Paul Industries is a single-source CIP/SIP systems supplier and installer serving manufacturers across Massachusetts. We design, fabricate, install, passivate, and validate CIP/SIP systems – the clean-in-place and steam-in-place circuits that sterilize and clean a process train without disassembly – for one accountable partner instead of a split between a vendor and a contractor.

CIP/SIP Systems for Massachusetts manufacturers

Massachusetts is the biotech capital of the U.S. – Kendall Square in Cambridge, the Route 128 corridor, and the Devens biomanufacturing campus concentrate more bioprocessing capacity per square mile than anywhere else. From clinical-scale suites in Boston to commercial biologics plants in Devens and Worcester, the region runs on validated water, sanitary piping, and cleanroom infrastructure.

We serve Cambridge/Kendall Square, Boston, the Route 128 corridor, Devens, and Worcester, and we mobilize to sites across the state. Because we self-perform the full scope, Massachusetts plant engineers get one point of accountability from kickoff through turnover.

What we deliver

  • Clean-in-place (CIP) skids – single-use or recirculating, with spray-device coverage engineered for full wetted-surface contact
  • Steam-in-place (SIP) circuits designed for condensate removal, sterilization hold, and validated F0 delivery
  • Integration with your process piping so CIP/SIP loops actually reach every dead-leg and instrument
  • Cycle development and documentation to support cleaning and sterilization validation
  • Controls and recipe management for repeatable, auditable cycles

Why single-source matters

Splitting a project between an equipment vendor and a separate install crew is where schedules slip and accountability disappears. Paul Industries owns the whole chain – so on your Massachusetts project there is no finger-pointing between the people who supplied the system and the people who installed it.

Related: CIP/SIP Systems services · All services in Massachusetts · Request a quote

Frequently asked questions

Do you serve Massachusetts?

Yes. Paul Industries provides CIP/SIP systems throughout Massachusetts, including Cambridge/Kendall Square, Boston, the Route 128 corridor, Devens, and Worcester. We are a nationwide single-source supplier and installer, and Massachusetts manufacturers are a core part of our work.

Are you a supplier or an installer?

Both. Unlike a distributor who only sells equipment or a mechanical contractor who only installs it, we handle design, fabrication, installation, passivation, and validation under one contract – so there is one accountable party for the whole cip/sip systems scope.

Can you work in an operating GMP facility?

Yes. Much of our Massachusetts work happens inside live, regulated plants. We plan tie-ins, shutdowns, and turnovers to protect production and keep the installation audit-ready.

Get a single-source quote

Paul Industries designs, fabricates, installs, passivates, and validates – one accountable partner instead of a vendor plus a contractor plus a validation firm. Tell us about your project and we will scope it.

Request a Quote