Paul Industries designs and installs data center liquid cooling in North Dakota, building direct-to-chip loops, coolant distribution units, rear-door heat exchanger circuits and the facility water systems and dry coolers that reject the heat, for dense racks in halls from Fargo and Grand Forks to Bismarck, Jamestown and Ellendale. Warm-water liquid cooling suits North Dakota unusually well, because outdoor air is cool enough to carry the heat away without refrigeration for nearly every hour of the year. Paul Industries builds the loops, the plant behind them and the freeze protection that a prairie winter demands.
Request a quote or call 201-450-8280
Why does data center liquid cooling in North Dakota run so efficiently?
Data center liquid cooling in North Dakota runs efficiently because warm facility water can be cooled by dry coolers for almost the whole year, leaving chillers with very little to do. A cold plate loop runs on water a few degrees below the temperature the processor can tolerate, and modern designs run facility water far warmer than the 45 degree water of older chilled water plants. NOAA’s 1991 to 2020 hourly normals put Fargo at or above 75 degrees for only 621 hours a year, Jamestown for 499 and Bismarck for 673. A dry cooler with a reasonable approach can hold warm-water supply through nearly all of the remaining hours.
The general case for liquid cooling, from rack densities to cold plate types, is set out on the national data center liquid cooling page. This page covers what changes in North Dakota: the loop temperatures the climate allows, the freeze protection it requires, the water used to fill the loops, the campuses being built and the way heat can be put to use through a long heating season.
What the Ellendale and Harwood campuses show about liquid cooling in North Dakota
Liquid cooling in North Dakota already operates at very large scale, and the published designs of the campuses near Ellendale and Harwood show the approach the climate favors. Applied Digital’s published description of Polaris Forge 1 at Ellendale is a waterless, closed-loop cooling system feeding cold plates directly, projected to reach a PUE of 1.18 while consuming almost no water. Ten halls in two buildings were carrying 250 megawatts of IT load by October 2026, out of 400 megawatts under contract, and a 150 megawatt third building is going up.
Near Harwood, the same developer’s Polaris Forge 2 is being built with 200 megawatts in its first two buildings, a site designed for expansion toward a gigawatt, and the same projected PUE and near-zero water consumption; initial operation is expected by the end of 2026. These campuses are named here as market facts about the state. For owners of smaller halls the useful point is that a closed loop liquid cooling data center with dry heat rejection is a proven pattern in this climate, and it scales down to a few rows of liquid cooled racks in North Dakota enterprise, university and hospital rooms as readily as it scales up.
Direct to chip cooling and the loops behind it
Direct to chip cooling removes heat at the processor through a cold plate fed by a technology cooling loop, and that loop is the part of the system an owner touches most often. A typical direct to chip cooling data center has three circuits: the technology loop that runs through the cold plates, the facility water loop that carries heat from the coolant distribution units to the plant, and the heat rejection loop that runs out to the dry coolers. Each is a closed circuit, and each has different requirements for water quality, pressure and temperature.
| Loop | What flows in it | North Dakota requirement | What Paul Industries builds |
|---|---|---|---|
| Technology cooling loop | Treated water or a propylene glycol mix specified by the server maker | Fill water with low minerals and no residual disinfectant; tight filtration for fine cold plate channels | Manifolds, rack hoses and quick disconnect points, flushing and filling to the cold plate maker’s limits |
| Facility water loop | Warm water between the CDUs and the central plant | Supply held above the minimum the CDUs allow, even on subzero nights | Mains, branch piping, isolation valves, mixing and bypass controls, insulation where piping crosses cold spaces |
| Heat rejection loop | Glycol solution out to dry coolers on the roof or in a yard | Glycol strength chosen for minus 16 to minus 18 degree hourly lows; snow clearance at the coils | Dry cooler yards, plate exchangers, pumps, expansion tanks, glycol fill stations |
Separating the glycol heat rejection loop from the facility water loop with a plate exchanger keeps glycol out of the building piping and lets the facility side run on treated water, which carries heat better. Smaller rooms sometimes run glycol all the way to the coolant distribution units to save the exchanger. Paul Industries sets out both arrangements, a liquid cooling distribution unit with or without the extra exchanger, for the owner with the effect on flow, pump energy and freeze risk.
What is a coolant distribution unit, and how does it work in a cold climate?
A coolant distribution unit is the pump and heat exchanger package that separates the technology loop serving the racks from the facility water loop, controlling the flow, pressure and supply temperature the cold plates receive. A liquid to liquid coolant distribution unit transfers rack heat into facility water through a plate exchanger; a liquid-to-air unit rejects it into the room air, which suits a few liquid cooled racks in a hall that has no facility water. A coolant distribution unit for data center rows can sit in the row, at the end of the row or in a gallery outside the white space, and larger units serve several rows from one position.
In North Dakota the CDU has a winter job most climates never test. When outdoor air drops to minus 20, the dry coolers can return facility water far colder than the CDU wants, so a mixing or bypass valve in the facility loop holds supply above the unit’s minimum and the CDU holds the technology loop above the server maker’s minimum. Paul Industries designs and tunes those two control layers together so the processor loop stays at its warm design temperature on the coldest night.
Liquid cooling CDU selection for North Dakota halls
A liquid cooling CDU is selected from the heat load, the flow per rack, the approach between facility and technology water, and the redundancy the owner requires, usually with N+1 pumps inside each unit and spare units across a row. Paul Industries sizes CDUs, manifolds and the facility branch together so the pressure drop at full flow is known before the racks arrive, and supplies pump skids and secondary loop packages built and tested before delivery.
| Arrangement | Where it sits | Suits | North Dakota note |
|---|---|---|---|
| In-row liquid to liquid CDU | In the rack row, beside the racks it serves | Retrofits and halls adding liquid cooling a row at a time | Facility water branch must reach each row; insulate where it crosses cold spaces |
| End-of-row or gallery CDU | At the row end or in a service corridor outside the white space | New halls with planned rows of dense racks | Service access without entering the hall; shorter facility branches |
| Large central CDU skid | In a mechanical room serving several rows or a whole hall | Campus-scale buildings with uniform rack types | Prefabricated and tested off site, then set as one module |
| Liquid to air CDU | In the row, rejecting heat into the room air | A few liquid cooled racks in a room with no facility water | Room air system carries the load, usually on economizer in this climate |
Which loop temperatures does the North Dakota climate allow?
The North Dakota climate allows facility water temperatures warm enough for dry coolers to carry the load for nearly the whole year, with a trim chiller or an adiabatic boost covering the few hot afternoons. Hours at or above 80 degrees are rare in the hourly normals: 69 a year at Fargo, 290 at Bismarck, 272 at Williston and 4 at Jamestown. If a dry cooler is designed for an assumed approach of 10 degrees, facility water at 90 degrees is available whenever the air is below 80, which in a normal year is nearly all the time.
| Station | Hourly normals at or above 75 F | Hourly normals at or above 80 F | Heating degree days a year | What it means for the loop |
|---|---|---|---|---|
| Fargo | 621 | 69 | 8,806 | Dry coolers carry warm-water loops nearly all year; humid July nights narrow the margin for adiabatic assist |
| Bismarck | 673 | 290 | 8,471 | More hot afternoons, so a trim chiller or adiabatic boost earns its place |
| Jamestown | 499 | 4 | 9,010 | Close to chiller-free for warm-water designs; long heating season for heat recovery |
| Minot | 510 | 62 | 8,382 | Similar to Fargo with drier air; freeze protection sized for long cold spells |
| Williston | 621 | 272 | 8,906 | Hot, dry summer afternoons and the coldest 10th percentile lows on this list |
That is the heart of liquid cooling data center design in this state. The owner chooses a facility water temperature, and that choice sets how much mechanical cooling the plant needs, which in turn sets most of the plant cost and energy use. Warmer water means smaller or no chillers, but it narrows the server models that can run without a trim stage. Paul Industries works from the server maker’s published inlet limits and the site’s hourly record to find the setpoint that removes the most equipment without risking the hottest day.
The liquid cooling data center temperature inside the hall also changes the air side. Racks on cold plates still release some heat to the air from memory, drives, power supplies and networking gear, so the hall keeps an air system sized for that residual load. In North Dakota that air system can usually run on economizer as well, and the data center cooling in North Dakota page covers its plant.
Filling liquid cooling loops with North Dakota water
Liquid cooling loops in North Dakota are filled with treated water, never raw city or well water, because cold plates have fine channels that scale, corrode or foul quickly when minerals or residual disinfectant get in. Fargo, for example, draws hard Red River water averaging 17 grains per gallon, softens it to about 7 and adds chloramine before distribution. That is good drinking water and poor technology loop water.
Technology loops are filled with deionized or reverse osmosis water blended with the inhibitor or glycol package the cold plate maker specifies, then filtered down to the maker’s particle limit before the racks connect. Paul Industries supplies portable or permanent fill stations so makeup water during service matches the original fill, and on-site production of that water is the subject of the ultrapure water systems in North Dakota page. Each fill is logged with the fluid lot, concentration and conductivity, so the owner can trace any later water chemistry problem.
Freeze protection without glycol in the racks
Freeze protection in a North Dakota liquid cooling system belongs on the outdoor side, so the racks can run on treated water. The heat rejection loop carries propylene glycol at a strength set from the design low, and the plate exchanger between it and the facility loop is protected against a cold start that could freeze water in the plates. Piping that runs through unheated spaces, loading docks or mechanical yards gets heat tracing and insulation, and fill and drain points are placed where they can be reached in winter.
Power failures need their own plan. If the pumps stop on a subzero night, outdoor coils can freeze before morning if the glycol is weak or stratified, so Paul Industries specifies glycol strength for that case, sets dry cooler isolation and drain points, and puts the heat rejection pumps on the same backup power as the CDUs. The emergency sequence is tested during commissioning, and the data center commissioning in North Dakota page describes how.
Single phase vs two phase direct to chip cooling in North Dakota
The choice of single phase vs two phase direct to chip cooling in North Dakota turns on the server platform and the owner’s appetite for refrigerant handling more than on climate. Single phase systems pump water or a glycol mix through cold plates and keep it liquid throughout; they are what most new halls install. Two phase systems boil a dielectric fluid at the cold plate and condense it in the CDU, which handles very high heat flux with low flow but brings refrigerant-type piping, pressure ratings and leak checks into the white space.
Both reject heat to facility water, so the North Dakota plant behind them looks the same. Two phase fluids can also fall under federal refrigerant rules: from January 1, 2027, the EPA caps the global warming potential of refrigerants in newly manufactured or imported IT cooling equipment at 700. Owners weighing tank-based systems can see the immersion cooling page, which uses the same facility water plant.
Leak prevention, detection and response
Leak prevention in a liquid cooled hall starts with the piping materials and joint types chosen for each loop. Paul Industries builds technology and facility loops from stainless steel or other materials the server maker approves, with welded or press-fit joints in the mains, a minimum of threaded joints above equipment, and drip trays and leak detection cable under manifolds and CDUs. Every loop is pressure tested before fill and again after flushing, and the test records go into the turnover file.
Operators often ask how often does liquid cooling leak; leaks in a well-built system are rare and are usually found at quick disconnects, hose connections or valve packing rather than at welded mains. A liquid cooling data center leak response plan sets what the detection system does, which valves close, how the CDU isolates the affected rack and who is notified. Paul Industries writes that plan with the owner and tests it, so the hall knows the sequence before the first rack goes live.
Using rack heat through a long prairie heating season
Rack heat from a liquid cooled hall leaves the cold plates as warm water, which makes it far easier to reuse than the warm air of an air-cooled room, and North Dakota has a long heating season to put it to work. NOAA’s normals give Fargo 8,806 heating degree days a year, Jamestown 9,010 and Grand Forks 9,533. Facility return water can heat the hall’s own offices and support spaces, melt snow at entrances and docks, preheat ventilation air or, with a heat pump to lift the temperature, feed a building heating loop next door.
Heat recovery adds a heat exchanger, a separate loop and controls that give priority to IT cooling, so the data hall never depends on the heat customer. Paul Industries designs those connections so the dry coolers remain the primary heat sink and the recovery loop takes what it can use.
Liquid cooling data center PUE and the power bill in North Dakota
A liquid cooling data center PUE in North Dakota can be low because dry coolers and pumps replace most chiller energy, and the published 1.18 projection at Ellendale shows the scale involved. Power prices set the value of each improvement. North Dakota’s average commercial price was 7.36 cents per kilowatt-hour in 2025 against 13.37 nationally, so a given PUE gain is worth less per megawatt-hour here than on either coast, yet the cooling plant that delivers it is also cheaper to build because most of the year needs no refrigeration.
The other half of the power question is delivery. Large liquid cooled halls arrive in phases tied to utility capacity, and the data center mechanical contractor in North Dakota page covers how the mechanical schedule follows the power schedule.
What does data center liquid cooling cost in North Dakota?
Data center liquid cooling in North Dakota costs what the number of liquid cooled racks, the heat per rack, the CDU arrangement, the facility water temperature and the heat rejection plant require. Coolant distribution unit cost is one visible line, but the larger costs are often the facility piping, the dry cooler yard and the electrical and controls work that ties them together. A retrofit inside an operating hall adds the cost of working around live equipment and of temporary cooling while connections are made.
Sizing gives the first numbers. Water carries about 500 Btu an hour per gallon per minute for each degree of temperature rise, so a 100 kilowatt liquid cooling data center rack row segment with a 10 degree rise needs roughly 68 gallons per minute of plain water, and more with glycol. Paul Industries uses those flows to size the manifolds, CDUs and mains, gives a budget range from comparable scope, then a firm price once rack counts and the server platform are fixed. Supply-only CDUs and manifolds, design-build loops and complete installation are all available.
Who installs data center liquid cooling in North Dakota?
Paul Industries installs data center liquid cooling in North Dakota: technology loops and rack manifolds, coolant distribution units, facility water mains, plate exchangers, dry cooler yards, glycol systems, leak detection and the controls that link them. Liquid cooling in Fargo, Bismarck, Grand Forks, Minot and the Ellendale and Jamestown area is delivered under one contract from design through flushing, filling, testing and start-up, with process piping in North Dakota standards applied to every weld and pressure test.
The headquarters is 256 Shore Drive in Kilmarnock, Virginia; Paul Industries was formerly based in northern New Jersey and then Pennsylvania, and North Dakota halls are part of a project list that covers all 50 states and international sites. Retrofit work in dense existing halls is covered on the Virginia counterpart, data center liquid cooling in Virginia, and warm-water loop practice in another Midwest market is covered on data center liquid cooling in Illinois. The Midwest and North Dakota pages show the wider work Paul Industries takes in the region.
Liquid cooling projects with Paul Industries in North Dakota
Paul Industries designs, prefabricates, installs, flushes, fills, tests and maintains liquid cooling systems for North Dakota data halls, from a few liquid cooled racks in an enterprise room to a full campus loop. Send the rack count and heat per rack, the server platform, the facility water temperature under consideration and the site plan, and request a quote to begin.
Standards referenced: ASHRAE TC 9.9 liquid cooling guidelines · ASHRAE 90.4 · ASME B31.9 · 2024 International Mechanical Code (North Dakota State Building Code) · EPA Technology Transitions rule (40 CFR Part 84) · NFPA 75
Frequently asked questions
Who installs liquid cooling in Fargo and the Harwood area?
Paul Industries installs liquid cooling in Fargo and the Harwood area, from rack manifolds and coolant distribution units to facility water mains and dry cooler yards. Red River Valley water is hard and city supply carries chloramine, so Paul Industries fills technology loops with treated water and logs each fill. Every outdoor component is protected for the valley’s subzero winter nights.
Does Paul Industries build liquid cooling loops in Bismarck, Mandan and Minot?
Paul Industries builds liquid cooling loops in Bismarck, Mandan and Minot for enterprise, hospital, utility and research rooms as well as new halls. Central and northern North Dakota summers bring more hot afternoons than the Red River Valley, with Bismarck logging 290 hourly normals at or above 80 degrees, so the plant usually pairs dry coolers with a small trim chiller or adiabatic assist.
Is warm-water liquid cooling available for sites in Stutsman, Dickey and Grand Forks counties?
Paul Industries delivers warm-water liquid cooling for sites around Jamestown in Stutsman County, Ellendale in Dickey County and Grand Forks, covering technology loops, CDUs, facility water piping, glycol heat rejection loops and controls. Jamestown’s hourly normals reach 80 degrees only 4 hours a year, which suits warm-water designs that run almost entirely on dry coolers. Freeze protection for the outdoor loop is designed for the region’s long, cold winters.
What is direct to chip cooling?
Direct to chip cooling pumps a liquid through cold plates mounted on processors and other hot components, removing heat at the source instead of blowing air across the board. The liquid carries that heat to a coolant distribution unit, which passes it to facility water. Direct liquid cooling data center designs in North Dakota then reject the heat to dry coolers for almost the whole year.
Is a closed loop liquid cooling data center practical in North Dakota winters?
A closed loop liquid cooling data center is practical in North Dakota, and the climate favors it. The outdoor heat rejection loop runs on propylene glycol sized for minus 16 to minus 18 degree hourly lows, a plate exchanger keeps glycol out of the building loop, and controls hold facility water above the CDU’s minimum on the coldest nights. Water use stays close to zero year round.
Can direct to chip liquid cooling data center loops run without chillers in North Dakota?
Many can run with little or no chiller capacity. Hours at or above 80 degrees are rare in North Dakota’s hourly normals, so facility water around 90 degrees can be produced by dry coolers for nearly all of a normal year. Owners usually keep a small trim chiller or adiabatic boost for heat waves and for residual air cooling, sized from the site’s own hourly record.
Coolant distribution unit how it works with glycol in a cold climate?
A CDU pumps technology loop fluid through the racks and passes its heat across a plate exchanger to facility water. In a cold climate the facility side may carry glycol or plain water behind a second exchanger. Either way, a mixing valve holds facility supply above the CDU’s minimum, and the CDU’s own controls hold the rack loop within the server maker’s range.
Which water should fill a liquid cooling loop in North Dakota?
Technology loops should be filled with deionized or reverse osmosis water blended with the inhibitor or glycol the cold plate maker specifies, then filtered to the maker’s particle limit. City water in North Dakota carries hardness and, in Fargo, chloramine, both unwelcome in fine cold plate channels. Paul Industries supplies fill stations so top-off water during service matches the original fill.
Should glycol run through the racks in a North Dakota liquid cooling system?
Glycol usually belongs on the outdoor heat rejection loop, with a plate exchanger separating it from facility and technology water inside the building. Water carries heat better and is simpler to treat, so keeping glycol outdoors reduces flow and pump energy indoors. Some server platforms specify a glycol mix in the technology loop, and Paul Industries follows that specification where it applies.
How is a liquid cooling loop protected during a winter power outage?
Heat rejection pumps share backup power with the CDUs, glycol strength is chosen for the case where flow stops, and dry coolers have isolation and drain points that can be reached in snow. Piping in unheated spaces is traced and insulated. Paul Industries tests the outage sequence during commissioning so the operators see what happens at minus 20 before it happens for real.
How is a liquid cooling data center leak found and isolated?
Leak detection cable or point sensors sit under manifolds, CDUs and quick disconnect points, with drip trays where piping passes over equipment. When a sensor trips, the response plan sets which valves close, how the CDU isolates the rack and who is alerted. Welded mains rarely leak; most events occur at hoses, couplings or valve packing, so those get the closest monitoring.
Can heat from a liquid cooled hall warm buildings through a North Dakota winter?
Heat from a liquid cooled hall can warm offices, support spaces, loading docks and walkways, and with a heat pump it can feed a neighboring building’s heating loop. North Dakota’s heating season is long, with 8,806 heating degree days a year at Fargo and 9,533 at Grand Forks. The recovery loop always yields to IT cooling, with dry coolers remaining the primary heat sink.
What does the EPA refrigerant rule mean for two phase cooling in North Dakota?
From January 1, 2027, IT cooling equipment made or imported for the US market must use refrigerants with a global warming potential under 700 under the EPA’s Technology Transitions rule, and two phase cold plate fluids fall within it where they are regulated substances. Owners choosing two phase systems should confirm the fluid’s status at order. Paul Industries builds the facility water plant the same way for single or two phase racks.
How many gallons per minute does a liquid cooled row need?
Water carries about 500 Btu an hour per gallon per minute for each degree of temperature rise, so 100 kilowatts with a 10 degree rise needs roughly 68 gallons per minute of plain water. Glycol mixes need more flow for the same heat. Paul Industries uses the server maker’s flow per rack and allowed rise to size manifolds, CDUs and facility mains.
Can liquid cooling be added to an operating North Dakota hall?
Liquid cooling can be added to an operating hall by extending facility water to new CDUs, installing row manifolds and connecting liquid cooled racks in phases. Hot work is planned around live equipment, often with prefabricated spools that need only a few joints in the hall. Paul Industries confirms the existing plant’s spare capacity first and adds dry coolers where the plant needs more.
Does Paul Industries supply CDUs and manifolds without installing them in North Dakota?
Paul Industries also supplies coolant distribution units, rack manifolds and prefabricated loop spools to North Dakota sites as separate packages, each with pressure test and cleanliness records attached. Owners can also choose design-build or complete installation, including flushing, filling and start-up. Each route ends with the same documentation set for the operations team.
Which project details let Paul Industries put a figure on a North Dakota liquid cooling job?
Send the number of liquid cooled racks, heat and flow per rack, the server platform and its fluid specification, the facility water temperature under consideration, the redundancy target and a site or room plan. For a retrofit, add drawings and photos of the existing plant. Paul Industries returns a budget range from comparable scope and a firm price once the platform and layout are set.
Bringing liquid cooled racks into a North Dakota hall?
Send the rack count, heat per rack, server platform and the facility water temperature you have in mind. Call 201-450-8280 or request a quote.