Paul Industries designs, fabricates, installs and maintains data center liquid cooling in Alaska, building coolant distribution units, direct-to-chip loops, manifolds and glycol heat rejection that carry dense racks through Anchorage summers and Fairbanks winters without compressors for most of the year. In Alaska the warm water leaving liquid-cooled racks is a heating resource, not just waste, so Paul Industries designs the loop with heat reuse and freeze protection in mind from the first sketch. Supply-only, design-build and complete installation are all available.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Heating degree days Anchorage 9,979; Fairbanks 13,420 a year (NOAA normals)
Fairbanks January normal low Minus 17.2 F (NOAA, 1991-2020)
Commercial power 22.35 cents/kWh in Alaska, 13.37 nationally (EIA, 2025)
Flow for 1 MW at 10 C rise About 379 gpm of water
Reviewed November 2026

What does data center liquid cooling in Alaska involve?

Data center liquid cooling in Alaska involves the same equipment used in any dense hall, cold plates on processors and accelerators, rack manifolds, coolant distribution units and a facility water loop, joined to heat rejection and heat reuse systems shaped by a subarctic climate. The rack side looks the same in Anchorage as in Phoenix. The facility side does not: outdoor air cold enough to cool warm water for nearly the whole year, glycol mixed for deep winter, and buildings next door that need heat for nine or ten months.

That combination makes liquid cooling a better fit for Alaska than its reputation for complexity suggests. Warm-water loops can reject their heat to dry coolers with no compressor running on almost every hour of the year, and the water that leaves the racks is warm enough to be useful. The general principles are on the data center liquid cooling page; this page covers the Alaska design choices.

How does data center liquid cooling work in a cold-climate hall?

Data center liquid cooling works by pumping a coolant through cold plates or heat exchangers at the rack, where it picks up heat directly from the chips, then carrying that heat to a coolant distribution unit that passes it to a facility water loop, which rejects it outdoors or delivers it to a heating system. Three loops are involved, and each has a job in an Alaska design.

  • Technology cooling system loop. A clean, filtered coolant, often a propylene glycol and water mix such as PG25 or treated water, circulates between the coolant distribution unit and the cold plates through rack manifolds and quick disconnects.
  • Coolant distribution unit. The data center liquid cooling CDU holds the pumps, filters, plate heat exchanger, expansion and controls that separate the clean rack loop from the facility water and set the supply temperature the servers see.
  • Facility water system. A building loop carries heat from the coolant distribution units to dry coolers, chillers or a heat recovery exchanger. In Alaska the outdoor part of this loop runs glycol strong enough to survive the coldest night at the site.

The key number is flow. Water carries about 4.18 kilojoules per kilogram per degree Celsius, so removing 1,000 kilowatts with a 10 degree rise across the racks takes about 23.9 kilograms of water a second, roughly 379 gallons a minute. Glycol mixes need more flow for the same duty, which is why the coolant choice and pipe sizing are settled together.

Data center liquid cooling vs air cooling in Alaska

Data center liquid cooling vs air cooling in Alaska is less a contest than a division of labor: liquid cooling handles the dense racks whose heat air cannot carry efficiently, while air handles the remaining heat from storage, network gear and the residual load from liquid-cooled servers. Most liquid-cooled halls still keep an air system, so the comparison below is about which carries the bulk of the load.

Air-cooled and liquid-cooled halls compared for Alaska sites
FactorAir-cooled hall with economizerLiquid-cooled hall with warm-water loop
Rack densityPractical for moderate densities; very dense racks need large air volumesCarries dense GPU and accelerator racks directly at the chip
Outdoor air in the hallOften uses filtered outdoor air, with winter humidification and frost issuesKeeps outdoor air out; heat leaves through sealed glycol coils
Compressor hoursFew in Anchorage and Southeast; more in Fairbanks summersClose to none with warm supply water and dry coolers
Recovered heat temperatureReturn air in the eighties Fahrenheit; usually needs a heat pumpReturn water warm enough to feed heating coils directly or with a small lift
Fan energy at 22 cents per kWhLarge air volumes and server fansLower facility and server fan power; added pump energy
Freeze exposureIntakes, filters and coils exposed to subzero airOutdoor glycol loop only; indoor loops stay warm

Choosing a data center liquid cooling temperature for Alaska

The right data center liquid cooling temperature for an Alaska hall is usually set by the warmest facility water the server vendor accepts and by the heating system the recovered heat will feed, because the climate seldom limits it. ASHRAE groups liquid cooling facility water into classes named for the maximum supply temperature in degrees Celsius: W17, W27, W32, W40, W45 and W+ above 45.

ASHRAE facility water classes and how they fit an Alaska plant
ClassMaximum facility supplyHeat rejection in AlaskaHeat reuse value
W17 and W2717 C and 27 C (about 63 F and 81 F)Dry coolers most of the year; chillers trim warm afternoons, mainly in the InteriorLow grade; heat pumps needed to lift it for space heating
W3232 C (about 90 F)Dry coolers on virtually every hour in Anchorage and SoutheastUsable for low-temperature radiant floors and preheat coils
W40 and W4540 C and 45 C (about 104 F and 113 F)Dry coolers all year across the stateWarm enough for many heating coils and snow melt with a modest lift or none
W+Above 45 CDry coolers all yearHighest-grade heat; easiest to put straight into a building heating loop

Paul Industries works through that choice with the owner and the server supplier, because a warmer class shrinks the chiller plant and raises the value of recovered heat, while some equipment generations ask for cooler water. Where a hall mixes equipment, the coolant distribution units can serve different supply temperatures from one facility loop.

Can data center cooling water be reused to heat Alaska buildings?

Data center cooling water can be reused to heat buildings in Alaska, and the case for it is stronger here than almost anywhere in the country, because heating demand runs most of the year. NOAA’s 1991 to 2020 normals put Anchorage at about 9,979 heating degree days annually, Fairbanks at about 13,420 and Juneau at about 8,335, against cooling degree days in single or low double digits.

A liquid-cooled hall delivers its heat as warm water at a steady rate around the clock, which is exactly what a heating loop wants. The design steps are practical ones:

  • Find the load. Heat reuse pays when a building, campus loop, greenhouse, warehouse or snow-melt system can absorb heat during the months the hall produces it, which in Alaska is all of them.
  • Match temperatures. Return water from W40 or warmer racks can feed fan coils, air handler preheat and radiant systems with a plate heat exchanger; cooler classes need a heat pump to lift the temperature.
  • Keep a heat sink. Dry coolers stay in the design to reject whatever the heating load cannot take, on warm days and during heating system outages, so the servers never depend on a building’s thermostat.
  • Separate the fluids. Plate heat exchangers keep the rack coolant, the outdoor glycol and the building heating water apart, so a problem in one cannot contaminate the others.

Paul Industries designs the heat recovery side alongside the cooling side and pipes both, including the heating connection that ties recovered heat into existing boilers or a building heating loop. The broader plant choices for Alaska halls are on data center cooling in Alaska.

Data center liquid cooling coolant, glycol and fill water

Data center liquid cooling coolant has two jobs in Alaska: keeping the rack loop clean enough for the narrow channels in cold plates, and keeping the outdoor loop from freezing. The two loops usually carry different fluids, separated by the coolant distribution unit’s heat exchanger.

The rack loop carries the fluid the server and cold plate suppliers specify, commonly a premixed propylene glycol solution with inhibitors or treated water, held to tight limits on particles, conductivity and microbial growth. The outdoor loop carries glycol mixed for the site’s extreme minimum, which in Fairbanks, where the January normal low is minus 17.2 degrees Fahrenheit, means a stronger mix than an Anchorage or Juneau plant needs. Stronger glycol lowers heat transfer and raises pumping power, so the outdoor coils and pumps are sized for the actual mix.

Fill water matters as much as the glycol. Alaska supplies vary: Anchorage has drawn most of its public water from Eklutna Lake since the late 1980s, with wells making up the balance, while many other communities rely on groundwater with its own hardness, iron and manganese. Paul Industries fills technology cooling loops with deionized or reverse osmosis water, or with the vendor’s premixed coolant, never with raw tap water. Data center cooling water treatment, filtration and sampling are set out in the turnover documents, and the purification equipment behind it is covered on ultrapure water systems in Alaska.

Is data center water cooling closed loop?

Data center water cooling for liquid-cooled racks is closed loop: the rack coolant circulates in a sealed circuit between the cold plates and the coolant distribution unit, and the facility water loop is also sealed when it rejects heat through dry coolers. Neither loop evaporates water in normal operation, so makeup is limited to small top-ups after maintenance.

The open, evaporating part of a conventional plant is the cooling tower, and in Alaska many liquid-cooled halls do without one. Warm facility water can be cooled by dry coolers on nearly every hour of the year, which removes tower makeup water, chemical treatment, blowdown and winter icing from the design, a meaningful simplification where municipal water and wastewater capacity are limited.

Data center liquid cooling options for Alaska rooms

Data center liquid cooling options range from rear door heat exchangers that remove heat from the air leaving a rack, through data center liquid cooling direct to chip with cold plates, to single-phase immersion tanks. Each brings a different amount of change to the room, and Alaska conditions favor the warmer-water options because they pair with dry coolers and heat reuse.

  • Rear door heat exchangers fit existing enterprise rooms with moderate density, using cool facility water and keeping the room’s air system in place.
  • Direct-to-chip cold plates carry most of a dense server’s heat in liquid at warm temperatures, leaving a smaller air load for the room.
  • Single-phase immersion submerges servers in a dielectric fluid and rejects heat through a heat exchanger, with heavy tanks that need floor loading checks and fluid handling procedures.

Paul Industries designs and installs the facility side for each option, from the water connection at a rear door to the full coolant distribution and heat rejection plant behind a row of cold-plate racks.

Data center liquid cooling piping, manifolds and leak control

Data center liquid cooling piping in a hall carries facility water to the coolant distribution units and, on the rack side, connects each data center liquid cooling manifold to the units through secondary headers. Materials are chosen for cleanliness and compatibility with the coolant: stainless steel and copper are common, with joints and gaskets matched to glycol and inhibitors, and building service piping follows ASME B31.9.

A data center liquid cooling leak is managed by design rather than by luck. Paul Industries routes mains away from electrical gear where the layout allows, adds isolation valves so a single row can be drained, places leak detection cable under manifolds and coolant distribution units, specifies drip trays where pipe crosses equipment, and pressure tests every section before coolant goes in. After testing, loops are flushed and filtered until particle counts meet the cold plate supplier’s limit, because debris left from construction is a frequent cause of early blockages. Field piping work in the state is described on process piping in Alaska.

Adding liquid-cooled racks to an existing Alaska computer room

Adding liquid-cooled racks to an existing Alaska computer room starts with three checks: whether the room has a water source the coolant distribution unit can use, whether the floor can carry the heavier racks, and whether the electrical service can feed the new load and the pumps. Many enterprise and carrier rooms in Anchorage, Fairbanks and Juneau were built around direct expansion units with no chilled water at all, so the first liquid-cooled row often brings its own small facility loop and dry cooler.

Paul Industries surveys the room and proposes the least disruptive path. Where a building already has chilled water, a coolant distribution unit can take a branch from it, with a plate heat exchanger protecting the rack loop from the building water. Where it does not, a packaged unit with its own glycol circuit to a roof or pad dry cooler adds liquid cooling without touching the existing air system. Pipe routes are planned to avoid running water over live equipment, isolation valves are added at every branch, and tie-ins to a running system are made during scheduled windows with the existing cooling proven first. The result is a room that keeps its air-cooled equipment running while the dense racks move to liquid, one row at a time.

In an older room, the survey also covers the condition of the existing air units and their refrigerant, because a liquid retrofit is often the moment to retire a failing direct expansion unit and let the new loop carry part of its load. Repairs to existing machines are covered on chiller repair in Alaska.

Shipping and installing liquid cooling equipment for Alaska sites

Liquid cooling equipment for Alaska sites ships on fixed barge, rail and road schedules, so coolant distribution units, manifolds, dry coolers and pipe modules are ordered against those windows and built to arrive ready to connect. Paul Industries prefabricates pump and heat exchanger skids and piping modules, pressure tests them, then ships them drained and dried or blanketed with nitrogen so no water sits in them during a winter delivery.

Plans for modules manufactured off site are sealed by an Alaska registered design professional, as 13 AAC 50.020 requires, before the modules are set, and the mechanical plans go through state plan review under 13 AAC 50.027 or through a deferred municipal office such as Anchorage, Fairbanks or Juneau. Paul Industries builds those steps into the schedule so equipment and approvals arrive together. Campus-scale sequencing is covered on data center mechanical contractor in Alaska.

Data center liquid cooling maintenance in Alaska

Data center liquid cooling maintenance in Alaska follows the same core tasks as elsewhere, with added attention to the outdoor glycol loop and to the seasonal swing between maximum heat reuse in winter and maximum heat rejection in summer.

Maintenance tasks for a liquid-cooled Alaska hall
IntervalTaskWhy it matters in Alaska
ContinuousMonitoring of supply temperature, flow, pressure, filter differential and leak detectionEarly warning of blockage or loss of coolant before servers throttle
MonthlyCoolant sampling for conductivity, pH and inhibitor level on the rack loopKeeps cold plate channels clean and corrosion in check
Before winterOutdoor glycol concentration test and correction; dry cooler coil and fan inspectionPrevents a burst coil during the first deep cold
Before summerHeat rejection capacity check with heat reuse reduced; chiller trim readiness in the InteriorConfirms the dry coolers alone can carry the hall when heating demand falls
AnnuallyFilter and strainer changes, pump inspection, valve exercise, quick disconnect inspectionKeeps redundancy real and isolation valves usable
On any refillFill with treated water or premixed coolant; record volume addedRepeated top-ups point to a leak that needs finding

Paul Industries offers that program under service contracts, covering the coolant distribution units, the facility loop, the dry coolers and the heat recovery connection together.

What does data center liquid cooling cost in Alaska?

Data center liquid cooling cost in Alaska depends on the number and size of coolant distribution units, the piping length and material, the heat rejection and heat reuse design, redundancy, freight and how much of the work is prefabricated. A rear door retrofit for a few racks in an enterprise room is a modest project; a hall of dense cold-plate racks with a new facility loop, dry coolers and a heating connection is a major one.

Operating cost often decides the business case. If a liquid design removes 100 kilowatts of fan and compressor load from a hall, that is 876,000 kilowatt-hours a year, worth about $196,000 at the 2025 Alaska commercial average of 22.35 cents per kilowatt-hour reported by the EIA, before any credit for recovered heat. The figure is an illustration with stated assumptions; Paul Industries runs the same calculation with the owner’s tariff, load and heating demand, then gives a budget range from comparable scope and a firm price once the design is set.

Who installs data center liquid cooling in Alaska?

Paul Industries installs data center liquid cooling in Alaska, supplying and installing coolant distribution units, rack manifolds, facility water piping, dry coolers, chillers and heat recovery exchangers for halls in Anchorage, the Mat-Su, Fairbanks, Juneau, the Kenai Peninsula and the North Slope. Paul Industries, which was formerly based in northern New Jersey and then Pennsylvania, now operates from headquarters at 256 Shore Drive, Kilmarnock, Virginia, and takes liquid cooling work across Alaska and in every state.

Owners choose the route that fits: supply-only skids and manifolds, design-build of the whole liquid cooling system, or complete installation of an engineer’s design. Startup testing of the loops is covered on data center commissioning in Alaska. For comparison, the headquarters state’s version of this service is data center liquid cooling in Virginia, and a hot-climate design is on data center liquid cooling in Texas.

Liquid-cooled racks in Alaska with Paul Industries

Paul Industries plans, prefabricates, installs and services liquid cooling for Alaska data halls, from a few rear doors in an existing computer room to a dense hall whose heat warms the buildings around it, and supports the same owners on the West Coast and nationwide. Send the rack count and power per rack, the server supplier’s coolant and temperature requirements, the existing cooling plant, any heating load that could take recovered heat, and the room or building drawings. Call 201-450-8280 or request a quote. Other Alaska work is listed on the Alaska page.

Standards referenced: ASHRAE TC 9.9 Liquid Cooling Guidelines (W17 to W+ facility water classes) · ASHRAE Thermal Guidelines for Data Processing Environments · ASME B31.9 · ASME B31.3 · 2021 International Mechanical Code as adopted by 13 AAC 50.023 · 13 AAC 50.027 plan review · 13 AAC 50.020 (construction manufactured off site)

Frequently asked questions

Who installs liquid cooling for dense racks in Anchorage and Eagle River?

Paul Industries installs liquid cooling for dense racks in Anchorage, Eagle River and the Mat-Su, from coolant distribution units and rack manifolds to dry coolers and heat recovery connections. Anchorage’s mild summers let warm-water loops reject heat without compressors on nearly every hour, and its long heating season gives recovered heat a use. Paul Industries prefabricates and tests the skids before they ship, then installs, flushes and starts the system.

Does Paul Industries build liquid cooling for halls in Fairbanks and North Pole?

Paul Industries builds liquid cooling for halls in Fairbanks, North Pole and the Interior. The Fairbanks climate brings both a January normal low of minus 17.2 degrees Fahrenheit and summer afternoons warm enough to need some trim cooling for cooler water classes, so outdoor glycol strength and chiller backup are sized carefully. Fairbanks also logs more heating degree days than Anchorage or Juneau, which makes heat reuse especially valuable there.

Can a Juneau or Ketchikan computer room add liquid-cooled racks?

Computer rooms in Juneau, Ketchikan and Southeast Alaska can add liquid-cooled racks, often starting with rear door heat exchangers or a small coolant distribution unit fed from the existing chilled water or a new dry cooler. The mild maritime climate makes heat rejection easy, while wet weather calls for corrosion-resistant outdoor coils. Paul Industries surveys the room, the floor loading and the available water connection before proposing a design.

Are data centers liquid cooled in Alaska today?

Most existing Alaska data centers are air cooled, typically enterprise, carrier and government rooms built before dense GPU racks became common. Liquid cooling enters with high-density computing, through rear doors, cold plates or immersion, and new halls planned for dense workloads increasingly include it from the start. Paul Industries designs facility water connections that let an air-cooled room take liquid-cooled racks in stages.

What does a data center liquid cooling CDU need from the building in Alaska?

A coolant distribution unit needs a facility water supply at the right temperature and flow, electrical power for its pumps and controls, preferably on uninterruptible supply, drains and fill connections, leak detection and space for service access. In Alaska the facility water usually comes from a glycol loop with dry coolers, so the plate heat exchanger in the unit is sized for glycol rather than plain water. Paul Industries designs and installs those connections.

Is glycol needed in the rack loop of an Alaska liquid cooling system?

The rack loop sits indoors and stays warm, so glycol there is chosen for the server supplier’s requirements and microbial control rather than freeze protection. Many cold plate systems specify a premixed propylene glycol coolant with inhibitors. The outdoor facility loop is the one that needs glycol for freeze protection, mixed for the coldest temperature the site can reach. Paul Industries keeps the two fluids separate through the coolant distribution unit.

How warm is the water coming back from liquid-cooled racks?

Return temperature depends on the supply temperature and the rise across the cold plates, commonly around 10 degrees Celsius. A hall running warm facility water can return water above 40 degrees Celsius, warm enough for many building heating coils. Cooler supply classes return water that needs a heat pump before it is useful for heating. Paul Industries designs the heat recovery around the actual return temperature the chosen equipment will produce.

Can recovered data hall heat replace a boiler in an Alaska building?

Recovered heat can carry much of a building’s heating load when the hall’s output and the building’s demand line up, but most designs keep the boiler for backup and for the coldest days. The hall must also keep a way to reject heat when the building needs none. Paul Industries sizes the heat recovery exchanger, pumps and controls so the boiler and the data hall share the load and either can carry it alone when needed.

Does liquid cooling remove the need for a chiller in an Alaska hall?

With warm facility water classes, many Alaska halls can reject all their heat through dry coolers on nearly every hour, and some owners eliminate chillers for the liquid-cooled load. Cooler supply classes, the remaining air load and redundancy requirements may still call for a smaller chiller plant, especially in Fairbanks summers. Paul Industries models hourly weather against the supply temperature to show how many compressor hours, if any, the design needs.

How is a new liquid cooling loop cleaned before servers connect?

The loop is pressure tested, then flushed at high velocity through temporary bypasses around the cold plates and coolant distribution units, with strainers and filters catching construction debris. Flushing continues until samples meet the particle and water quality limits the cold plate supplier sets, then the loop is filled with the specified coolant. Paul Industries records each flush and sample result in the turnover file.

What happens to liquid cooling loops during a winter power outage in Alaska?

Coolant distribution unit pumps on uninterruptible power keep the rack loops moving while generators start. The outdoor glycol loop is mixed to stay liquid even with pumps stopped, and indoor loops stay warm from the building. The risk is an unprotected water line that freezes during a long outage, so Paul Industries keeps exposed lines in glycol, drainable or traced, and tests restart sequences during commissioning.

How heavy is an immersion tank compared with a raised floor's rating?

A single-phase immersion tank filled with dielectric fluid and servers can weigh several times as much per square foot as a conventional rack, so floor ratings, slab capacity and seismic anchorage are checked before a tank is placed. Alaska buildings also face seismic design requirements under the adopted building code. Paul Industries reviews the structure with the owner’s engineer and provides tank, piping and heat exchanger layouts for that review.

Can data center liquid cooling run in a modular building on the North Slope?

Liquid cooling suits modular buildings in Arctic conditions because the rack loops stay indoors and heat leaves through sealed glycol coils, without bringing subzero outdoor air into the room. The design work goes into glycol strength, drift clearance for outdoor coils, freeze-safe piping between modules and prefabrication sized for the routes that reach the Slope. Paul Industries builds and tests those modules before shipment.

What records come with a liquid cooling installation in Alaska?

The owner receives as-built drawings, pressure test and flushing records, coolant and glycol specifications with fill volumes and sample results, coolant distribution unit startup reports, control sequences, leak detection test records and maintenance instructions. Plan approval records from the state or the deferred municipal office are filed with them. Paul Industries assembles that package so operators and the next contractor have what they need.

Does Paul Industries sell coolant distribution units and manifolds without installation?

Paul Industries supplies coolant distribution units, manifolds, heat exchanger skids and prefabricated piping as supply-only orders for Alaska projects, built and tested before shipment and documented for the receiving team. Owners who want one contract for the whole system choose design-build or complete installation, and Paul Industries also maintains the system after startup under a service agreement.

What should an Alaska owner send to start a liquid cooling design?

Send the number of racks and power per rack, the server or cold plate supplier’s coolant and temperature specifications, drawings of the room and building, the existing cooling plant and its spare capacity, the redundancy target, any heating load that could take recovered heat, and the planned in-service date. Paul Industries uses that to propose an arrangement, a budget range and a schedule built around freight windows.

Bringing dense racks into an Alaska hall?

Send rack counts and power, the server supplier’s coolant specification and any heating load that could use the recovered heat. Call 201-450-8280 or request a quote.