Paul Industries designs, installs and services data center cooling in Georgia, building chilled water plants, cooling tower and dry cooler yards, air handler galleries and the piping that feeds liquid-cooled racks for halls from metro Atlanta to Savannah. Georgia asks three things of a cooling plant that few other states ask at once: long humid summers, a water supply that counties now watch closely, and a power contract with Georgia Power that rewards a plant for drawing less at peak. Paul Industries plans the plant around all three and carries it from design and equipment supply through installation, testing and service.
Request a quote or call 201-450-8280
What does data center cooling in Georgia involve?
Data center cooling in Georgia involves the whole chain that carries heat from servers to the outdoor air: computer room air handlers, fan walls or coolant distribution units in the hall, chilled water and condenser water loops, chillers, towers, fluid coolers or dry coolers in the yard, and the controls that hold supply temperature steady when the Atlanta dew point sits above 70 degrees Fahrenheit for weeks. The equipment is familiar anywhere in the country. What changes in Georgia is the weather the plant must reject heat into, the water rules the site lives under, and the electric contract that prices every kilowatt the plant draws.
The general view of plant types, airflow and equipment sits on the data center cooling systems page. This page stays with Georgia: where the campuses are, what hourly weather at Atlanta, Macon and Savannah means for plant sizing, how the state energy code treats computer rooms, what the Fayette County water episode taught owners, and how the large-load rules at the Public Service Commission reach the mechanical design.
Where are data centers in Georgia, and how fast is the market growing?
Most data centers in Georgia sit in a ring around Atlanta, with the heaviest building west and south of the city in Douglas and Fayette counties, east along Interstate 20 in Newton County, and inside the city in older enterprise and carrier buildings. CBRE reported that Atlanta led North America in 2024 with 705.8 megawatts of net absorption, up from 18 megawatts the year before, and that the metro closed 2024 with 1,000.4 megawatts of inventory and more than 2,100 megawatts under construction. In February 2026 CBRE still counted 2,076 megawatts under construction in Atlanta, so Atlanta data center development is still running well ahead of what the metro had built five years earlier.
Those numbers describe the Atlanta data center market as the second large hub on the East Coast after Northern Virginia, and they explain why proposals for new data centers in Georgia now reach counties far beyond the metro, from Floyd County around Rome to Effingham County near Savannah. The campuses named below are market facts only. They show what each part of the state asks of a cooling plant.
| Area | Market facts | Cooling question that comes first |
|---|---|---|
| Douglas County (Lithia Springs, Douglasville) | Google campus cooled with recycled wastewater since 2008; one of the oldest hyperscale clusters in the Southeast | Reclaimed water treatment, tower chemistry and expansion beside operating halls |
| Fayette County (Fayetteville) | Large multi-building campus; county water system traced 29 million gallons of unmetered water there in 2025 | Metering of every makeup and construction connection; water budget agreed with the county |
| Newton County (Covington, Stanton Springs) | Meta campus announced in 2018 at $750 million and 970,000 square feet, since expanded | Plant standardization across many buildings; phased chiller and tower additions |
| City of Atlanta and inner suburbs | Carrier hotels, enterprise rooms and colocation in older buildings | Roof and yard space, sound at the property line, retrofits without outages |
| Floyd County (Rome) | 80-day pause on new data center projects adopted in June 2026 while rules were written | Setbacks and sound limits the new county rules set for chillers, towers and dry coolers |
| Savannah and the coast | Effingham County weighing data center interest west of Savannah | Salt air on coils, the highest dew points, hurricane wind ratings on yard equipment |
Questions about data centers in Douglasville, GA and Lithia Springs usually come from owners adding a building beside an operating one, where new chilled water mains have to cross live utility corridors. A Covington, Georgia data center on a large Newton County campus raises the opposite problem: a long series of near-identical plants, where small design errors repeat across every building unless they are caught on the first one.
Why so many data centers in Georgia?
Georgia drew so many data centers because of available power, fiber routes through Atlanta, land at the edge of the metro, and a state sales and use tax exemption for high-technology data center equipment that the legislature extended through 2031. In May 2024 Governor Kemp vetoed a bill that would have paused new exemption certificates, citing projects already under way. Georgia Power then asked for, and in December 2025 received, Public Service Commission approval for 9,885 megawatts of new resources, most of it meant for large loads such as hyperscale data centers in Georgia.
The same growth brought pushback. In 2026 more than a dozen Georgia counties and cities, among them Clayton, DeKalb, Cherokee, Paulding and Floyd counties, adopted temporary pauses on new data center projects while they wrote zoning rules. For a cooling plant, the practical effect of a Georgia data center moratorium is schedule risk: long-lead chillers, switchgear and towers are often ordered before a county finishes its rules, so the mechanical design has to fit the setbacks, sound limits and water conditions the county is likely to adopt.
Atlanta, Macon and Savannah weather, hour by hour
Georgia weather loads a cooling plant with humidity more than with extreme heat: Atlanta logged about 161 hours a year above 90 degrees Fahrenheit from 2021 through 2024, but its dew point stayed at or above 65 degrees for about 2,300 hours a year. Paul Industries computed the figures below from National Weather Service hourly observations at Hartsfield-Jackson, Middle Georgia Regional Airport in Macon and Savannah/Hilton Head International for 2021 through 2024.
| Measure | Atlanta (ATL) | Macon (MCN) | Savannah (SAV) |
|---|---|---|---|
| Hours per year above 90 F | 161 | 305 | 195 |
| Hours per year above 95 F | 16 | 50 | 11 |
| Highest hourly reading | 99 F | 105 F | 102 F |
| Lowest hourly reading | 8 F | 13 F | 19 F |
| Hours per year at or below 55 F dry bulb | 2,417 | 2,323 | 1,789 |
| Hours per year with dew point at or above 65 F | 2,298 | 3,019 | 3,343 |
| Hours per year with dew point at or above 70 F | 1,041 | 1,818 | 2,031 |
| Dew point exceeded 0.4% of hours | 75 F | 77 F | 77 F |
| Full water-side economizer hours at 60 F supply | 2,767 | 2,398 | 1,942 |
| Full or partial economizer hours at 60 F supply, 72 F return | 4,897 | 4,424 | 3,968 |
The economizer rows assume a cooling tower with a 7 degree approach to wet bulb and a plate heat exchanger with a 3 degree approach, with wet bulb calculated from each hourly temperature and humidity reading. Three lessons follow. First, Macon is the hardest of the three on heat rejection, with almost twice Atlanta’s hours above 90 degrees and a 105 degree peak, so dry coolers and air-cooled chillers there need more surface or a higher design ambient. Second, Savannah has the most humid air, which cuts economizer hours and makes condensation on cold pipe a year-round concern. Third, Atlanta’s lowest reading of 8 degrees is cold enough to freeze an idle tower basin, an outdoor coil or a dead-ended branch, so freeze protection is part of every north Georgia design even in a state known for heat.
Georgia data center cooling regulations: the energy code and the computer room exception
Data center cooling regulations in Georgia start with the Georgia State Minimum Standard Energy Code, which is still the 2015 International Energy Conservation Code with Georgia Supplements and Amendments, and the 2024 International Mechanical Code with Georgia Amendments that took effect on January 1, 2026. Georgia’s energy amendments do three things a cooling designer notices at once. They add a tenth exception to the economizer requirement in section C403.3 for computer room applications. They require cooling towers in new construction to meet ASHRAE 90.1. And they require chilled water plants with more than one chiller to reduce flow automatically through the plant when a chiller shuts down.
The computer room exception lets a Georgia hall be permitted without an air-side or water-side economizer, yet an economizer still deserves a price of its own. At a 60 degree chilled water supply, Atlanta offers about 2,767 hours a year of full economizer cooling and roughly 4,900 hours of full or partial relief. Paul Industries prices the economizer as a payback question with the owner rather than a code checkbox, and in most Atlanta-area plants with warm supply water it earns its place. The cooling tower rule matters for the yard: a tower bought on first cost alone can fall below the 90.1 efficiency floor, and the Georgia mechanical amendments also call for factory-built towers listed to UL 1995 or UL/CSA 60335-2-40.
Georgia data center water: towers, reclaimed water and metering
Georgia data center water use depends almost entirely on the heat rejection choice: an evaporative tower plant consumes makeup water every hour it runs, while a closed loop with dry coolers or air-cooled chillers uses little after the initial fill. Under O.C.G.A. 12-5-31 and 12-5-96, anyone drawing more than 100,000 gallons a day from surface water or groundwater needs a permit from the Georgia Environmental Protection Division, so most metro Atlanta campuses buy water from a county system instead and negotiate the volume with that utility.
The Fayette County episode shows why metering belongs in the cooling design. In 2025 the Fayette County Water System traced more than 29 million gallons of unmetered water to two connections on a Fayetteville campus, one installed without the utility’s knowledge and one never tied to a billing account. The problem surfaced only after residents of an adjacent subdivision complained about Georgia data center water pressure, and the operator, which attributed the use to construction work, paid a retroactive bill of $147,474. For an owner, the lesson behind the Fayetteville Georgia data center water story is simple: every tower makeup line, construction tap and fill connection should carry a meter that the building automation system trends from the first day of construction, well before the first day of operation.
Recycled water is the other Georgia answer. Google’s Douglas County campus has cooled with treated wastewater diverted from the Chattahoochee since 2008, using a sidestream plant to bring it to tower quality. Reclaimed water carries more phosphate, ammonia and suspended solids than potable supply, so it changes tower materials, filtration, chemical feed and blowdown, and Paul Industries designs those pieces together when an owner chooses it.
| Option | Water use | Power at peak | Fit in Georgia |
|---|---|---|---|
| Water-cooled chillers with open towers | Highest; evaporation plus blowdown | Lowest compressor power | Strong where the county will sell the water or reclaimed water is available |
| Evaporative fluid coolers on a closed loop | Moderate; spray water on hot days | Low | Good in Atlanta and Macon; humid coast shortens dry hours |
| Adiabatic dry coolers | Low; wetting only above a set ambient | Moderate | Balances water and power for counties that cap water use |
| Air-cooled chillers with free-cooling coils | Near zero after fill | Highest on 95 degree afternoons | Suits sites where water is the binding limit; size for Macon-type peaks |
| Warm-water liquid loops on dry coolers | Near zero | Low pump and fan power | Dense racks with high supply temperature; see the liquid cooling page |
Data center cooling without water is practical in Georgia, but the trade is electricity on the hottest afternoons, exactly when the Georgia Power contract is most sensitive to peak draw. The right answer for a given campus comes from putting the water limit and the power limit on the same page, which is how Paul Industries frames the choice with an owner.
Georgia Power large load rules and the cooling plant
The Georgia Power large load rule that the Public Service Commission approved on January 23, 2025 lets the utility bill new customers above 100 megawatts on terms beyond its standard tariffs, including contracts of up to 15 years instead of 5, minimum bills, and payment for upstream generation, transmission and distribution costs as construction proceeds. Every such contract goes to the commission for review. What many people call the Georgia Power data center tariff is this rule plus the contract terms that follow from it, and most large campuses also deal with electric membership corporations or Georgia Power depending on where the site sits.
The rule turns cooling efficiency into a contract question. A campus that signs for a fixed capacity for 15 years pays for that capacity whether the IT load arrives or not, and the cooling plant’s draw on a 94 degree, 75 degree dew point afternoon decides how much of the contracted megawatts are left for servers. Warmer supply water, variable-speed pumps and towers, and economizer hours all lower that peak. Paul Industries sizes the plant against the peak hour and the annual hours together, so the owner sees both the energy bill and the capacity it reserves.
Cooling inside the hall: air, liquid and the hybrid many Georgia sites build
Cooling inside a Georgia hall today is often a hybrid: chilled water air handlers or fan walls with hot aisle containment for most racks, and a coolant distribution unit loop for dense racks that air cannot cool. Supply air in the range ASHRAE’s thermal guidelines recommend lets the chilled water run warmer, which buys economizer hours, but the coil leaving temperature still has to stay low enough to hold humidity in a building that leaks Georgia air through every door cycle. Paul Industries sets the chilled water supply temperature, the coil selection and the dehumidification strategy together so that warmer water does not turn into a moisture problem in July.
Dense racks change the plant. A hall that adds direct-to-chip cooling needs a facility water loop at a warmer temperature than the air handlers, and in Georgia that loop can run on dry coolers for most of the year. The design, phasing and controls for that work are on the data center liquid cooling in Georgia page, and the start-up testing that proves both loops is described on the Georgia data center commissioning page.
Adding data center cooling in Atlanta to a hall that cannot go down
Data center cooling in Atlanta is increasingly retrofit work, because enterprise rooms and early colocation halls in the city and inner suburbs were built for 5 to 10 kilowatt racks and now host far denser equipment. An Atlanta data center that cannot take an outage gets new capacity through valved stubs left on the original headers, line stops and hot taps where no valves exist, temporary chillers on a trailer during the switchover, and work windows set with the operator’s change control.
Paul Industries surveys the existing plant first: pump curves against actual flow, chiller capacity against measured load, the condition of the original pipe, and the room left on the roof and in the yard. The survey shows whether the plant can be extended in place or needs a new header. Where the building is older, the retrofit often also fixes what the original design left out, such as isolation valves on each chiller, flow meters on each loop and a bypass that lets a single chiller run at low load. The chilled water side of that work ties into the same skills Paul Industries uses for chiller repair in Georgia and for process piping in Georgia.
What does data center cooling in Georgia cost?
The cost of data center cooling in Georgia is set by heat load, redundancy, heat rejection type and water source more than by anything particular to the state, so Paul Industries prices each plant from its load profile and site rather than from a per-megawatt rule. The main drivers are the IT load and its growth phases, the redundancy level (N+1, N+2 or 2N chillers, pumps and towers), the chilled water supply temperature, the heat rejection choice in the table above, the water source and its treatment, the distance from the plant to the halls, and how much of the work happens in an operating building.
Operating cost is easier to frame with verified numbers. Georgia’s average commercial electricity price in 2025 was 11.53 cents per kilowatt hour against a national average of 13.37, and its industrial price was 7.88 cents against 8.51, according to the U.S. Energy Information Administration. Georgia data center electricity at those rates means that every 1,000 kilowatts of cooling load running all year costs about $1,010,000 at the commercial average or about $690,000 at the industrial average. Switching off 1,000 kilowatts of chiller compressors during Atlanta’s 2,767 full-economizer hours at a 60 degree supply saves about $319,000 a year at the commercial rate. Large campuses negotiate their own rates under the large-load rule, so these are reference points, not quotes.
Taxes matter as well. Are data centers tax exempt in Georgia? Qualifying high-technology data center projects can buy equipment free of state sales and use tax under an exemption that now runs through 2031, and the certificate terms decide which mechanical items qualify, so Paul Industries prices equipment both ways until the owner confirms its certificate.
Who designs and installs data center cooling in Georgia?
Paul Industries designs, supplies, installs, tests and services data center cooling in Georgia, from the first load study through the chilled water plant, heat rejection yard, hall piping and the service plan after turnover. Paul Industries is headquartered at 256 Shore Drive in Kilmarnock, Virginia, was formerly based in northern New Jersey and then Pennsylvania, and is an East Coast contractor that takes work across Georgia, in all 50 states and at plants outside the United States. The same team builds data center cooling in Virginia, its headquarters state, and plants for halls covered on the North Carolina data center cooling page.
Owners choose the route that suits the project. Supply-only covers chillers, towers, dry coolers, pumps, plate heat exchangers and prefabricated pump and pipe modules built off site to the owner’s design. Design-build covers the engineering, equipment and installation under one contract. Complete installation covers a design by the owner’s engineer, built, tested and started by Paul Industries. Paul Industries also handles the mechanical package for the building as a whole, described on the data center mechanical contractor in Georgia page.
Paul Industries cooling plants for Georgia data halls
Paul Industries builds data center cooling in Georgia for hyperscale campuses, colocation halls, enterprise rooms and research computing: chilled water plants, towers and dry cooler yards, air handler and fan wall galleries, liquid cooling loops, metering, controls and the service that keeps them running. Owners in metro Atlanta, Macon, Columbus, Augusta and Savannah can see the full range of Georgia work on the Georgia page and the regional picture on the Southeast page. Send the load profile, site plan and water source, and request a quote for the plant.
Standards referenced: Georgia State Minimum Standard Energy Code (2015 IECC with Georgia Supplements and Amendments) · 2024 International Mechanical Code with Georgia Amendments · ASHRAE 90.1 · ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments · ASME B31.9 · UL 1995 · O.C.G.A. 12-5-31 and 12-5-96 (Georgia water withdrawal permits)
Frequently asked questions
Who provides cooling for data centers in Douglas County and Lithia Springs?
Paul Industries designs, installs and services cooling plants for data halls in Douglas County, including Lithia Springs and Douglasville. Work there is often expansion beside operating buildings, so Paul Industries plans new chilled water mains, tower cells and tie-ins around live utility corridors and the operator’s change control. Where a campus uses reclaimed water, the tower materials, filtration and chemical feed are designed for that supply. Call 201-450-8280 to discuss a Douglas County project.
Does Paul Industries build cooling plants for data halls in Fayetteville and Fayette County?
Paul Industries builds and services chilled water plants, heat rejection yards and hall piping for Fayette County sites, including Fayetteville. Every makeup line, construction tap and fill connection gets a meter tied to the building automation system from the start of construction, so water use is visible to the owner and the county from day one. Plants are sized against Atlanta-area hourly weather and the owner’s Georgia Power contract.
Can Paul Industries cool a Savannah, Georgia data center or a site elsewhere on the coast?
Paul Industries designs and installs cooling for halls in Savannah, Effingham County, Brunswick and the rest of the Georgia coast. Coastal plants need coated or corrosion-resistant coils, stainless or coated tower components, wind-rated anchoring for yard equipment and more dehumidification, because Savannah’s dew point reaches 70 degrees or higher for about 2,000 hours a year. Paul Industries selects equipment for those conditions and builds the plant to suit them.
Who handles data center cooling around Covington and Newton County?
Paul Industries handles cooling design, installation and service for Newton County campuses around Covington and Stanton Springs. Large campuses there repeat one plant design across many buildings, so Paul Industries reviews the first building’s plant closely, records what changes in the field, and carries those changes into every building that follows. That keeps chillers, pumps and controls consistent and makes spare parts and service simpler across the campus.
How many data centers are in Georgia?
Counts vary with how buildings and campuses are counted, so capacity is the clearer measure. CBRE reported 1,000.4 megawatts of data center inventory in metro Atlanta at the end of 2024 and 2,076 megawatts under construction in early 2026, which places Atlanta second in North America after Northern Virginia. Each new building needs its own cooling plant or a share of a campus plant, and Paul Industries designs and builds both.
How should an owner read the numbers on Atlanta data center water usage?
Atlanta data center water usage depends on heat rejection more than on size. A tower plant evaporates water every hour it rejects heat, while a closed loop on dry coolers or air-cooled chillers uses little after filling. Published totals often mix construction water, tower makeup and domestic use. Paul Industries meters each of those separately so an owner can show the county exactly where the water goes.
How much water do data centers use for cooling in Georgia's climate?
The answer depends on the plant. An evaporative tower rejects heat largely by evaporating water, so its use rises with load and with the hours of warm weather, and Georgia’s long humid season adds to the total. A closed liquid loop on dry coolers, or air-cooled chillers, uses close to none after the initial fill but draws more power on hot afternoons. Paul Industries models both for the site before the heat rejection choice is made.
Does the Georgia energy code require an economizer in a data center?
Georgia’s amendments to the 2015 IECC add an exception to the economizer requirement for computer room applications, so a Georgia hall can be permitted without one. An economizer is still worth pricing: at a 60 degree chilled water supply, Atlanta offers about 2,767 hours a year of full water-side economizer cooling. Paul Industries calculates the payback with the owner and builds the economizer when it pays.
How warm can chilled water run in a Georgia hall before humidity becomes a problem?
Chilled water can run warm enough to serve sensible-only coils, often in the 60s Fahrenheit, as long as some other part of the system removes moisture. Georgia air brought in through doors and ventilation carries dew points above 65 degrees for 2,300 to 3,300 hours a year at the three airports measured here, so Paul Industries pairs warm-water coils with a dedicated dehumidification path and sets the supply temperature from the room’s actual latent load.
Why does a 15-year Georgia Power contract make plant efficiency a contract issue?
Under the 2025 large-load rule, customers above 100 megawatts can sign contracts of up to 15 years with minimum bills. The cooling plant’s draw on the hottest, most humid hour takes part of that contracted capacity away from servers for the life of the contract. Lower peak cooling power, from warmer supply water, variable-speed equipment and economizer hours, leaves more capacity for IT load. Paul Industries designs the plant against that peak hour.
What freeze protection does a north Georgia cooling plant need?
Atlanta’s lowest hourly reading from 2021 through 2024 was 8 degrees Fahrenheit, and colder nights reach the mountain counties. Idle tower basins, outdoor coils, makeup lines and dead-ended branches can freeze in those hours. Paul Industries specifies basin heaters or indoor sumps, heat tracing on exposed water lines, glycol on dry cooler loops where the design allows, and controls that keep water moving through outdoor equipment during a cold snap.
Which Georgia city is hardest on heat rejection equipment?
Macon was the hardest of the three airports measured, with about 305 hours a year above 90 degrees Fahrenheit and a peak of 105 degrees from 2021 through 2024, against 161 hours and 99 degrees at Atlanta. Dry coolers and air-cooled chillers in Middle Georgia need more coil surface or a higher design ambient. Paul Industries selects yard equipment from the measured hours at the nearest station rather than from a statewide average.
Is a design-build contract or a supply-only order better for a Georgia cooling plant?
Design-build suits owners who want one contract for engineering, equipment, installation and start-up, with a single schedule. Supply-only suits owners whose engineer has designed the plant and who want chillers, towers, pumps or prefabricated modules delivered to that design. Complete installation sits between them: the owner’s design, built and started by Paul Industries. Paul Industries offers all three routes for Georgia projects and prices whichever the owner asks for.
Does a Georgia data center moratorium affect cooling work on an existing hall?
The 2026 moratoriums in Georgia counties and cities were temporary pauses on new data center projects while zoning rules were written, and each ordinance sets its own scope. Owners should read the text that applies to their parcel. For cooling plants, the larger effect is timing, since equipment is often ordered before rules are final. Paul Industries designs to the setbacks and sound limits a county is likely to adopt so the plant fits when approval comes.
How is new cooling tied into an Atlanta hall that has to stay online?
New capacity enters through valved stubs left on the original headers, line stops and hot taps where no valves exist, and temporary chillers on a trailer during switchover. Each step runs in a window agreed through the operator’s change control, with a written back-out plan. Paul Industries surveys pumps, chillers and pipe first so the tie-in plan matches the real plant, not the original drawings.
What does Paul Industries need to start pricing cooling for a Georgia data hall?
Send the IT load and its phases, rack densities and any liquid cooling plans, the redundancy level, the site plan with yard and roof space, the water source, the electric service and utility, and drawings of any existing plant. With those, Paul Industries can give a budget range from comparable scope and then a firm price once the design is set. Call 201-450-8280 or use the quote form.
Cooling a new or growing data hall in Georgia?
Send the IT load, phasing, site plan and water source, and Paul Industries will lay out the plant and its cost. Call 201-450-8280 or request a quote.