Paul Industries is a data center mechanical contractor in Washington that designs, prefabricates, installs and starts up central cooling plants, chilled and condenser water piping, liquid cooling distribution, fuel and water systems for campuses in Quincy, Moses Lake, East Wenatchee, Malaga and the Puget Sound area. Washington’s rural data center tax exemption, its hydro-powered utilities and the scale of the Columbia Basin campuses shape how each mechanical package is planned. Paul Industries builds to that schedule from the first equipment order through commissioning.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Grant County 7 of the 10 highest-assessed properties are data centers (2025)
Sales tax exemption Rural counties, 20,000+ sq ft of servers, construction before July 1, 2035
Grant PUD queue About 800 MW of large-load requests (2026)
Contractor rule Every contractor registers with Labor and Industries (RCW 18.27)
Reviewed November 2026

What does a data center mechanical contractor in Washington deliver?

A data center mechanical contractor in Washington delivers the systems that move heat out of the data halls and keep the campus running: chillers or dry coolers, cooling towers and evaporative units, pumps, chilled and condenser water mains, coolant distribution for liquid-cooled racks, air handlers and fan walls, water treatment, generator fuel piping and the controls that tie them together. On a Washington campus that package also carries freeze protection for eastern winters, treatment for hard groundwater and seismic bracing for Puget Sound buildings.

In data center construction MEP terms, the mechanical scope is one of the two largest systems packages beside electrical, and it is closely tied to phasing, because cooling must arrive with each new hall’s IT load. The national view of scope, prefabrication and roles is on the data center mechanical contractors page; this page covers what Washington adds.

Where are data centers in Washington State being built?

Data centers in Washington State are concentrated in the Columbia Basin around Quincy and Moses Lake in Grant County, along the Columbia River at East Wenatchee and Malaga, and in the Puget Sound area from Seattle and Tukwila to the Eastside. Grant PUD serves eight data center operators. Of the ten Grant County properties topping the 2025 assessment roll, seven are data centers, six in Quincy and one in Moses Lake, according to the state’s Data Center Workgroup.

The pattern follows power and land. Quincy data centers grew from 2006 onward on Columbia River hydropower, open farmland and a dry climate, and Microsoft now operates datacenters in Quincy and East Wenatchee with a campus in development at Malaga. In Seattle, the city adopted a one-year moratorium in June 2026 on new data centers above 20 megavolt-amperes, which steers Puget Sound mechanical work toward upgrades and densification of existing buildings while that pause runs.

Washington data center areas and what each asks of the mechanical contractor
AreaTypical projectMechanical emphasisUtility
Quincy and Grant CountyMulti-building campuses, new halls beside operating onesPhased central plants, hard-water treatment, freeze protectionGrant PUD
Moses LakeNew campuses and expansionsLarge prefabricated plants, dry cooler yards, winter constructionGrant PUD
East Wenatchee and MalagaHyperscale builds along the ColumbiaLiquid-cooled halls, glycol loops, smoke filtrationDouglas and Chelan County PUDs
Seattle and TukwilaColocation upgrades in established buildingsLive-room retrofits, seismic bracing, roof and riser limitsSeattle City Light and neighboring utilities
Spokane and the Tri-CitiesEnterprise and regional facilitiesFree cooling plants, freeze protection, summer trim coolingRegional utilities

The Washington data center exemption and the mechanical equipment list

The Washington data center exemption in RCW 82.08.986 removes retail sales and use tax from eligible server equipment and eligible power infrastructure at qualifying data centers in rural counties, and it shapes procurement planning on every Columbia Basin campus. A qualifying facility sits in a rural county as defined in RCW 82.14.370, has at least 20,000 square feet dedicated to working servers and must begin construction before July 1, 2035; no new certificates may be issued on or after July 1, 2036.

For the mechanical contractor the important detail is what the statute names. Eligible power infrastructure covers generators, wiring, cogeneration equipment and associated fixtures such as switches, batteries and monitoring gear, and it excludes substations. Cooling plant equipment sits outside those definitions, so chillers, dry coolers, pumps and piping are bought, tracked and invoiced separately from the exempt electrical and server items. Paul Industries keeps mechanical procurement on its own schedule of values so that the owner’s tax team can separate exempt and taxable items without reworking invoices.

The 2026 Legislature narrowed the benefit for existing buildings. ESSB 6231, signed on April 1, 2026, ended the exemption for replacing server equipment at existing data centers from July 1, 2026, while the Governor noted that the exemptions available for new construction remain in place. Owners planning refreshes of older Quincy halls now weigh that change alongside cooling upgrades.

Washington data center incentives beyond the sales tax exemption

Washington data center incentives reach further than the exemption itself, through property tax effects in host communities and through utility rates that remain low by national standards. The Workgroup reported that the assessed value of Grant County’s ten largest taxpayers rose from about $313 million in 2006 to about $6.14 billion in 2025, and that Quincy’s levy rate is about 70 percent lower than before data centers arrived.

The incentives also carry conditions. The Workgroup noted that the state’s tax incentives require data centers to meet green building standards, but that those standards leave the efficiency of processor cooling unaddressed. Efficiency requirements for the cooling plant therefore come from the Washington State Energy Code, where Section C403.1.3 sends data center systems to ASHRAE 90.4, and from the owner’s own targets. Paul Industries builds to the energy code calculation and the owner’s design basis together.

Power arrival and phasing on Columbia Basin campuses

Power arrival sets the pace of every Columbia Basin campus, and Grant PUD reported roughly 800 megawatts of large-load requests in its queue in 2026, with large users responsible for the cost of new generation and the transmission and distribution built for them. Mechanical work is planned around the date each hall can be energized, which is often fixed later than the building shell.

The mechanical response is phasing with room to grow. Central plant buildings, pipe racks and mains are built for the full campus, while chillers, dry cooler modules, pumps and CDUs are installed hall by hall as power arrives. Valved and capped connections for future equipment are placed during the first phase, so that later halls connect without shutting down plants that serve operating buildings. Paul Industries lays out those connections with the engineer and the operator and documents each one on the as-builts.

The Northwest Power and Conservation Council has projected that data centers and chip fabrication could add 2,200 average megawatts of regional load by 2030. A campus designed for that growth avoids rebuilding its mains when the next phase is approved.

Prefabrication for Washington data center campuses

Prefabrication for Washington data center campuses moves pipe spools, pump skids, valve stations, CDU galleries and multi-trade racks off site and into controlled conditions, which matters most in the Columbia Basin where field work runs through hot summers and freezing winters. Modules arrive tested and labeled, are set by crane and connected with a small number of field joints.

Paul Industries fabricates and tests modules to the project’s piping specification, with ASME B31.9 for building services piping and ASME B31.3 where the specification calls for it, and ships them in the order the site needs them. Weld records, pressure test certificates and material traceability ship with each module, which shortens site inspection and gives the commissioning team a record for every assembly.

Washington rules that touch the data center mechanical package
RuleAgencyEffect on the mechanical work
Contractor registration, RCW 18.27Department of Labor and IndustriesEvery contractor performing construction work in Washington registers with the department
Prevailing wage, RCW 39.12Department of Labor and IndustriesApplies to public works of the state, counties, cities and other public bodies, including publicly owned data rooms
State Mechanical Code, chapter 51-52 WACCity and county building departments2021 International Mechanical Code with state amendments, including A2L refrigerant provisions
State Energy Code, chapter 51-11C WACCity and county building departmentsASHRAE 90.4 for data center systems and Section C408 commissioning before final inspection
Chapter 173-443 WACDepartment of EcologyRefrigerant limits for new chillers; Refrigerant Management Program for systems over 50 pounds
Chapter 173-60 WACDepartment of Ecology, plus city and county ordinancesNoise limits at property lines govern dry cooler, tower and generator placement
Rural data center exemption, RCW 82.08.986Department of RevenueSeparates exempt server and power items from taxable mechanical equipment

Mechanical scope by phase on a Washington campus

Mechanical scope on a Washington campus is easiest to price and schedule when it is broken into phases that follow the power and the IT load, with the shared infrastructure built first and the hall-by-hall equipment added as each building is energized. The table below shows how that sequence usually runs on a Columbia Basin site.

Phased mechanical scope on a Washington data center campus
PhaseMechanical workWashington detail
Site and campus infrastructureWater service, makeup treatment building, fuel storage, main pipe routes and sleevesHard-water treatment sized for the full build; discharge route settled with the city or Ecology
Central plant, first blockPlant building, headers, first chillers or dry cooler modules, pumps, controls backboneRefrigerant selection checked against chapter 173-443 WAC; glycol systems for winter
First hallAir handlers or fan walls, CDUs, branch piping, leak detectionEnergy code commissioning under Section C408 before final inspection
Later hallsEquipment added on prepared connections; plant blocks expandedTie-ins made around operating buildings with redundancy confirmed
OperationsService, water treatment, refrigerant inspections, seasonal checksEcology leak inspection schedule; autumn freeze checks; summer smoke readiness

Paul Industries prices each phase on its own while holding the campus standards constant, so that a later hall uses the same valves, pipe specification, controls and records format as the first.

Upgrading first-generation Quincy halls

First-generation Quincy halls built after 2006 were designed for rack densities that look modest today, and many of them now face the choice between a mechanical upgrade and a full rebuild. The buildings are usually sound; what has aged is the cooling equipment, the controls, the water treatment and the airflow arrangement in the halls.

A typical upgrade replaces evaporative media and fans, adds chilled water or liquid cooling capacity for dense rows, improves filtration for smoke seasons, and upgrades water treatment so that the plant runs more cycles on hard groundwater. Each step is done while the hall keeps running. Paul Industries surveys the existing systems, rebuilds missing drawings and records, and stages the work one unit or loop at a time so that redundancy is never lost. Since ESSB 6231 removed the sales tax exemption for replacement servers from July 1, 2026, owners are reviewing these upgrades together with their server refresh plans.

Liquid cooling on new Washington campuses

Liquid cooling on new Washington campuses changes the mechanical package from an air-handling job into a piping job, with CDUs, technology cooling loops and warm-water heat rejection taking the place of many air handlers. Microsoft has said that its newest central Washington datacenters are designed to use no water for cooling, which points the mechanical design toward closed loops and dry coolers.

For the mechanical contractor this brings more welded and grooved piping inside the halls, more valve stations and leak detection, glycol systems outdoors and stricter cleanliness during installation. Paul Industries prefabricates headers and valve assemblies, flushes each loop to the cleanliness target the hardware vendor sets and coordinates the hall layout so that piping, cable trays and containment fit together.

Service after turnover on Washington campuses

Service after turnover on Washington campuses follows the seasons and the state’s refrigerant program. Spring brings cleaning of evaporative media and tower fill before the hot months, summer brings checks of trim cooling and smoke filtration, autumn brings freeze protection tests and winter brings economizer and humidity trend reviews.

Chillers covered by Ecology’s Refrigerant Management Program need leak inspections on their size category’s schedule and records kept for five years. Paul Industries offers service contracts that combine those inspections with water treatment, pump and valve maintenance and controls tuning, so that one team keeps the plant it built in condition.

Codes, inspections and records on a Washington mechanical package

Codes and inspections on a Washington mechanical package come from the State Building Code, which every city and county enforces through its own building department. The mechanical code is the 2021 International Mechanical Code with Washington amendments in chapter 51-52 WAC, and the energy code is the 2021 Washington State Energy Code, both in effect since March 15, 2024. A Quincy campus inside city limits is permitted by the City of Quincy, while a site in unincorporated Grant County goes through the county.

Refrigerants add a state layer. The Department of Ecology prohibits listed high global warming potential refrigerants in new chillers under chapter 173-443 WAC and runs a Refrigerant Management Program for systems charged with over 50 pounds of refrigerant at GWP 150 or above. Paul Industries selects equipment against the current Ecology tables and hands the owner the refrigerant records the program requires.

Noise rules shape the yard. Under chapter 173-60 WAC, an industrial noise source may reach 60 dBA at a home’s property line by day and 50 dBA overnight between 10 p.m. and 7 a.m., a limit that drives the selection and placement of dry coolers, cooling towers and generators on campuses near homes.

Mechanical work in operating Puget Sound buildings

Mechanical work in operating Puget Sound buildings is shaped by the region’s older building stock, its seismic design requirements and the operator’s need to keep every room online. Data rooms in Seattle, Tukwila and the Eastside often sit in buildings designed for offices, telecom or light industry, with limited roof area for heat rejection, shared risers and floors rated for lighter equipment than today’s racks.

Paul Industries begins with a survey of structure, risers, plant capacity and electrical service, then designs routes and supports that the building can carry. Equipment and piping are anchored and braced to the Washington State Building Code for the site’s seismic design category, which is more demanding here than in the Basin. Work in occupied floors is scheduled around change windows, with each tie-in written up as a method of procedure, temporary cooling staged where redundancy is thin and noise and access limits agreed with building management before the first delivery.

Water, wastewater and fuel on Washington campuses

Water, wastewater and fuel systems are part of the mechanical package on most Washington campuses, and each carries a Washington-specific concern. Groundwater in the Columbia Basin is high in hardness and silica, so evaporative plants need softening, side-stream filtration or reverse osmosis to reach useful cycles of concentration; Quincy’s water reuse utility, operating since 2021, shows how far that can go. Discharges to the Columbia River face temperature limits to protect salmon, and sewer discharges follow each city’s pretreatment rules.

Generator fuel systems carry their own planning, because emergency engines need permits, and Ecology has been preparing a general order covering emergency engine operations at data centers, as the Workgroup reported in 2025. Paul Industries installs fuel supply and return piping, day tanks and leak detection with the generator package, and coordinates test runs with the permit conditions.

Building in Washington weather

Building in Washington weather means planning for two very different field seasons east of the Cascades: summer afternoons above 90 degrees in Moses Lake and the Tri-Cities, and winter weeks below freezing across the Basin. Hydrostatic tests, flushing and coatings all depend on temperature, and an unheated shell full of test water can freeze overnight.

Paul Industries schedules outdoor tests and coatings for suitable weather, drains or protects test sections before cold nights, heats enclosures where needed and moves as much work as possible into prefabrication. West of the Cascades the issues are rain, limited laydown space in urban sites and access to operating buildings, which call for staged deliveries and work planned around the operator’s change windows.

What does data center mechanical work cost in Washington?

Data center mechanical work in Washington costs what the cooling architecture, the IT load and its phasing, the water treatment, freeze protection, seismic requirements and the labor terms of the project make it cost, so owners compare packages on a consistent scope rather than on a single headline figure. Data center construction cost per megawatt is the usual yardstick across a campus, but it varies widely with redundancy, liquid cooling share and how much of the central plant is built ahead of later phases.

Washington adds a few line items that East Coast campuses rarely carry: hard-water treatment and blowdown handling in the Basin, glycol systems and heat tracing for winter, seismic bracing for Puget Sound buildings and smoke filtration for outside-air systems. Paul Industries gives a budget range from comparable work when it has the IT load, the phasing plan and the basis of design, then a firm price once drawings and equipment selections are set.

Who builds data center mechanical systems in Washington?

Paul Industries builds data center mechanical systems in Washington, as a design-build contractor for complete central plants and piping, as the installing contractor to an engineer’s design, or as a supplier of prefabricated skids, spools and modules for the owner’s construction team. Headquartered at 256 Shore Drive in Kilmarnock, Virginia, after earlier years in northern New Jersey and then Pennsylvania, Paul Industries takes data center mechanical work throughout Washington, in all 50 states and abroad.

Owners comparing data center mechanical contractors for a Washington campus look for one accountable contract for design, prefabrication, installation, testing and startup, consistent records across every phase and a team that stays for service after turnover. Paul Industries provides that, and connects the mechanical package to the specialist scopes covered under data center cooling in Washington, data center liquid cooling in Washington, data center commissioning in Washington, process piping in Washington and industrial welding in Washington.

Paul Industries on Washington data center campuses

Paul Industries designs, supplies, fabricates, installs, tests, starts up and maintains data center mechanical systems on Washington campuses, from the first hall on a new Basin site to upgrades inside Seattle buildings. Related services include pipe fabrication and pump skids. For the same service in the headquarters state, see data center mechanical contractors in Virginia; for another western market, see data center mechanical contractors in California, and the regional view on the West Coast and Washington pages. Send the phasing plan and basis of design and request a quote.

Standards referenced: Washington State Mechanical Code (chapter 51-52 WAC) · Washington State Energy Code, commercial provisions (chapter 51-11C WAC) · Washington State Building Code (chapter 19.27 RCW) · ASHRAE 90.4 · ASME B31.9 · ASME B31.3 · Chapter 173-443 WAC, Refrigerant Management Program · Chapter 173-60 WAC, maximum environmental noise levels

Frequently asked questions

Which contractor builds mechanical systems for Quincy data centers?

Paul Industries builds central plants, chilled and condenser water mains, evaporative and dry cooler systems, liquid cooling distribution and water treatment for Quincy data centers and the rest of Grant County. Campuses there are built in phases beside operating halls, so mains and plants are sized for the full build with valved connections for later halls. Paul Industries offers design-build, installation to an engineer’s design and supply of prefabricated modules.

Which contractor builds hyperscale mechanical systems along the Columbia at East Wenatchee and Malaga?

Paul Industries installs data center mechanical packages in East Wenatchee, Malaga and along the Columbia valley, including dry cooler yards, glycol systems, CDU galleries, pumps and piping for liquid-cooled halls. Designs account for freezing winters, smoke seasons and noise limits at neighboring homes. Prefabricated modules shorten field work through both summer heat and winter cold.

Does Paul Industries take data center mechanical work in Seattle and the Puget Sound area?

Paul Industries takes data center mechanical work in Seattle, Tukwila, Bellevue and across Puget Sound, mostly upgrades and densification inside existing buildings. That work includes new chilled water plants, liquid cooling distribution, seismic bracing to the Washington State Building Code and phased tie-ins around live equipment. Seattle’s 2026 moratorium on new large data centers keeps much of the near-term work in existing rooms.

What does the Washington data center sales tax exemption cover?

RCW 82.08.986 exempts eligible server equipment and eligible power infrastructure, such as generators, wiring, switches, batteries and monitoring equipment, at qualifying data centers in rural counties with at least 20,000 square feet of working servers. Substations are excluded, and cooling equipment is outside the listed definitions. Paul Industries keeps mechanical procurement on a separate schedule of values so the owner’s tax team can track exempt and taxable items cleanly.

How did ESSB 6231 change the Washington data center exemption in 2026?

ESSB 6231, signed on April 1, 2026, ended the sales tax exemption for replacing server equipment at existing data centers from July 1, 2026. The Governor said the exemptions available when a data center is constructed stay as they were. Owners of older Washington halls now plan server refreshes and cooling upgrades with that change in mind.

Why do so many data centers sit in Grant County, Washington?

Grant County drew data centers from 2006 onward with low-cost Columbia River hydropower, available land, a dry climate that suits economizer cooling and the state’s rural sales tax exemption. Grant PUD now serves eight data center operators that drew about 37 percent of its load in 2025, and data centers now hold most of the top places on the county’s assessment roll.

Do Washington data center contractors have to register with the state?

Washington law, RCW 18.27, requires every contractor performing construction work in the state to register with the Department of Labor and Industries, and it treats bidding or working without registration as a gross misdemeanor. Paul Industries includes its project documentation and site safety plans with each Washington proposal.

Does prevailing wage apply to data center mechanical work in Washington?

Prevailing wage under RCW 39.12 applies to public works of the state, counties, cities and other public bodies, so it covers data rooms built for agencies, universities and public utilities. Whether a project counts as a public work depends on its owner and funding, so the wage basis is confirmed in the contract documents. Paul Industries prices each Washington project on the wage basis its contract requires.

How is a new hall connected to a running Columbia Basin campus loop?

A new hall is connected through valved and capped branches installed during an earlier phase, or through hot taps where no branch was left. The new piping is pressure tested, flushed and filled on its own before the isolation valves open, and the operator confirms redundancy before any tie-in. Paul Industries writes a method of procedure for each step and keeps temporary cooling available where the plant is near capacity.

How much of a Washington data center mechanical package can be prefabricated?

Most pipe spools, pump skids, valve stations, CDU galleries, multi-trade racks and many central plant modules can be prefabricated, leaving field work for setting, connecting and testing. Prefabrication is especially valuable in the Columbia Basin, where field conditions run from 90 degree afternoons to freezing weeks. Paul Industries fabricates and tests modules to the project specification and ships them in installation order.

What noise limits apply to dry coolers and towers on a Washington campus?

Washington’s noise rule caps an industrial source at 60 dBA by day and 50 dBA overnight where the receiving property is residential, with brief allowances above those levels. Some cities and counties add their own ordinances. Fan selection, low-speed operation at night, barriers and equipment placement are used to meet the limit, and Paul Industries provides sound data for each selection.

Which refrigerant rules affect chillers on a Washington data center campus?

Ecology’s rule in chapter 173-443 WAC prohibits listed high global warming potential refrigerants in new chillers, and under its Refrigerant Management Program owners register, inspect for leaks on schedule, fix leaks inside 14 days and retain five years of records for any system carrying over 50 pounds of a refrigerant rated GWP 150 or higher. Paul Industries selects compliant equipment and starts the records at startup.

How does Grant PUD's large-load policy affect mechanical planning?

Grant PUD expects large users, data centers included, to pay for additional generation and the transmission and distribution built to serve them, and its queue held about 800 megawatts of large-load requests in 2026. Energization dates therefore set the pace of each hall. Paul Industries phases plants and mains around those dates so that cooling is ready when power arrives without idle equipment waiting months for load.

Is design-build available for a Washington data center mechanical package?

Design-build is available from Paul Industries for complete central plants, piping systems and liquid cooling distribution on Washington campuses, with the engineering, fabrication, installation, testing and startup under one contract. Paul Industries also installs to an owner’s engineer’s design and supplies prefabricated modules on a supply-only basis, and owners can change route from one phase to the next.

What does data center mechanical work cost per megawatt in Washington?

Mechanical cost per megawatt in Washington varies with the cooling architecture, redundancy, the share of liquid cooling, water treatment, freeze protection, seismic requirements and how much of the central plant is built ahead of later phases. With the IT load, phasing and basis of design in hand, Paul Industries sets an early budget from similar campuses and fixes the price when drawings and selections are complete.

What should a Washington owner send to price a data center mechanical package?

Send the IT load and phasing, the basis of design or engineer’s drawings, equipment preferences, the water analysis, the site plan with noise-sensitive neighbors marked, energization dates and the contract and wage basis. With that, Paul Industries returns a budget range, a phasing approach and a prefabrication plan, and then a firm price.

Planning a data center campus phase in Washington?

Send the IT load and phasing, the basis of design or drawings, energization dates, the water analysis and the site plan. Call 201-450-8280 or request a quote.