancy, the hall layout and rack densities, the preferred chilled water temperatures, the site address and water source, and any utility capacity letters. Existing plants should add equipment schedules and recent trend data. Paul Industries returns a budget range from that information, then a firm price once the design basis is set.
Planning a cooling plant for a Kentucky data hall?
Send the IT load, redundancy target, site address and water source. Call 201-450-8280 or request a quote.
