Paul Industries designs, builds and services data center cooling in Massachusetts, from chilled water plants and cooling tower yards to dry coolers, economizer exchangers and the piping that feeds liquid-cooled racks, for carrier hotels in Boston, enterprise halls on Route 128 and the I-495 belt, and research computing in the Pioneer Valley. Headquartered at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries is an East Coast contractor that takes cooling work across the Commonwealth and in all 50 states. Each plant is sized for New England weather, Massachusetts power prices and the state’s new rules for data center growth.
Request a quote or call 201-450-8280
Data center cooling in Massachusetts: weather that helps, power that costs
Data center cooling in Massachusetts is shaped by two numbers pulling in opposite directions: cool, dry air for more than half the hours of the year, and commercial electricity that cost 23.10 cents per kilowatt-hour in 2025, against a US average of 13.37 (EIA). The weather rewards plants that switch to free cooling early in autumn and stay there into spring. The power price punishes every kilowatt the plant still spends, so economizer design, chilled water temperature and fan and pump efficiency matter more here than in most of the country. On data center cooling, Massachusetts owners therefore judge a plant by its annual kilowatt-hours as much as by its peak tons.
A third force arrived in 2026. Cities including Lowell, Holyoke and Westfield paused or barred new projects, and the Healey administration tied state support to clean energy, water and community approval. For data centers, Massachusetts now rewards owners who get more cooling out of buildings they already have, and that turns many cooling jobs into retrofits and expansions inside operating halls. The national data center cooling systems page covers plant types and components; this page covers what is particular to Massachusetts.
Where are data centers in Massachusetts, and what do they cool?
Massachusetts data centers sit in four clusters: carrier hotels and colocation floors in downtown Boston and its inner suburbs, enterprise and colocation halls along Route 128 and the I-495 belt, the large Markley building in Lowell, and research computing in Holyoke. Published estimates put the state at 40 to 60 operating data centers, most of them modest by the standard of Northern Virginia, which is why a typical cooling job here is measured in hundreds or a few thousand tons rather than tens of thousands.
The largest data center in Massachusetts is the Markley facility in Lowell, a 352,000 square foot building on a 14-acre site, according to reporting by GBH. In Boston, colocation floors fill converted commercial buildings, and the cooling plant sits wherever the structure allows: on the roof, in a basement, or split between the two. A data center in Marlborough, MA or a data center in Andover, MA is more often a purpose-built or converted single-story building with room for a ground-level chiller yard. Data centers in western Massachusetts are fewer: the Pioneer Valley adds university research computing at Holyoke, covered on the data center liquid cooling in Massachusetts page.
| Cluster | Typical building | Cooling pattern | What drives the design |
|---|---|---|---|
| Downtown Boston and Cambridge | Carrier hotels and colocation floors in multi-story commercial buildings | Water-cooled chillers with rooftop towers, CRAH galleries, risers between floors | Roof structure, crane access on city streets, floor-to-floor height, sound at neighboring windows |
| Route 128 (Waltham, Burlington, Lexington) | Enterprise rooms and colocation halls in office and flex buildings | Air-cooled or water-cooled chillers with economizers, some packaged units | Tenant improvement limits, shared building chilled water, retrofit phasing |
| I-495 belt (Marlborough, Andover, Devens) | Single-story purpose-built or converted industrial halls | Chiller yards, dry coolers, water-side economizers | Yard space, property-line sound, water source, utility capacity |
| Lowell and the Merrimack Valley | Large multi-tenant building in a dense neighborhood | Cooling towers and chillers at scale, diesel backup | Air permits, noise, moratorium limits on expansion |
| Pioneer Valley (Holyoke, Springfield) | Research computing and enterprise rooms | Outside-air and water economizers, warm-water loops | Hydro-backed municipal power, zoning bans on new campuses |
Cooling a data center: Boston, Worcester and Chicopee weather
Massachusetts weather gives a cooling plant a short, humid peak and a long, cool shoulder, and the hourly record shows both clearly. Paul Industries pulled four years of hourly airport observations (2021 to 2024) for Boston Logan, Worcester and Westover in Chicopee and computed the figures below. Boston’s dry bulb passed 92 degrees Fahrenheit in only 0.4 percent of hours, and its wet bulb passed 76.9 degrees in the same share. Worcester, at about 1,000 feet of elevation, ran cooler on both counts, while the Connecticut River valley at Chicopee was nearly as warm as the coast in summer and colder than Boston in winter.
| Measure | Boston (BOS) | Worcester (ORH) | Chicopee (CEF) |
|---|---|---|---|
| Dry bulb exceeded 0.4% of hours | 92.0 F | 87.0 F | 91.2 F |
| Wet bulb exceeded 0.4% of hours | 76.9 F | 75.1 F | 76.4 F |
| Hours per year at or above 90 F | 62 | 10 | 54 |
| Share of hours with wet bulb at or below 45 F | 44.9% | 49.3% | 48.1% |
| Share of hours with wet bulb at or below 50 F | 54.3% | 57.8% | 56.5% |
| Share of hours with wet bulb at or below 55 F | 62.4% | 66.8% | 65.0% |
| Hours per year at or below 32 F | 994 | 1,496 | 1,434 |
| Lowest hourly reading | -9 F | -13 F | -10.5 F |
Two design points follow. The peak wet bulb in the mid-70s means cooling towers and evaporative equipment must be selected for humid July and August afternoons, even though those afternoons are few. The winter column means every outdoor coil, tower basin and exposed pipe must survive single-digit and below-zero nights, so freeze protection is a design item rather than an afterthought.
How many free cooling hours does a Massachusetts hall get?
A Massachusetts hall with a water-side economizer can cover most or all of its cooling from the towers for roughly half to two-thirds of the year, depending on the chilled water temperature it runs. A common rule of thumb is that a tower and plate exchanger can carry the full load once the wet bulb sits about 10 degrees below the chilled water supply temperature, allowing roughly 7 degrees for the tower approach and 2 to 3 for the exchanger. Applying that rule to the hourly record gives the estimates below; partial economizer hours add more on top.
- At 55 degree chilled water supply, full economizer conditions (wet bulb at or below 45 degrees) occur in about 45 percent of Boston hours and 49 percent of Worcester hours.
- At 60 degrees, the share rises to about 54 percent in Boston and 58 percent in Worcester.
- At 65 degrees, which suits halls that have adopted containment and ASHRAE’s recommended inlet range, it reaches about 62 percent in Boston and 67 percent in Worcester.
Raising chilled water temperature is often a low-cost efficiency step in an older Boston hall, but it only pays if the air side can deliver the same inlet temperature with warmer water. Containment, coil selection and fan control come first; Paul Industries checks coil capacity at the new temperature before recommending the change, and reprograms the economizer changeover so the plant does not flip between modes on marginal days.
Massachusetts data center moratorium votes and what they mean for cooling work
The Massachusetts data center moratorium votes of 2026 were municipal, and each one limits new buildings or expansions rather than the cooling of halls already running. Lowell’s city council passed a 360-day ban on new data center construction and expansion in March 2026, and in August a Superior Court judge paused the installation of four new diesel generators at the Markley building while residents’ air permit challenge proceeds. Holyoke’s council voted 9 to 4 in June to bar future data centers, exempting the existing Massachusetts Green High Performance Computing Center. Westfield adopted a one-year moratorium in July, and Mansfield voters approved a near-total ban in May.
Are data centers banned in Massachusetts? Statewide, they are allowed, subject to the new state framework, but the town-by-town map now matters as much as the power map. For cooling work the practical effects are clear: owners in restricted cities add capacity inside existing walls; heat rejection equipment draws scrutiny for sound and plume; and diesel-driven backup is harder to expand, which raises the value of thermal storage and cooling plants that ride through a power transfer without a long restart.
What does the Massachusetts data center executive order require?
The Massachusetts data center executive order, Executive Order 658, signed by Governor Maura Healey on September 8, 2026, requires projects with peak electricity demand above 25 megawatts to show they follow the state’s data center framework before they can secure state permits. Proposed data centers in Massachusetts must also reach community benefits agreements with host communities before state permitting begins, and MassDEP has until December 31, 2026 to set an alternative compliance payment for operators that do not procure enough new clean electricity.
The framework behind the order, announced in June 2026, sets the Massachusetts data center clean energy expectation at 100 percent of consumption under the state’s Clean Energy Standard, asks developers to pay the full cost of grid and water upgrades, to show sufficient water and drought compliance, to use alternatives to diesel backup where they can and to minimize noise. Because a data center pays for clean energy on every kilowatt-hour, cooling efficiency now reduces two bills: the utility bill and the clean energy obligation.
The 2024 Massachusetts data center law created a 20-year sales and use tax exemption for qualified data centers of at least 100,000 square feet with 100 jobs and a $50 million investment. The administration paused the Massachusetts data center sales tax exemption in June 2026 until stronger protections are in place, and a Senate bill would tie eligibility to the framework. Paul Industries prepares the cooling plant data an owner needs for these filings: design load, annual energy and water estimates, generator interaction and sound data for heat rejection equipment.
Eversource, National Grid and the municipal light plants
Massachusetts electricity for data centers comes from one of three investor-owned utilities regulated by the Department of Public Utilities (Eversource, National Grid and Unitil) or from one of 41 municipal light plants, with ISO New England running the regional grid and wholesale markets. Eversource serves Boston, Cambridge and much of the I-495 belt; National Grid serves much of Worcester County, the Merrimack Valley and the South Shore; municipal plants such as Holyoke Gas and Electric set their own rates and interconnection terms.
The utility matters to the cooling plant in three ways. Capacity at the substation sets how much chiller and pump load can be added in a retrofit. Demand charges reward plants that shave peaks with thermal storage or chilled water temperature reset. And transfer behavior during a utility event decides how the plant’s controls must respond: a chiller that takes minutes to restart after a power blip needs a buffer tank or ride-through controls so the hall does not overheat while it recovers.
How much does it cost to cool a data center on Massachusetts power prices?
Cooling energy for a 10 megawatt IT load in Massachusetts costs roughly $2.0 million to $8.1 million a year at the 2025 average commercial rate, depending on how efficient the plant is. The table works the arithmetic for four levels of cooling energy, expressed as a share of IT energy, using EIA’s 2025 average commercial prices. Actual tariffs, demand charges and clean energy costs vary by utility and contract; the comparison shows why every point of cooling efficiency is worth more here than in most states.
| Cooling energy as share of IT energy | Cooling energy per year | Cost at 23.10 cents (Massachusetts) | Cost at 13.37 cents (US average) |
|---|---|---|---|
| 40% (older air-cooled plant, little economizer use) | 35,040 MWh | $8,094,240 | $4,684,848 |
| 25% (water-cooled plant, partial economizer) | 21,900 MWh | $5,058,900 | $2,928,030 |
| 15% (warmer chilled water, strong economizer) | 13,140 MWh | $3,035,340 | $1,756,818 |
| 10% (warm-water liquid cooling with dry coolers) | 8,760 MWh | $2,023,560 | $1,171,212 |
Capital cost depends on scope: tonnage and redundancy, chiller type, tower or dry cooler count, structural work for rooftop equipment, crane picks on city streets, piping length, controls and the phasing needed to keep a live hall running. Paul Industries prices from the owner’s load profile and drawings, gives a budget range from comparable scope early, and firms the price once the design is set. Routes include supply-only for chillers, towers, pumps and skids, design-build, and complete installation with startup and service.
Water, drought and data center cooling without water
Water is now a permitting question for Massachusetts data centers, because the state framework asks developers to show sufficient supply and a plan for drought restrictions. A large withdrawal from a private well or surface source above an annual average of 100,000 gallons per day needs a Water Management Act permit from MassDEP, and municipal suppliers in many towns already restrict outdoor use during summer droughts. For scale, the Holyoke research computing center reports using 20,000 to 30,000 gallons a day.
Data center cooling without water is practical in Massachusetts for much of the year. Dry coolers and air-cooled chillers reject heat with no evaporation, and the cool shoulder seasons let dry coolers carry warm-water loops for long stretches. The trade is energy: on a 90 degree afternoon an air-cooled machine works harder than a water-cooled one with a tower. Hybrid plants split the difference, running dry in cool weather and adding evaporative assist only near peak. Paul Industries models water and energy together for the owner’s site so the choice is made on annual numbers, not on the design day alone.
Which heat rejection suits a Massachusetts site?
Heat rejection for a Massachusetts data center is a choice among evaporative cooling towers, dry coolers, air-cooled chillers and hybrid units, and the right answer depends on the site more than the state. A Boston roof favors compact water-cooled plants with towers because they reject the most heat per square foot. An I-495 yard with a tight water supply favors dry coolers and air-cooled machines. A Pioneer Valley room with warm-water liquid cooling can reject heat through dry coolers for most of the year with no chiller running at all.
| Option | Water use | Peak summer performance | Winter care | Best fit |
|---|---|---|---|---|
| Open cooling tower with water-cooled chillers | Evaporation, drift and blowdown | Strong; condenser water tracks the wet bulb | Basin heat, fill de-icing, plume control | Boston and Cambridge roofs, large plants |
| Closed-circuit fluid cooler | Spray water only when wet | Good; dry in cool weather | Glycol or drain-down for the coil | Halls that want a closed condenser loop |
| Dry cooler with glycol | None for heat rejection | Weaker on 90 degree afternoons | Glycol strength set for record lows | Warm-water loops, water-limited towns |
| Air-cooled chiller with free-cooling coil | None | Higher compressor energy at peak | Glycol in the free-cooling circuit | Route 128 and I-495 buildings with yard space |
| Hybrid (adiabatic) cooler | Small, only near peak | Close to evaporative at peak | Drain the wetting system in winter | Sites balancing water limits and energy cost |
Redundancy shapes the count. A hall promising N+1 to tenants needs one more cell, cooler or chiller than the design day requires, and the spare must work in July and in January. Paul Industries sizes each option against the hourly record above, not just the design day, so annual energy, water and sound are compared on equal terms before equipment is ordered.
Rooftop heat rejection in Boston and Cambridge buildings
Rooftop heat rejection is the norm for data centers in Boston’s dense core, because a multi-story colocation building has no yard. Towers and air-cooled chillers sit on reinforced dunnage, condenser water risers run through the building, and every replacement involves a crane pick that needs street occupancy, a lift plan and often a weekend window. Older roofs may need new steel to carry modern equipment, which is heavier per ton of capacity when it includes variable-speed drives and sound attenuation.
Sound and plume are the other rooftop constraints. Neighbors in upper floors look directly at the equipment, and tower plume in winter can drift onto adjacent buildings. Low-sound fans, attenuators, plume abatement coils and careful placement address both. In Lowell, noise from data center equipment is the subject of a class-action lawsuit, which shows how seriously Massachusetts neighbors take it. Paul Industries plans rooftop work with the structural engineer’s review, the crane plan and a sound check at the nearest receptor before equipment is ordered.
Winter operation of a Massachusetts cooling plant
Winter operation of a Massachusetts cooling plant means running heat rejection equipment through roughly 1,000 to 1,500 hours a year at or below freezing while the IT load stays constant. Cooling tower basins need heaters or remote sumps, spray headers and fill need ice management through fan reversal or bypass, and makeup water lines need heat tracing and insulation. Dry coolers and outdoor piping carry glycol at a concentration chosen for the lowest expected temperature, and the plate exchanger between glycol and chilled water is sized for the extra viscosity.
Economizer changeover deserves its own attention. As the wet bulb falls in October, the plant shifts from chillers to towers, and a poorly tuned sequence can cycle chillers on and off for weeks. Paul Industries sets changeover points from the plant’s actual approach temperatures, adds hysteresis, and tests the sequence before the first cold snap so the hall rides through the transition without temperature swings.
Upgrading cooling inside an operating Massachusetts hall
Upgrading cooling inside an operating Massachusetts hall is the main job type under the 2026 limits on new campuses. Typical scopes include adding a chiller to an existing header with hot taps or a planned shutdown under bypass, replacing towers one cell at a time, adding a plate exchanger for water-side economizing, installing a thermal storage tank to cover power transfers, and extending chilled water or facility water to new rows of liquid-cooled racks. Each step is planned so the redundancy the hall promised its tenants holds throughout.
Data center construction in Massachusetts that does move forward tends to sit in towns that welcome it and in existing industrial buildings with power already in place. Are data centers being built in Massachusetts? Expansions and conversions are, and the proposed hyperscale data center Massachusetts watched most closely, the Servistar campus in Westfield, lost its permit extension in October 2026. The data center mechanical contractors in Massachusetts page covers the wider mechanical scope, and the data center commissioning in Massachusetts page covers testing and turnover.
Who builds and services data center cooling in Massachusetts?
Paul Industries builds and services data center cooling in Massachusetts as an East Coast contractor headquartered in Kilmarnock, Virginia, and formerly based in northern New Jersey, then Pennsylvania. The work covers load and redundancy planning, chiller, tower and dry cooler selection, economizer and thermal storage design, piping fabrication and installation, controls, startup, testing and long-term service. For chiller faults and overhauls, see chiller repair in Massachusetts; for the piping behind the plant, see process piping in Massachusetts; for towers specifically, see data center cooling towers.
Paul Industries brings the same plant approach used on its data center cooling in Virginia work in its headquarters state and on data center cooling in New York projects to Massachusetts, adjusted for New England weather, power prices and the state framework. Work across the region is summarized on the New England page and the Massachusetts hub, with industry background on the data centers page.
Paul Industries cooling plants for Massachusetts data halls
Paul Industries takes data center cooling projects in Boston, Cambridge, Route 128, the I-495 belt, Worcester, Lowell, the Pioneer Valley and the rest of Massachusetts, from a single chiller addition to a complete plant. It designs, supplies, fabricates, installs, tests, starts up and maintains the equipment and piping, with records an owner can use for state filings and tenant reporting. Send the IT load and phasing, redundancy target, site drawings and any trend data, then request a quote.
Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments · ASHRAE 90.4 · ASHRAE 15 · 780 CMR Massachusetts State Building Code, 10th edition · 522 CMR 9.00 (refrigeration and air conditioning systems) · Massachusetts Water Management Act (310 CMR 36.00) · Massachusetts Clean Energy Standard (310 CMR 7.75) · Executive Order 658
Frequently asked questions
Who provides data center cooling for carrier hotels in downtown Boston?
Paul Industries designs, installs and services cooling plants for multi-story colocation buildings in downtown Boston, including rooftop towers and chillers, condenser water risers, CRAH galleries and economizer exchangers. Work in a dense block is planned around crane access, street occupancy, structural capacity and sound at neighboring windows, and equipment changes are phased so tenants keep their promised redundancy. Call 201-450-8280 to discuss a Boston building.
Which cooling options fit data halls in Waltham, Burlington, Marlborough and Devens?
Halls in these towns usually have room for options a downtown roof cannot hold. Paul Industries builds and upgrades cooling for enterprise and colocation halls in Waltham, Burlington, Lexington, Marlborough, Andover, Devens and the towns around them. Yard space allows chillers and dry coolers at grade, water-side economizers, hybrid heat rejection and thermal storage tanks. The plant is sized for the site’s utility capacity and the owner’s growth plan.
Who handles data center cooling in Worcester and Central Massachusetts?
Paul Industries handles cooling for data centers in Worcester, MA and across Central Massachusetts, where the higher elevation gives cooler summers and colder winters than the coast. Worcester’s wet bulb sat at or below 50 degrees for about 58 percent of hours in 2021 to 2024, which favors economizers, while 1,496 hours a year at or below freezing make freeze protection for towers and dry coolers essential.
Can Paul Industries cool data centers in Springfield, MA and the Pioneer Valley?
Paul Industries takes cooling work for data centers in Springfield, MA, Chicopee, Holyoke and the wider Pioneer Valley. The valley floor runs nearly as warm as Boston in July and colder in winter, so plants there need both summer capacity and winter freeze protection. Several Pioneer Valley cities restricted new data centers in 2026, so most work in the valley involves upgrading or densifying existing rooms.
How many data centers in Massachusetts are operating today?
Published estimates place the number at 40 to 60 operating facilities, ranging from enterprise rooms and university research computing to multi-tenant colocation buildings. Most are far smaller than the hyperscale campuses of Northern Virginia, and the largest is the Markley building in Lowell. For cooling contractors that means a market weighted toward upgrades, chiller additions and economizer retrofits in existing buildings rather than greenfield plants.
Are data centers banned in Massachusetts cities and towns?
State law allows them, but several municipalities have acted. Holyoke’s council barred future data centers in June 2026, Lowell adopted a 360-day ban on new construction and expansion in March, Westfield passed a one-year moratorium in July, and Mansfield voters approved a near-total ban in May. Existing facilities generally continue to operate and maintain their cooling plants, so upgrades inside existing walls remain the main path for growth.
What happened to the proposed data center in Westfield, Massachusetts?
The Westfield planning board unanimously denied Servistar Realties’ request to extend its special permit on October 14, 2026, which reporters described as ending the multi-building campus the developer had pursued since 2019 on more than 150 acres. State law allowed an appeal within 20 days. Westfield had also passed a one-year moratorium on new data center projects in July 2026.
What are the Massachusetts data center regulations a cooling plant must answer to?
A cooling plant answers to the State Building Code (780 CMR) and the energy code that applies in the host town, 522 CMR inspection and certification for refrigeration systems of 20 tons or more, MassDEP air rules for backup generators, Water Management Act limits for large withdrawals, and now Executive Order 658 for projects above 25 megawatts. Town zoning, sound limits and any moratorium sit on top of those.
How does the Massachusetts clean energy requirement change cooling plant economics?
Under the state’s 2026 framework, a data center procures clean electricity equal to its consumption or pays an alternative compliance amount into a ratepayer fund. That attaches a second cost to every kilowatt-hour the cooling plant uses. A plant that cuts cooling energy from 25 to 15 percent of IT energy reduces both the utility bill and the clean energy obligation, which shortens the payback on economizers, warmer chilled water and efficient drives.
What chilled water temperature suits an older Boston hall after containment?
Many halls that add hot or cold aisle containment can raise chilled water supply from the mid-40s to the high 50s or low 60s while still meeting ASHRAE’s recommended inlet range, provided coils and fans can deliver the load at the warmer temperature. Each degree of increase adds economizer hours in Boston’s climate. Paul Industries checks coil performance and airflow before changing setpoints, then resets controls and alarms to match.
Do Massachusetts cooling towers need special attention in winter?
Massachusetts towers run through hundreds of freezing hours a year, so they need basin heaters or indoor sumps, heat-traced makeup lines, bypass valves to keep warm water on the fill, and fan sequences that prevent ice buildup. Plume from towers on cold mornings can also drift onto neighbors. Paul Industries reviews winter sequences each fall and corrects anything that caused icing or nuisance trips the prior season.
Is thermal storage worth adding to a Massachusetts data center cooling plant?
Thermal storage often pays in Massachusetts for two reasons: it carries the hall through a power transfer while chillers restart, and it can shift chiller operation away from demand peaks that drive utility charges. With backup generator expansion harder to permit, a chilled water tank that bridges a short outage is a practical alternative to more diesel capacity. Sizing depends on the hall’s load, restart time and available space.
Can a data center in Lowell or another restricted city still upgrade its cooling?
Moratoriums in Lowell and other cities target new construction and expansion; maintenance, repair and replacement of existing equipment usually continue, though each ordinance and permit must be read for its own terms. Projects that change capacity, add generators or alter the exterior may need further approval. Paul Industries scopes upgrades so the permit path is clear before equipment is ordered.
Which delivery routes does Paul Industries offer for Massachusetts cooling plants?
Owners can buy chillers, towers, dry coolers, pump skids and exchangers on a supply-only basis, choose design-build, where Paul Industries engineers and builds the plant under one contract, or take complete installation of an engineer’s design with startup, testing and service. Many Massachusetts owners combine routes, buying long-lead chillers early under supply-only and adding installation once permits and the design are settled.
How should a Massachusetts cooling plant respond to a utility outage?
When the utility drops and generators start, chillers may trip and take several minutes to return to full output. During that gap, pumps on backed-up power keep water moving and a buffer tank or thermal storage holds supply temperature. Controls should restart chillers in a set order and avoid restarting them all at once on generator power. Paul Industries tests this sequence during commissioning and after any controls change.
What does the Boston data center market look like for cooling projects?
For a data center, Boston offers dense fiber and a large customer base, and the Boston data center market centers on carrier hotels and colocation floors downtown and enterprise halls on Route 128, with demand driven by finance, health care, universities and biotech. Space is tight and power expensive, so projects focus on extracting more capacity from existing plants: chiller replacements, economizer additions, warmer water and liquid cooling for dense racks. Paul Industries plans each job around the building’s structural and access limits.
How do Massachusetts sound limits affect cooling equipment selection?
Massachusetts communities weigh equipment sound heavily, and data center noise has drawn complaints and litigation in Lowell. Low-speed fans, variable-speed drives, attenuators and barrier walls reduce sound at the property line, and placement away from residential sides helps. Night setbacks are limited because IT load stays constant. Paul Industries checks predicted sound at the nearest homes before selecting towers or dry coolers.
Could a hyperscale data center Massachusetts communities accept still be built here?
A campus of that size would need a willing host community, a community benefits agreement, utility capacity, a clean energy plan under Executive Order 658 and water for its cooling choice. None of those is ruled out by state law, and Massachusetts weather favors efficient cooling. Paul Industries can model plant size, water use and annual cooling energy early, so an owner knows what a site must provide.
What should a Massachusetts data center send to price a cooling project?
Send the current and planned IT load by phase, rack densities, the redundancy target, the site address and utility, drawings of the existing plant and roof or yard, recent trend data for chilled water and condenser water, and any constraints from the host town. With that, Paul Industries can give a budget range from comparable scope and then a firm price once the design is defined.
Planning a cooling plant for a Massachusetts data hall?
Send the IT load by phase, redundancy target, site drawings and any chilled water trend data for an existing plant. Call 201-450-8280 or request a quote.
