Paul Industries handles alloy selection, passivation and corrosion remediation for Washington seafood, marine and coastal process plants. The point this page exists to make is one Paul puts in front of every Washington buyer: on some Washington duties, 316 stainless is the wrong material, and no amount of passivation will fix that, so Paul fabricates the higher alloy. Where seawater, brine or marine atmosphere is involved, the honest answer is sometimes a higher alloy, and finding that out before fabrication is far cheaper than after.
Request a quote or call 201-450-8280
Chlorides are a different adversary
Washington’s process industry includes a large seafood sector, coastal and marine operations, and inland plants using brine, all of which put chlorides in contact with stainless steel. Chloride attack is not general corrosion and it does not behave like it.
General corrosion is slow, visible and predictable. Chloride pitting is local, fast and frequently invisible until it perforates. A chloride ion penetrates the passive film at a weak point and initiates a pit, and the chemistry inside that pit then becomes self-sustaining: it grows more aggressive as it deepens, which is why a pit accelerates rather than stabilizing. A vessel can have an almost perfect surface and a hole through it.
Crevice corrosion is the same mechanism in a geometry that helps it. Under a gasket, in a lap joint, beneath a deposit, the solution stagnates and its chemistry diverges from the bulk, and attack begins at chloride levels far below what the open surface would tolerate. That is why crevices matter more than concentration in many real failures.
What resists this is alloy content, specifically chromium, molybdenum and nitrogen, and the industry expresses it through the pitting resistance equivalent number, which weights those three. It is an approximation and it is a genuinely useful one for ranking candidates.
| Family | Typical resistance | Normal application |
|---|---|---|
| Type 304 | Lowest of these | Dry or low-chloride service only |
| Type 316 | Mid twenties | General food and process; mild chloride exposure |
| Duplex 2205 | Mid thirties | Moderate chlorides; also higher strength |
| Super duplex | Low to mid forties | Seawater and severe brine service |
| 6-moly austenitics | Low to mid forties | Seawater where austenitic fabrication is preferred |
| Nickel alloys | Higher still | Where even the above are insufficient |
Two decisions follow from that table and they pull in opposite directions, which is why this is a conversation rather than a lookup.
Temperature moves the threshold. Chloride attack becomes markedly more likely as temperature rises, so a material that performs well in a cold brine line can fail in the same brine heated. A specification that states chloride concentration without stating temperature has not stated the duty.
Higher alloys are harder to fabricate. Duplex grades in particular are unforgiving of welding practice, because their properties depend on the balance between two phases and that balance is affected by heat input and cooling rate. A super duplex installation welded as though it were 316 can end up with worse corrosion performance than the 316 it replaced, which is an expensive way to make a problem worse. If a higher alloy is specified, the fabrication procedure and the welder qualification have to match it.
Where passivation fits, and where it does not
Passivation restores the chromium oxide film and removes free iron. On the correct alloy, properly fabricated, it is essential and it works. Cleaning per ASTM A380 followed by passivation per ASTM A967, with the method and verification recorded, is the standard we work to.
What it cannot do is raise an alloy’s inherent resistance. Passivating 316 in a duty that needs super duplex produces a properly passivated 316 component that will still pit, on a slightly longer timescale. Paul says that at specification stage and fabricates in the right alloy, so the work is done once with no callback.
Three situations where passivation is exactly the right answer are worth naming, because the argument above should not be read as dismissing it.
After fabrication, always. Welding leaves heat tint, which is chromium-depleted underneath and is the preferred initiation site for chloride attack. Removing it and repassivating is not optional in chloride service, and on higher alloys it matters more rather than less, because a plant that has paid for super duplex and then left heat tint in place has spent the money and kept the failure mode.
After any repair. Every cut and reweld reintroduces heat tint and potentially embedded iron from tooling. In marine service that repair becomes the next pit unless it is treated.
Where free iron contamination is suspected. Carbon steel tooling, adjacent fabrication, or storage against steel all embed iron that rusts and undercuts the film. Passivation removes it, and in chloride service that is a meaningful intervention rather than a cosmetic one.
| Heating load | Per treatment | Per 20 treatments |
|---|---|---|
| 30 kW | $15.86 | $317 |
| 60 kW | $31.73 | $634 |
| 120 kW | $63.46 | $1,269 |
Energy is a minor component at Washington’s 6.61 cents per kilowatt-hour, below the 8.13 cent national average (EIA, 2024). The costs that matter are downtime and, on marine work, access.
Standards referenced: ASTM A380 · EIA electricity price data · ASTM A967 · ASME BPE
More Washington service pages from Paul Industries:
- Data center cooling in Washington
- Data center liquid cooling in Washington
- Data center commissioning in Washington
- Data center mechanical contractor in Washington
- Chiller repair in Washington
- Ultrapure water systems in Washington
- Boiler repair in Washington
- Pressure vessel fabrication in Washington
- Tank fabrication in Washington
- Process piping in Washington
- Industrial welding services in Washington
- Validation and commissioning in Washington
Frequently asked questions
Do you handle passivation and corrosion work in Washington?
Yes, across Seattle, Tacoma, Spokane, Yakima, the Tri-Cities, the coast and statewide: alloy selection advice, in-place and shop passivation per ASTM A967 after cleaning per ASTM A380, weld heat tint removal, corrosion investigation, and fabrication in higher alloys with procedures matched to the material.
Why are chlorides so damaging to stainless?
Because chloride attack is local rather than general. A chloride ion penetrates the passive film and initiates a pit whose internal chemistry becomes self-sustaining and more aggressive as it deepens, so the pit accelerates rather than stabilizing. A vessel can have an almost perfect surface and a hole through it.
Why do crevices matter so much?
Because a stagnant solution in a crevice develops a chemistry different from the bulk, and attack begins at chloride levels far below what the open surface would tolerate. Under a gasket, in a lap joint or beneath a deposit is where most real failures start, which makes geometry as important as concentration.
What does the pitting resistance equivalent number tell us?
It combines chromium, molybdenum and nitrogen content into a single figure for ranking candidate alloys. Type 316 typically sits in the mid twenties, duplex 2205 in the mid thirties, and super duplex and 6-moly grades in the low to mid forties. It is an approximation and a genuinely useful one for selection.
Does temperature change the answer?
Significantly. Chloride attack becomes markedly more likely as temperature rises, so an alloy that performs well in a cold brine line can fail in the same brine heated. A specification stating chloride concentration without stating temperature has not stated the duty.
Is upgrading the alloy always the answer?
No, and it carries its own risk. Duplex grades are unforgiving of welding practice because their properties depend on a phase balance affected by heat input and cooling rate. Super duplex welded as though it were 316 can end up performing worse than the 316 it replaced.
Can passivation compensate for the wrong alloy?
No. It restores the passive film and removes free iron, both of which are essential, but it cannot raise an alloy’s inherent resistance. Passivating 316 in a duty that requires super duplex gives you a properly passivated 316 component that will still pit, on a slightly longer timescale.
Is passivation still necessary on a high alloy?
More so, not less. Welding leaves chromium-depleted heat tint that is the preferred initiation site for chloride attack. A plant that has paid for super duplex and left heat tint in place has spent the money and kept the failure mode, which is the worst of both outcomes.
What about repairs?
Every cut and reweld reintroduces heat tint and potentially embedded iron from carbon steel tooling. In marine or brine service that repair becomes the next pit unless it is cleaned and passivated afterwards, which makes post-repair treatment part of the maintenance procedure rather than an optional extra.
How do I get a quote for Washington corrosion or alloy work?
Use the form on this page or call 201-450-8280. Useful inputs are the fluid and its chloride content, the operating temperature, current material and how long it has lasted, where failures appear, and whether the item is new fabrication or a replacement.
How does duplex stainless passivation differ from austenitic?
The chemistry and verification are similar, but duplex's two-phase structure and its sensitivity to heat tint mean that tint removal after welding is more critical and that some test methods respond differently. The procedure is qualified on the duplex grade rather than transferred from 316.
What alloys suit seawater and brine service?
Super duplex and super austenitic grades with high molybdenum and nitrogen for most duties, and nickel-based alloys or titanium for the most severe. 316 is used in cold, well-flushed seawater with a short life expectation, and rarely in brine.
What tube materials serve seawater heat exchangers?
Titanium for most seawater duties, copper-nickel where biofouling is the larger problem, and super duplex or 6% molybdenum stainless where the exchanger's other side sets the material, because 316 tubes pit in seawater at any temperature. Exchanger tubes are the most seawater-exposed surfaces in a plant.
Where is cathodic protection used on seawater systems?
On seawater pumps, intake structures, heat exchanger water boxes and mixed-metal piping, using sacrificial anodes or impressed current, to protect the less noble metal where galvanic couples cannot be avoided. It complements alloy selection rather than replacing it.
How is biofouling controlled in seawater piping?
With chlorination or other biocide at the intake, velocity that discourages settlement, and cleaning and inspection at low-flow points, because fouling reduces flow and creates the crevices and deposits where corrosion starts. Fouling control is a corrosion control.
What filler metal is used for seawater-service welds?
An over-alloyed filler with higher molybdenum and nickel than the base metal, so that the weld metal's pitting resistance matches or exceeds the parent's after the dilution and segregation of welding. Welds made with matching filler pit before the plate.
How is corrosion inspected on coastal equipment?
At crevices, welds, under deposits and at the waterline, where chloride attack initiates, on an interval set by the alloy and the duty. Visual inspection of the general surface misses the damage.
What about brine and glaze systems in seafood plants?
Cold saturated brine is a demanding chloride duty, and equipment in it needs an alloy selected for it, fresh water rinsing when idle, and passivation after cleaning. Brine tanks and chillers are a common failure location.
How does marine atmosphere affect external surfaces?
Salt deposition attacks exposed stainless, especially sheltered surfaces that rain does not wash, and fresh water washing removes it. Coastal plants include external washing in maintenance.
How does a failure analysis distinguish pitting, crevice and microbial attack?
By the location and form of the attack, deposit and microbiological analysis, and metallography of the pit morphology, which show whether the attack started at a crevice, under a deposit or on an open surface. The mechanism determines whether the fix is design, alloy or chemistry.
What about galvanic coupling in marine systems?
Different alloys in contact in seawater form galvanic cells, and mixed-alloy systems fail at the less noble metal. Alloy consistency and isolation at joints are designed in.
How is spent passivation chemistry handled at a coastal plant?
Neutralised and discharged under the plant's permit, which for coastal and marine sites often has strict limits. The route is confirmed before treatment.
Does inland Washington see the same problem?
Inland plants using brine or high-chloride water see the same mechanism without the marine atmosphere. The chloride in the fluid is what matters.
How do you tell an alloy problem from a surface problem?
By the chloride and temperature at the failure against the alloy's capability. Failure within the alloy's capability points to a surface or fabrication issue that passivation and repair fix; failure beyond it is a materials issue.
What is the commonest coastal corrosion finding in Washington?
316 in brine or seawater failing at crevices and welds, repeatedly repaired in 316, with each repair failing sooner. The alloy is the answer.
Will citric passivation make 304 behave like 316 in seafood service?
No. Passivation restores the surface an alloy is capable of and cannot add the molybdenum that gives 316 its chloride resistance. Citric passivation on 304 in brine service is worth doing and will not save it. Where the duty is genuinely chloride-heavy, the honest answer is a material change rather than a surface treatment.
Where does citric passivation genuinely help on a coastal plant?
On correctly specified equipment after fabrication, welding or repair, where embedded iron and heat tint would otherwise be the first place a pit starts. Citric passivation in place, with rinse water whose chloride content has been checked, is the standard treatment and the rinse water is the part most often overlooked.
Pitting or failures at a Washington coastal plant?
Send the fluid chemistry and the operating temperature with your current material. That combination usually tells us whether you have a treatment problem or a specification problem. Call 201-450-8280 or use the form below.
