Paul Industries provides tank fabrication in Washington, designing, building, erecting and installing carbon steel and stainless storage tanks, process tanks and water tanks for terminals, refineries, food and beverage plants, wineries, utilities and manufacturers across the state. Washington writes detailed seismic and tsunami requirements for oil storage into the Department of Ecology's facility rules, and runs its own underground storage tank program. Paul Industries builds each tank to the standard its service calls for and to the Washington rules that apply at its site, and delivers the records an inspector or Ecology reviewer asks for.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Oil terminal tanks API 650 Annex E seismic design and tsunami resistance for new Class 1 tanks (WAC 173-180-330)
Containment 100% of the largest tank, inspected monthly (WAC 173-180-320)
Underground tanks Double-walled for petroleum USTs installed or replaced since October 1, 2012
Wine Second largest wine producer in the US (Washington State Wine Commission)
Reviewed November 2026

What does tank fabrication in Washington cover?

Tank fabrication in Washington covers field-erected API 650 storage tanks at terminals and refineries, shop-built UL 142 and API 650 tanks for fuel and chemicals, low-pressure API 620 tanks, stainless process, mix, holding and fermentation tanks for food, beverage and biotech plants, double-walled underground systems, and welded steel water tanks for utilities, fire protection and plant water. Each one involves design, materials, welding, examination, testing, coatings or finishes, foundations and anchorage, and the connections that tie the tank into the plant.

The general methods, standards and design inputs are laid out on the national tank fabrication page. This page covers what Washington changes: Ecology's rules for oil storage at marine and pipeline facilities, the state's underground tank regulation, the seismic and tsunami design the state asks for, and the industries whose tanks Paul Industries builds in Washington.

Which Washington rules apply to a new storage tank?

The Washington rules that apply to a new storage tank depend on what the tank holds, whether it sits above or below ground, and whether the facility transfers oil in bulk to vessels or pipelines. Oil terminals and refineries on or near navigable water fall under Ecology's facility standards in chapter 173-180 WAC; underground petroleum and hazardous substance tanks fall under chapter 173-360A WAC; and every tank holding flammable or combustible liquid answers to the Washington State Fire Code, the International Fire Code as adopted in chapter 51-54A WAC, along with the federal spill prevention rule in 40 CFR Part 112 where its oil capacity triggers it.

Washington rules by type of tank
TankMain Washington ruleAgencyWhat it adds to fabrication
Aboveground oil tank at a Class 1 facility (terminal, refinery dock, pipeline transfer)Chapter 173-180 WAC, Parts C and FDepartment of EcologyAPI 650 Annex E seismic design, ASCE 7-22 Risk Category III or IV, tsunami resistance, containment for 100% of the largest tank
Underground petroleum or hazardous substance tankChapter 173-360A WACDepartment of EcologyDouble-walled tank and piping, interstitial monitoring, spill and overfill equipment
Aboveground fuel tank at a plant, generator or fleet yardWashington State Fire Code, chapter 51-54A WAC; federal SPCC where triggeredFire code official; EPAUL 142 or API 650 construction, venting, overfill protection, containment, anchorage
Stainless food, beverage or wine tankBuilding code for anchorage; food safety rules for contact surfacesBuilding department; food regulatorsSanitary finishes, drainable heads, seismic legs or skirts, CIP spray coverage
Water storage tankBuilding code; drinking water rules for public water systemsBuilding department; state drinking water programAWWA D100 design, seismic sloshing freeboard, coatings for potable service

Building permits for foundations and anchorage come from city and county building departments under the Washington State Building Code. Washington moved to the 2021 code editions in March 2024 and has scheduled the 2024 editions for May 2027, so a tank designed this year and erected next year may straddle two editions.

Tank fabrication for Washington oil terminals under Ecology's seismic standard

Tank fabrication for a Washington oil terminal or refinery dock follows WAC 173-180-330, which Ecology amended effective July 7, 2023 to require that new storage tanks at Class 1 facilities meet NFPA 30 (2021) and a recognized construction standard, UL 142, API 650 or API 620, and be designed to API 650's seismic requirements, including Annex E and the piping flexibility provisions of section E.7.3. The rule then goes further than most states: the tank is designed for ASCE 7-22 Risk Category III or IV with the site class taken from on-site soil properties, meets the seismic provisions of the 2021 International Building Code as Washington adopts them, and resists tsunamis according to the facility's risk area.

A Class 1 facility is any structure on or near the navigable waters of the state that transfers oil in bulk to or from a tank vessel or pipeline, which takes in the refineries at Anacortes, in Whatcom County and in Tacoma, and the marine and pipeline terminals around Puget Sound and along the Columbia River. Washington had five operating refineries with 648,200 barrels per day of crude capacity on January 1, 2026, according to the EIA, and each ships product by water, pipeline or both.

The Risk Category III or IV requirement raises the seismic importance factor over an ordinary structure, which changes shell thickness at the bottom courses, anchorage, and the freeboard left for sloshing. Paul Industries designs Class 1 tanks with the anchorage calculation, the overturning and sliding checks, the freeboard for the convective wave, flexible connections at every shell nozzle, and a tsunami load case where the risk area calls for it, and delivers the design file in the form the facility's spill risk analysis uses.

Existing Washington terminal tanks: seismic protection and containment

Existing tanks at Washington Class 1 facilities must carry seismic protection measures within 10 years of the 2023 rule taking effect, or by the next scheduled internal API 653 inspection, whichever is later. The rule accepts flexible connections between tank and piping, foundation driven pilings, anchored tanks, or another measure Ecology approves, including a demonstration that the tank meets the API 650 seismic design requirements. API 653 inspections must cover the seismic design requirements, and their results feed the facility's spill risk analysis, which bears a professional engineer's seal.

Ecology requirements for new and existing Class 1 storage tanks (WAC 173-180-320 and -330)
RequirementNew tankExisting tankHow Paul Industries meets it
Construction standardNFPA 30 (2021) plus UL 142, API 650 or API 620Standard in force when built (1993 editions for tanks built after May 1994)Design and fabrication to the stated edition, with data sheets and calculations
Seismic designAPI 650 Annex E, ASCE 7-22 Risk Category III or IV, 2021 IBC chapter 16Protection measures by the later of the 10-year date or the next internal API 653 inspectionAnchorage retrofits, flexible nozzle connections, Annex E evaluation of the existing shell
TsunamiResist tsunami loads for the facility's risk areaAssessed in the spill risk analysisTsunami load case in the tank and foundation design
Secondary containment100% of the largest tank, compatible materials, monthly visual inspectionSameDike walls, liners and drain valves designed to lock closed
InspectionAPI 653 including seismic requirementsAPI 653 including seismic requirementsBottom, shell and nozzle repairs to API 653 with documented results

Containment carries its own duties under WAC 173-180-320: secondary containment that holds at least the full capacity of the largest tank, built of materials compatible with the product, sloped or designed to drain, inspected visually every month, and fitted with drain valves that stay closed except during a lawful discharge and are locked when the facility is unattended. Paul Industries builds and repairs dikes, containment liners, valve stations and tank bottoms with those requirements in the design.

Washington state underground storage tank rules for new and replacement systems

Washington's underground storage tank rules, chapter 173-360A WAC, require that every hazardous substance tank and every petroleum tank installed or replaced after October 1, 2012 be double-walled, with interstitial monitoring that detects a leak from the inner wall before product leaves the outer wall. Piping and dispensers installed or replaced after the same date need secondary containment and under-dispenser containment, and the rule also covers spill and overfill equipment, release detection, cathodic protection where it applies, designated and trained operators, facility compliance tags and financial responsibility.

Several common plant tanks sit outside the program. The rule exempts tanks of 110 gallons or less, farm and residential motor fuel tanks of 1,100 gallons or less, tanks used solely to heat the building they serve, flow-through process tanks, operational equipment tanks such as hydraulic lift reservoirs, and tanks in basements or vaults where the outside of the tank can be inspected. Many owners replace a buried tank with an aboveground one for exactly that reason: an aboveground or vaulted tank is visible, and it moves out of the underground program into the fire code. Paul Industries supplies and installs double-walled underground systems and the aboveground and vaulted alternatives, and documents tightness and containment tests for the owner's records.

Stainless tanks for Washington wine, fruit and potato processors

Stainless tank fabrication in Washington serves an agricultural processing industry that ranks among the country's largest: the Washington State Wine Commission ranks the state second among US wine producers, with 985 wineries, and frozen french fries were Washington's top export in 2025 at $1.09 billion, according to the Washington State Potato Commission. Fruit packing and juice plants around Yakima and Wenatchee, potato and vegetable processors in the Columbia Basin, dairies and breweries add their own tank demand.

Each sector orders something different. Wineries order jacketed fermenters, variable-capacity tanks and storage tanks with racking valves and manways; juice plants order aseptic-ready holding and blending tanks; potato and vegetable processors order oil, starch recovery, water and wastewater tanks; and dairies and breweries order silos, process tanks and CIP supply tanks. Paul Industries builds stainless tanks with polished or pickled finishes as the product requires, drainable heads, sanitary fittings and CIP spray devices placed for full coverage, and installs them with the CIP and SIP systems that clean them. New plants keep arriving in the region; Simplot opened its new Columbia Basin potato processing plant officially in February 2026.

Surface finish and cleanability decide how these vessels perform through a crush or a processing run. Wine leaves tartrate deposits that need an acid step to remove, juice sugars bake onto warm surfaces, and starch and fryer oil foul anything that holds them, so Paul Industries specifies the finish, the weld profile on product-contact seams, the slope of the bottom head and the placement of spray balls or rotary jets to match the soil and the cleaning chemistry. Every new stainless unit is pickled and passivated after fabrication, with the passivation record handed over at turnover, because heat tint left on a weld is where corrosion starts in chloride-bearing wash water. Outlets, sample valves and manway gaskets are chosen so they drain and clean in place rather than holding product between batches.

Seismic anchorage applies to these tanks too. A tall stainless fermenter on legs is a light structure carrying a heavy liquid load, and the building code's seismic forces in western Washington and much of the state govern the leg design, the anchor plates and the slab connection. Paul Industries designs legs, skirts and anchors for the site's seismic design category, and supplies anchor layouts before the slab is poured.

Water storage tanks Washington utilities and plants depend on

Water storage tanks Washington utilities, industrial plants and fire protection systems depend on are usually welded steel tanks built to AWWA D100, sized for the storage the system needs and designed for the seismic loads of the site. Seismic design of a water tank governs more than the shell: the freeboard has to accommodate the sloshing wave so the roof is not damaged, the anchorage must resist overturning, and the inlet and outlet piping must tolerate the tank's movement without tearing a nozzle. Utilities that serve the public also follow the state's drinking water rules for coatings and disinfection.

Industrial plants use the same construction for process water, raw water, fire water and cooling water storage. Paul Industries fabricates and erects water tanks with coatings suited to the water quality, cathodic protection where it is specified, overflow and vent screens, level instruments and the flexible connections that the seismic design calls for.

Which tank standard fits which Washington service?

The tank standard for a Washington project follows the product, the pressure and the size, and the state rules then add seismic, containment and inspection requirements on top. Choosing the standard early fixes the design method, the examination and the documents, so it is the first line of every Paul Industries tank data sheet.

Construction standards for common Washington tank services
StandardTypical Washington useWashington layer
API 650Refinery and terminal storage, large fuel, water and chemical storageAnnex E seismic design; Risk Category III or IV and tsunami case at Class 1 facilities
API 620Low-pressure storage, refrigerated and gas-blanketed tanksAccepted at Class 1 facilities under WAC 173-180-330
UL 142Shop-built fuel, generator day and lube oil tanksFire code construction, venting and overfill rules in chapter 51-54A WAC
AWWA D100Utility, fire protection, raw and process waterSeismic sloshing freeboard and flexible connections; drinking water rules for public systems
ASME BPE and 3-AStainless process, wine, juice, dairy and biotech tanksBuilding code anchorage for legs and skirts; sanitary finishes and drainability
Double-walled underground systemsFuel and hazardous substance storage below gradeInterstitial monitoring and containment under chapter 173-360A WAC

Repairing and modifying tanks already in Washington service

Repairs and modifications to welded storage tanks in Washington follow API 653, which sets the evaluation, repair methods, examination and testing for bottoms, shells, roofs and nozzles, and at Class 1 facilities API 653 inspections must also address the seismic design requirements. Common Washington repairs are bottom replacements after underside corrosion, new or relocated nozzles for a process change, floating roof seal replacement, shell repairs at corroded courses, and the seismic retrofits that the 2023 Ecology rule calls for on existing terminal tanks.

Repair work inside an operating plant or terminal runs under hot work rules, gas-freeing and entry procedures, and the owner's permits. Paul Industries cleans and gas-frees the tank, inspects and measures, designs the repair, welds it to qualified procedures, examines and tests it, and returns the tank with an updated record of thicknesses and repairs. Where a modification changes a tank's service, the evaluation covers the new product's specific gravity and temperature and a fresh seismic check before the tank refills.

Weather on both sides of the Cascades and what it does to tanks

Weather in Washington splits at the Cascades, and a tank's coatings, insulation and accessories are chosen for its side of the mountains. West of the Cascades, long wet seasons and marine air attack exterior coatings, roof seams and the chime where the shell meets the bottom, so drainage away from the chime, sealed insulation jacketing and a coating system rated for marine exposure pay back over the tank's life. East of the Cascades, cold winters and hot, dry summers put the emphasis on freeze protection for water and process tanks, heat tracing on outlets and level instruments, and coatings that tolerate wide temperature swings.

Snow and ice load the roof and platforms east of the mountains, and wind in the Columbia Gorge and on open sites matters for tall, empty tanks that must resist overturning before they are filled. Paul Industries designs roofs, stairs, platforms and anchors for the site's snow, wind and seismic loads together, so an empty tank in a winter storm and a full tank in an earthquake are both covered.

How large can a shop-built tank be for a Washington site?

A shop-built tank for a Washington site is limited by what a truck or barge can carry, so its diameter, height and weight are set by the oversized load permits and routes available, including the Cascade passes for eastern Washington destinations. Larger tanks are erected in the field from rolled plate, under the same standard and examination.

Shop fabrication suits stainless process tanks, fuel day tanks, UL 142 tanks and smaller API 650 tanks, because finishes, welding and testing are controlled before shipment. Field erection suits terminal tanks, large water tanks and big silos. Paul Industries chooses the method for each tank from its size, the site access, the season and the outage window, and many projects combine both, with shop-built process tanks and field-erected storage on the same site.

What does tank fabrication in Washington cost?

Tank fabrication in Washington is priced from the tank's size, material, construction standard and site conditions, and the cost drivers are plate thickness and alloy, the seismic design and anchorage, roof type, coatings or sanitary finishes, nozzles and internals, foundations, containment, shipping or field erection, and the documentation the regulator and owner need. Washington's seismic requirements usually show up in thicker bottom courses, anchor chairs and bolts, and flexible connections, and a Class 1 terminal tank adds the Risk Category III or IV design and a tsunami load case.

Paul Industries gives a budget range from a tank data sheet and a site location, and a firm price once the standard, materials, foundation interface and erection method are settled. The quote shows fabrication, delivery or erection, testing and coatings as separate lines so the owner can compare options, such as stainless against lined carbon steel, or an aboveground tank against a buried one.

Who fabricates tanks in Washington?

Paul Industries fabricates tanks in Washington, building and erecting storage tanks for terminals, refineries and plants, stainless process and fermentation tanks for food, beverage and wine producers, underground and aboveground fuel systems, and water tanks for utilities and industry, with the seismic design, testing and records each rule asks for. Owners choose supply-only delivery of a finished tank, design-build from a storage or process need, or complete installation with foundations interface, piping and startup. Paul Industries, headquartered at 256 Shore Drive, Kilmarnock, Virginia and formerly based in northern New Jersey, then Pennsylvania, is an East Coast contractor whose tank work reaches across Washington, every one of the 50 states and plants abroad through its international work.

Readers in the headquarters state can compare the tank fabrication in Virginia page, and the Pacific coast neighbor's rules are covered on tank fabrication in California. Within Washington, tanks connect to pressure vessel fabrication in Washington when the duty moves above 15 psig, process piping in Washington for transfer and fill lines, industrial welding services in Washington for tank repairs and modifications, and passivation in Washington for new stainless tanks.

Tank fabrication from Paul Industries for Washington sites

Paul Industries designs, fabricates, erects, installs, repairs and modifies tanks for owners from Anacortes, Everett, Seattle and Tacoma to Vancouver, Yakima, Wenatchee, Walla Walla, the Tri-Cities, the Columbia Basin and Spokane. Send the tank data sheet or the storage duty, the product, the site address and any Ecology, fire code or owner specifications. Call 201-450-8280 or request a quote. Other Washington process and piping services appear on the Washington hub, and the West Coast page covers the Pacific region.

Standards referenced: Chapter 173-180 WAC (Ecology facility oil handling standards) · Chapter 173-360A WAC (underground storage tanks) · API 650 including Annex E · API 620 · API 653 · UL 142 · NFPA 30 · ASCE 7-22 · International Building Code as adopted in chapter 51-50 WAC · International Fire Code as adopted in chapter 51-54A WAC · AWWA D100 · ASME BPE · 3-A Sanitary Standards · 40 CFR Part 112

Frequently asked questions

Who erects API 650 tanks at Puget Sound terminals and Columbia River docks?

Paul Industries builds and erects API 650 storage tanks, and repairs existing ones under API 653, for refinery and marine terminals at Anacortes, Ferndale, Tacoma, Seattle and the Columbia River ports. New tanks at these Class 1 facilities are designed to API 650 Annex E for ASCE 7-22 Risk Category III or IV, with tsunami resistance where the risk area calls for it, and Paul Industries delivers the design file for the facility's spill risk analysis.

Who fabricates stainless tanks for wineries in Yakima, Walla Walla and the Tri-Cities?

Paul Industries fabricates jacketed fermenters, variable-capacity tanks, storage and blending tanks for wineries in the Yakima Valley, Walla Walla, and the Tri-Cities, with racking valves, manways, cooling jackets and CIP spray devices. Legs and anchors are designed for the site's seismic loads, because a tall full fermenter carries a large overturning force. Tanks are polished or pickled and passivated to suit the wine and the cleaning program.

Does Paul Industries build tanks for Columbia Basin potato and vegetable plants in Moses Lake and Othello?

Yes. Paul Industries builds process, oil, water, starch recovery and wastewater tanks for potato and vegetable processors in Moses Lake, Othello, Quincy, Pasco and across the Columbia Basin. Tanks for those plants are sized for long production runs, designed for winter cold outdoors, and fitted for the cleaning between runs. Paul Industries also installs the transfer piping and pumps that connect them.

What are the Washington state underground storage tank regulations for a new fuel tank?

The Washington state underground storage tank regulations, chapter 173-360A WAC, require a new petroleum or hazardous substance tank to be double-walled with interstitial monitoring, with secondary containment for piping and under-dispenser containment. The system also needs spill and overfill prevention, release detection, a designated and trained operator, a facility compliance tag and financial responsibility. Paul Industries supplies and installs systems built to those requirements.

Which Washington underground storage tanks are exempt from Ecology's rules?

Washington underground storage tanks exempt from chapter 173-360A WAC include tanks of 110 gallons or less, farm and residential motor fuel tanks of 1,100 gallons or less, tanks used solely to heat the building they serve, flow-through process tanks, operational equipment tanks such as hydraulic reservoirs, and tanks in basements or vaults that can be inspected from outside. Wastewater collection and septic systems are exempt as well.

What does an underground storage tank Seattle building owner replaces usually become?

An underground storage tank Seattle building owners replace, often an old heating oil or generator fuel tank, usually becomes an aboveground or vaulted tank, because a tank whose outside can be inspected falls outside Washington's underground program and under the fire code instead. Paul Industries removes the connections, supplies and installs the replacement tank with containment and overfill protection, and connects it to the burner or generator.

What does Ecology's 2023 tank rule require of an existing terminal tank?

An existing tank at a Washington Class 1 facility must have seismic protection, such as flexible connections between tank and piping, driven pilings, anchorage or another measure Ecology approves, within 10 years of the 2023 rule or by the next internal API 653 inspection, whichever is later. API 653 inspections must cover seismic requirements. Paul Industries evaluates tanks against API 650 Annex E and builds the retrofit.

How much secondary containment does a Washington terminal tank farm need?

A Washington Class 1 facility must keep secondary containment for at least 100 percent of the capacity of the largest tank in the area at all times. Containment must be compatible with the product, drain properly, be inspected visually each month, and have drain valves kept closed except during permitted discharges and locked when the facility is unattended. Paul Industries designs and builds dikes, liners and valve stations to those terms.

Why do Washington tank rules mention tsunamis?

Washington's oil facility rule requires new storage tanks at Class 1 facilities to resist tsunamis based on the facility's risk area, using a tsunami hazard tool or design zone map and chapter 16 of the 2021 International Building Code. Many terminals sit on the shoreline of Puget Sound or the coast, where a Cascadia earthquake could produce a tsunami. Paul Industries adds the tsunami load case to tank and foundation design where it applies.

What should a plant ask tank fabrication companies about a Washington project?

Ask tank fabrication companies which construction standard and edition the tank will meet, how the seismic design and anchorage are calculated for the site, what examination and testing are included, how the tank reaches the site, and what records come with it. Paul Industries answers each point in its proposal, with the design basis, the anchorage approach and a list of the documents the owner receives at turnover.

Can a Washington plant reuse an existing tank in a new service?

An existing tank can often be reused in Washington after an API 653 evaluation for the new product, temperature and specific gravity, with repairs to the bottom, shell and nozzles as needed and a seismic check for the site. Moving a tank to a Class 1 facility brings it under the 2023 seismic rule. Paul Industries evaluates, repairs, modifies and relocates tanks with the calculations and test records documented.

Which tanks Washington wineries and juice plants buy should be jacketed?

Fermenters, cold stabilization tanks and juice holding tanks are the tanks Washington wineries and juice plants usually jacket, because temperature control during fermentation, settling and storage drives quality. Jacket area is set from the heat load and the glycol supply temperature, and dimple or channel jackets are placed where the product contacts the shell. Paul Industries sizes jackets and connects them to the plant's glycol system.

Does a Washington generator day tank need a fire code permit?

A generator day tank in Washington falls under the Washington State Fire Code, the International Fire Code as adopted in chapter 51-54A WAC, which governs construction, venting, overfill protection, containment and location for tanks holding combustible liquids. Fire code officials issue the permits. Paul Industries supplies UL 142 day tanks with containment, level controls and overfill protection, and installs them with the fuel piping and transfer pumps.

How are water storage tanks for Washington utilities designed for earthquakes?

Water storage tanks for Washington utilities are designed under AWWA D100 for the site's seismic ground motions, with freeboard for the sloshing wave, anchorage against overturning, and flexible inlet and outlet connections so piping does not tear a nozzle. Shell thickness at the bottom course often increases for seismic hoop stress. Paul Industries fabricates and erects water tanks with these elements in the design.

How large a shop-built tank can reach eastern Washington by road?

A shop-built tank bound for eastern Washington usually reaches the site by road over a Cascade pass, so its diameter, height and weight are set by the oversized load routes and permits available on that crossing. Tanks too large for the route are field erected from rolled plate. Paul Industries confirms the route and permits before fixing the tank's dimensions, and splits large vessels into shop-built sections where that keeps the finish work in the shop.

Which details start a tank quote for a Washington site?

Send the product and its specific gravity and temperature, the working capacity, the construction standard if specified, the site address and soil report if one exists, nozzle and instrument needs, finish or coating requirements, and whether the site is a Class 1 facility. For a replacement, include the existing tank's data and inspection reports. Paul Industries replies with the design basis, a schedule and a price for each option.

Planning a new or replacement tank for a Washington site?

Send the tank data sheet or storage duty, the product, the site address and any Ecology, fire code or owner specifications. Call 201-450-8280 or request a quote.